I-95 Northbound at US 1 (Exit 126) Design and Study Final Report

Similar documents
Appendix B: Forecasting and Traffic Operations Analysis Framework Document

I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Truck Climbing Lane Traffic Justification Report

Chapter 4 Traffic Analysis

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Harrah s Station Square Casino

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Introduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

DUNBOW ROAD FUNCTIONAL PLANNING

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Figure 1: Vicinity Map of the Study Area

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Operational & Geometrical Analysis Technical Memorandum

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

THIS PAGE LEFT BLANK INTENTIONALLY

TRAFFIC ASSESSMENT River Edge Colorado

Design of Turn Lane Guidelines

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

NO BUILD TRAFFIC OPERATIONS

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Capital Region Council of Governments

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

REDEVELOPMENT TRAFFIC IMPACT STUDY

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

Shockoe Bottom Preliminary Traffic and Parking Analysis

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

Glenn Avenue Corridor Traffic Operational Evaluation

Troutbeck Farm Development

Grant Avenue Streetscape

Traffic Impact Analysis (TIA) Process and Procedures Manual. September 2017

Transportation Impact Study for Abington Terrace

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

6060 North Central Expressway Mixed-Use Site Dallas, Texas

A Comprehensive HCM 2010 Urban Streets Analysis Using HCS 2010 US 31W in Elizabethtown, KY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

Operational Comparison of Transit Signal Priority Strategies

Henderson Avenue Mixed-Use Development

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Community Advisory Committee

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

TRAFFIC STUDY GUIDELINES Clarksville Street Department

Highway 111 Corridor Study

Traffic Academy: IJS & IMS FAQ/RULES OF THUMB

Highway Capacity and LOS. Reading Assignment: pgs

APPENDIXB. Traffic Operations Technical Memorandum

Practical Application of Turn Lane Design Criteria in Developing Suburban & Urban Corridors

TRAFFIC IMPACT ANALYSIS

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

TRAFFIC SIGNAL WARRANT STUDY

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Access Location, Spacing, Turn Lanes, and Medians

Roundabout Feasibility Memorandum

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES

TABLE TRAFFIC ANALYSIS SCENARIOS

Low Level Road Improvements Traffic Analysis. Report

INTERSECTION SAFETY STUDY State Route 57 / Seville Road

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Effects of Traffic Signal Retiming on Safety. Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc.

ALLEY 24 TRAFFIC STUDY

Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation

unsignalized signalized isolated coordinated Intersections roundabouts Highway Capacity Manual level of service control delay

US-6 Spanish Fork Fact Finding Study. December 2017

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

An Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs

3 ROADWAYS 3.1 CMS ROADWAY NETWORK 3.2 TRAVEL-TIME-BASED PERFORMANCE MEASURES Roadway Travel Time Measures

Impact of Signalized Intersection on Vehicle Queue Length At Uthm Main Entrance Mohd Zulhilmi Abdul Halim 1,b, Joewono Prasetijo 2,b

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

Intersection Traffic Control Feasibility Study

Arterial Management Plan for US Route 250 and State Route 623

Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION

TRAFFIC IMPACT STUDY

Appendix D: Concept Screening

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc.

Transcription:

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report July 2018 Prepared by: Prepared for:

TABLE OF CONTENTS 1 Introduction... 1 Study Area Limits... 1 Purpose and Need of the Study... 1 Safety Analysis... 2 1.3.1 Summary of I-95 Northbound Crashes... 2 1.3.2 Summary of US 1 Crashes... 2 2 Future Conditions... 5 2040 No-Build Traffic Analyses... 5 2.1.1 Measures of Effectiveness... 5 2.1.2 No-Build Geometry and Traffic Volumes... 6 2.1.3 Synchro Analysis... 7 2040 Build Analysis... 8 2.2.1 Build Geometry and Traffic Volumes... 8 2.2.2 Synchro Analysis... 8 2.2.3 Freeway Analysis... 8 3 Concept Development... 16 Initial Concept Screening...16 3.1.1 US 1 Concept Design Process...16 3.1.2 I-95 Concept Design Process...16 4 Preferred Alternative... 17 Planning Level Cost Estimates...17 Project Summary...17 5 Next Steps... 19 Apply for Prioritized Funding Programs...19 5.1.1 SMART SCALE...19 Advance Selected Projects to VDOT Six-Year Improvement Program (SYIP)...19 i i

1 INTRODUCTION The region s only interstate, I-95, experiences heavy traffic flows during weekday mornings and afternoons. Currently, I-95 carries more than 115,000 vehicles per day (total in both directions) between Exit 130 (Route 3) and Exit 126 (US 1). The purpose of this study is to identify a proposed improvement at the US 1 and I-95 interchange that will mitigate existing congestion and safety issues on US 1 and I-95. The alternatives evaluation will consider improvements to both northbound US 1 and northbound I-95 at Exit 126. The goals of the STARS (Strategically Targeted and Affordable Roadway Solutions) Program are to develop comprehensive, innovative transportation improvements to relieve congestion bottlenecks and create projects that improve critical traffic and safety challenges to be programmed in the VDOT Six-Year Improvement Program. The purpose of this project is to relieve existing and future traffic congestion in the study area, and improve safety. This report documents the existing and future conditions, the alternatives analyzed, and the preferred alternative, the planning level cost estimate, and preliminary conceptual design. Purpose and Need of the Study The purpose of this study is to identify proposed improvements at the US 1 and I-95 interchange (Exit 126) that will help to mitigate existing congestion and safety issues on both northbound US 1 and northbound I-95, especially during the morning peak hour. Improvement alternatives must be able to reduce the northbound queue length on northbound US 1 and improve the merging operations on northbound I-95. Ultimately, the purpose is to positively impact these two Corridors of Statewide Significance (CoSS). Figure 1: Corridor Study Area This project was conducted in two phases: 1) design concept development to specifically determine if a second northbound US 1 left-turn lane could be constructed under the I-95 bridge at the northbound I-95 signalized intersection, and 2) traffic analysis to document the future year no-build and build results within the study area, primarily focusing on the US 1 at I-95 ramp signalized intersection. Study Area Limits The study area for this project is shown in Figure 1. The study area consists of the following corridors and intersections. Corridors Northbound I-95 between northbound US 1 ramp and Route 208 bridge consisting of two off-ramps and one on-ramp at Exit 126 Northbound US 1 between Southpoint Parkway and the northbound I-95 intersections, which includes the following intersections Intersections on US 1 Analyzed for improvements Southbound I-95 Ramps (Signalized) Northbound I-95 Ramps (Signalized) Market Street (Signalized) Not analyzed for improvements Southpoint Parkway (Signalized) US 1 at commercial entrance [KFD/Exxon] (Signalized) Legend Overall Influence Area Analysis Study Area Not Analyzed for Improvements Analysis Traffic Signals 1 1

Safety Analysis Kimley-Horn reviewed and analyzed crash data, from the VDOT crash database, to evaluate traffic safety within the study area and identify crash patterns. VDOT Roadway Network System (RNS) crash data was obtained for the latest available five years of crash data (January 1, 2012 to December 31, 2016). The following sections provide a summary of the crashes that occurred within the project study area during the five-year crash analysis period. 1.3.1 Summary of I-95 Northbound Crashes Crashes on northbound I-95 from 1 mile south of the beginning of the off-ramp taper to northbound US 1 to 1-mile north of the end of on-ramp taper from US 1 were analyzed as part of this study. Over the 5-year crash analysis period, 231 crashes occurred in this area. Of the reported crashes there was one fatal crash, 70 injury crashes, and 160 property damage only (PDO) crashes. The one fatal crash occurred near the off-ramp to southbound US 1. The crash occurred in 2016 and was classified sideswipe same direction crash. The crash was a result of an unsafe lane change from the center lane into the right lane causing the vehicle and two others to lose control. The fatal injury occurred to one of the drivers of the other vehicles. The driver at fault was determined to no be distracted, under the influence of alcohol, or exceeding the speed limit at the time of the crash. In total, it was found that the number of crashes year over year is also growing, with crashes showing a steady increase from 33 total crashes in 2012 to 57 crashes in 2016. A yearly summary of crashes by crash severity is shown in Table 1. Crash severity is coded using the KABCO scale, which is defined using the following classifications: K Fatal Injury A Suspected Serious Injury B Suspected Minor Injury C Possible Injury PDO Property Damage Only Table 1: Northbound I-95 Study Area Crashes Number of Crashes Year K A B C PDO Total 2012 0 2 5 0 26 33 2013 0 3 7 3 31 44 2014 0 5 9 0 34 48 2015 0 2 8 5 34 49 2016 1 6 11 4 35 57 Total 1 18 40 12 160 231 A summary of northbound I-95 crashes by collision type is included in Figure 2. The predominant crash type was rear end, which accounted for 58.9% of crashes. Rear-ends are typical crash types on congested facilities like I-95 within the study area. A crash density analysis was also performed and a summary is included in Figure 3. The high-density locations south of the Exit 126 interchange, near mile marker 125, were caused by clusters of congestion related rear end crashes. The other high-density crash area was the area near the on-ramp from US 1. A map of crashes classified by collision type for the merge area is included in Figure 4. This figure shows rear-end crashes occurring throughout the area. Specifically, 54% of crashes from the US 1 on-ramp to Route 208 overpass are rear ends and 65% of those rear ends occurred during heavy congestion. There were also angle and sideswipe same direction crashes clustered in the area between the gore point and taper for the US 1 on-ramp. 1.3.2 Summary of US 1 Crashes Crashes on US 1 in the study area, which includes the intersections of US 1 at the southbound I-95 ramps, at the northbound I-95 ramp, and at Market Street are summarized in Table 2 by year and severity. The coding for crash severity is detailed in Section 1.3.1. Over the study period from 2012 to 2016, one fatal crash, 155 injury crashes, and 289 PDO crashes occurred. Altogether, 445 total crashes occurred and there was a steady frequency of close to 90 crashes per year. The one fatal crash was a pedestrian related incident. A pedestrian, under the influence of alcohol, attempted to cross northbound US 1 just south of the intersection at the northbound I-95 ramps and was struck by a vehicle. It was determined that the driver was not distracted or under the influence of alcohol. The crash occurred under clear weather conditions at 7:35 PM, the roadway was dark and not lighted. 0.4% 0.4% 13.0% Figure 2: Northbound I-95 Crashes (2012-2016) by Collision Type 13.0% 9.5% 2.2% 2.6% 58.9% Table 2: US 1 Study Area Crashes Number of Crashes Rear End Angle Sideswipe - Same Direction Sideswipe - Opposite Direction Fixed Object in Road Fixed Object - Off Road Non-Collision Deer Year K A B C PDO Total 2012 0 7 9 13 50 79 2013 0 3 27 10 61 101 2014 0 7 21 4 59 91 2015 0 3 17 7 60 87 2016 1 1 19 7 59 87 Total 1 21 93 41 289 445 2 2

Figure 3: Northbound I-95 Crash Density Map (2012-2016) Figure 4: Northbound I-95 Exit 126 Merge Area Crash Map 3 3

Crash activity on US 1 was analyzed by intersection and a summary of crashes for the three study intersections by collision type is included in Figure 5. Crashes were assigned to intersections using intersection influence areas. Intersection influence areas typically comprise the functional area of the intersection, including turn lanes and tapers. Intersection influence areas were individually reviewed and extended as needed to include crashes related to the intersection that occurred outside of the functional area. The predominant collision type at all three intersections is rear end crashes at 56%, 47 %, and 55% for the southbound I-95 ramps, northbound I-95 ramps, and Market Street intersections, respectively, which can likely by attributed to the heavy congestion in the corridor. The intersection with the highest crash frequency was at the northbound I-95 ramps with 172 crashes in the 5-year study period. This intersection also had a higher proportion of angle crashes than the other two intersections at 44%. Figure 5: US 1 Intersection Crash Pie Charts by Collision Type A map of crashes at this intersection classified by collision type is included as Figure 6. This graphic shows a cluster of angle crashes where the northbound left turns, onto the northbound I-95 on-ramp, and southbound through movements conflict. The intersection operates with protected/permissive left-turn phasing. During the permissive portion of the traffic signal cycle vehicles are expected to look for gaps in traffic to make the northbound left turn and are not protected by a red light for southbound US 1 traffic. This permissive portion of the traffic signal cycle likely contributes to the high number of crashes between these two movements. There is also a cluster of crashes where the northbound I-95 off-ramp meets southbound US 1. This movement was changed from a merge to yield control somewhere in late 2015 or early 2016. After this change in traffic control and geometry, there was an increase in crashes in 2016 relating to this turning movement, from three or fewer before 2016 to six during 2016 as shown in Table 3. However, only two crashes relating to this movement occurred in 2017. To determine the safety impact of this change, more after data is required. Table 3: Yearly Summary of Northbound I-95 to Southbound US 1 Crashes Northbound I-95 to Southbound US 1 Crashes 2012 3 2013 2 2014 1 2015 3 2016 6 2017 2 TOTAL 17 4 4

Figure 6: US 1 at Northbound I-95 Ramps Intersection Crash Map 2 FUTURE CONDITIONS 2040 No-Build Traffic Analyses Once the study team determined that the proposed roadway improvements on US 1 were feasible, the no-build traffic analysis on US 1 and I-95 commenced. Traffic operational analyses were conducted to evaluate the overall performance of the study corridor under AM and PM peak hour conditions in 2040. No weekend analysis was conducted for this project, especially since no weekend traffic counts were collected on US 1. However, traffic data on I-95 at Exit 126 were obtained from either the ongoing Fredericksburg Area MPO (FAMPO) I-95 Corridor Evaluation Phase 2, conducted by Baker and ATCS in 2018 (heretofore referred to as the FAMPO Study) or the STARS I-95 Exit 126 Area Study, conducted by Kimley-Horn in 2015 (heretofore referred to as the Area Study). Traffic operations analysis were conducted on US 1 and I-95 using the calibrated CORSIM model developed for the Area Study. Inputs and analysis methodologies are consistent with the VDOT Traffic Operations and Safety Analysis Manual (TOSAM). As the traffic analysis progressed, the scope of the traffic analysis was narrowed to focus on the key issues at the intersection of US 1 at I-95. The study team separated the traffic analysis into a screening analysis using HCS and Synchro and a more detailed analysis using CORSIM and Synchro. The Synchro and CORSIM files from the Area Study were used as the basis for this analysis. The interaction between traffic flow from the traffic signal onto the northbound I-95 entrance ramp was measured using methodologies from the Highway Capacity Manual, Version 6. The table showing the calculation of estimated maximum AM peak period traffic volumes that could be serviced by the traffic signal is provided in the Appendix. The Highway Capacity Software (HCS7) was used to evaluate the effectiveness of the entrance ramp merging operations and its corresponding density and speed. Since this ramp is projected to be over capacity in future conditions, the Highway Capacity Manual methodologies were not applicable to this condition. As a result, the study team used CORSIM to compare the no-build and build conditions on I-95. No existing conditions traffic analysis was conducted for this project. Instead, the future no-build conditions were compared to the build conditions to determine the effectiveness of the build alternatives. 2.1.1 Measures of Effectiveness Due to the proximity of the signalized intersection to the interstate ramp at this location, the study team used a few measures of effectiveness to determine how the pieces of the network were operating. Two measures of effectiveness were selected to document the quantitative performance of the US 1: Average vehicle delay by movement, approach, and intersection: measured in seconds per vehicle 95 th percentile queue length: measured in feet Three measures of effectiveness were selected to document the quantitative performance of the northbound I-95: Throughput: measured in vehicles per hour Speed: measured in miles per hour Density: measured in vehicles per mile per lane The traffic operations at this interchange are complex, especially in the northbound US 1 to northbound I-95 movement in the morning peak hour. Improvements that reduce the queue length on northbound US 1 may not 5 5

include adequate capacity to improve the northbound I-95 operations. In addition, it is important to find a balance of benefits to improve safety in the study area. Because of these challenges, the study team used multiple traffic analysis tools to evaluate the effectiveness of the recommended improvements: Traffic signal analysis Synchro and CORSIM Entrance ramp analysis HCS and CORSIM 2.1.2 No-Build Geometry and Traffic Volumes Since traffic analyses near this project were conducted using 2040 or 2045 as the future analysis years, it was determined that this study would be conducted using 2040 traffic volume to determine if the design concepts could accommodate anticipated growth. The future no-build turning movement traffic volumes and geometry on US 1 were obtained from the Area Study as shown in Figure 7; whereas traffic counts on I-95 were derived from the I-95 Corridor Study Phase 2 as shown in Figure 8 and Figure 9. The no-build condition on I-95 includes all funded SMART SCALE projects from Rounds 1 and 2, the Express Lanes Fredericksburg Extension to Exit 133 (US 17) project, and the Rappahannock River Crossing project. Figure 7: No-Build Geometry and Traffic Volumes Figure 8. 2045 No-Build I-95 Traffic Forecast AM Peak Hour 5,720 N Source: From FAMPO_Model_3.1_20170623 Figure 9. 2045 No-Build I-95 Traffic Forecast PM Peak Hour N 5,470 6 6

2.1.3 Synchro Analysis The study team used Synchro to evaluate the No-Build conditions at the signalized intersections in the corridor. Synchro was used to evaluate the delay and queue lengths for the study intersections. 2.1.3.1 and Level of Service The Transportation Research Board s (TRB) Highway Capacity Manual (HCM) methodologies govern the methodology for evaluating capacity and the quality of service provided to road users traveling through a roadway network. There are six letter grades of Level of Service (), ranging from A to F. A indicates a condition of little or no congestion whereas F indicates a condition of severe congestion, unstable traffic flow, and stop-and-go conditions. Intersection is defined in terms of control delay. Table 4 summarizes the delay associated with each category for signalized and unsignalized intersections, respectively. If intersection traffic volume exceeds capacity, a F is automatically reported. Table 5 summarizes the 2040 No-Build delay associated for the three signalized intersections and Table 6 summarizes the 2040 No-Build queue lengths at each intersection. Table 4: Signalized and Unsignalized Intersection Level of Service Criteria Volume-to- Capacity Ratio Control Signalized Intersection Unsignalized Intersection A 1.0 10 10 B 1.0 >10 20 >10 15 C 1.0 >20 35 >15 25 D 1.0 >35 55 >25 35 E 1.0 >55 80 >35 50 F > 1.0 >80 >50 Source: Transportation Research Board, Highway Capacity Manual 2010 Intersection Number and Description 1 Market Street 2 I-95 Northbound Ramps 3 I-95 Southbound Ramps Type of Control Signal Signal Signal Lane Group HCM 2000 results reported. SYNCHRO does not provide level of service or delay for movements with no conflicting volumes. Table 5: 2040 No-Build Signalized Intersection and Level of Service Northbound Southbound Eastbound Westbound AM PM AM PM AM PM AM PM US 1 US 1 Market Street Market Street Overall AM PM Left 29.6 C 39.6 D 236.3 F 164.8 F -- -- -- -- 108.7 F 171.8 F Through 149.3 F 65.3 E 54.0 D 212.3 F 418.4 F 344.3 F 108.6 F 166.2 F 104.9 145.0 Right 19.1 B 23.1 C -- -- -- -- -- -- -- -- 40.8 D 42.6 D Approach 120.4 F 55.2 E 74.8 D 208.8 F 418.4 F 344.3 F 94.4 F 136.3 F F F US 1 US 1 I-95 NB to NB US 1 Ramp I-95 NB to SB US 1 Ramp Left 83.8 F 404.9 F -- -- -- -- -- -- -- -- -- -- -- -- Through 0.7 A 0.4 A 83.5 F 49.8 D -- -- -- -- -- -- -- -- 303.9 168.6 Right -- -- -- -- 852.9 F 377.3 F 16.4 B 30.4 C -- -- Approach 40.2 D 166.5 F 497.7 F 191.3 F 16.4 B 30.4 C -- -- F F US 1 US 1 From I-95 Southbound To I-95 Southbound Left -- -- -- -- 407.0 F 365.9 F 368.6 F 320.8 F -- -- -- -- Through 446.3 F 238.8 F 4.0 A 3.8 A -- -- -- -- -- -- -- -- 323.7 310.0 Right 6.3 A- 8.4 A -- -- -- -- 394.4 B 585.3 F -- -- -- Approach 373.6 F 195.5 F 47.4 D 70.8 E 389.7 F 548.3 F -- -- -- F F 7 7

Intersection Number and Description 1 Market Street 2 I-95 Northbound Ramps 3 I-95 Southbound Ramps Type of Control Signal Signal Signal Lane Group Effective Storage (ft) Table 6: 2040 No-Build Signalized Intersection Queue Lengths Northbound Southbound Eastbound Westbound 95th Percentile 95th Percentile 95th Percentile 95th Percentile Effective Effective Effective Queue (ft) Queue (ft) Queue (ft) Queue (ft) Storage (ft) Storage (ft) Storage (ft) AM PM AM PM AM PM AM PM US 1 US 1 Market Street Market Street Left m18 360 #384 400 #649 Through #1151 #2067 #319 #643 Right 391 - Left 728 m#1413 m#1032 Through US 1 US 1 I-95 NB to NB US 1 Ramp I-95 NB to SB US 1 Ramp Right 800 m#1434 US 1 US 1 From I-95 Southbound To I-95 Southbound Left 300 m#559 Through #2075 m48 Right Synchro 95th percentile queue length results reported. SYNCHRO does not provide queue length for movements with no conflicting volumes. m Volume for Synchro 95th percentile queue is metered by upstream signal. # 95th percentile volume exceeds capacity, queue may be longer m180 Based on the movement capacity analysis during the 2040 AM and PM peak hours, the dual northbound left-turn lanes will be able to process the demand in the AM and PM peak hours. The southbound right-turn lane will not be able to process the demand in neither of the AM nor PM peak hour. Thus, the throughput, which will access the I-95 northbound on-ramp released by the metering effects from the signalized intersection on US 1 will be less than the actual demand. 2040 Build Analysis 2.2.1 Build Geometry and Traffic Volumes The traffic volumes used for the No-Build analysis were used for the Build analysis; however, the geometry was changed because of the recommended improvements on US 1 in both directions as shown in Figure 10. 2.2.2 Synchro Analysis The study team used Synchro to evaluate the build conditions at the signalized intersections in the corridor. Synchro was used to evaluate the delay and queue lengths for the study intersections. 2.2.2.1 and Level of Service The same methodology used for the No-Build analysis was used for the Build analysis. Table 8 summarizes the 2040 Build delay associated for the three signalized intersections and Table 9 summarizes the 2040 Build queue lengths at each intersection. 2.2.3 Freeway Analysis 2.2.3.1 Throughput Analysis The US 1 at I-95 northbound ramps intersection meters traffic flow onto the I-95 northbound on-ramp. Using the Highway Capacity Manual (HCM), 6th Edition, Chapter 19 Signalized Intersections methodologies for signalized intersections and optimizing the signal timing phase splits, the adjusted saturation flow rates for the movement groups and the effective phase green times were used to calculate the capacity of the movements subject to the signal timing. The capacity was compared to the demand volumes to determine the throughput. The movement capacity analysis was conducted in a three-step process. The first step was to optimize the signal phase timings using Synchro, Version 10, for the 2040 AM and PM peak hours. The 2040 Synchro models in AM and PM peak hours for the US 1 corridor were provided by VDOT. The models included the intersection of US 1 at I-95 northbound on-ramp and its adjacent intersections, however without the dual northbound left-turn lanes on US 1. The 2040 Synchro models were updated by adding the dual northbound left-turn lanes on US 1 at the intersection of I-95 northbound on-ramp. Then the signal phase timings at this intersection was optimized, while holding the network coordinated cycle length, offsets and phase timings of the remaining intersections constant. 8 8

Figure 10. Build Traffic Volumes and Geometry Where the capacity of the movement group is greater than the demand volume for that movement, the throughput equals to the demand volume. Where the capacity is less than the demand volume, the throughput equals to the capacity of the movement. The total throughput on the ramp is the sum of the lower values of either capacity or demand. The results are shown in Table 7. Even though the computed throughput volumes are less than the demand volumes, the demand volumes were used in the CORSIM traffic analysis to determine the worst-case operations on the freeway. Movement Group Table 7: I-95 Northbound On-Ramp Throughput Northbound Left AM Southbound Right Northbound Left PM Southbound Right Adjusted Saturation Flow Rate for Movement (vph) 3,618 1,611 3,618 1,612 Capacity of Movement Group Subject to Signal Timing (vph) 2,134 537 1,425 853 Demand Traffic Volume for Movement Group (vph) 2,059 1,337 1,236 1,393 Total Throughput Volume (vph) 2,596 2,089 2.2.3.2 HCS Analysis The Highway Capacity Software (HCS 7) was used to conduct a sensitivity analysis for varying lengths of the acceleration lanes using AM peak hour traffic volumes and density, expressed in passenger cars per mile per lane, as the primary measure of effectiveness. However, since the merging methodologies in the Highway Capacity Manual (HCM), 6th Edition do not differentiate results once the acceleration lane exceeds 1,500 feet, the study team determined that these capacity results should not be used for decision-making purposes, especially since the results were F for all scenarios. The CORSIM analysis followed this analysis. The second step in the process was to calculate the adjusted saturation flow rates for the northbound left-turn movement and the southbound right-turn movement from US 1 onto the I-95 northbound on-ramp. HCM Equation 19-8, shown as below, was used to calculate the adjusted saturation flow rates for the left- and right-turn movements. The adjusted factors and assumptions used in the formula for the calculations are shown in the Appendix. s = s0 fw fhvg fp fbb fa flu flt frt flpb frpb fwz fms fsp Equation 19-8 in HCM The adjusted saturation flow rates for the lane group were multiplied by the number of turn-lanes for each movement resulting in the adjusted saturation flow rate for the movement group. The third step was to compute the capacity of each movement group subject to the signal by multiplying the adjusted saturation flow rate for the movement group with its proportion of the effective green time for the movement in the cycle. The study team analyzed the following scenarios: 2040 AM one-lane merge (1,500 feet acceleration lane) 2040 AM two-lane merge (acceleration lengths in design file as minimum length) 2040 AM two-lane merge (1,500 feet for each acceleration lane as maximum length allowable in HCS) 2045 FAMPO AM one-lane merge (1,500 feet acceleration lane) 2045 FAMPO AM two-lane merge (acceleration lengths in design file as minimum length) 2045 FAMPO AM two-lane merge (1,500 feet for each acceleration length as maximum length allowed in HCS) The following assumptions were used for the merge area capacity analysis. Peak hour factors for the 2040 AM scenarios for the I-95 northbound mainline, I-95 northbound off-ramp at Exit 126B (considered as upstream adjacent ramp), and the I-95 northbound on-ramp from US 1 were calculated based on four 15-minute interval traffic volumes 2040 No-Build CORSIM files. Heavy vehicle percentages (HV%) for the 2040 AM scenarios for the I-95 northbound off-ramp at Exit 126B and the I-95 northbound on-ramp from US 1 were extracted from 2040 No-Build Synchro files. For the 2045 Hybrid AM scenarios, I-95 northbound mainline traffic volumes were derived from the 2045 FAMPO traffic forecast. Since the 2045 forecasts did not include PHFs, the PHF were assumed to be the same as the 2040 AM scenarios. All other inputs in the 2045 hybrid AM scenarios were the same as the 2040 AM scenarios. Rolling terrain was assumed for all scenarios, since both I-95 northbound mainline and the on-ramp are on an upgrade. 9 9

Intersection Number and Description 1 Market Street 2 I-95 Northbound Ramps 3 I-95 Southbound Ramps Type of Control Signal Signal Signal Lane Group Table 8: 2040 Build Signalized Intersection and Level of Service Northbound Southbound Eastbound Westbound AM PM AM PM AM PM AM PM US 1 US 1 Market Street Market Street Overall AM PM Left 29.6 C 39.0 D 236.3 F 164.8 F -- -- -- -- 108.7 F 171.8 F Through 149.3 F 66.0 F 54.0 D 212.3 F 418.4 F 344.3 F 108.6 F 166.2 F 104.9 145.3 Right 19.1 B 24.4 C -- -- -- -- -- -- -- -- 40.8 D 42.6 D Approach 120.4 F 56.2 E 74.8 D 208.8 F 418.4 F 344.3 F 94.4 F 136.0 F F F US 1 US 1 I-95 NB to NB US 1 Ramp I-95 NB to SB US 1 Ramp Left 83.8 F 51.7 D -- -- -- -- -- -- -- -- -- -- -- -- Through 0.7 A 0.4 A 83.5 F 43.0 D -- -- -- -- -- -- -- -- 303.9 98.2 Right -- -- -- -- 852.9 F 364.8 F -- -- -- - -- -- Approach 40.2 D 21.5 C 497.7 F 182.0 F -- -- -- - -- -- F F US 1 US 1 From I-95 Southbound To I-95 Southbound Left -- -- -- -- 407.0 F 365.6 F 368.6 F 320.8 F -- -- -- -- Through 446.3 F 238.8 F 4.0 A 3.7 A -- -- -- -- -- -- -- -- 323.7 310.0 Right 6.3 A- 8.3 A -- -- -- -- 394.4 B 585.3 F -- -- -- Approach 373.6 F 195.5 F 47.4 D 70.7 E 389.7 F 548.3 F -- -- -- F F HCM 2000 results reported. SYNCHRO does not provide level of service or delay for movements with no conflicting volumes. Table 9. 2040 Build Signalized Intersection Queue Lengths Intersection Number and Description 1 Market Street 2 I-95 Northbound Ramps 3 I-95 Southbound Ramps Type of Control Signal Signal Signal Lane Group Effective Storage (ft) Northbound Southbound Eastbound Westbound 95th Percentile 95th Percentile 95th Percentile 95th Percentile Effective Effective Effective Queue (ft) Queue (ft) Queue (ft) Queue (ft) Storage (ft) Storage (ft) Storage (ft) AM PM AM PM AM PM AM PM US 1 US 1 Market Street Market Street Left 280 m8 m18 360 #511 #384 400 #416 #649 Through #1621 #1156 #1371 #2067 #273 #319 #417 #643 Right 326 406-223 Left 728 m138 m#280 US 1 US 1 I-95 NB to NB US 1 Ramp I-95 NB to SB US 1 Ramp Through m0 m#724 Right 800 m#2447 m#1443 US 1 US 1 From I-95 Southbound To I-95 Southbound Left 300 m#219 m#546 #1091 #1003 Through m#2400 #2075 m58 m47 #2459 #3866 Right m70 m180 Synchro 95th percentile queue length results reported. SYNCHRO does not provide queue length for movements with no conflicting volumes. m Volume for Synchro 95th percentile queue is metered by upstream signal. # 95th percentile volume exceeds capacity, queue may be longer 10 10

2.2.3.3 CORSIM Analysis Operational impacts of modifying the existing single I-95 northbound acceleration lane to two lanes were assessed by comparing travel speed results obtained through a CORSIM point-processing analysis (PPA). The PPA was performed under future 2040 No-Build and Build conditions, along all three northbound I-95 mainline lanes and along each acceleration lane. Overall, one No-Build and four Build scenarios were evaluated in the PPA. No Build: One acceleration lane with approximately 1,350 feet of effective auxiliary length Build Scenario 1 (SC1): One acceleration lane with approximately 1,020 feet of effective auxiliary length and a second acceleration lane with approximately 2,220 feet of effective auxiliary length Build Scenario 2 (SC2): One acceleration lane with approximately 1,020 feet of effective auxiliary length and a second acceleration lane with approximately 3,220 feet of effective auxiliary length Build Scenario 3 (SC3): One acceleration lane with approximately 1,020 feet of effective auxiliary length and a second acceleration lane with approximately 4,220 feet of effective auxiliary length Build Scenario 4 (SC4): One acceleration lane with approximately 2,020 feet of effective auxiliary length and a second acceleration lane with approximately 4,220 feet of effective auxiliary length Each of the five operational analysis scenarios were evaluated under 2040 AM and PM peak hour conditions. Travel speeds reported in the PPA outputs are time mean speeds (TMS), or the average speeds all vehicles are traveling at a specific point on a link. TMS results were obtained at 200-foot intervals along each lane, and the results were averaged from 10 individual microsimulations. By evaluating anticipated TMS, isolated instances of congestion can be better identified. Figure 11 and Figure 12 summarize AM peak hour PPA results, while Figure 13 and Figure 14 summarize PM peak hour PPA results. The No-Build traffic analysis model consisted of the same network elements as the Build models, except at the US 1 and I-95 northbound on-ramp intersection. Initially, with the signalized intersection included in the No-Build model, approximately 50% of the anticipated 2040 peak hour traffic demand was not able to access the on-ramp, resulting in significant queuing on US 1. This unmet traffic demand resulted in low simulated merge traffic volumes (reduced demand by approximately 1,200 vehicles); thereby, resulting in an inaccurate representation of anticipated future merge operations on northbound I-95. To obtain a more accurately represent the future merge operations on northbound I-95, the US 1 and I-95 northbound on-ramp signalized intersection was omitted from the 2040 No-Build AM and PM peak hour CORSIM models. With this approach, the on-ramp processed vehicles up to its approximate capacity and provided a more reasonable evaluation of merge operations on northbound I-95. After removing the signalized intersection, simulated ramp traffic volumes under AM peak hour conditions were approximately 2,165 vehicles. While this is still less than the forecasted 2040 AM peak hour demand of approximately 1,975 vehicles, the simulated traffic volume is comparable to the approximate capacity of a single-lane ramp. Under Build conditions, the proposed two-lane ramp had adequate capacity at both the intersection and along the ramp to accommodate future AM and PM peak hour traffic demands. Under all four AM Build scenarios, a second acceleration lane is expected to increase upstream travel speeds in Lane 1 by approximately 10 percent (i.e. an approximate 5 MPH increase in Lane 1 travel speeds upstream from the ramp merge). Under Build SC1 conditions, Lane 1 travel speeds within the ramp merge area are expected to range between approximately 43 and 49 MPH, and are similar to anticipated AM No Build conditions. Build SC2 includes a longer inside acceleration lane (A1) and is anticipated to increase Lane 1 travel speeds within the merge area by up to 4 MPH. In Build SC3, A1 is extended an additional 1,000 feet from Build SC2. This extension is expected to increase Lane 1 travel speeds within the merge area by up to 2 MPH as compared to Build SC2 conditions. Under SC4 conditions, the length of A1 is held constant from Build SC3; however, the outer acceleration lane (A2) is extended an additional 1,000 feet as compared to either of the three other Build scenarios. Overall within the merge area, it is not anticipated that Build SC4 will result in an increase in Lane 1 travel speeds as compared to Build SC3. 2.2.3.3.2 PM PEAK HOUR RESULTS Under 2040 No Build conditions, Lane 1 travel speeds within the merge area are expected to range between approximately 25 and 50 MPH. The mainline I-95 traffic volumes in the PM peak hour are approximately 700 vehicles per hour higher than in the AM peak hour. Because of this difference, merging speeds are much slower under 2040 No Build PM peak hour conditions than AM peak hour conditions. Like AM peak hour conditions, Lane 1 travel speeds upstream from the ramp merge are expected to be reduced due to ramp merge operations. Under all four PM Build scenarios, a second acceleration lane is expected to increase upstream travel speeds in Lane 1 by approximately 10 percent (i.e. an approximate 5 MPH increase in Lane 1 travel speeds upstream from the ramp merge). Under Build SC1 conditions, Lane 1 travel speeds within the ramp merge area are anticipated to increase by up to 5 MPH from No-Build conditions. Under Build SC2, SC3, and SC4, Lane 1 travel speeds within the ramp merge area are anticipated to be like those expected under Build SC1 conditions. 2.2.3.3.3 PEAK HOUR RESULTS Under each AM scenario, the benefits of a second acceleration lane can be directly observed with the approximate 10 percent increase in Lane 1 travel speeds upstream from the ramp. Under each PM scenario, the benefits of a second acceleration lane can be directly observed with the approximate 45 percent increase in Lane 1 travel speeds upstream from the ramp. Within the ramp merge area, the length of the outermost acceleration lane has the largest impact on Lane 1 speeds. An increase in effective auxiliary lane length from approximately 2,220 feet (Build SC1) to approximately 3,220 feet (Build SC2) is anticipated to result in an approximate 4 to 5 MPH increase in AM and PM No-Build travel speeds in Lane 1. Further extension of the outermost acceleration lane is not anticipated to provide additional increases in Lane 1 travel speeds. 2.2.3.3.1 AM PEAK HOUR RESULTS Under 2040 No Build conditions, anticipated travel speeds in Lane 1 (i.e., outer mainline travel lane that is adjacent to the acceleration lane) are expected to range between approximately 25 and 50 MPH within the ramp merge area. These travel speeds are lower than those anticipated in Lane 2 or Lane 3, and are a result of vehicles merging from the acceleration lane. Upstream from the merge, travel speeds in Lane 1 are expected to be less than 45 MPH, indicating that merging operations are anticipated to reduce travel speeds upstream from the ramp as well. 11 11

Figure 11: 2040 AM Traffic Volume Point Processing Results 2040 NO BUILD AM " 953 969 1018 1084 1166 1265 1368 1465 1559 1639 1712 1772 1826 1875 1917 1954 1987 2015 2041 2066 2090 Peak Hour " 1137 1298 1414 1501 1582 1643 1699 1727 1728 1721 1703 1695 1688 1675 1660 1645 1635 1625 1611 1597 1585 Volumes " 1828 2065 2077 2057 2022 1932 1819 1728 1634 1561 1505 1453 1406 1369 1342 1320 1297 1279 1266 1255 1244 2,750 A1 997 582 406 275 148 80 34 2,465 NB: Effective Aux1= 1,350 feet 2 4 6 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 2040 BUILD AM - SC1 " 939 954 987 1042 1106 1183 1264 1353 1437 1511 1576 1633 1680 1725 1762 1795 1825 1857 1889 1915 1938 Peak Hour " 1106 1217 1334 1421 1505 1579 1640 1680 1708 1722 1728 1717 1708 1691 1681 1664 1656 1643 1626 1616 1609 Volumes " 1368 2018 2083 2096 2123 2150 2167 2146 2087 2026 1966 1928 1889 1862 1836 1819 1797 1781 1768 1754 1739 2,750 A1 1459 982 830 701 535 360 203 95 42 15 7 A2 392 93 32 9 3 2,465 B-SC1: 2 4 6 Effective Aux1 = 2,220 feet Effective Aux2 = 1,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 2040 BUILD AM - SC2 " 929 942 970 1012 1058 1112 1171 1229 1294 1363 1426 1486 1550 1606 1657 1699 1739 1782 1817 1851 1878 Peak Hour " 1048 1154 1266 1335 1413 1472 1519 1573 1621 1654 1689 1720 1729 1733 1730 1726 1716 1699 1687 1679 1671 Volumes " 1400 2019 2084 2096 2090 2099 2117 2115 2107 2099 2072 2023 1974 1925 1883 1850 1823 1797 1775 1750 1733 2,750 A1 1499 1044 910 812 703 587 463 354 251 158 88 46 21 11 6 3 A2 388 104 34 11 4 2,465 B-SC2: 2 4 6 Effective Aux1 = 3,220 feet Effective Aux2 = 1,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 2040 BUILD AM - SC3 " 934 943 968 1005 1044 1086 1129 1175 1226 1282 1336 1396 1453 1508 1563 1613 1660 1703 1745 1783 1819 1856 1883 1907 Peak Hour " 1021 1130 1237 1303 1364 1420 1466 1511 1552 1589 1627 1660 1689 1716 1727 1735 1734 1740 1732 1721 1715 1699 1693 1685 Volumes " 1400 1989 2055 2070 2064 2063 2068 2067 2068 2066 2055 2038 2013 1975 1943 1908 1872 1828 1798 1773 1744 1723 1703 1686 2,750 A1 1515 1095 965 872 790 701 607 519 426 336 257 182 121 77 43 22 12 7 4 2 1 A2 390 104 38 14 4 2,465 B-SC3: 2 4 6 Effective Aux1 = 4,220 feet Effective Aux2 = 1,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 4,2 4,4 4,6 2040 BUILD AM - SC4 " 924 933 955 989 1027 1070 1117 1173 1226 1278 1335 1394 1450 1510 1571 1625 1676 1722 1765 1800 1834 1866 1898 1926 Peak Hour " 1020 1125 1233 1299 1357 1414 1461 1500 1546 1594 1624 1656 1684 1702 1713 1721 1721 1715 1702 1694 1686 1678 1667 1658 Volumes " 1410 1989 2062 2085 2080 2078 2077 2075 2076 2066 2066 2051 2028 1998 1957 1913 1871 1838 1809 1782 1759 1738 1716 1697 2,750 A1 1324 1008 905 827 768 692 608 521 422 334 246 172 110 64 35 18 10 5 3 2 1 A2 583 207 107 63 35 16 7 3 1 0 2,465 B-SC4: 2 4 6 Effective Aux1 = 4,220 feet Effective Aux2 = 2,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 4,2 4,4 4,6 Northbound I-95 at US 1 CORSIM Point Processing VOLUME Results 12 12

Figure 12: 2040 PM Traffic Volume Point Processing Results 2040 NO BUILD PM " 1260 1313 1404 1511 1640 1780 1915 2044 2141 2217 2271 2313 2347 2373 2391 2406 2419 2429 2440 2445 2450 Peak Hour " 1466 1551 1620 1687 1739 1772 1804 1788 1753 1717 1690 1671 1653 1637 1626 1618 1610 1601 1592 1584 1575 Volumes " 1432 1621 1693 1761 1792 1742 1631 1591 1529 1490 1462 1441 1425 1414 1408 1403 1400 1400 1400 1402 1407 3,450 A1 1271 942 710 466 252 128 73 1,971 NB: Effective Aux1= 1,350 feet 2 4 6 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 2040 BUILD PM - SC1 " 1180 1195 1223 1261 1308 1364 1424 1492 1557 1619 1680 1733 1781 1826 1864 1901 1934 1962 1992 2018 2043 Peak Hour " 1293 1364 1440 1505 1575 1639 1685 1715 1749 1765 1765 1762 1753 1745 1738 1727 1718 1711 1702 1691 1684 Volumes " 1400 1964 2048 2081 2115 2147 2167 2163 2111 2056 2004 1964 1926 1891 1860 1835 1812 1793 1775 1759 1742 3,450 A1 1320 856 716 598 453 306 181 86 41 19 9 A2 259 74 24 8 2 1,971 B-SC1: 2 4 6 Effective Aux1 = 2,220 feet Effective Aux2 = 1,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 2040 BUILD PM - SC2 " 1179 1193 1217 1244 1281 1318 1361 1409 1457 1512 1569 1623 1673 1723 1770 1813 1855 1891 1924 1955 1984 Peak Hour " 1253 1316 1387 1444 1492 1544 1591 1628 1671 1704 1734 1755 1773 1781 1780 1776 1764 1753 1747 1739 1734 Volumes " 1423 1951 2027 2044 2062 2081 2097 2119 2120 2110 2078 2039 1992 1945 1903 1868 1841 1815 1790 1769 1746 3,450 A1 1342 912 793 712 614 510 406 299 206 128 72 37 18 8 5 2 A2 259 81 30 10 3 1,971 B-SC2: 2 4 6 Effective Aux1 = 3,220 feet Effective Aux2 = 1,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 2040 BUILD PM - SC3 " 1172 1184 1207 1233 1265 1299 1334 1376 1423 1467 1514 1564 1620 1670 1719 1766 1814 1856 1893 1928 1960 1996 2024 2052 Peak Hour " 1242 1307 1371 1417 1465 1507 1542 1573 1607 1637 1673 1698 1718 1736 1753 1762 1759 1756 1755 1750 1746 1735 1725 1715 Volumes " 1436 1936 1998 2027 2029 2040 2045 2056 2060 2063 2051 2042 2018 1992 1952 1912 1879 1845 1810 1784 1758 1733 1715 1697 3,450 A1 1336 947 847 765 690 609 533 448 363 288 215 150 100 60 35 19 10 5 3 2 1 A2 266 78 28 10 3 1,971 B-SC3: 2 4 6 Effective Aux1 = 4,220 feet Effective Aux2 = 1,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 4,2 4,4 4,6 2040 BUILD PM - SC4 " 1182 1195 1215 1240 1271 1305 1343 1383 1430 1478 1530 1580 1632 1684 1734 1782 1825 1867 1905 1938 1972 2005 2036 2064 Peak Hour " 1232 1294 1357 1405 1449 1495 1535 1574 1610 1649 1679 1696 1711 1725 1735 1742 1746 1740 1739 1733 1726 1713 1707 1698 Volumes " 1428 1910 1989 2025 2028 2034 2041 2052 2054 2048 2037 2036 2019 1990 1957 1919 1881 1850 1816 1792 1766 1748 1723 1704 3,450 A1 1214 902 805 731 678 607 529 441 359 278 207 142 94 58 31 16 9 5 3 2 1 A2 398 152 85 51 26 12 6 3 1 0 1,971 B-SC4: 2 4 6 Effective Aux1 = 4,220 feet Effective Aux2 = 2,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 4,2 4,4 4,6 Northbound I-95 at US 1 CORSIM Point Processing VOLUME Results 13 13

Figure 13: 2040 AM Speed Point Processing Results 2040 NO BUILD AM " 62.6 62.5 62.0 61.4 60.5 59.6 58.8 58.3 58.0 58.0 58.1 58.2 58.4 58.5 58.7 58.8 58.9 58.9 58.9 58.9 58.8 Time Mean " 60.7 58.4 56.8 54.9 52.8 51.3 50.1 49.9 50.1 50.5 50.8 51.0 51.0 51.1 51.1 51.2 51.2 51.1 51.1 51.1 51.1 Speed " 48.7 48.6 46.2 42.9 40.1 38.0 37.4 39.0 40.6 41.6 42.1 42.6 43.0 43.3 43.5 43.6 43.7 43.8 43.9 44.1 44.2 2,750 A1 43.8 45.2 42.2 38.3 35.2 32.7 14.9 2,465 NB: Effective Aux1= 1,350 feet 2 4 6 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 2040 BUILD AM - SC1 Time Mean Speed 2,750 " " " 62.6 61.0 52.5 62.5 59.4 50.9 62.2 58.2 49.3 61.8 56.9 45.9 61.3 55.4 43.6 60.6 54.0 42.8 60.1 53.3 43.0 59.6 52.9 44.1 A1 44.0 46.9 47.0 44.7 43.5 43.1 43.6 43.6 A2 45.2 45.8 45.9 45.7 30.5 59.4 52.8 59.3 52.9 59.3 53.0 59.4 53.3 59.6 53.4 59.7 53.6 59.7 53.6 59.8 53.5 59.8 53.4 59.7 53.2 59.7 53.1 59.6 52.9 59.5 52.8 45.6 47.2 48.6 49.9 51.1 51.9 52.4 52.7 52.7 52.7 52.6 52.4 52.3 43.6 43.9 34.0 2,465 B-SC1: 2 4 6 Effective Aux1 = 2,220 feet Effective Aux2 = 1,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 Time Mean Speed 2040 BUILD AM - SC2 " 62.6 62.6 62.4 62.2 61.9 61.7 61.4 61.1 60.9 60.6 60.4 60.2 60.1 60.1 60.1 60.1 60.0 59.9 59.9 59.8 59.7 " " 61.3 53.4 59.9 52.7 59.1 52.8 58.7 51.5 57.8 49.8 57.1 48.2 56.4 46.9 55.8 46.4 55.3 46.3 54.9 46.5 54.5 47.0 54.3 47.7 54.2 48.6 54.1 49.6 54.1 50.3 54.0 50.7 53.9 51.2 53.9 51.5 53.8 51.6 53.6 51.6 53.5 51.7 44.0 47.9 47.8 47.6 47.7 47.2 45.3 45.8 33.8 45.6 2,750 A1 48.0 50.1 49.9 49.0 48.4 48.2 48.0 A2 48.2 49.9 49.9 35.3 2,465 B-SC2: 2 4 6 Effective Aux1 = 3,220 feet Effective Aux2 = 1,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 2040 BUILD AM - SC3 " 62.5 62.5 62.3 62.2 62.1 61.9 61.8 61.7 61.5 61.3 61.2 61.0 60.9 60.7 60.5 60.3 60.2 60.1 60.1 60.0 59.9 Time Mean " 61.3 59.9 59.3 59.1 58.6 58.1 57.8 57.3 56.9 56.3 55.8 55.4 55.0 54.7 54.5 54.3 54.2 54.0 53.9 53.7 53.6 Speed " 53.7 53.2 54.0 53.3 52.0 51.1 50.2 49.5 48.9 48.4 48.0 47.9 47.9 48.2 48.4 48.9 49.5 50.0 50.3 50.5 50.6 2,750 A1 44.1 48.2 50.8 51.3 50.7 50.2 50.1 50.0 49.9 50.0 49.8 49.6 49.8 49.6 49.2 48.9 48.2 42.5 42.3 38.6 22.9 A2 45.6 48.7 50.7 50.2 35.3 59.8 59.7 59.6 53.5 53.4 53.3 50.8 50.8 50.6 2,465 B-SC3: 2 4 6 Effective Aux1 = 4,220 feet Effective Aux2 = 1,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 4,2 4,4 4,6 2040 BUILD AM - SC4 " 62.7 62.7 62.5 62.4 62.2 62.1 61.9 61.7 61.5 61.3 61.1 60.9 60.8 60.5 60.4 60.3 60.1 60.0 Time Mean " 61.2 59.9 59.3 59.2 58.8 58.3 57.8 57.3 56.6 55.9 55.4 55.0 54.5 54.2 54.0 53.9 53.8 53.7 Speed " 53.9 53.5 54.5 53.9 52.6 51.6 50.6 49.6 48.9 48.2 47.6 47.4 47.5 47.8 48.5 49.2 49.8 50.3 2,750 A1 44.5 48.8 51.5 51.9 51.2 50.5 49.9 49.5 49.4 49.2 49.2 49.1 48.9 48.9 48.4 48.3 48.0 46.7 A2 44.4 48.1 50.6 51.8 51.4 50.8 49.0 48.5 24.9 6.5 59.9 53.6 59.9 53.5 59.8 53.4 50.7 50.9 50.9 46.3 48.2 24.7 59.7 59.6 59.5 53.2 53.1 53.0 50.9 50.9 51.0 2,465 B-SC4: 2 4 6 Effective Aux1 = 4,220 feet Effective Aux2 = 2,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 4,2 4,4 4,6 Northbound I-95 at US 1 CORSIM Point Processing SPEED Results 14 14

Figure 14: 2040 PM Speed Point Processing Results 2040 NO BUILD PM " 61.3 60.4 59.0 57.4 55.9 54.4 53.4 52.8 52.5 52.6 53.0 53.5 53.9 54.3 54.7 55.0 55.1 55.2 55.3 55.3 55.3 Time Mean " 55.8 51.1 46.7 43.1 40.5 39.0 38.5 39.5 40.6 41.7 42.5 43.1 43.5 44.0 44.4 44.7 44.9 45.0 44.9 45.0 45.2 Speed " 42.5 35.7 29.6 26.4 25.0 25.0 26.0 29.7 32.9 35.1 36.7 38.0 39.0 39.8 40.4 40.9 41.3 41.7 42.0 42.3 42.5 3,450 A1 36.3 30.2 25.2 23.0 21.7 20.4 11.1 1,971 NB: Effective Aux1= 1,350 feet 2 4 6 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 2040 BUILD PM - SC1 " 62.0 62.0 61.8 61.6 61.3 61.0 60.5 60.2 59.9 59.6 59.5 59.4 59.3 59.3 59.3 59.3 59.3 59.2 59.1 59.0 58.8 Time Mean " 60.3 59.4 58.5 57.5 56.0 54.9 54.3 53.9 53.5 53.4 53.3 53.2 53.2 53.1 53.0 52.8 52.6 52.4 52.2 52.0 51.7 Speed " 55.1 52.9 51.9 49.5 47.3 46.3 46.1 46.5 47.3 48.0 48.7 49.3 50.0 50.5 50.7 50.7 50.8 50.6 50.5 50.4 50.2 3,450 A1 44.3 48.2 49.6 48.3 47.1 46.9 46.6 46.1 45.8 44.9 33.9 A2 45.4 47.9 48.9 48.9 30.6 1,971 B-SC1: 2 4 6 Effective Aux1 = 2,220 feet Effective Aux2 = 1,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 2040 BUILD PM - SC2 " 62.1 62.0 61.9 61.7 61.6 61.4 61.2 61.0 60.8 60.6 60.4 60.2 60.1 59.9 59.8 59.7 59.6 59.5 59.4 59.2 59.2 Time Mean " 60.5 59.7 59.1 58.6 58.0 57.3 56.6 56.1 55.6 55.1 54.7 54.5 54.3 54.0 53.8 53.5 53.3 53.2 53.0 52.8 52.5 Speed " 55.6 54.1 54.2 53.2 51.6 50.4 49.5 48.8 48.3 48.2 48.2 48.4 48.8 49.3 49.8 50.1 50.3 50.3 50.2 50.0 49.8 3,450 A1 44.3 48.5 50.9 51.0 50.4 50.0 50.0 49.9 49.8 49.4 49.2 48.2 46.6 46.8 46.7 26.8 A2 45.6 48.7 50.7 49.7 31.7 1,971 B-SC2: 2 4 6 Effective Aux1 = 3,220 feet Effective Aux2 = 1,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 2040 BUILD PM - SC3 " 62.0 61.9 61.8 61.7 61.6 61.5 61.4 61.2 61.0 60.8 60.7 60.5 60.3 60.2 60.1 59.9 59.7 59.6 59.4 59.3 59.2 59.0 58.8 58.7 Time Mean " 60.4 59.6 59.1 58.7 58.2 57.8 57.3 56.8 56.3 55.9 55.4 55.1 54.6 54.2 53.8 53.5 53.4 53.2 53.1 52.9 52.6 52.2 52.0 51.7 Speed " 55.7 54.5 55.0 54.3 53.1 52.1 51.2 50.5 49.9 49.5 49.0 48.7 48.6 48.4 48.4 48.6 48.9 49.1 49.3 49.4 49.5 49.5 49.3 49.2 3,450 A1 44.3 48.5 51.3 52.0 51.5 51.2 51.1 51.1 51.0 50.9 50.9 50.7 50.4 50.1 50.1 48.8 48.3 48.0 46.5 41.5 20.3 A2 45.7 49.1 51.1 51.0 35.3 1,971 B-SC3: 2 4 6 Effective Aux1 = 4,220 feet Effective Aux2 = 1,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 4,2 4,4 4,6 2040 BUILD PM - SC4 " 62.0 62.0 61.9 61.8 61.6 61.5 61.3 61.2 61.0 60.8 60.6 60.4 60.2 60.0 59.9 59.7 59.6 59.5 59.4 59.3 59.2 59.0 58.8 58.7 Time Mean " 60.5 59.6 59.2 58.9 58.4 57.9 57.3 56.8 56.2 55.5 54.9 54.6 54.3 54.0 53.7 53.5 53.2 53.0 52.7 52.5 52.4 52.3 52.1 52.0 Speed " 55.8 54.6 55.1 54.5 53.3 52.3 51.4 50.7 50.0 49.5 49.1 48.8 48.7 48.7 48.8 49.1 49.5 49.7 49.8 49.8 49.7 49.5 49.5 49.4 3,450 A1 44.8 49.2 52.1 52.7 52.0 51.3 51.0 50.8 50.8 50.7 50.6 50.4 50.3 49.8 49.8 49.5 48.8 46.8 46.4 39.7 19.8 A2 44.4 48.6 51.3 52.5 52.1 52.4 52.1 51.9 35.8 2.4 1,971 B-SC4: 2 4 6 Effective Aux1 = 4,220 feet Effective Aux2 = 2,020 feet 8 1,0 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 3,4 3,6 3,8 4,0 4,2 4,4 4,6 15 15

3 CONCEPT DEVELOPMENT Initial Concept Screening Kimley-Horn divided the design analysis into two phases. Kimley-Horn starting by developing a design concept to specifically determine if a second northbound US 1 left-turn lane can be constructed under the I-95 bridge at the northbound I-95 signalized intersection. Once the feasibility for improvements on northbound US 1 was verified, Kimley-Horn then determined the feasibility of improvements to the northbound I-95 on-ramp and northbound I-95 to the Route 208 bridge over I-95. 3.1.1 US 1 Concept Design Process Kimley-Horn began the design process by completing a field visit in which measurements were taken and compared to as-builts plans to determine the feasibility of a second northbound US 1 left-turn lane. The existing left-turn lane on northbound US 1 to the I-95 northbound on ramp has 700 feet of storage. After confirming the feasibility of a second northbound US 1 left-turn lane, Kimley-Horn developed two options of varying storage lengths for the inside and outside left-turn lanes. Kimley-Horn informed the SWG that bridge pier protection systems (BPPS) would be required to protect the I-95 bridge piers in both directions for both options. The typical section under the I-95 bridge for each concept in both directions would consist of a thirteen-foot left-turn lane, two eleven-foot through lanes, and a seven-foot outside paved shoulder. Alternative 1 included 750 feet of storage for the inside left-turn lane and 1,350 feet for the outside left-turn lane. Alternative 1 would also consist of reconfiguring the I-95 northbound to southbound US 1 off-ramp to create a yield condition from the ramp onto southbound US 1. Alternative 4 was designed to maximize the safety and congestion improvements from US 1 to north of the Route 208 overpass. Alternative 4 included an 820-foot acceleration lane (for 45 mph to 70 mph), a 300-foot merging taper, a 2,440-foot auxiliary lane, and an 840-foot merging taper. Alternative 5 was designed to balance the cost and benefits of the previous alternatives while meeting AASHTO standards. Alternative 5 included an 820-foot acceleration lane (for 45 mph to 70 mph), a 300-foot merging taper, a 1,440-foot auxiliary lane, and an 840-foot merging taper. The design of the northbound acceleration lane was not only based on the results of the traffic analysis, but also on the results of the safety analysis even though safety is weighted at 5% compared to 45% for congestion for SMART SCALE scoring in the Fredericksburg area. As shown in Table 10, the crash modification factor for extending the acceleration lane by 1,000 feet provides a 55% reduction in related crashes; however, the cost of extending the acceleration by 1,000 was approximately $500,000. The study team used this information to determine the most appropriate acceleration lane length. Table 10. Crash Modification Factors for Ramp Extensions Extend Ramp Length Planning Level CMF Extend ramp acceleration length (250') 0.80 Extend ramp acceleration length (500') 0.65 Extend ramp acceleration length (1000') 0.45 Alternative 2 included 1,650 feet of storage for the inside left-turn lane and 675 feet for the outside left-turn lane. Alternative 2 would also consist of reconfiguring the I-95 northbound to northbound US 1 off ramp to create a yield condition from the ramp onto southbound US 1. Kimley-Horn determined that both alternatives would require design exceptions for the lack of shoulder width on US 1, the stopping sight distance for US 1 due to the bridge piers for the I-95 overpass, and the vertical clearance under the I-95 overpass. The SWG provided additional input stating that both alternatives would also require operational impacts due to bridge maintenance inspections conducted every few months during the day. Another design consideration that Kimley-Horn investigated was the length of the southbound US 1 left-turn lane at its signalized intersection with the southbound I-95 ramps. The accommodate southbound left turns, the effective storage length of the southbound left-turn lane is 350 feet. 3.1.2 I-95 Concept Design Process Once it was determined that the dual left-turn lanes could be accommodated on US 1, Kimley-Horn needed to determine the length of the dual acceleration lanes on northbound I-95. Field measurements were compared to asbuilt plans to confirm that there is room for the two acceleration lanes. Once the designs along I-95 were determined to be feasible, Kimley-Horn began analyzing the necessary lengths for the auxiliary lane on I-95 northbound. Alternative 3 was designed to meet the minimum distance needed to satisfy the AASHTO acceleration lane length. Alternative 3 included an 820-foot acceleration lane (for 45 mph to 70 mph), a 300-foot merging taper, a 540-foot auxiliary lane, and an 840-foot merging taper. 16 16

4 PREFERRED ALTERNATIVE A combination of Alternative 2 and Alternative 5 was chosen as the preferred alternative for US 1 and I-95, respectively. The advantage of the Alternative 2 for US 1 is that it fully uses the second northbound left-turn lane at the intersection with the I-95 on-ramp. With alternative 1, the queue of the outside left-turn lane would have blocked the inside left-turn lane. The Alternative 2 design bypassed that problem by shifting all three northbound lanes 8 feet to the east, over 150 feet. But due to this shift, the gore point of the I-95 northbound off ramp to US 1 northbound (Ramp A) also needed to be adjusted. Alternative 2 also included a modification of the US 1 right-turn lane to the I-95 southbound on-ramp (Ramp B) to a thru-right lane and modifying the US 1 southbound left-turn lane to the I-95 southbound on-ramp (Ramp B) to include a 135-foot left-turn lane taper and 280-foot left-turn lane storage. The modifications to the right-turn lane will help the capacity on US 1 and help northbound drivers preposition to avoid any queues for the left turns to the I-95 northbound on-ramp. The modifications to the left-turn lane increase the effective storage to the existing deficient left-turn lane. Figure 15: Preferred Alternative Typical Sections Ramp D also was widened from one to two lanes to accommodate the additional left-turn lane from US 1 at the I-95 northbound on-ramp intersection. To accommodate the additional lane from US 1, the preferred alternative includes a 420-foot long, 12-foot wide lane shift on I-95 northbound prior to the gore at Ramp D. This shift uses the existing full-depth inside shoulder on I-95 and will include an additional 8-foot inside, paved shoulder. Due to the lane shift, the proposed acceleration lane from US 1 will use the existing paved, right shoulder and widen the existing pavement. The lengthening of the auxiliary lane will also utilize the existing paved, right shoulder and widen the existing to meet VDOT standards. The typical sections for the preferred alternative is shown in Figure 15. The plan view graphics of the preferred alternative is shown in Figure 16, Figure 17, and Figure 18. Planning Level Cost Estimates Planning level cost estimates, in 2018 dollars, were developed for the preferred alternative. Construction (CN) costs were estimated using a combination of PCES, the 2015 version of Transportation and Mobility Planning Division Statewide Planning Level Cost Estimate Spreadsheet, quantity take-offs, and recent bid costs. Preliminary engineering and construction engineering and inspection (CEI) costs were estimated as a percentage of construction costs including contingency. A 30% contingency was included on the construction items estimate (prior to adding CEI costs). A detailed cost estimate should be prepared during the design phase of this project. Cost estimates should be adjusted for appropriate inflation costs when used in funding applications or project allocations. The FY19 total cost for the project is approximately $20.4 million as is shown in Figure 19. Project Summary The previously described preferred alternatives are summarized in a one-page project summary sheet (Figure 19). The information pertaining to the project summary include project description, preferred alternative concept, traffic operational benefits, project cost, and project implementation schedule. 17 17

Figure 16: Preferred Alternative Sheet 1 Figure 17: Preferred Alternative Sheet 2 18 18

Figure 18: Preferred Alternative Sheet 3 5 NEXT STEPS This study and design should be used as a planning tool to achieve the next steps of planning, programming, designing, and constructing the identified safety and operational improvements in the I-95 Northbound at US 1 (Exit 126) study corridor. To advance these projects beyond the planning stage, FAMPO should take the following steps. Apply for Prioritized Funding Programs The following funding sources should be considered for improvement projects identified in this study. 5.1.1 SMART SCALE SMART SCALE allocates funding from the construction District Grants Program (DGP) and High-Priority Projects Program (HPPP) to transportation projects based on a scoring process. The scoring process evaluates, scores and ranks projects based on congestion mitigation, economic development, accessibility, safety, environmental quality, and land use factors. The location of the project determines the weight of each of these scoring factors in the calculation of the total score. For projects in Fredericksburg, the scoring factors with the highest weight are congestion (45%) and land use (20%). The preferred alternative is a candidate projects for SMART SCALE funding. Advance Selected Projects to VDOT Six-Year Improvement Program (SYIP) Once project applications are approved for funding through SMART SCALE, the project should be incorporated in the VDOT SYIP, so it can enter the project development process. 19 19

Figure 19: Project Summary Sheet 20 20