The timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated.

Similar documents
Comments Heard PUBLIC INFORMATION CENTRE #1: SUMMARY

PUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012

PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013

Federal Way City Center Access Study Comment Log Summary

Lamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV

Technical Memorandum. Introduction. Projected Traffic Volumes

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission

Technical Briefing Rapid Transit

North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4

3 ways to build a healthy future for NSW

2017 Active Allegheny Grant Program Program Guidelines

EXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network M"p, Revised Criteria and Joint Resolution

Presented by: Presented to:

Project No.: Notes taken by:

Nine Elms Lane and Battersea Park Road

CHAPTER 4 VISION, GOALS AND OBJECTIVES

CARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station

City of Ottawa. Transit Solutions. O c t o b e r

2.0 VISIONING DIRECTION

American Association of State Highway and Transportation Officials

Minutes of the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE. Members Present Gary Sipsma... Director of Highways/Highway Commissioner,

Completed Project Justification Package Example

South Portland Public Input Meeting Summary Notes and Public Comments

Transportation Border Working Group Portland March 3-4, CBSA Infrastructure Project Update

TITLE TEXT. School Start Times Exploration Update. Presented by Scott Nielsen

Advisory Group Meeting #7. March 9, Transcribed Breakout Group Discussion Notes.

Quebec Street Multimodal Improvement Project Open House Summary September 27, 2017

A template mass rescue operations plan

SANDYFORD BUSINESS DISTRICT SUMMARY OF AREA WIDE MOBILITY MANAGEMENT PLAN.

STATE OF NORTH CAROLINA Office of the State Auditor

Deer harvest objective for the Deer Plan

Long-Term Transportation Plan

Phase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options

Sellwood Bridge AM Traffic Evaluation

ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019

Project Advisory Team Existing Conditions Meeting Agenda

Stakeholder Working Group (SWG) Meeting #2 Summary

SVJFAC 2016 Review HIGHLIGHTS ACCOMPLISHMENTS

Selection Policy for Badminton Australia Support Structure (BASS) and National Squad.

Atherton Middlefield Road Bicycle Lane Improvements Public Meeting

Subject: Recommended Updates to Transportation Development Parameters

PILKINGTON RESPONSE o Rich Martinko returned call on 8/10/2014 at 2:50pm and spoke with Ms. Pilkington o The information below was given to her.

Alternative Ways to Improve Traffic on Loop 360 Paul Schumann 1

TRANSPORTATION IMPACT ASSESSMENT. Executive Summary

TECHNICAL MEMORANDUM

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG

Binghamton Metropolitan Transportation Study Pedestrian & Bicycle Advisory Committee Meeting Minutes April 14, 2008

DRAFT - TRANSPORTATION AND PUBLIC HEALTH

!! 1st/ 2nd Grade. 3rd Grade

Appendix C. Travel Demand Forecasting Technical Memorandum

Prepared by: TH STREET SUITE 2301 DENVER, CO CITY AND COUNTY OF DENVER. n W

The Facts About Brentwood School s Expansion Plans

Pedestrian Safety Fourth Grade Lesson 1. Subject: Health, Physical Education

Health and Safety Policy for Groups Policy

NSW HEALTH HOSPITAL CAR PARKING FEES FOR STAFF POLICY DRAFT FOR CONSULTATION PURPOSES FROM THE MINISTRY OF HEALTH

Neighborhood Bikeway Concept Plan

System Development Principles

American Association of State Highway and Transportation Officials

Let s go through the mechanics of air resistance that way we can understand why an aero helmet may be a good option for someone.

Bikeway Classification

TRANSPORTATION DISCUSSION GROUP Laptop notes (as projected on screen during the meeting) Monday, June 10, 2013

Additional Investigation Report for a Second Bridge Across the Ashburton River

NX2 Albany to Universities bus route and service layovers public feedback report Total number of public submissions received = 71

Dear Erin: In addition, we would like a copy of all materials underlying the proposal, including the research that was conducted.

City of London Transport Strategy

BSO PLUS MONTHLY SAFETY TOPIC October 2012: Driving Hazards and Ergonomics

MISSOURI STATE 4-H COUNCIL REGIONAL REPRESENTATIVE APPLICATION

Running a Raffle. There are 3 types of Legal Wisconsin Raffles

Technical Memorandum #18 - Transit Solutions - DRAFT

GIRLS ON THE RUN NYC 5k JUNE 4, 2017 VOLUNTEER HANDBOOK

Highway Construction

Full Event Package Charity Events

IAAF WORLD ATHLETICS CHAMPIONSHIPS DOHA, QAT 27 SEPTEMBER 6 OCTOBER 2019

Who s Your School Breakfast Star? Writing Contest Official Rules

CITY of LOMPOC 2030 General Plan

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

Stakeholder Interviews Memo

CSR Campaign Stop, Look, Wave. Traffic Safety Kit INSTRUCTOR S GUIDE

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3

UCP of Central MN STUCK IN MOTION STATIONARY. bike race. January. 27 Saturday PARTICIPANT PACKET

To enforce and defend our rights to Handicap and Course Rating terminology and services as deferred through the agreement with the USGA.

Department of Transportation Project No Rehabilitation of Bridge No Towns of East Haddam and Haddam, Connecticut

Community Meeting September 29, :30 7:30 p.m. Leataata Floyd Elementary School Multi-Purpose Room 401 McClatchy Way, Sacramento.

Opportunity for Public Participation. Plain Language Summary

Canadian Sport Institute Pacific and BC Sailing Athlete and Coach Nomination Criteria

2017 Chili Bowl Classic 5k. FAQ s. About the Race

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No.

All these organisations and representatives support this objection and the points made in the critical design review.

Training Teams and Selection Criteria:

Location Consider areas in your community to focus attention on pedestrian safety. Example locations include:

Ipswich Central State School Executive Summary

CITY OF STEVENS POINT AGENDA

FY 2018 Transportation Alternatives Instructions

NORTH-EAST WALES NETBALL ASSOCIATION LEAGUE RULES

Active and Safe Routes to School Surveu Summary Program

Cycling Strategy Group. Terms of Reference

Vista Field Redevelopment Project Transportation System Impact Evaluation Volume II Additional Analysis Completed for Mitigation Requirements

SAN MATEO COUNTY TRANSIT DISTRICT 1250 SAN CARLOS AVENUE, SAN CARLOS, CALIFORNIA CITIZENS ADVISORY COMMITTEE MINUTES OF MEETING APRIL 24, 2013

E25 FATIGUE MANAGEMENT

Orange Line Bus Rapid Transit Sustainable Corridor Implementation Plan

Transcription:

100 20111 93A Avenue Langley, BC V1M 4A9 e bcta@bctrucking.cm t 604 888 5319 f 604 888 2941 tll free 1 800 565 2282 bctrucking.cm 16 th Avenue Crridr Imprvements BCTA Survey Results & Recmmendatins September 15, 2015 ABOUT BCTA The BC Trucking Assciatin (BCTA) is the recgnized vice f the cmmercial rad transprtatin industry in British Clumbia. Funded in 1913, BCTA is a prvince-wide, nn-partisan, nn-prfit industry assciatin frmed t advance the interests f mtr carriers in BC. BACKGROUND Further t the Online Open Huse - 16 th Avenue Crridr Study (the Study) and accmpanying survey distributed by TransLink and the ther study partners; BCTA cnducted a similar survey f its members in the Lwer Mainland. The survey was sent t 277 cmpanies yielding 34 respnses (and a respnse rate f 12 percent). A detailed summary f the survey results is attached in Appendix A. The ntice t participate in the survey is included in Appendix B. As nted in the Study, the 16 th Avenue Crridr is part f TransLink s Majr Rad Netwrk (MRN) and is a designated truck rute with significant truck traffic. Accrding t the Study, trucks accunt fr 13 t 16 percent f the traffic alng the crridr, while typically trucks nly make up 5 t 10 percent f traffic vlume n an average arterial rad. BCTA RECOMMENDATIONS AND SURVEY RESULTS Based n the results frm the survey, BCTA recmmends that: The timelines fr the prpsed shrt-term, medium-term, and lng-term imprvements t the crridr be accelerated. The entire crridr be 4-laned, but withut median barriers (see explanatin belw), particularly between Highway 99 and Lefeuvre. TransLink, individual municipalities, and the Ministry f Transprtatin and Infrastructure (MTI) crdinate the permit apprval prcess fr this particular crridr, and mre generally, establish an integrated municipal-prvincial permit system in the regin (i.e., a ne-stp-shp fr permits). This is critical because the crridr wuld serve as a majr versize-verweight (OS-OW) vehicle rute (particularly fr ver-height vehicles) as it spans multiple municipalities and cnnects with several prvincial highways in a rural setting. Currently, the primary East-West ver-height crridr in the regin, while suitable, requires that carriers travel thrugh a mre urban envirnment using Highway 10, the Langley Bypass, Highway 1A (Fraser Highway), Highway 13 (264 Street), and 8 th Avenue (Vye Rad) t Highway 11. A fully upgraded 16 th Avenue crridr wuld serve as an alternate, mre efficient, and safer rute fr the mvement f OS-OW vehicles.

September 15, 2015 Page 2 f 3 Pririty and Timing f the Prpsed 16 th Avenue Crridr Imprvements Respndents were asked t rank the imprtance f the package f prpsed imprvements t the 16 th Avenue Crridr against three ther majr transprtatin infrastructure prjects in the Lwer Mainland the Pattull Bridge Replacement Prject, Nrth Fraser Perimeter Rad, and Gerge Massey Tunnel Replacement Prject, n a scale f ne (mst imprtant) t fur (least imprtant). Over 50 percent f respndents ranked the 16 th Avenue Crridr as the first r secnd mstimprtant imprvement prject amng the fur infrastructure imprvement prjects listed in the survey. Overall, imprvements t the 16 th Avenue Crridr scred third-highest, ahead f the Nrth Fraser Perimeter Rad, and als nearly tied with the Pattull Bridge Replacement Prject fr secnd place (see Appendix A fr rankings f all prjects). In terms f timing, 70 percent f respndents wuld like t see the shrt-term imprvements cmpleted sner than within the next 5 years, 74 percent wuld like t see the medium-term imprvements cmpleted sner than within the next 6 t 15 years, and 64 percent wuld like t see the lnger-term imprvements cmpleted sner than 15 r mre years frm nw. Reasns fr an accelerated timeline included increasing traffic vlume, traffic peratins issues, safety issues, and the ptential fr increased csts if the imprvements are delayed. Shrt-term imprvements There was verall supprt fr the prpsed scpe f the shrt-term imprvements, including imprved driveway alignment, lighting, and brush clearing t imprve safety. Hwever, there were cncerns regarding the ability f trucks t get back n the rad if pull-uts are added fr passing because f the high amunt f traffic n the crridr. As well, current high traffic vlume was cited as the main reasn the shrt-term imprvements are insufficient. Medium-term imprvements The medium-term imprvement f 4-laning 16 th Avenue with a median west f 176 th Street was identified as a cncern because f the hindrance median barriers pse t mving huses and ther versized lads. Additinally, there was supprt fr 4-laning the entire crridr, at least frm Highway 99 t Lefeuvre, nt just west f 176 th Street. There was mre supprt fr the King Rad/Peardnville Rad ptin rather than the Marshall Rad Extensin. Lnger-term imprvements A number f cmments encuraged 4-laning f the crridr sner than the 15 r mre year timeframe because f the high vlume f traffic alng this crridr. Additinally, there was a preference fr tw-way left-turn lanes t be installed alng the crridr rather than median barriers, which can hinder the mvement f versize vehicles.

September 15, 2015 Page 3 f 3 Oversize-Overweight (OS-OW) Vehicles Overall, 24 f the 34 respndents (71 percent) indicated a fully upgraded crridr wuld be extremely imprtant, imprtant, r smewhat imprtant fr the mvement f OS-OW vehicles t, frm, and within the Lwer Mainland regin. Of the 17 carriers that transprt OS-OW lads, 16 respndents (94 percent) indicated a fully upgraded crridr wuld be extremely imprtant, imprtant, r smewhat imprtant fr the mvement f OS-OW vehicles. Due t its mre rural setting, an imprved 16 th Avenue crridr wuld be a safer and mre efficient rute fr transprting OS-OW lads, particularly thrugh the Twnship f Langley and City f Langley, as Fraser Highway is becming increasingly cngested.

A-1

A-2

A-3

A-4

RE: 16 TH AVENUE CORRIDOR IMPROVEMENTS Dear <First Name>: BCTA is cnducting a shrt survey f BCTA members abut prpsed near and lng-term imprvements t 16th Avenue between Highway 99 in Suth Surrey and Marshall Rad in Abbtsfrd. Please take a few minutes t cmplete this shrt 7-questin survey by Mnday, August 31, 2015: https://www.surveymnkey.cm/r/tsp3hzb Backgrund TransLink, the Twnship f Langley, the City f Surrey, the City f Abbtsfrd, ICBC and the Ministry f Transprtatin and Infrastructure (MTI) cnducted a preliminary study that utlines ptential imprvemets t the 16th Avenue Crridr in the Lwer Mainland (i.e., the 29 km segment f 16th Avenue between Highway 99 in Suth Surrey and Marshall Rad in Abbtsfrd). Yu can dwnlad a detailed presentatin utlining the study s results and prpsed imprvements by fllwing the link. A summary is prvided belw. www.tl.ca/prtals/0/twnship%20f%20langley/engineering/current%20prjects/16%20avenue%20crri dr%20study.pdf?timestamp=1436465558793 Current Situatin: The study acknwledges the imprtance f the 16th Avenue Crridr, which is ne f a limited number f cntinuus east-west rutes cnnecting the City f Surrey, the Twnship f Langley, and the City f Abbtsfrd. 16th Avenue als cnnects Highways 99, 15, and 13, and three brder crssings between Canada and the United States (Peace Arch, Pacific Highway, and Aldergrve). 1. It is part f TransLink s Majr Rad Netwrk (MRN) and a designated truck rute with significant truck traffic trucks accunt fr 13 t 16 percent f the traffic alng the crridr (typically, trucks make up 5 t 10 percent f traffic vlume n an average arterial rad). 2. Tday, 16th Avenue is primarily a straight, 2-lane rural radway with a psted speed limit f 60 km/h, and limited passing pprtunities. 3. Since it passes thrugh the Agricultural Land Reserve (ALR), it is frequently used by slw-mving farm vehicles. 4. The study suggests that speeding cupled with a number f ther factrs such as the high number f intersectins, limited passing pprtunities, direct access t/frm farm and residential prperties, relatively high prprtin f truck traffic, and presence f slw-mving farm vehicles cntribute t delays, cngestin, and safety-related cncerns. Prpsed Crridr Imprvement Plans: Shrt-term (within the next 5 years) Cnstruct slw-mving vehicle pulluts (x8) t imprve passing pprtunities. Cnstruct RCMP pulluts (x4) fr speed enfrcement purpses.

Brush clearing at the 240th Street intersectin, which has been identified as a high cllisin area, t imprve sight lines and visibility. Prvide additinal warning signs and lighting. Establish a plicy t reduce the number f driveways alng the crridr ver time. Prvide mre intersectin and driveway warning signs and imprve pavement markings and lighting. Cnslidate and realign adjacent driveways between 200 and 208 Street t reduce turn mvement cnflicts. Prvide additinal wildlife fencing t reduce the number f animal-related cllisins in the crridr. Medium-term (6 t 15 years) Assumes that the King Rad Cnnectr between Bradner Rad and Peardnville Rad/Marshall Rad will be cnstructed in Abbtsfrd in the next 5 t 10 years. 4-lane 16 th Avenue west f 176th with a median barrier. Cnstruct tw-way-left-turn-lanes (TWLTL) between 184 th and 200 th Street, and 240 th and 248 th Street t separate left turning traffic frm thrugh traffic. Upgrade and signalize five intersectins - 208th, 232nd, 272nd, Lefeuvre Rad, and Bradner Rad. Cntinue with the plicy t reduce the number f driveways alng the crridr. Prvide additinal wildlife fencing. Lnger-term (15 years plus) Fur-lane the entire crridr, with a centre median barrier west f 176 th Street, and a twway-left-turn-lane (TWLTL) in the median east f 176 th street (i.e., n median barrier) t preserve driveway access t farms and residential prperties. 70 km/h hur psted speed limit Intersectin upgrades and signalizatin at 224th and 240th Street. Cntinue with the plicy t reduce the number f driveways alng the crridr. Thank yu fr yur assistance.