ATC Year Asessment Network Project List

Similar documents
Interconnection Feasibility Study Report Request # BHCT-G5

Inventory of Schools with Renewable Energy Systems

Upper Peninsula Generation Integration Screening Study. September 2016

Connection Engineering Study Report for AUC Application: Fortis Okotoks 678S and High River 65S Upgrades

Appendix N Freight Density Graphs

2016 Girls Fastpitch State Tournament Results

Northern States Power Company Wisconsin. Application for a Certificate of Public Convenience and Necessity

Power Supply Facilities Failure (Units 3-4 Temporary M/C (A), etc.) March 22, 2013 Tokyo Electric Power Company

Attachment Pro Forma Pro Forma Regulatory Statements Revised proposed access arrangement information

Labor Hours per Lane Mile per Severity Index (to date, as of 4/14/16) From Winter Storm Reports,

Inventory of Schools with Renewable Energy Systems

FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009

2020 & 2024 LCR Study Draft Results Greater Bay Area

G.O. LOOP Commercial Projects

APPENDIX M FOR THE JEFFERSON COUNTY PORTION OF THE VISION 2050 PLAN RECOMMENDATIONS MILWAUKEE URBANIZED AREA INTRODUCTION

1200 MW Wind Generation: 20 Year Transmission Development Plan - Exploratory Study

I m Sandy. My family has had too much cancer. I want my voice heard.

Administrative Note: The collection was reprocessed by Kevin Abing, February The finding aid was retyped on August 8, 2011 by Jenny Stevenson.

January 1, AUTHORIZED SIGNATURE: Princeton Fire Dept BOX ALARM # 859 LOCAL DISPATCH AREA: Entire fire district MABAS BOX ALARM:

Kodiak Electric Renewable Energy Implementation. Colin Young System Engineer 4/26/2016

2110 8:00 Arrive NLR Middle School #41

2020 & 2024 Draft LCR Study Draft Results Kern Area

2019 Membership Totals Processed as of November 27, 2018

(Revised 10/5/2017) SOLOMON/PLAINS JR. HIGH SCHOOL STA BUS LINES

Twinning Hwy 11/17 Thunder Bay to Nipigon

2018 & 2022 Final LCR Study Results LA Basin and San Diego-Imperial Valley Areas

Real-Time Models for Real-Time Analysis. Motivation

Monitoring of Real-Time SOL and IROL Exceedances

Con Edison, Inc. New York, NY March 11, Shields & Company Berenson & Company Transmission Seminar

ANATOMY OF GREEN LAKE COUNTY: A TRAFFIC SAFETY SUMMARY

Neil Street Plaza Placemaking Plan

REVISED DRAFT APPENDIX I IH 43 BETWEEN HOWARD AVENUE AND SILVER SPRING DRIVE RECONSTRUCTING WITH WIDENING AND NOT WIDENING

Seattle Bicycle Master Plan

Who are my Wisconsin Legislators?

Our September Powerball $250,000 Bonus Drawing was popular with players. They loved hearing the

Connection. Ideas and Information for RETAILERS INSIDE: April 2017 Volume 18 Issue 4. retailer.wilottery.com

NOTE: THIS BUS ONLY PICKS UP STUDENTS WITH MILL STREET ADDRESSES

Beaver Trapping Questionnaire By Brian Dhuey and John Olson

OSCILLATION MONITORING SYSTEM AT TVA

Medium voltage standard-duty, heavyduty, and extreme-duty single-phase, unfused capacitor units and accessories

Beaver Trapping Questionnaire By Brian Dhuey and John Olson

Nordel GRID DISTURBANCE AND FAULT STATISTICS

TVPPA Lineman Apprenticeship Program

POW ER EN GIN EER S, LLC Electrical Engineering, Power, Lighting, Technical Studies and Utility Consulting

NOTE: THIS BUS ONLY PICKS UP STUDENTS WITH MILL STREET ADDRESSES

Development and Evolution of an Asset Management Organization

2019 WISCONSIN COURSES 18 HOLES

Monitoring of Real-Time SOL and IROL Exceedances

Team Name ROUTINE Jr All Star Pom Yth All Star Pom Jr All Star Pom Yth All Star Pom Jr All Star Pom Yth All Star Pom Mini All Star Pom

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Wisconsin TB Program Update

Saunders GS 11 No projects in this category

2018 Top 50 Lists Summary

NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2014

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

Monthly Construction Plan Project Status Report Report Date: 3/7/2014

Appendix P (Version 2) Bikeway Projects in Currently Approved Plans. Planned Improvements from Sector & Area Plans that have been added to the MTP

Please forward comments, suggestions, and corrections to or

Pre-Application Document Kaweah Project (FERC Project No. 298)

State Team Championships

23.1 Functions, Basic Configuration, and Interfaces

Frog and Toad Survey, 2000 By Brian Dhuey, and Bob Hay

Original Hol id ay Route CITY Delivery Delivery Week 1 Monday Week 1 Tuesday Week 1 Wednesday Week 1 Tuesday Week 1 Tuesday Week 1 Wednesday

PNWA Conference Update

: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA

AUDIT U.S. FISH AND WILDLIFE SERVICE WILDLIFE AND SPORT FISH RESTORATION PROGRAM GRANTS

OSHKOSH BOYS HIGH SCHOOL INVITATIONAL INFORMATION

STCP 01-1 Issue 008 Operational Switching

Benefits for the Bronx, Brooklyn, Queens and Staten Island

Monthly Long Term Transmission Plan Project Status Report

CONSTRUCTION CONTRACTS

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

2. Context. Existing framework. The context. The challenge. Transport Strategy

4. Action Plan & Projects

RELIABILITY OF ENERGY SYSTEMS

Niagara Region Transportation Master Plan. Subarea Analysis Summary

Superintendent s Proposed Capital Improvements Program. Fiscal Years (Revised January 14, 2019)

CONSTRUCTION CONTRACTS

WSYBL Baseball 2014 Final Standings

COLD-WEATHER APPLICATION OF GAS MIXTURE (SF 6 /N 2, SF 6 /CF 4 ) CIRCUIT BREAKERS: A UTILITY USER S PERSPECTIVE SUMMARY

COMMONWEALTH OF MASSACHUSETTS ENERGY FACILITIES SITING BOARD DEPARTMENT OF PUBLIC UTILITIES NOTICE OF ADJUDICATION NOTICE OF PUBLIC COMMENT HEARING

COMMONWEALTH OF VIRGINIA t,,, r, cl < - OFFICE. STATE CORPORATION COMMISSION n ^,o mam-2 p? u PRE FILED TESTIMONY WAYNE D. MCCOY

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

FISCALLY CONSTRAINED TRANSPORTATION PLAN

WELCOME BUS RAPID TRANSIT PUBLIC MEETING. MEETING TIME: 5 p.m. - 8 p.m.

SERTP - 1 st Quarter Meeting

Local Chapter Pictorial

HRC EVENTS. Club Date of Event Type of Event Report Received. January 2014: Carolina Boykin HRC January 4 & 5, 2014 Upland 1/20/2014

Power Unit 075. Maintain Substation Circuit Breakers

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

Revised on 7/21/16 Page 1 of 6

ACTION TRANSMITTAL No

CITY OF OVERLAND PARK MAINTENANCE PROGRAM

Fighting Alabama s Prescription Drug Abuse Epidemic

September 8, Transmission Congestion and Resource Adequacy Analysis

Nottingham Cycle City Frequently Asked Questions

ARLINGTON COUNTY, VIRGINIA

RECEIVED. Be it Enacted by the People of the State of Colorado: SECTION 1. In Colorado Revised Statutes, add part 11 to article 4 of title 43 as

Existing Data. City of Mauston. Legend " 58 " 82 " 16. ù ù. ù Pedestrian. Miles !G!G. !G ù. Sidewalk Location. Crash Type ( )

Transcription:

Project Berryville substation: loop in 3124 (Paris - Albers) into new Berryville substation 2017*** 2015 5 T-D interconnection Planned Targeted A 4358 Blaney Park 69-kV Substation: Reconfiguration 2015 2015 2 condition, reliability Planned Targeted A 7978 Empire - Presque Isle 138-kV line uprate Goose Lake 2015** 2015 2 reliability (P1.2) Planned A 3916 Kenosha - Lakeview 138-kV line uprate 9341 2016** 2015 5 reliability (P1.2) Planned A 3811 Lyndon substation: Install 2 line breakers to sectionalize 2015*** 2015 4 Operating flexibility Planned N/A N/A Maes substation: Install 2 line breakers to sectionalize 2015*** 2015 4 Operating flexibility Planned N/A N/A Neenah Creek substation: install new 69-kV bus and 2 line breakers to sectionalize 2015*** 2015 1 T-D interconnection Planned A 4354 Oak Creek-Bluemound 230-kV line uprate 862 2016** 2015 5 reliability (P1.2) Planned A 4337 Presque Isle Substation: Install redundant bus differentials on 138- kv buses 2015*** 2015 2 reliability (P5.5) Planned Targeted A 7980 Rock Springs - Artesian 138-kV line rebuild X-70 2016** 2015 3 reliability (P1.2) Planned A 3899 Rock Springs Tap - Kirkwood 138-kV line uprate X-70 2016** 2015 3 reliability (P1.2) Planned A 3899 South Sheboygan Falls: Install two 138 kv 32.66 Mvar capacitor banks 2015*** 2015 4 reliability (P1.3 with prior maintenance) Planned A 4356 Waunakee - Westport 69-kV line rebuild Y-131 2017** 2015 3 reliability (69 P1.2) Planned A 3902 ACEC Dellwood substation: Install line breakers to sectionalize Y- 146 2016*** 2016 1 T-D interconnection Planned Targeted A 7741 Albers - Kenosha 138-kV line uprate 9352 2016** 2016 5 reliability (P1.2) Planned A 3906 American Transmission Co. 2015 10-Year Assessment Page 1 of 8

Project Bain - Albers 138-kV line uprate 63143 2016** 2016 5 reliability (P1.2) Planned A 3900 Bay Lake: Holmes - Old Mead Road 138-kV project ASAP*** 2016 2 Beardsley St. Substation: Install 3 69-kV line breakers to sectionalize 69-kV circuit J-10 Bloomington substation: Install SCADA controlled breakers to sectionalize 2016*** 2016 4 operating flexibility Planned Targeted A 7981 2016*** 2016 3 Operating flexibility Planned N/A N/A Fitchburg - Nine Springs 69-kV line rebuild 6943 2016** 2016 3 reliability (69 P1.2) Planned A 3909 Fitzgerald - Ellinwood 138-kV uprate W-101 2016* 2016 4 Fitzgerald - Sunset Point 138-kV uprate C-107 2016* 2016 4 Fitzgerald Substation: Install 2nd 345/138-kV transformer 2016* 2016 4 Glory Road Substation: Install a new 138/69-kV transformer 2016*** 2016 4 (P1.3 with prior maintenance) (P1.3 with prior maintenance) (P1.3 with prior maintenance) T-D interconnection, reliability (69P6) Planned A 3965 Planned A 3965 Planned A 3965 Planned A 3841 Guenther substation: loop T-20 in and out 2016*** 2016 1 T-D interconnection Planned A 4712 Iron Foundry Substation: 138/69-kV Substation construction and Glenview-Iron Foundry 69-kV line extension 2016* 2016 4 T-D Interconnection Planned Targeted A 4422 McCue - Lamar 69-kV line rebuild Y-171 2016** 2016 3 reliability (69 P1.2) Planned A 3904 Montello substation: Install 2 line breaker on line Y-17 to sectionalize 2016*** 2016 1 T-D interconnection Planned Targeted A 7601 Morrison Ave - Sherman 115-kV line re-conductor Z-52 2016** 2016 1 reliability (P1.2) Proposed A 3889 Nicholson - Barland 138-kV line uprate OACG48 2016** 2016 5 reliability (P1.2) Planned A 3812 American Transmission Co. 2015 10-Year Assessment Page 2 of 8

Project Norwich - Ramsey - Barland 138-kV line uprate NWHG41 2016** 2016 5 reliability (P1.2) Planned A 3887 Oak Creek - Ramsey - Kansas 138-kV line uprate 824 2016** 2016 5 reliability (P1.2) Planned A 3895 Oak Creek-Bluemound 230-kV line uprate 873 2016** 2016 5 reliability (P1.2) Planned A 3486 Oak Creek-Pennsylvania 138-kV line uprate 837 2016** 2016 5 reliability (P1.2) Planned A 2056 Pflaumn - Royster 69-kV line rebuild 6934 2016** 2016 3 reliability (69 P1.2) Planned A 3910 Portage-Trienda 138-kV uprate X-67 2018** 2016 3 reliability Proposed A 1624 Pulliam - Glory Road 138-kV line conversion K-115 2016*** 2016 4 Pulliam Substation: Install a new 138/69-kV transformer 2016*** 2016 4 T-D interconnection, reliability (69P6) T-D interconnection, reliability (69P6) Planned A 3841 Planned A 3841 Racine - Oak Creek 138-kV line uprate 812 2016** 2016 5 reliability (P1.2) Planned A 3894 Red Maple substation: Install a bus tie breaker 2016*** 2016 4 Operating flexibility Planned N/A N/A Rocky Run - Plover 115-kV line uprate S-45 2016** 2016 1 reliability (P1.2) Proposed A 3915 Royster to Sycamore 69-kV uprate 6986 2016** 2016 3 reliability (69 P1.3) Planned A 1726 Stagecoach - Wick Drive 69-kV line rebuild Y-62 2016** 2016 3 reliability (69 P1.3) Planned A 3892 Sun Valley Tap to Oregon 69-kV rebuild Y-119 2016** 2016 3 reliability (69 P1.3), condition Planned A 3429 University/Whitewater line reconfiguration 2018** 2016 3 reliability (P1.2) Planned A 4728 American Transmission Co. 2015 10-Year Assessment Page 3 of 8

Project Wautoma - Wild Rose Pumping 69-kV line rebuild Y-19 2016** 2016 1 reliability Proposed A 3903 Williams Bay substation: Loop X44 in and out 2016*** 2016 3 T-D interconnection Proposed Targeted A 4421 Zone 2 switching initiative ASAP*** 2016 2 Operating flexibility Proposed N/A N/A Birchwood substation: Install a bus tie breaker 2017*** 2017 3 T-D interconnection Proposed N/A N/A Canal Substation: Install 138-kV breakers on 138/69-kV transformers Canal Substation: Install redundant bus differentials on 138-kV buses 2017*** 2017 4 (69P1.3 with prior maintenance) Proposed Targeted B 7983 2017*** 2017 4 reliability (P5.5) Proposed Targeted B 7985 Construct Fairwater-Mackford Prairie 69-kV line 2018* 2017 1 reliability Planned A 1708 Creekview Substation: 138 kv line construction to serve T-D interconnection 2017*** 2017 4 T-D interconnection Planned Targeted A 4353 Mukwonago substation: Install line breaker on line 67K61 2017*** 2017 5 Operating flexibility Proposed N/A N/A Reconfigure the North Randolph-Ripon 69-kV line to form a second Ripon-Metomen 69-kV line and retire the circuit between Metomen and the Mackford Prairie tap 2018* 2017 1 reliability, condition Planned A 1708 West Middleton-Stage Coach 69-kV uprate 6927, short term fix 2018** 2017 3 reliability (P1.2, 69 P1.3, P2.1) Planned Targeted A 3159 Badger Coulee: La Crosse area - North Madison - Cardinal 345-kV line construction 2018*** 2018 3 reliability, economics and policy benefits Planned A 3127 Branch River Substation: Construct new 345-kV switching station 2018* 2018 4 new generation Planned A 3206 Colley Road-Brick Church 69-kV rebuild Y-32 2018* 2018 3 reliability (P1.2, 69P1.3, 69P7, P6) condition Planned A 2031 Forest Junction 138kV Substation: Install 25 Mvar inductor >2030 2018 4 system intact (P0) Targeted B 7581 American Transmission Co. 2015 10-Year Assessment Page 4 of 8

Project Forest Junction 138-kV Substation: Install redundant bus differential 2019*** 2018 4 reliability (stability E2.5) Proposed Targeted B 8101 Highway V Substation: Install 138-kV and 69-kV breakers on 138/69- kv transformers Ogden St. ing Project: Ogden St. - Bayshore 69-kV line construction Pershing Substation: Loop Stone Lake - Gardener Park 345-kV line into new Pershing 345-kV Substation Point Beach Substation: Install new series 345-kV breaker for circuit Q-303 2018*** 2018 4 (69P1.3 with prior maintenance) Targeted B 7986 2018* 2018 4 T-D interconnection Proposed Targeted A 4732 2018*** 2018 1 T-T interconnection Proposed TBD TBD 2018* 2018 4 new generation Planned A 3206 Saukville substation: Install parallel breaker on line 8222 2020 2018 5 reliability (P2.1) TBD TBD Werner West 138kV Substation: Install 25 Mvar inductor >2030 2018 4 system intact (P0) Targeted B 7580 West Marinette substation: Install 138-kV circuit switchers on 138/69-kV transformers 2020*** 2018 4 Proposed Targeted A 8076 Atlantic Substation: Reconfiguration 2019 2019 2 Bain - Spring Valley 138-kV uprate 63141 2019 2019 3 & 5 (69P5) Targeted B 7586 Bay Lake: Benson Lake Substation -- Construct new 138-kV substation and install 150 Mvar SVC (near Amberg Substation) ASAP*** 2019 2 Bay Lake: Morgan - Stiles 138-kV circuit de-bifurcate to form 2 separate 138-kV lines ASAP*** 2019 4 Bay Lake: Morgan Substation -- reconfigure and expand 345-kV and 138-kV switchyards ASAP*** 2019 4 Bay Lake: North Appleton - Morgan 138 kv line construction ASAP*** 2019 4 Bay Lake: North Appleton - Morgan 345 kv line construction ASAP*** 2019 4 Planned A 3952 American Transmission Co. 2015 10-Year Assessment Page 5 of 8

Project Bay Lake: North Appleton Substation -- Construct new 345-kV switchyard and reconfigure 138-kV switchyard ASAP*** 2019 4 City Limits 138-kV bus reconductor 2020 2019 4 reliability (P3.2) Proposed Targeted B 8640 Construct a new 138/69-kV substation on Spring Valley - North Lake Geneva 138-kV circuit 2019 2019 3 & 5 Construct a new 69-kV circuit from Twin Lakes to the new substation 2019 2019 3 & 5 Construct a new Spring Valley-North Lake Geneva 138-kV circuit 2019 2019 3 & 5 M13-Reinforcement-Bunker Hill-Blackbrook 2019** 2019 1 reliability (P1.2) Proposed Targeted A 7602/7603 Presque Isle - Tilden 138 kv line loop into National and uprate National - Tilden 138 kv line Somers substation: Close the N.O. Somers - Albers 138-kV line and install N.O. bus tie breaker at Somers 2019 2019 2 reliability (P1.2, P6) B 3838 2019*** 2019 5 T-D interconnection Planned Targeted A 8660 Twin Lakes - Katzenberg 69-kV rebuild Y-102 2019 2019 3 & 5 Y-121: re-rate 1.2 miles of 69 kv line between Council Creek and Tomah Industrial Park 2015 2019 1 reliability (P1), operating flexibility TBD TBD Cardinal - Hickory Creek 345-kV line construction 2020*** 2020 3 Depere - Glory Rd 138-kV overhead line rebuild 2020*** 2020 4 Highway V - Preble 138-kV line uprate 2020*** 2020 4 Morgan - Plains 345-kV loop into new Thunder 345-kV substation. 2020*** 2020 4 Morgan - Thunder 138-kV project 2020*** 2020 4 reliability, economics and policy benefits Proposed A 3127 Targeted A 8082 Targeted B 8082 Targeted B 8076 Targeted B 8076 American Transmission Co. 2015 10-Year Assessment Page 6 of 8

Project Oak Creek - Hayes 138-kV line 811 upgrade and reconfiguration ASAP*** 2020 5 reliability (P7) Proposed TBD TBD Pine River-9 Mile 6921/6923 Minimum Asset Renewal and Uprate *** 2020 2 reliability, condition Targeted B 3678 Plains - Arnold 138-kV uprate 2020*** 2020 2 Plains - National 138-kV project 2020*** 2020 2 Plains 345/138-kV project (2-500 MVA replace existing) 2020*** 2020 2 Targeted B 8073 Targeted A 8071 Targeted B 8073 Southestern Wisconsin Northeastern Illinois Reinforcement Project ASAP*** 2020 5 reliability (P7) Proposed Targeted A 8065 Thunder substation: install 345/138-kV and 138/69-kV transformers, convert 1 ckt of Thunder to Crivitz to 138-kV 2020*** 2020 4 Targeted B 8076 Wesmark Substation: Install 2-8 Mvar 69-kV capacitor banks >2030 2020 4 reliability (69P2.1) TBD 4338 West Middleton - Stagecoach 69 kv line rebuild 6927 2018** 2020 3 reliability (P1.2, P1.3) TBD TBD Port Washington - Saukville 138-kV line uprate 742 2016** 2021 5 reliability (P1.2) A 3890 Port Washington - Saukville 138-kV line uprate 762 2016** 2021 5 reliability (P1.2) A 3891 Construct Shoto to Custer 138-kV line >2030 2022 4 reliability (69P1.2, 69P1.3) Targeted B 1719 Custer Substation: Install 138/69-kV transformer >2030 2022 4 reliability (69P1.2, 69P1.3) Targeted B 1718 Spring Green substation: Install a second 138/69-kV transformer 2022 2022 3 reliability (69 P1.3) Targeted B 3127 Winona - Atlantic 69-kV line rebuild Winona69 2022 2022 2 reliability TBD 4727 American Transmission Co. 2015 10-Year Assessment Page 7 of 8

Project Arcadian substation: install redundant bus differentials on 345-kV and 138-kV buses 2023 2023 5 reliability (stability E2.5) N/A N/A Boscobel 69 kv Substation: Install 1-8.16 Mvar capacitor bank 2023 2023 3 reliability (69 P2.1) Targeted B 8641 Colley Road substation: Install 2nd 100 MVA 138/69kV transformer 2023 2023 3 reliability Targeted B 7585 Granville substation: install redundant bus differentials on 345-kV and 138-kV buses 2023 2023 5 reliability (stability E2.5) N/A N/A Arcadian-Waukesha 138-kV lines KK9942/KK9962 rebuild 2029 2025 5 reliability (P3.2) Proposed A 1270 Aviation - North Fond du Lac 138-kV rebuild G-111 2025 2025 4 reliability (P3.2) TBD TBD Brick Church substation: Install 2-24.5 Mvar 138-kV capacitor bank and 1-18 Mvar 69-kV capacitor bank >2030 2025 3 reliability (P1.2, 69P1.2) TBD 2029 Portage - Columbia 138-kV line rebuild X-13 2030 2025 3 reliability (P1.2) TBD 4730 Portage - Columbia 138-kV line rebuild X-20 2030 2025 3 reliability (P1.2) TBD 4730 West Middleton-Pheasant Branch 69-kV line rebuild 6963 >2030 2028 3 reliability (69 P1.2) TBD 3487 Construct Cardinal-Blount 138-kV line 2030 2029 3 reliability (P6) TBD 1730 Legend * = dates based on approved project scope ISDs ** = SBRM Study *** = Other Major Project Study need year No Shading = No change to project since previous Assessment Orange Shading = new project, was not in previous Assessment project list Gray Shading = some change (e.g. In-service year or scope) since previous Assessment American Transmission Co. 2015 10-Year Assessment Page 8 of 8