A52 Nottingham Junctions Nottingham Knight and Wheatcroft Public information exhibition

Similar documents
A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

M6 Junction 10 Public Consultation

Upgrade to smart motorway Junctions 2 to 4

M20. Upgrade to smart motorway Junctions 3 to 5

M25 junction 28 improvement scheme. Have your say

M23. Upgrade to smart motorway Junctions 8 to 10

Improving the A1 in Northumberland Public consultation. November December North of Ellingham

M1 Smart Motorways Junctions 32 to 35a

Smart motorway. M6 junctions 16 to 19

Upgrade to smart motorway Junctions 13 to 16

Proposed smart motorway Junctions 2 to 4

Know your smart motorways M60/M62, Greater Manchester

Upgrade to smart motorway Junctions 3 to 12

A27 East of Lewes improvement scheme Have your say

A30 Chiverton to Carland Cross Moving forward: The application

Highways England Creative M Welcome. Smart motorway M6 junctions 16 to 19 public information exhibition

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

MARKHOUSE ROAD IMPROVEMENTS

Nottingham, the great cycle city

MILTON ROAD LLF PROJECT UPDATE

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

Public Consultation Report December M6 Junction 10 Improvements

Welcome. Smart motorway M1 junctions 13 to 16 public information exhibition. Highways England Creative [XXXXX_XXXX_XXX]

CAMBRIDGE SOUTH WEST PARK & RIDE

HISTON ROAD Have your say on better public transport, cycling and walking journeys

The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass).

Nottingham Cycle City Frequently Asked Questions

CUERDEN TRANSPORT PROPOSALS

Design Workshops Summary of all Feedback January 2017

LET US KNOW WHAT YOU THINK

Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

Improving journeys to the South West The case for the A303/A358 corridor

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

WHANGAREI IMPROVEMENTS

Chelmsford City Growth Package

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

ENFIELD TOWN THE REVISED DESIGN

Highways England Creative GFD18_0125. Welcome. Upgrade to smart motorway junctions 3 to 12

Welcome. Smart motorway M6 junctions 13 to 15 public information exhibition. Highways England Creative BHM18_0060_RHK

5 Highways and Transport Assessment

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.

Giles Run Connector Road

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016

10 SHERFORD Town Code

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

Community engagement guide May 2018

M6 junction 16 to 19 Smart motorway project newsletter

M6 Junctions 16 to 19 smart motorway project

Technical note. 1. Introduction

Lea Bridge Road A street for everyone Tell us

BYRES ROAD: PUBLIC REALM Public Consultation

Terwillegar Drive Expressway Draft Concept Plan

SH1 Western Belfast Bypass Transportation Assessment

Newcastle Racecourse Masterplan. 1 Introduction. Completing the vision of a redeveloped Newcastle Racecourse Welcome to our exhibition.

The Consultation has now ended.

North West Non-Technical Summary of the Transport Assessment September 2011

Roads and public rights of way

TRANSPORT AND MOVEMENT

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

SCHEME DESIGN AND ENGINEERING

Your views are important. Please fill in a form before you leave. Or alternatively

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

RESPONSIVE ROUNDABOUTS MYTH OR REALITY

The Wincheap Society

Chelmsford City Growth Package

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

Appendix N(b): Portishead Station Outline Travel Plan

Works Approval Application. G.2 Traffic

Milton Road Project Update. Paul van de Bulk 30 January 2018

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

CAMBRIDGE SOUTH EAST. Transport Study. Consultation extended to 9 April. Formerly known as A1307, Three Campuses to Cambridge.

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015

Public Consultation on A127 / A130 Fairglen Interchange Improvement Scheme. Consultation open from 6 February to 20 March 2018 HAVE YOUR SAY

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

NOTTS COUNTY FC VISITING SUPPORTER GUIDE

122 Avenue: 107 Street to Fort Road

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Chelmsford City Growth Package

CAMBOURNE TO CAMBRIDGE Better Bus Journeys: Phase One

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

EB1413. West Essex and East Hertfordshire Local Plans Modelling. Essex County Council Technical Note 5: East Harlow Corridor VISSIM Study (Sept 2016)

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

Bristol City Council has produced a draft Bristol Transport Strategy document.

Road Investment Strategy PCF Stage 2 A27 East of Lewes. Report on Public Consultation

New Seward and 36 th Avenue Intersection Conceptual Design

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Transit boulevard: A new road type for Sydney s Growth Centres

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

Sevenways Roundabout, and the need for a Road Safety Scheme:

Part B Design Guidance / Principles _

Welcome to the Open House

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

Transcription:

Nottingham Junctions Nottingham Knight and Wheatcroft Public information exhibition

Aerial view of Wheatcroft roundabout Introduction Investing in our roads At Highways England we believe in a connected country and our network makes these connections happen. We strive to improve our major roads and motorways engineering the future to keep people moving today and moving better tomorrow. We want to make sure all our major roads are more dependable, durable and, most importantly, safe. That s why we re delivering 15 billion of investment on our network the largest investment in a generation. The Nottingham Junctions project is a critical part of this investment and will improve journeys and support development along the and around Nottinghamshire. Why the scheme is needed The is the key east-west link across the East Midlands. The route is subject to congestion at its junctions due to capacity issues, resulting in significant queuing and delays. Several junctions have been identified as requiring improvements to cope with the existing problems, as well as to provide capacity for the increase in traffic anticipated when the local developments are completed. In this brochure we explain our design proposals for improvements for the 2 larger western junctions in more detail: Nottingham Knight Wheatcroft

Evolution of the scheme In 2017 we completed the improvements to 2 of the smaller junctions, Nottingham Road and Cropwell Road junctions. Safety and flow of traffic at these junctions have been improved by the addition of new traffic signals and pedestrian crossings Street lighting, road signs and road surfacing have been replaced At Nottingham Road a dedicated U-turn facility, wide enough for lorries to turn with ease, has been provided, to replace the facility which is currently planned to be removed from the Stragglethorpe junction later in the project to support the Wheatcroft improvements. We will be holding local community events in January 2019 to talk to customers about our plans for these junctions. The 4 smaller junctions, Silverdale, Bingham, Stragglethorpe and Gamston junctions, will also be delivered together and we anticipate work to begin on these in autumn/winter 2019. We intend to hold further local community events in summer 2019 to talk to customers about our plans for these junctions. To minimise disruption to road users, whilst also providing value for money, our ongoing development work has identified the best solution will be to deliver the remaining 6 junction improvements in two major construction phases. Nottingham Knight Edwalton Tollerton We plan to deliver the 2 larger western junctions, Nottingham Knight and Wheatcroft, at the same time and anticipate work to begin in 2022. Improvements are also planned at Tollerton Ruddington Wheatcroft The two larger junctions: in blue Nottingham A60 N Bingham Road Saxondale University of Nottingham QMC Island Dunkirk Queen s Drive West Bridgford Gamston Holme Pierrepont Bassingfield Radcliffe on Trent Nottingham Road Stragglethorpe Road Cropwell road Beeston Wilford Silverdale Clipston A46 Clifton Nottingham Knight Ruddington Edwalton Wheatcroft Tollerton Key Smaller junctions (Completed) Smaller junctions (Remaining) Smaller junctions (Not in scope) Larger junctions The junctions that form the Nottingham Junctions scheme

Evolution timeline To accommodate the local authority plan to encourage commuters on to public transport we have made the decision to not carry out any improvement works to QMC, Queens Drive or Dunkirk junctions as part of the scheme. Ongoing: December 2016 January 2017 Identification and review of options to improve traffic flow at several junctions along the, whilst providing value for money and development of the options for assessment Public information events for Nottingham Road and Cropwell Road junctions Works started on 2 junctions (Nottingham Road and Cropwell Road) June 2017 Completion of works at Nottingham Road junction August 2017 Completion of works at Cropwell Road junction August 2017 to date Ongoing development work on the remaining junctions January 2019 Public information events for Nottingham Knight and Wheatcroft junctions Nottingham Knight and Wheatcroft junctions We have been continuing our development work to find the best solution to improve traffic flow through each of the identified junctions along this key route, whilst providing value for money. The Nottingham Knight junction is currently used by approximately 64,000 vehicles a day; the Wheatcroft junction is currently used by approximately 50,000 vehicles a day. Traffic forecasts predict that this will increase at both junctions to approximately 100,000 vehicles a day within 15 years. These junctions suffer from severe congestion at peak travel times, leading to long queues on all approaches. Congestion is expected to increase as traffic levels grow unless significant improvements are made. We have identified solutions to improve both junctions, which will include: Widening all of the approaches to provide additional traffic lanes Increasing the size of the existing roundabouts to allow better movement of traffic Introducing traffic signals to manage traffic safely and effectively Additional link roads In this brochure we explain our design proposals for improvements to the 2 larger junctions in more detail, Nottingham Knight and Wheatcroft.

Wheatcroft junction - Progress so far We have been working hard to progress the scheme design for the Wheatcroft junction: Stage 1 We identified 11 options which would meet our objectives for the scheme which included: Minor improvements including signalisation of the existing roundabout Moderate improvements including a junction enlargement and signalisation of existing roundabout, and Major improvements including a grade separated junction A detailed assessment was undertaken, and 2 options were taken forward for further consideration. Stage 2 We carried out detailed analysis and modelling on the 2 best options to ensure that the final scheme would offer the best value for money based on the benefits it would give against future traffic demands. Option 1: Hamburger with enlarged roundabout and a link road from the to A606 eastbound, 6 lanes for eastbound The existing layout is shown in red and the option is shown in grey. Option 2: Hamburger with enlarged roundabout and a link road from the to A606 eastbound, 5 lanes for eastbound The existing layout is shown in red and the option is shown in grey. Stage 3 Option 1 has been progressed to the next design stage: Hamburger with enlarged roundabout and a link road from the to A606 eastbound was identified as the most suitable and cost-effective solution. The additional lanes on the eastbound approach add more capacity to the overall junction, thereby reducing journey times further. Improvements and widening to all approaches including 6 lanes for the eastbound approach Land take required Reduced journey times No significant environmental impacts Improvements and widening to all approaches including 5 lanes for the eastbound approach Land take required Reduced journey times, however journey times expected to be slower than Option 1 No significant environmental impacts

N To West Bridgford ad A606 Melton Ro Garden centre Edwalton Park housing estate ch Dedicated lane for A606 southbound to towards Gamston nd a ro pp a u bo t 52 A Agricultural land east boun s we Agricultural land d ap proa ch To Melton and Tollerton A606 Melton Road Agricultural land New signalised crossing for cyclists and pedestrians an e New cut through for eastbound to A606 toward Melton Key Existing carriageway Agricultural land Proposed carriageway Proposed traffic islands hl Proposed footway/cycleways Fla wf ort Verge and landscape areas Embankment Wheatcroft scheme design: The scheme design for the Wheatcroft junction includes: The roundabout will be enlarged to the south of the existing roundabout and redesigned as a hamburger layout with a new link road from eastbound to A606 Melton Road. This will improve the existing junction to allow better flow of traffic reducing congestion through the junction All approaches to the junction will be widened to provide extra lanes and increase capacity at the junction. This includes: Widening the eastbound approach from 3 lanes to 6 Widening the westbound approach from 2 lanes to 4 Widening the A606 Melton Road southbound approach from 3 lanes to 4 Widening the A606 Melton Road westbound approach from 2 lanes to 4 Signalisation of the junction will ensure better management of traffic, improving safety by reducing turning conflicts and increasing capacity New signalled crossings will be built to make it safer for cyclists and pedestrians to cross the junction. All crossing points will be designed for users with disabilities

Next steps for Wheatcroft junction: Engage with our stakeholders and members of the public on our plans for this junction Carry out further safety, traffic, engineering and environmental assessments to continue to develop the scheme design Nottingham Knight - progress so far We have been working hard to progress the scheme design for the Nottingham Knight junction: Stage 1 We identified 12 options which could meet our objectives for the scheme which included: Minor improvements including signalisation of the existing roundabout Moderate improvements including a junction enlargement and signalisation of existing roundabout, and Major improvements including a grade separated junction A detailed assessment was undertaken, and 2 options were taken forward for further consideration. Stage 2 We carried out detailed analysis and modelling and have identified 2 viable options to take forward for further assessment. Option 1: A hamburger with an enlarged roundabout and two link roads running through the junction for eastbound traffic: Option 2: A hamburger with an enlarged roundabout and a link road for eastbound traffic to west only 1. To the west, and 2. To the A60 southbound The existing layout is shown in red and the option is shown in grey. The existing layout is shown in red and the option is shown in grey. Dedicated link roads from the eastbound approach to the east and A60 south Land take required Reduced journey times Dedicated link road from the eastbound approach to the east Traffic from the eastbound approach would go around the roundabout to access A60 south Land take required Reduced journey times

To West Bridgford ast bo un da pp Nottingham Knight hotel and pub roa ch oad gh R orou ghb Lou 2e La nd me re La ne A60 A5 Agricultural land Dedicated lane for eastbound to A60 towards West Bridgford New signalised crossing for cyclists and pedestrians Agricultural land Access to from Landmere Lane closed New cut through for eastbound traffic Golf course Dedicated lane for eastbound to A60 towards Ruddington A5 2w es tb To Ruddington Key Existing carriageway Proposed carriageway Proposed traffic islands Golf course Proposed footway/cycleways nd ap pr oa ch A60 Verge and landscape areas ou Embankment Nottingham Knight scheme design: The scheme design for the Nottingham Knight junction includes: The roundabout will be enlarged to the east of the existing roundabout and redesigned as a hamburger layout with a new link road from eastbound. This will improve the existing junction to allow better flow of traffic reducing congestion through the junction All approaches to the junction will be widened to provide extra lanes and increase capacity at the junction, including; Increasing the eastbound approach from 3 lanes to 4 Increasing the westbound approach from 3 lanes to 4 Signalisation of the junction will ensure better management of traffic, improving safety by reducing turning conflicts and increasing capacity New signalled crossings will be built to make it safer for cyclists and pedestrians to cross the junction. All crossing points will be designed for users with disabilities Closing the access from Landmere Lane to eastbound N

The best solution, to maximise the flow of traffic through the junction, for the approach from Nottingham to the A60 towards Ruddington is still being developed. We will be taking forward 2 potential layout designs for further assessment: Potential solution 1: A dedicated lane that would run through the junction (as indicated on the main plan) as part of a new link road. Road users would use the right hand lane from the eastbound and turn right from the new link road section (the solid purple line in the adjacent plan). Potential solution 2: A dedicated link road for traffic travelling eastbound along the only. No link road for traffic traveling south on the A60 - traffic would follow roundabout rules similar to the Bramcote roundabout design: Road users wishing to travel south on the A60 would use the left-hand lane and travel around the roundabout to the 4th exit onto the A60 (the blue dashed line in the adjacent plan). Next steps for Nottingham Knight junction: Engage with our stakeholders and members of the public on our plans for this junction Continue to develop the scheme design to identify the most suitable and cost-effective solution for the Nottingham Knight junction, that will improve traffic flow whilst offering value for money What are the benefits of these improvements? The upgrade of the Nottingham Knight and Wheatcroft roundabouts will lead to more reliable and safer journeys for road users and businesses, by reducing congestion and providing more capacity on the road. Improving the junctions will: Improve safety: The project will improve safety with changes to the layouts of the junctions to reduce congestion and turning conflicts and introduce traffic signals managing the flow of traffic through the junctions more effectively. Improve journey times: The planned upgrades will improve journey time reliability through the junctions by providing additional lanes and traffic signals to manage the flow of traffic. Support economic growth: The current congestion and delays are significant constraints to future investment and economic growth. Improvements to the junctions along the will encourage continued investment in the regional economy and support new corporate, commercial and residential opportunities; such as the Edwalton Housing development. Improve access for pedestrians and cyclists: New signalled crossings will be built at both junctions for pedestrians and cyclists, to make it safer to cross the junctions. All crossing points will be designed for users with disabilities. Environment: We will work to minimise our impact on the environment and enhance environmental features where possible; such as introducing new planting to enhance the junctions and safe routes for pedestrians, and cyclists.

Environmental and local impacts We are currently carrying out environmental assessments to look at how the scheme will affect air quality, traffic flow, noise and the local landscape, and what we can do to minimise this. We may need to purchase additional land outside the existing highways boundaries to carry out these improvements and will be undertaking discussions with any affected parties. We will assess the noise and vibration impacts of the project throughout construction and will work hard to keep this to a minimum. Some existing vegetation will need to be removed during construction which may change the local landscape. We will carry out replanting around the junction, which will be designed to blend the scheme into the wider landscape as the planting matures. There are no ecologically important sites in the area. However where species are identified as affected, we will put in place measures to reduce the impacts of our works, for example we would ensure vegetation clearance would take place outside of the nesting bird season. During construction, local residents and the travelling public may experience adverse impacts, such as increased noise and delays to their journeys. We will work hard to minimise disruption particularly during the busy peak hours wherever possible, this will mean that some works will need to be undertaken at night. We will be working with our contractors to develop proposals before construction starts. We will take all opportunities to re-use materials and use sustainable construction methods. We will reduce energy emissions by using LED bulbs in all new street lights and traffic signals. Next steps Smaller junctions: Gamston, Stragglethorpe, Bingham, Silverdale Larger junctions: Nottingham Knight and Wheatcroft Summer 2019 - Engage with our stakeholders and members of the public on our plans Autumn/Winter 2019 - Anticipated construction start January 2019 - Engage with our stakeholders and members of the public on our plans Winter 2019 - Preferred route announcement for Nottingham Knight and Wheatcroft junctions 2022 - Anticipated construction start

Contact us: 0300 123 5000 www.highwaysengland.co.uk/projects/a52-nottingham-junctions www NottinghamJunctions@highwaysengland.co.uk @HighwaysEMIDS Nottingham Junctions team, Highways England, Floor 5, 2 Colmore Square, Birmingham, B4 6BN. Aerial view of Nottingham Knight roundabout

If you need help accessing this or any other Highways England information, please call 0300 123 5000 and we will help you. Crown copyright 2018. You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence: visit www.nationalarchives.gov.uk/doc/open-government-licence/ write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email psi@nationalarchives.gsi.gov.uk Mapping: Crown copyright and database rights 2018 OS 100030649. You are permitted to use this data solely to enable you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form. This document is also available on our website at www.highwaysengland.co.uk For an accessible version of this publication please call 0300 123 5000 and we will help you. If you have any enquiries about this publication email info@highwaysengland.co.uk or call 0300 123 5000*. Please quote the Highways England publications code PR171/18 Highways England Creative job number BHM18_0475 *Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count towards any inclusive minutes in the same way as 01 and 02 calls. These rules apply to calls from any type of line including mobile, BT, other fixed line or payphone. Calls may be recorded or monitored. Printed on paper from well-managed forests and other controlled sources when issued directly by Highways England. Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363