C C S Technical Information

Similar documents
AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS

WHAT IS IMPACT OF PANAMA CANAL WIDENING?

Vessel Requirements. OP NOTICE TO SHIPPING No. N

OP NOTICE TO SHIPPING No. N (Revision 1)

GENERAL LIMITATIONS AND RESTRICTIONS. LNGC Temporary Exemption (Effective August 21, 2018)

Vessel Requirements. OP NOTICE TO SHIPPING No. N

3.1 Definitions, p Size and Draft Limitations of Vessels, p Requirement for Pilot Platforms and Shelters on Certain Vessels, p.

IMO ANCHORING, MOORING AND TOWING EQUIPMENT. Submitted by the Republic of Korea

Pilotage Directions 2017

VESSEL TRANSIT SCHEDULING AT THE PANAMA CANAL NUMBER AND ORDER OF VESSELS IN THE SCHEDULE

The Spanish is the official version of this document. The English translation is intended solely for the purpose of facilitating an overall

WORK-REST REQUIREMENTS FOR PILOTS

SEMI FINAL EXAMINATION

PANAMA CANAL AUTHORITY

GENERAL GUIDELINES FOR VESSELS TRANSITING RESTRICTED WATERWAYS OR PORTS

National Maritime Center

National Maritime Center

Harbor Operations. PANAMA CANAL AUTHORITY (ACP) Executive Vice Presidency for Operations Building 729, Balboa-Ancon Panama, Panama

AGREEMENT No. 13 (of June 3, 1999) Whereby the Regulation on Navigation in Panama Canal Waters is approved

OP NOTICE TO SHIPPING No. N (Revision 1)

Vessel Requirements. OP NOTICE TO SHIPPING No. N

PANAMA CANAL AUTHORITY (ACP) Executive Vice Presidency for Operations Building 729, Balboa-Ancon Panama, Panama

Columbia River Pilots Vessel Movement Guidelines. Table of Contents

GENERAL LIMITATIONS AND RESTRICTIONS. Draft Restrictions

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014

Canal Traffic performance Grain cargo through the Panama Canal Panama Canal Expansion program Conclusion

(Refer Slide Time: 0:25)

Steamship Agents, Owners and Operators

Canal traffic performance Grain cargo through the Panama Canal Panama Canal Expansion program Conclusion

NavRule Practice Exam, 70 Series Practice April 18, Labeled C have been copied to collection

Rules Practice Exam 11

THE MOORING OF OIL CARRIERS AT SINGLE POINT MOORINGS

INTERNATIONAL Steering and Sailing Rules

Transport Infrastructure Act 1994 Gladstone Ports Corporation. Port Notice 04/17 LNG Vessel Operating Parameters

INTERNATIONAL NAVAL SHIPS 2018

COAST GUARD ADVISORY NOTICE (CGAN ) To: Distribution Date: September 1, 2017

MAC Transit Advisories as of April 30, 2018

Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras

Marine Safety Information Bulletin COAST GUARD GUIDANCE FOR DEAD SHIP MOVEMENT IN SECTOR HONOLULU CAPTAIN OF THE PORT ZONE.

Dr. Konstantinos Galanis

New Locks Alignment at the Pacific Side. Alignment PMD

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

Rules Practice Exam 14

You must stop your. pass with caution on the port side of vessel "B" The vessel moving upstream against the current

ABP South Wales and River Usk Towage Guidelines

NOTICE TO SHIPPING #1 NIAGARA REGION WELLAND CANAL GENERAL INSTRUCTIONS 1. HOLDING POSITION - 'HEAD OF THE LOCK'

MR NOTICE TO SHIPPING No. N , Rev. 1. Steamship Agents, Owners and Operators

Rules Practice Exam 5

TOWAGE GUIDELINES FOR THE GLOUCESTER HARBOUR. August 2018

National Maritime Center

SHIP FORM DEFINITION The Shape of a Ship

Port Sections Guide Section 01

PANAMA CANAL AUTHORITY

PORT INFO GENERAL BERTH INFO

Rules Practice Exam 12

STANDARD PILOTAGE CONDITIONS

Appendix HK1 HKSF Prescriptions

REGULATION on life boats operated from land, No 123/1999 CHAPTER I. General provisions Article 1

Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines)

Use of Equipment to Undertake Work Over the Side on Yachts and Other Vessels

Rules Practice Exam 7

Experience and Future Potential of the Oblique Icebreaker

NAUTICAL TERMINOLOGY

Delaware River Vessel Reporting System Mariners Advisory Committee For

South African Maritime Safety Authority Ref: SM6/5/2/1 /1

References: Manual Chapt. 9 ISO 9001 par.7 ISO par. 4 ISM Code par. 7; 8

PILOTAGE DIRECTIONS REVIEWED DECEMBER 2016

PILOTAGE INFORMATION

REGULATION FOR THE ADMEASUREMENT OF VESSELS TO ASSESS TOLLS FOR USE OF THE PANAMA CANAL 1 (May 2016) Chapter I General Standards and Definitions

Table of Summary on Operating Regulations governing Vessels Entering and Exiting and Mooring/Berthing at the Port of Taichung

APC Operating Procedures Oil Tankers

ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION

POS 02 VTS Guidelines

RESOLUTION MEPC.64(36) adopted on 4 November 1994 GUIDELINES FOR APPROVAL OF ALTERNATIVE STRUCTURAL OR OPERATIONAL ARRANGEMENTS AS CALLED FOR IN

International regulations and guidelines for maritime spatial planning related to safe distances to multiple offshore structures (e.g.

UNITED NEW YORK SANDY HOOK PILOTS BENEVOLENT ASSOCIATION AND UNITED NEW JERSEY SANDY HOOK PILOTS BENEVOLENT ASSOCIATION

AGREEMENT No. 292 (of May 26, 2016) Whereby the Regulation for the Admeasurement of Vessels and the Panama Canal Tolls System is Approved

a. On the centerline of the T-top b. On the aft starboard corner of the deck c. On the aft deck as close to centerline as possible

3 Navigation Rules Rules General

Rules Practice Exam 9

IMO DEVELOPMENT OF MODEL PROCEDURE FOR EXECUTING SHIPBOARD EMERGENCY MEASURES. Emergency steering drills. Submitted by the Republic of Korea

Berkeley Island Marine Pre-Rental Instructions. If you do not have a

Unmanned Ships and their International Regulation

GUIDELINES FOR NAVIGATION UNDER THE CONFEDERATION BRIDGE

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE

X-03 EMERGENCY TOWING ARRANGEMENTS

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX

Physical Model for the Filling and Emptying System of the Third Set of Panama locks

GUIDANCE NOTICE. Unpowered Barges. Definition. General. Risk assessment. Application. Safety Management. Compliance

TERMAP S.A. Terminales Marítimas Patagónicas Sociedad Anónima

All comments received will be taken into consideration before the proposed amendments are implemented.

To: Relevant departments of CCS Headquarters, Plan approval centers, CCS surveyors, relevant shipyards, designers and shipping companies

STANDARD PILOTAGE CONDITIONS

NOTICE TO SHIPPING #1

DUBLIN PORT COMPANY PILOTAGE BYE-LAWS. 1st July Dublin Port Company Pilotage Bye-Laws, 1 st July 2018 Page 1

Rule 1. Application. (d) Traffic separation schemes may be adopted by the Organization for the purpose of these Rules.

Part 7 Fleet in service Chapter 2 Inclining test and light weight check

August April 18,2008 First Revision

Tees & Hartlepool Pilotage Co. Ltd. Effective from 1 st January Pilotage Charges. Tees and Hartlepool Pilotage District

UNMANNED SHIPS: LEGAL ISSUES

Transcription:

C C S Technical Information (2014) Technical Information No.7 Total No.129 Jan.28,2014 (Total 3+5+1 pages) To: CCS Surveyors, Plan Approval Surveyors, Relevant Ship Companies, Shipyards and Design Institutes Notice on Vessel Requirements for New Panamax after expansion of the Panama Canal The government of Panama launched the canal expansion project in September 3, 2007, in order to enable the Canal to remain competitive in the future world trade activities. The whole project is expected to be completed in 2015, however, the completion date may be affected because of a commercial dispute between The Panama Canal Authority (ACP) and the contractor for the new locks currently. The whole project includes the following integrated components: 1.Building new Pacific and Atlantic lock complexes. Each of the new lock complexes will feature three chambers which are composed of three water-saving basins per chamber, a lateral filling and emptying system and rolling gates. 2.Excavating the new Pacific locks access channel. 3.Dredging and deepening the navigation channels at both Canal entrance at the Atlantic and Pacific sides as well as at Culebra Cut and Gatun Lake. 4.Raising Gatun Lake's maximum operating level to improve Canal water supply and draft dependability. The parameters of Panama Canal after expansion are changed as listed in the following table 1. Table 1 Changes of parameters after expansion of Panama Canal Items Before expansion After expansion Locks Parameters A two-step flight lock and a single flight lock at the Pacific side, a triple flight lock at Atlantic side. The new lock will be constructed at the entrance on both Pacific and Atlantic sides.

For each chamber of the lock Length: 304.8m; Breadth: 33.53m; Depth of water: 12.8m. Each of the locks complexes will feature three chambers. For each chamber of the lock Length: 427m; Breadth: 55m; Depth of water: 18.3m. Maximum allowable Overall length: 294m, maximum Overall length: 366m, dimension of ships beam: 32m, draft: 12m maximum beam: 49m, draft: 15m Transit capacity 13,000 ships per year; Cargo volume: 0.3 billion tons Expect to 17,000 ships per year; Cargo volume: 0.6 billion tons Maximum container vessel 9600TEU(even up to 12000 3500-4000TEU TEU) Maximum oil tanker 70,000-76,000 dwt 200,000-300,000 dwt (VLCC) Maximum bulk carrier 70,000-76,000 dwt 170,000 dwt Panama Canal Authority (ACP) released recently Advisory to Shipping No. A-20-2013 to inform the shipping community of the definitions and requirements applicable to all vessels intending to transit the Panama Canal s new lock. The Panama Canal Authority (ACP) reminds all vessels arriving at Canal waters, whether for docking or transiting the Panama Canal, must comply with the vessel requirements as stated in the Marine Regulations for the Operation of the Panama Canal and OP s Notice to shipping No. N-1-2013(Rev 1), Vessel s Requirements. Please refer to Attachment 1 for more details. Besides, Advisory to Shipping No. A-33-2013 also released by Panama Canal Authority (ACP) reiterated the current manning requirements for all vessels navigating in Panama Canal waters in order to guide vessels, safely and expeditiously, to transit the canal or docking at the port located at both ends of the Canal. Vessels not in compliance with such requirements may result in transit delays and the assessment of additional charges. For more details, please refer to Attachment 3. For the latest official information about the Panama Canal Expansion project, please visit the ACP s official website. (http://www.pancanal.com/eng/expansion/index.html) All parties concerned are informed to pay attention to and take the necessary measures accordingly.

This Notice is published on CCS website (www.ccs.org.cn) and is to be forwarded by CCS branches to parties in relevance to their business area. Hereby notify the above. Attachment 1: Advisory to Shipping No. A-20-2013, Vessel requirements for new Panamax Attachment 2:Advisory to Shipping No.A-33-2013, Reminder of the Manning Requirements on Board Transiting Vessels

3654-A (OPXI v. 3-2-2011 EXECUTIVE VICE PRESIDENCY FOR OPERATIONS ADVISORY TO SHIPPING No. A-20-2013 August 2, 2013 TO : All Shipping Agents, Owners, and Operators SUBJECT: VESSEL REQUIREMENTS FOR NEW PANAMAX The Panama Canal Authority (ACP) reminds all customers that vessels arriving at Canal waters, whether for docking or transiting the Panama Canal, must comply with vessel requirements, as stated in the Maritime Regulations for the Operation of the Panama Canal and OP s Notice to Shipping No. N-1-2013 (Rev 1), Vessel Requirements. The purpose of this Advisory is to inform the shipping community of the definitions and requirements applicable to all vessels intending to transit the Panama Canal s new locks. Definitions: Tropical Fresh Water (TFW): Tropical Fresh Water of Gatun Lake, density 0.9954 tons/m³ at 29.4 ºC. (Note: Transition to fresh water frequently alters trim of large vessels by the head). Panamax: All Supers that comply with the size and draft limitations of the actual locks; namely, 294.13 meters in length by 32.31 meters in beam by 12.04 meters TFW draft. Panamax Plus: All Panamax vessels authorized for TFW drafts greater than 12.04 meters and approved for transit of the new locks. New Panamax: All vessels with dimensions greater than Panamax or Panamax Plus that comply with the size and draft limitations of the new locks; namely, 366 meters in length by 49 meters in beam by 15.2 meters TFW draft. Safe Working Load (SWL): The SWL should not exceed 80 percent of the design load. Maximum Length: The maximum length overall including bulbous bow for commercial or non-commercial vessels acceptable for regular transit is 366 meters. Vessels transiting the Canal for the first time, whether newly-constructed or newly-modified, are subject to inspection and prior review and approval of vessel plans. Vessels not receiving advance approval and/or not in compliance with Canal requirements may experience delays or denial of transit. The maximum length for integrated tug-barge (ITB) combination acceptable for regular transit is 366 meters overall, including the tug. A tug-barge combination must transit together as one unit with the tug supplying propelling power. ADVISORIES ARE AVAILABLE AT http://www.pancanal.com FOR ETAS OR DIRECT COMMUNICATION WITH OUR OFFICES, REFER TO NOTICE N-3-2013

3654-A (OPXI) EXECUTIVE VICE PRESIDENCY FOR OPERATIONS v. 28-01-2011 OP, August 2, 2013 Subject: VESSEL REQUIREMENTS FOR NEW PANAMAX The maximum aggregate overall length for non-self-propelled vessels acceptable for transit is 305 meters, including accompanying tugs. Accompanying tugs must lock through with the non-self-propelled vessel. One time only transits that exceed these limitations may be permitted on a case-by-case basis with prior approval of the Executive Manager for Transit Operations, and subject to requirements listed in Section 2.k (9), of the OP s Notice to Shipping No. N-1-2013 (Rev 1), Vessel Requirements. Maximum Beam: The maximum beam for commercial or non-commercial vessels and the integrated tug-barge combination acceptable for regular transit is 49 meters, measured at the outer surface of the shell plate, including all protruding structures below the top of the lock walls. The maximum beam for non-self-propelled vessels, other than integrated tug-barge combinations, acceptable for transit is 36.5 meters. One time transit of wider vessels may be permitted with prior approval of the Executive Manager for Transit Operations, and subject to requirements listed in Section 2.k (9), of the OP s Notice to Shipping No. N-1-2013 (Rev 1), Vessel Requirements. Vessels that carry cargo within 2.5 centimeters or less of the extreme beam must have approved provisions, such as rubbing bands to protect the cargo, should the vessel rest alongside the wall while in the chamber. The maximum beam of 49 meters must not be exceeded by the cargo protection method. Protrusions: Anything that extends beyond a vessel's hull, except for the main anchors, shall be considered a protrusion and subject to all applicable regulations and limitations. The ACP is not responsible for damages to protrusions, whether permanent or temporary. Vessels with protrusions may be permitted to transit provided that such protrusions will not interfere with the safe transit of the vessel or present a hazard to Canal structures and appurtenances, as determined by the Executive Manager for Transit Operations. Before transit is permitted, the master of the vessel will be required to complete a form Undertaking to Release and Indemnify to exonerate and indemnify the ACP from liability in case of an accident or damages sustained to or as a result of these protrusions. Vessels with permanent protrusions must, prior to proceeding to the Canal, furnish detailed information regarding the protrusion(s), including plans, and request authorization for transit. Advance information will minimize the possibility of delays or denial of transit. For detailed information, contact the Executive Manager for Transit Operations.

3654-A (OPXI) EXECUTIVE VICE PRESIDENCY FOR OPERATIONS v. 28-01-2011 OP, August 2, 2013 Subject: VESSEL REQUIREMENTS FOR NEW PANAMAX Draft: Vessels with protrusions extending beyond the maximum length and beam limitations specified in the previous sections of this advisory may, on a case-by-case basis, be permitted to transit, provided that approval is obtained in advance from the Executive Manager for Transit Operations and that those protrusions do not present a hazard or interfere with lock structures, equipment and/or operation, and the master completes a form releasing the ACP from liability. See Section 2.h, of the OP s Notice to Shipping No. N-1-2013 (Rev 1), Vessel Requirements. Protrusions, cargo or extensions beyond the ship s side located 16.85 meters or less above the waterline are not acceptable; however, extensions up to 4 meters beyond the hull and higher than 16.85 meters from the waterline will be reviewed on a case-by-case basis to verify the minimum clearance of 1000 mm from all equipment above the lock walls (such as valve stems, bitts, etc.). Protrusions of up to 5 meters located higher than 22.87 meters or up to 6.5 meters and located higher than 25.44 meters over the waterline, will also be reviewed on a case-bycase basis to verify the minimum clearance is provided from all equipment (such as light posts, valve stems, etc.). The maximum permissible draft for Canal transits has been set at 15.2 meters Tropical Fresh Water (TFW) at a Gatun Lake level of 25.91meters or higher. Gatun Lake density is 0.9954 tons/m³ at 29.4 ºC. This provides a safe navigational margin of at least 1.52 meters over critical elevations in the navigational channels and a clearance over the lock sills of 3.05 meters. Construction, Number, and Location of Chocks and Bitts: The mooring requirements, as stated in Section 8.a of OP s Notice to Shipping No. N-1-2013 (Rev 1), Vessel Requirements, will remain unchanged for Panamax vessels. For the Panamax Plus and New Panamax vessels, the mooring requirements will be as stated in Section 8.a except as required herein. Namely, the chocks and bitts will be used by ACP tugs assisting vessels through the new locks, as well as for mooring vessels inside the locks. All chocks for the Panamax Plus and New Panamax vessels shall be double chocks and shall have a throat opening area of not less than 900 square centimeters (preferred dimensions are 355 millimeters x 255 millimeters) and shall be capable of withstanding a SWL of 90 tons (883kN) in towing operations and a minimum SWL of 64 tons (628 kn) in mooring operations from any direction, in accordance with Section 8.a (5), of the OP s Notice to Shipping No. N-1-2013 (Rev 1), Vessel Requirements.

3654-A (OPXI) EXECUTIVE VICE PRESIDENCY FOR OPERATIONS v. 28-01-2011 OP, August 2, 2013 Subject: VESSEL REQUIREMENTS FOR NEW PANAMAX New Panamax and Panamax Plus vessels shall have additional tugboat chocks fitted in the bow and stern about 3.0-14.0 m off centerline, port and starboard sides. Each of these double chocks shall be served by one pair of accompanying heavy bitts with a preferred diameter of 500 millimeters, and each bitt shall be capable of withstanding the stress caused by a SWL of 90 tons (883kN). All other towing chock locations, namely SET2 and SET3, will also require one pair of heavy bitts with each bitt capable of withstanding a SWL of 90 tons (883kN). The rest of the chock locations for use in mooring operations shall be accompanied by one pair of heavy bitts meeting the minimum SWL of 64 tons (628 kn) in accordance with Section 8.a (7), of the OP s Notice to Shipping No. N-1-2013 (Rev 1), Vessel Requirements. See Figure 6A. Vessels with large flared bows, pronounced counters or unusually high freeboards, such as LNG carriers, container vessels, cruise vessels or vehicle carriers, will be required to provide closed chocks located further aft than those required in Section 8.a (12), of the OP s Notice to Shipping No. N-1-2013 (Rev 1), Vessel Requirements, for correct positioning of assisting tugs. These vessels may be required to fit recessed tug bollards into the hull in lieu of the chocks detailed in this paragraph so that tugs can work without coming in contact with the flare or counter and without requiring extra-long lines and/or inefficient leads. See Figure 6A. Recessed bitts shall meet the 90 tons (883kN) SWL required above. The use of existing roller chocks on vessels will be evaluated for approval during transit, upon request, on a case-by-case basis, provided they are located not less than 16.24 meters above the waterline at the vessel's maximum Panama Canal draft, are in good condition, meet all requirements for closed chocks, as specified above, and are fitted so that the transition from the rollers to the body of the chock prevents damage to the mooring lines. The equivalency of the proposed closed roller chocks shall be submitted for review and acceptance by the ACP.

3654-A (OPXI) EXECUTIVE VICE PRESIDENCY FOR OPERATIONS v. 28-01-2011 OP, August 2, 2013 Subject: VESSEL REQUIREMENTS FOR NEW PANAMAX ALTERNATE CHOCKS, IF NO CENTERLINE STERN CHOCK PROVIDED (ABOUT 3.0 m FORWARD OF STERN, ABOUT 3.0 m OFF CENTERLINE, PORT AND STBD) ALTERNATE CHOCK, IF NO CENTERLINE BOW CHOCK PROVIDED (ABOUT 2.5 m ABAFT THE STEM AND 3.0 m OFF CENTERLINE, PORT AND STBD) ADDITIONAL TUGBOAT CHOCKS (BOW AND STERN): ABOUT 3.0-14.0 m OFF CENTERLINE, PORT AND STBD TUG CHOCK 3.0-14.0 m OFF CENTERLINE TUG CHOCK 3.0-14.0 m OFF CENTERLINE ALTERNATE ABOUT 3.0 m OFF CENTERLINE ABOUT 3.0 m OFF CENTERLINE SET 4 SET 3 SET 2 SET 1 ALTERNATE ABOUT 3.0 m ABOUT 2.5 m 12-16 m 12-16 m MINIMUM REQUIREMENTS (cm): DOUBLE CHOCK - 35.5 x 25.5 RADIUS -18.0 24-28 m 24-28 m VESSEL SIZE: VESSELS OVER 294.13 m O.L. OR 32.37 m BEAM OR OVER RECESSED BITTS: MAY BE FITTED INTO THE HULL IN LIEU OF SET 2 AND SET 3 REQUIRED IN THIS FIGURE. RECESSED BITTS SHALL MEET THE 90 TONS (883kN) SWL SAME AS THE TOWING CHOCKS AND BITTS. CHOCKS REQUIRED: ONE BOW CENTERLINE AND ONE STERN CENTERLINE CHOCKS (MOORING) TWO CHOCKS (ALTERNATE IF NO CENTERLINE PROVIDED) SET 1 (MOORING 12 to 16 m ABAFT OF STEM) SET 2 (TOWING 24 to 28 m ABAFT OF STEM) SET 3 (TOWING 24 to 28 m FORWARD OF STERN) SET 4 (MOORING 12 to 16 m FORWARD OF STERN) FIGURE 6A Vessels not in compliance with OP s Notice to Shipping No. N-1-2013 (Rev 1), Vessel Requirements, or the above requirements, shall be evaluated in order to determine under what conditions, if any, they may be allowed to transit or dock. Vessels that require additional resources due to non-compliance or other deficiencies will be assessed the corresponding charges. These requirements are necessary in order to guarantee the readiness of vessels to transit through the new locks and the expanded Canal in a safe and efficient manner. The Panama Canal is committed to promoting a beneficial relationship with our customers and to continue offering the best possible service. ORIGINAL SIGNED Esteban G. Sáenz Executive Vice President for Operations

3654-A (OPXI) v. 3-2-2011 EXECUTIVE VICE PRESIDENCY FOR OPERATIONS ADVISORY TO SHIPPING No. A-33-2013 November 29, 2013 TO : All Shipping Agents, Owners, and Operators SUBJECT: Reminder of the Manning Requirements on Board Transiting Vessels The Panama Canal Authority (ACP) requires that all vessels navigating in Panama Canal waters comply with the manning requirements in order to guarantee a safe and expeditious transit or docking maneuver at the ports located at both ends of the Canal. As established in the Maritime Regulations for the Operation of the Panama Canal, Chapter VI, Requirements Concerning the Crew, Section One, Vessels to be fully manned, Article 102, A vessel navigating the waters of the Panama Canal shall be sufficiently manned to permit the safe handling of the vessel. In addition, The crew must meet the standards set forth in the International Convention on Standards of Training, Certification and Watchkeeping for Seafarers, 1978/95 (STCW). Article 103.1 (Annex) of the regulations requires transiting vessels to have sufficient seamen forward and aft to handle lines expeditiously during lockages, as well as when moored temporarily to lock walls or inside a lock chamber. The Canal requires transiting vessels to provide, as a minimum, one (1) officer and two (2) seamen forward and aft respectively. They are expected to operate winches simultaneously in order to assist during mooring operations, and handling of locks locomotive wires. Article 108, Chapter VIII of this regulation establishes sailing and collision prevention rules. Specifically Rule 4 establishes that, Every vessel shall at all times while underway in the Canal and adjacent waters, maintain a proper lookout by sight and hearing, as well as by all available means appropriate in the prevailing circumstances and conditions, so as to make a full appraisal of the situation The person acting as lookout shall have no other assigned duties, and shall report immediately all relevant and material information to the person in charge of the navigation of the vessel. This is also a requirement of the STCW convention. Non-compliance with these manning requirements may cause transit delays and the assessment of additional charges. ORIGINAL SIGNED Esteban G. Sáenz Executive Vice President for Operations ADVISORIES ARE AVAILABLE AT http://www.pancanal.com FOR ETAS OR DIRECT COMMUNICATION WITH OUR OFFICES, REFER TO NOTICE N-3-2013