Well PGE-6 Decommissioning Evaluation PG&E Topock Compressor Station

Similar documents
APPENDIX M Groundwater Monitoring Well Decommissioning Specifications

Casing and Cementing Requirements

3.0 SCOPE OF WORK FOR WELL RECOMPLETION, INSTRUMENTATION, AND PUMPING TEST

TECHNICAL MEMORANDUM 002 EMORANNO. 001

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

Construction Dewatering

Lecture 8&9: Construction Dewatering

Division of Environmental Quality Wellhead Protection Section

NYE COUNTY NUCLEAR WASTE REPOSITORY PROJECT OFFICE TEST PLAN TITLE: REVISION: 0 SUPERSEDES:

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY

ETL listed for installations within 5 ft. (1.5M) of outer edge of water

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

Perforation Design for Well Stimulation. R. D. Barree Barree & Associates LLC

DIRECTIONAL DRILLING

APPENDIX G SUMMARY OF EXISTING PUMPING TEST DATA AND DATA PLOTS

APPENDIX F GROUNDWATER SAMPLING LOGS

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Coal and Water Protection. PADEP: Well Plugging & Subsurface Activities Division Bureau of Oil and Gas Planning & Program Management

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

METHOD 2E - DETERMINATION OF LANDFILL GAS PRODUCTION FLOW RATE. NOTE: This method does not include all of the

APPENDIX A1 - Drilling and completion work programme

3. Types of foundation

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Analysis of 24-Hour Pump Test in Well NC-EWDP-3S, Near Yucca Mountain, Nevada

Float Equipment TYPE 925/926

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

1. A proper preparation of the cone and other material is inevitable prior to a CPTU test.

Dewatering Landfill Gas Wells to Maximize LFG Collection

Oil Well Potential Test, Completion or Recompletion Report, and Log

Casing Design. Casing Design. By Dr. Khaled El-shreef

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

MBMG Butte Mine Flooding Monthly Report BMFOU Consent Decree BU-SEH Remedial Action Monitoring Program Contract No TO-35 September 2013

Pilgrim Hot Springs Flow Testing

Oil Well Potential Test, Completion or Recompletion Report, and Log

Dr. Bob Harrington March 2, 2015 Inyo County Water Department 135 South Jackson Street Independence, CA 93526

OIL AND GAS DOCKET NO

OCEAN DRILLING PROGRAM

Item 404 Driving Piling

NYE COUNTY NUCLEAR WASTE REPOSITORY PROJECT OFFICE TEST PLAN SUPERSEDES: PURPOSE: Add duplicate grab samples from welf 22S once per week.

If you have any questions or comments, please feel free to contact me at

Water Storage for Agriculture

GROUND ANCHOR LOAD TESTING REPORT FOR WHITE POINT SLOPE STABILIZATION, PASEO DEL MAR, SAN PEDRO DISTRICT, LOS ANGELES, CALIFORNIA

MIA Training Example (Catalano 2H)

SUBSEA KILL SHEET EXERCISE No. 5

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

Le Sueur County, MN Tuesday, December 13, 2016 Board Meeting

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY

Simplified Start-Up Checklist For Fully-Pressurized Seasonal Systems

Revised Corrective Action Plan Part B

Rig Math. Page 1.

NEW PROGRAM! OIL AND GAS TECHNOLOGY PROGRAM

Perched Box Caisson Overview. January 2014

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Worked Questions and Answers

W I L D W E L L C O N T R O L FLUIDS

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score)

OREGON HEALTH. Systems Public Water Supply Systems Community Water Supply Systems Source Water Protection

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

Oil Well Potential Test, Completion or Recompletion Report, and Log

Appendix B Harris County Standard Operating Procedure for Determining In Situ Hydraulic Performance of High Flow Rate Bioretention Media

DB Bridge Plug. Features. Benefits. Applications

Oil, Gas and Salt Resources of Ontario

Methods for Measuring Groundwater Elevation and Vacuum Pressure During Soil Vapor Extraction

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

Orion In Situ Oil Sands 2014 Progress Update. Presented May 21, 2015

WATER WELL DRILLER AND PUMP INSTALLER LICENSING REPORT ADVISORY COUNCIL MEETING January 18, 2019

TECHNICAL SPECIFICATIONS SECANT CAISSON WALL TECHNICAL SPECIFICATIONS. October 19, Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC

Annex P Water Well Modification Plan

LAMINATED POLES. engineered to solve problems. Coastal Douglas-fir. Field Raked and Tangent Poles

RIH intermediate section casing in Bazian-1 exploration oil well

BLADERUNNER ULTRA LOW FRICTION REDUCING CENTRALIZER

Abandonment Program for Paramount Fort Liard F 36

Hose Management Inspection Guidelines for HP Drilling and Production Hoses

Maine Department of Environmental Protection (MEDEP) Stone Farm, Arundel Sample Collection - Data Report Summary Report Date: June 15, 2017

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Juneau Douglas Harbor

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Extended leak off testing

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

ANNUAL EVALUATION OF 2016 WATER-LEVEL MONITORING DATA FROM THE CITY OF LAS CRUCES WATER SUPPLY WELLS, NEW MEXICO

Homework 2 PROBLEM No. 1

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

SOIL ANCHORS ETSAB/UPC J.Llorens - ETSAB/UPC PASSIVE ANCHORS - ANTECEDENTS

Bore-Gard Installation - 1,000 ft. Perry, Oklahoma

Texas Administrative Code

PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT FLUSHING REPORT

Field Manual. Simple by Design

Gas Well De-Liquification Workshop. Denver, Colorado February 27 - March 1, Multi-Staging Wells. Chandler Frost Production Control Services

WELL SCAVENGER. Versatile wellbore clean-up tool for the most demanding operations

SPECIFICATION FOR CAISSON CONSTRUCTION

CONE PENETRATION TESTS

ZonePac System. Proven Technologies For An Integrated Solution IMPROVING RECOVERY IN OPENHOLE GRAVEL-PACKED WELLS

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe

Transcription:

TECHNICAL MEMORANDUM Well PGE-6 Decommissioning Evaluation PG&E Topock Compressor Station DATE: February 28, 2006 Introduction This technical memorandum presents an evaluation of inactive water supply well PGE-6, as requested in the Department of Toxic Substances Control s (DTSC s) January 6, 2006 letter, Conditional Approval of the Draft Well Installation Work Plan for Interim Measures Performance Monitoring Program, dated November 30, 200, PG&E, Topock Compressor Station. In the January 6, 2006 letter, DTSC requested a technical memorandum be submitted by February 28, 2006 with recommendations regarding whether this well should be decommissioned. If decommissioning was recommended, DTSC required that a work plan for decommissioning be submitted on the same date as the technical memorandum. The well decommissioning work plan has been prepared as a companion document to this memorandum. Existing well construction records, drilling logs, and water level and water quality data were reviewed for PGE-6 and nearby wells. Recommendations for the potential future use and decommissioning of PGE-6 are discussed below. PGE-6 Well Construction Details Well PGE-6 is located approximately 400 feet northeast from the eastern boundary of the Topock Compressor Station in an area known as the MW-24 bench, as shown on Figure 1. PGE-6 was originally installed in 1964 to 180 feet below ground surface (bgs) as a replacement industrial water supply well for the Topock Compressor Station. The well was constructed with 14-inch steel casing with perforations from 110 feet to 180 feet bgs. A 1998 video log of PGE-6 confirms the depth of the top of the screened interval. At the time of the video log, the well was silted in or collapsed to a depth of 162 feet bgs. Figure 2 provides a schematic diagram of PGE-6 construction details. The 1964 driller s log for PGE-6 and the video logging report are included in Attachment A. Table 1 summarizes well construction information for PGE-6, as well as for other nearby wells (PGE-7, MW-24A, MW-24B, and MW-24BR). The driller s log of well PGE-6 (Attachment A) indicates that the well is completed in alluvium and did not encounter bedrock at a depth of 180 feet. The water level at the time the well was drilled was 106 feet bgs, similar to the current depth to water. The video log of PGE-6 (Attachment A) shows the well casing to be in very poor condition. Numerous holes are visible in the casing above the zone between about 60 and 100 feet. The well screen is heavily encrusted but appears to be mostly intact. The casing above the screen is in such BAO\06090007 (PGE-6_TMEVAL_DTSC_2-28-06.DOC) 1

WELL PGE-6 DECOMMISSIONING EVALUATION PG&E TOPOCK COMPRESSOR STATION poor condition that there is significant risk of collapse if attempts were made to rehabilitate this well. Potential Use of PGE-6 for In-Situ Pilot Test The MW-24 bench, where PGE-6 is located, is being considered as an alternate location for an upland in-situ pilot test. It is likely that the upland pilot test may involve some pumping and injection of water to accelerate the movement of reagents through the otherwise very slow-moving Topock groundwater system. Although PGE-6 is in poor condition, it might be possible to use it as an extraction or injection well during the relatively short duration of an in-situ pilot test. It would be relatively easy to hang a 6- or 7-inch diameter, steel sleeve casing and well screen inside the 14-inch diameter well. This sleeve casing would protect and allow retrieval of the pump in the event the well collapsed. It is likely that the steel sleeve casing could be pulled back out of the well even if the well collapsed. Decommissioning Techniques for PGE-6 Conventional well decommissioning methods typically involve perforation of the casing above the screen followed by placement of grout in the well. The perforations in the casing allow the grout to penetrate and seal the annular space outside the casing. San Bernardino County Department of Environmental Health Services (DEHS) was contacted to discuss the proper means of decommissioning PGE-6, given the poor condition of the casing. Because there is a significant risk of collapse if attempts were made to perforate the casing, the DEHS agreed that perforation of the casing in PGE-6 would not be required (personal communication between Martin Barackman/CH2M HILL and Marvyn Cerdenio/San Bernardino County DEHS, February 17, 2006). Given that the groundwater sampled from PGE-6 contains hexavalent chromium (1,630 micrograms per liter in October 200), it will be necessary to contain and properly dispose of any water that is displaced from the well during the decommissioning. By filling the section of the well below the water level with sand, the amount of groundwater that will be displaced up the hole can be minimized. The details of the well decommissioning methods and materials are described in the work plan submitted to DTSC concurrently with this technical memorandum. Recommendation The poor condition of the casing and screen in well PGE-6 preclude any long-term use of this well as part of a final remedy at the site. The long screen length and large diameter make it unsuitable for use as a monitoring well. Additionally, existing wells MW-24A and MW-24B provide monitoring data for the alluvial aquifer at this location. However, well PGE-6 might be used as a pumping or extraction well for an in-situ pilot test, if one is conducted at this site location. We therefore recommend the following: 1. Well PGE-6 should not be decommissioned until a determination is made regarding the potential use of this well in an in-situ pilot test. BAO\06090007 (PGE-6_TMEVAL_DTSC_2-28-06.DOC) 2

BAO\06090007 (PGE-6_TMEVAL_DTSC_2-28-06.DOC) Table

TABLE 1 Well Construction Information for PGE-6, PGE-7, and MW-24 Monitoring Wells Technical Memorandum: Well PGE-6 Decommissioning Evaluation PG&E Topock Compressor Station Well Perforation / Screen Interval Completion Ground Well Well Screen Depth Elevation Well ID Date Elevation Depth Material Length monitored zone ft MSL ft bgs ft bgs ft MSL feet Remarks PGE-6 Jun-1964 62 180 14" steel 110-180 42-282 70 Installed as replacement supply well for Station Upper Alluvial Aquifer March 1998 video log: casing deteriorated and silted bottom at 162' (2' open perforations) PGE-7 Sep-1964 63 182 14" steel N.A. (1) --- --- Installed as replacement supply well for Station Bedrock and 2' of basal interval of Alluvial Aquifer Aug-1969 330 7" steel liner to 19' 19-330 6.7" openhole 368-283 13 Re-completed as a monitoring well in 1969 as part of well PGE-8 wastewater disposal operations March 1998 video log: casing liner to 19' and openhole boring to silted bottom at 303' (108' openhole) MW-24A May-1998 6 12 4" PVC 104-124 461-441 20 Upper Alluvial Aquifer MW-24B May-1998 63 214 4" PVC 194-214 369-349 20 Base Alluvial Aquifer MW-24BR Apr-1998 63 438 4" PVC 378-438 18-12 60 Bedrock Boring was logged as "Red Fanglomerate (rock) and Sandstone" from 22' to 441' NOTES: (1) Well perforation depths for original completion of PGE-7 are not available; assume similar well completion to the 70-foot perforated completion used for PGE-6. MSL = mean sea level. ft bgs = feet below ground surface. (--) = data not available. PVC = polyvinyl chloride. Ground surface elevations and well screen depths are rounded-off to whole-foot. Static water levels in PGE-6, PGE-7, and MW-24 wells typically range from approximately 106 to 108 feet bgs.

BAO\06090007 (PGE-6_TMEVAL_DTSC_2-28-06.DOC) Figures

CULVERTS!( Interstate Hwy 40!A MW-11 BAT CAVE WASH PGE-6 MW-24BR!A!A MW-24B!A!A!( MW-24A 600!(!( 600!A!A PGE-7!( 0 HNWR PG&E PROPERTY 0 LEGEND!A BUILDINGS MW-10 GRAVEL ROAD / AREA PAVED ROAD FENCE PG&E BOUNDARY!( POWER POLE ELECTRICAL POWER LINE MONITORING WELL 0 0 0 100 Feet³ 0 0 TW-1 600 NORTH GATE!( Topock Compressor Station FIGURE 1 SITE PLAN SHOWING WELL PGE-6 600 PG&E TOPOCK COMPRESSOR STATION NEEDLES, CALIFORNIA BAO \\ZINFANDEL\PROJ\PACIFICGASELECTRICCO\TOPOCKPROGRAM\GIS\MXD\2006\PGE_07_SITEPLAN.MXD PGE_07_SITEPLAN.PDF 2/13/2006 12:16:26 336424.NW.TM.01 Fig.1_PGE_6.pdf 02-23-06 ez BAO PG&E PROPERTY HNWR

PGE-06 Concrete pad Ground Surface 20 Conductor casing 19', Base of conductor 14" steel casing 106', Approx. static water level 110', Top of perforations (estimated) 14" Perforated steel casing (3/32" X 1" perforations) 162', Top of fill (1998 video log) 180', Base of perforations (estimated) 180', Total depth of well 3/4" X 12" X 14" shoe Base of Alluvial Aquifer, est. 220' Top of Miocene Conglomerate (Bedrock) DIAGRAM NOT TO SCALE All depths in feet below ground surface (bgs) PGE-6 is an inactive water supply well that was installed in 1964. Well contains Grundfos submersible pump for periodic sampling. FIGURE 2 SCHEMATIC DIAGRAM FOR INACTIVE SUPPLY WELL PGE-6 PG&E TOPOCK COMPRESSOR STATION NEEDLES, CALIFORNIA 336424.NW.TM.01 Fig.2_PGE_6_schematic-REV.ai 02-22-06 ez BAO

BAO\06090007 (PGE-6_TMEVAL_DTSC_2-28-06.DOC) Attachment A