NUCLEAR POWER BUSINESS UNIT TRAINING JOB PERFORMANCE MEASURES. JPM P COT Revision 0 DRAFT October 4, 2000

Similar documents
NUCLEAR POWER BUSINESS UNIT TRAINING JOB PERFORMANCE MEASURES. JPM P COT Revision 0 DRAFT July 11, 2000 TOTAL REWRITE PERFORM A REACTOR SHUTDOWN

Effects of Delayed RCP Trip during SBLOCA in PWR

Time-Delay Electropneumatic Applications

Kelsow Work Instruction. Subsea Well Control Hydraulic Panel Operation

CONDUCTIVITY POINT/S LEVEL SWITCH JAYCEEAQUA 4000 SERIES

EXPERIMENT 2 LEVEL CONTROL SYSTEM

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

INSTALLATION OPERATION MAINTENANCE

EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM

ATL R/V Atlantis AUXILIARY PLANT OPERATION APPENDIX OPERATING PROCEDURES

EDUCATION DEPARTMENT ACCU-TEST

Summary Report for Individual Task 551-8ST-1027 Operate Emergency Steering Status: Approved

User Instruction Manual

Portable Gas Monitor GX User Maintenance Manual (H4-0050)

MEDICAL AIR Effective date: 02/80 MAINTENANCE Revision date : 08/12

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

Lifespan Improvements Available in the Industry

Lockout/Tagout Training Overview. Safety Fest 2013

OPERATING PROCEDURES

LOCKOUT STATION FOR TRAINING PURPOSES

BIOGAS COMBUSTION PLANT MAINTENANCE MANUAL

Loss of Normal Feedwater Analysis by RELAP5/MOD3.3 in Support to Human Reliability Analysis

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

INSTALLATION AND OPERATING INSTRUCTIONS BIG TEX VENTED GAS LOGS

SECRETARY OF THE AIR FORCE 17 APRIL 2000 LOADMASTER MAFFS CHECKLIST. Summary of Revisions: Redundant pages removed.

Safety Manual: Hazardous Energy. January, 2017

User Manual 1 P a g e Rev. V1.6-EN 11/08/2014

safety Shut-Off Valve HON 721

Control units. Installation and operating instructions Series: DP-Control

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

USER MANUAL. Intelligent Diagnostic Controller IDC24-A IDC24-AF IDC24-AFL IDC24-F IDP24-A * IDP24-AF * IDP24-AFL * IDP24-F * 1/73

Specifications and information are subject to change without notice. Up-to-date address information is available on our website.

TECH TIPS TZ34/20 & TZ50/30. Service Call: Machine will not automatically level. Tools Needed: Multi Meter Jumper wire 7/16 Combination wrench.

Isolating plant. Guidance Note. June 2011

AIR CONDITIONING AND PRESSURIZATION CONTROLS AND INDICATORS

HIGH WIND PRA DEVELOPMENT AND LESSONS LEARNED FROM IMPLEMENTATION Artur Mironenko and Nicholas Lovelace

USER MANUAL OPERATION AND THE USE OF A CAR WITH. Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM

Engineering & Projects Organization

Gas Pressure Regulator HON 300

ASVAD THE SIMPLE ANSWER TO A SERIOUS PROBLEM. Automatic Safety Valve for Accumulator Depressurization. (p.p.)

TECHNICAL DATA. Trimpac 251a. Spetember 16, 2013

Burner Management System DEMO Operating instructions

Delayed Coker Automation & Interlocks

1. Unlimited, so long as adequate facility, supplies and time are provided to ensure comprehensive and complete training of subject matter

Page 1 GM-FAQ Club Profile FAQs. Page

R E D I C O N T R O L S

Series 3730 and Series 3731 EXPERTplus Valve Diagnostics with Partial Stroke Test (PST)

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

IWCF Equipment Sample Questions (Surface Stack)

TECHNICAL DATA. Dry 132a. October 1, 2008

Quickstart Installation Checklist (Please refer to operation manual for complete installation instructions)

MP15 Jockey Pump Controller

CP3R Quick Start Manual

Port: DISPORT Voyage No.:03 Date: 10-Aug-2016 No. Description Remarks [ ]

Master Control Systems, Inc. Variable Speed Fire Pump Controllers

AFDXXX(X)AC Series Operators Manual Please read this manual thoroughly before attempting to operate your water maker.

CPN1 Quick Start Manual

A4s Operation Manual

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

Specifications and information are subject to change without notice. Up-to-date address information is available on our website.

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

Index. Batch processing 56 Branching xiii 52 62

BUTTERFLY VALVES Series 800

MP-70/50 Series Scoreboard Controller User Guide

PREDICTING HEALTH OF FINAL CONTROL ELEMENT OF SAFETY INSTRUMENTED SYSTEM BY DIGITAL VALVE CONTROLLER

Thermcraft Tube Furnace General Use

Pressure Automated Calibration Equipment

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which

MODEL NUMBER: P PORTABLE COMPRESSOR

Lab 1c Isentropic Blow-down Process and Discharge Coefficient

Model: 43T. Bermad Pressure Relief Valve

TECHNICAL DATA. Trimpac 244a. September 16, 2013

SAFETY DEMONSTRATION TESTS ON HTR-10

safety shut-off Valve HON 703 / HON 704

SISTERS CREEK BRIDGE

GT-4130 STUNT PLANE. 3 Channel 2.4GHz RC Aeroplane Modelled after the famous Cessna 182 Skylane SKYLARK (GT-4130) Contents & Accessories

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Discharge Relief Valve Operation & Maint.

Annual Inspection and Calibration Checklist VAF Oilcon MK-6(M) MEPC.108(49) Page 1 of 5

RH800 & 2000 BASIC OPERATIONS

Courseware Sample F0

MODEL NUMBER: PSI AIR SOURCE KIT 200 PSI Compressor on 2.0 Gallon 200 PSI Air Tank

LSX Low Smoke Convertor Operations Manual

MODEL NUMBER: P PORTABLE COMPRESSOR

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

BETTIS J1-RT2 RATE OF DROP LINEBREAK DETECTION SYSTEM. FACTORY SET: psi/min psi P/L

ZORE-X. CORE SERIES 9x19. Owner s Manual. Watch the video before initial use

BUBBLER CONTROL SYSTEM

SCOTTISH WATER. Waste Water Treatment Works. Typical WWTW Ellipse Equipment No: XXXX Ellipse Plant No: STW00XXXX

VARIOspeed 3R User Manual

MODEL NUMBER: M20005 AIR SOURCE KIT. 30% Duty Compressor on. 2.0 Gallon Air Tank SAVE THIS MANUAL FOR FUTURE REFERENCE

200 PSI HIGH-FLOW AIR SOURCE KIT

200 PSI FAST-FILL AIR SOURCE KIT

C1960. Multi-recipe profile recorder/controller. Measurement made easy

Digital Level Control One and Two Loops Proportional and Integral Control Single-Loop and Cascade Control

SIP 1000 OPERATION AND PROGRAMMING MANUAL

Gas Fired Residential Heating Boilers

in84061.txt at Page 1 of 6 2/25/00

INTRA-OFFICE COMMUNICATION

Plasma Asher: March PX-500 User guide (May-30, 2017)

Transcription:

K/A REFERENCE: (NUREG-1122) 1. 3 (3.0/3.4) ALTERNATE PATH JPM YES X NO PERFORMANCE CHECKLIST: ISFACTORY - Properly performed critical step(s) and/or in sequence (if applicable) UNISFACTORY - Improperly performed critical step(s) and/or out of sequence (if applicable) Procedure adequately addresses task elements. Enter identifier here: Other document adequately describes necessary task elements. Enter identifier here: X Task elements described as attached. DESIRED MODE OF EVALUATION: APPLICABLE EVALUATION SETTING: SIMULATE[WALKTHROUGH X DISCUSSION X PERFORM X IN-PLANT CONTROL ROOM X VALIDATED TIME FOR COMPLETION: 20 MINUTES Page 1 of 5

EXAMINEE START TIME EVALUATOR FINISH TIME PERFORMANCE [1 [] UN JOB TITLE: [:] AOT E COT [:] SRO [] STA TOOLS/EQUIPMENT/REFERENCES: Simulator Control Boards TASK STANDARDS: Control Board Walkdown identifies at least four of five discrepancies. SIMULATOR INFORMATION: "* Initialize the simulator to a full power IC. ENSURE Tavg & RTO set-up on Digital's and Rod Counters reset. "* Position switches and equipment as listed below: 1. 2. 3. 4. 5. 1AF-4001 position indicator at 0% open. ISI 841A, (IT-34A Accumulator Discharge MOV) is powered up and shut (LOA,SIS12,T) G03 DG Mode Selector Switch is in the local position SG "B" Atmospheric Dump Valve is in manual and slightly open (-20%) Insert LOA/Transmitter/SGN-9 (1LT-463) @ fixed bias signal of 0 to fail the yellow non-controlling channel of "A" S/G Narrow Range Water Level Low. * All chart recorders should be forwarded. Page 2 of 5

READ AND PROVIDE TO THE EXAMINEE THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE. After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told. You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed. EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials. For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, "acknowledge." All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task. DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. INITIAL CONDITIONS: * Unit 1 and 2 are at 100% reactor power. "* You are an oncoming Unit 1 control operator (or DOS if the applicant is an SRO) " Several items have been inserted into the simulator that may impact plant or system operations. "* There are no surveillance or maintenance activities authorized at this time. NOTE: Shift Turnover Checklist and logs are NOT required for this 1PM and therefore NOT provided. INITIATING CUE(S) / TASK TO BE PERFORMED (SIMULATED): " You are to complete a control panel walkdown limited to the front of 1C04, 1C03, C01 and C02 as you would for a shift turnover. "* You have 20 minutes to complete the walkdown. "* Report any abnormal conditions you may find that effect system or plant operability at the end of the walkdown for discussion with the off-going watch (examiner). Page 3 of 5

CONDUCT CONTROL BOARD WALKDOWN FOR S=IF PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE. FOUR OF FIVE MALFUNCTIONS MUST BE IDE NTIFIED FOR A GRADE. IF THE EXAMINEE IDENTIFIES ADDITIONAL UNANTICIPATED MALFUNCTIONS DURING THE COURSE OF THIS JPM,, THESE ITEMS WILL BE EVALUATED SEPARATELY FOLLOWING JPM COMPLETION. ITEMS DO NOT NEED TO BE PERFORMED IN ANY SPECIFIC ORDER. START TIME 1 1 Y UN Examinee recognizes 1AF-4001 position indication is 0% open on 1C03. Recognizes IAF-4001 position indication is 0% open on 1C03 versus it's normal open position of approximately 20%. 2 1 Y UN Examinee recognizes the yellow channel (1LT-463) is indicating abnormally low on "A" S/G Narrow Range Water Level Indicator on 1C-03 versus at it's normal indicating level of 64%. Recognizes the "A" S/G narrow range indicating channel is reading low. 3 1 Y UN Examinee recognizes the "B" S/G atmospheric dump valve is in manual and open which is not in its proper position for existing plant conditions on 1C03. Recognizes 1MS-2015 is partially open and in manual vs. auto (lowered setpoint and red open indicating light) on 1C03.. Examinee should also mention RTO is >1518.5 MWT (RTO > 1518.5 MWT is not critical) Page 4 of 5

PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE. FOUR OF FIVE MALFUNCTIONS MUST BE IDE NTIFIED FOR A GRADE. IF THE EXAMINEE IDENTIFIES ADDITIONAL UNANTICIPATED MALFUNCTIONS DURING THE COURSE OF THIS JPM,, THESE ITEMS WILL BE EVALUATED SEPARATELY FOLLOWING JPM COMPLETION. ITEMS DO NOT NEED TO BE PERFORMED IN ANY SPECIFIC ORDER. 4 1 y UN Examinee recognizes 1SI-841A (IT-34A Accumulator Discharge MOV) is powered up and shut on CO. Examinee recognizes 1SI-841A is not in its proper at power position on COl. (1SI-841A indicating light is green). 5 1 y UN Examinee recognizes G03 DG mode selector switch is in the LOCAL position on C02. Recognizes G03 DG mode selector switch is in LOCAL vs. REMOTE position on C02. TERMINATION THIS COMPLETES THIS JPM. COMPLETION TIME: Page 5 of 5