M E M O R A N D U M M:\2017\117036\DATA\CORRESPONDENCE\MEMOS\ WINDSORPARKSURVEY.DOCX

Similar documents
INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

CPC Parking Lot Riverside Drive. Transportation Brief

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

350 SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT. Transportation Study. Prepared For: Morguard Real Estate Investment Trust.

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison

May 5, 2009 File:

Southern Windsor County 2018 Traffic Count Program Summary March 2018

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

Glebe Parking Garage 170 Second Avenue, Ottawa, Ontario Transportation Impact Study

TRAFFIC IMPACT STUDY

Glenn Avenue Corridor Traffic Operational Evaluation

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Road Conversion Study Plumas Street

Syracuse University University Place Road Closure

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building

APPENDIX C Additional Traffic Data

Intersection Control Evaluation

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

2510 Russell Road Industrial/Retail Tile Centre. Transportation Impact Assessment Report

Waterford Lakes Small Area Study

INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL

TRAFFIC IMPACT STUDY

APS Stratford Project Transportation Analysis Overview. Stratford BLPC #5 June 1, 2015

Enclosure 1. Crimson Drive Traffic Safety and Calming Review Report

Evaluation and Changes to Pedestrian Priority Phase Signal (Scramble Crossing) at Bay Street and Bloor Street

Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park

Public Works and Infrastructure Committee. General Manager, Transportation Services

REDEVELOPMENT TRAFFIC IMPACT STUDY

FINAL REPORT Traffic Analysis Report Port Coquitlam Recreation Complex Port Coquitlam, BC

TRANSPORTATION IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

List of Exhibits...ii

Michigan Avenue Traffic Study

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Intersection Control Evaluation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Boston Post Road Design Feasibility Study

Traffic Data Overview

The current document is revised based on the comments received on:

Signal Warrant Studies

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Harrah s Station Square Casino

2. Existing Conditions

MEMO DRAFT VIA . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink.

Gateway Transportation Study

Donahue Drive Corridor Traffic Operational Evaluation

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Student Housing Development

2. Executing a legal agreement with respect to (1) above.

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

1 2 I N T R O D U C T I O 6 G E N E R A L I N F O R M A T I O N. Across. 6. Knowledge communicated in a brief overview

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

HIGHWAY 401 WIDENING SECOND LINE WEST STRUCTURE

Blair/Williamson Intersection Expressed Needs

Traffic Control at. Pedestrian Crossings. City of Saskatoon 2004

TRAFFIC IMPACT ANALYSIS For Bradfield Elementary School In Highland Park, Texas

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

TECHNICAL MEMO #1 EXISTING CONDITIONS

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property

RÉGION D OTTAWA-CARLETON

Lake Zurich Police Department Traffic Safety Division 200 Mohawk Trail Lake Zurich, IL 60047

Water Street Corridor Streetscape TRAFFIC STUDY

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085

2. executing a legal agreement with respect to the above.

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

Analysis of Signalized Intersections

Table of Figures. Table of Tables. Table 1: Traffic Volumes Ramblas Delay. Table 2: Las

RM 620 FEASIBILITY STUDY

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

Traffic Study North Shore School District 112

Lake Whitney Elementary School

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Waterford Lakes Small Area Study

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Transcription:

M E M O R A N D U M DATE: NOVEMBER 24, 217 TO: FROM: RE: CC: WALLY DUBYK, CITY OF OTTAWA JENNIFER LUONG 126-4 HUNT CLUB ROAD RETIREMENT RESIDENCE TRIP GENERATION NEIL MALHOTRA, JIM BURGHOUT (CLARIDGE HOMES) This memo is provided in response to the City s request for information relating to the trips generated by the Windsor Park Community as mentioned during the community meeting on October 16, 217. Two turning movement traffic counts were undertaken at the Windsor Park Residence, east and west accesses on Thursday, 16 November between 3 & 173 and on Friday morning, 17 November between 73 & 93. Copies of the counts are attached for reference. The retirement residence is located approximately 1m to the west of the subject site, at 976 Hunt Club Road. It consists of 135 units and approximately 2 surface visitor parking spaces and 2 underground parking spaces. The survey results show a two-way total of 23 vehicles per hour (vph) in the a.m. peak and 29 vph in the p.m. peak. The projected number of trips for the proposed 145-unit facility as identified in the traffic study is 7vph in the a.m. peak and 2 vph in the p.m. peak. If the survey results are pro-rated for the proposed number of units, this results in a rate of 25 vph in the a.m. peak and 31 vph in the p.m. peak. The surveyed rate represents an increase of approx. 2 trips in the a.m. and 1 trips in the p.m. compared to the projected number of trips identified in the traffic study based on the Institute of Transportation Engineers (ITE) rates. Applying the surveyed rate to the proposed development results in a marginally higher number of trips, but with no significant difference in the impact as identified in the traffic study and addendum. M:\217\11736\DATA\CORRESPONDENCE\MEMOS\2171124-WINDSORPARKSURVEY.DOCX Suite 2, 24 Michael Cowpland Drive, Ottawa ON K2M 1P6 Tel: 613.254.9643 Fax: 613.254.5867 www.novatech-eng.com

, AM and PM Peak Hour Flow Diagrams Hunt Club Road & Windsor Park Residence-EAST Access Automobiles, Taxis, Light Trucks, Vans, SUV's, Motorcycles, Heavy Trucks, Buses, and School Buses All Vehicles (Except Bicycles & Electric Scooters) Thursday, 16 November 217 73-93 & 3-173 Ward: 16 4 Hour Survey 2 2 2 2 al Volume 58 Approaching Intersection Pedestrians Crossing Each Approach Survey 2 Traffic Survey Time Period(s) 73-93 & 3-173 4 Hours 58 al Pedestrian Crossings 8 8 2 12 6 6 21 8 6 8 12 6 12 12 AM Peak Hour 8 12 - AM Peak Hr. PM 6 - PM Peak Hr. Peak Hr. 83-93 Peak Hour Peak Hr. 3-163 2 Volume 2 21 Volume 21 % of al 34.5% % of al 36.2% PHF.63 PHF.66 Printed on: 11/17/217 Prepared by: thetrafficspecialist@gmail.com : All Vehicles

Report Including AM/PM Peak Hours, PHF, AADT and Expansion Factors Hunt Club Road & Windsor Park Residence-EAST Access Automobiles, Taxis, Light Trucks, Vans, SUV's, Motorcycles, Heavy Trucks, Buses, and School Buses Survey Date: Thursday, 16 November 217 Start Time: 73 AADT Factor: Weather: Light Rain Survey Duration: 4 Hrs. Survey Hours: 73-93 & 3-173 Eastbound Westbound Northbound Southbound Time E/B W/B Street N/B S/B Street Grand Period al al al 73-8 1 1 1 3 3 3 4 8-9 6 6 6 8 8 8 14 9-93 3 3 3 4 4 4 7 3-16 4 4 4 6 6 6 1 16-17 3 3 3 18 17-173 3 3 3 2 2 2 5 als 2 2 2 58 Equivalent 12-hour vehicle volumes. These volumes are calculated by multiplying the 8-hour totals by the 8 12 expansion factor of 1.39 Equ. 12 Hr n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Average daily 12-hour vehicle volumes. These volumes are calculated by multiplying the equivalent 12-hour totals by the AADT factor of:.9 AADT 12-hr n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 24-Hour AADT. These volumes are calculated by multiplying the average daily 12-hour vehicle volumes by the 12 24 expansion factor of 1.31 AADT 24 Hr n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a AM Peak Hour Factor.63 Highest Hourly Vehicle Volume between 7h & 1h AM Peak Hr LT ST RT UT TOT LT ST RT UT TOT S.TOT LT ST RT UT TOT LT ST RT UT TOT S.TOT G.TOT 83-93 8 8 8 12 12 12 2 OFF Peak Hour Factor ### Highest Hourly Vehicle Volume between 113h & 133h Off Peak Hr LT ST RT UT TOT LT ST RT UT TOT S.TOT LT ST RT UT TOT LT ST RT UT TOT S.TOT G.TOT 123-133 PM Peak Hour Factor.66 Highest Hourly Vehicle Volume between h & 18h PM Peak Hr LT ST RT UT TOT LT ST RT UT TOT S.TOT LT ST RT UT TOT LT ST RT UT TOT S.TOT G.TOT 3-163 6 6 6 21 Notes: Equivalent 12 & 24-hour Vehicle Volumes Including the Annual Average Daily Traffic (AADT) Factor Applicable to the Day and Month of the Expansion factors are applied exclusively to standard weekday 8-hour turning movement counts Comments AM portion of the traffic count conducted on Friday, 17 November 217. Weather conditions clear and sunny and temperature was -5C during this time period. 1. Includes all vehicle types except bicycles and electric scooters. 2. Expansion factors are not applied to turning movement counts if they are less than 8-hours in duration. 3. When expansion and AADT factors are applied, the results will differ slightly due to rounding. Disclaimer: The information contained in this data summary is for information purposes only, and may not apply to your situation. Every effort is made to ensure the traffic count information is accurate for the survey date provided on the summary and flow diagram forms. The author, publisher, and distributor provide no warranty about the content or accuracy of either the data summary or flow diagrams. Information provided is subjective. The author, publisher, and distributor shall not be liable for any loss of profit or any other commercial damages resulting from use of this data..9 Printed on: 11/17/217 Prepared by: thetrafficspecialist@gmail.com All Veh

, AM and PM Peak Hour Flow Diagrams Hunt Club Road & Windsor Park Residence-WEST Access Automobiles, Taxis, Light Trucks, Vans, SUV's, Motorcycles, Heavy Trucks, Buses, and School Buses All Vehicles (Except Bicycles & Electric Scooters) Thursday, 16 November 217 73-93 & 3-173 Ward: 16 4 Hour Survey al Volume Approaching Intersection Pedestrians Crossing Each Approach Survey Traffic Survey Time Period(s) 73-93 & 3-173 4 Hours al Pedestrian Crossings 3 3 3 8 8 8 3 8 3 8 AM Peak Hour 3 - AM Peak Hr. PM 8 - PM Peak Hr. Peak Hr. 745-845 Peak Hour Peak Hr. 16-17 3 Volume 3 8 Volume 8 % of al 2.% % of al 53.3% PHF. PHF.67 Printed on: 11/17/217 Prepared by: thetrafficspecialist@gmail.com : All Vehicles

Report Including AM/PM Peak Hours, PHF, AADT and Expansion Factors Hunt Club Road & Windsor Park Residence-WEST Access Automobiles, Taxis, Light Trucks, Vans, SUV's, Motorcycles, Heavy Trucks, Buses, and School Buses Survey Date: Thursday, 16 November 217 Start Time: 73 AADT Factor: Weather: Light Rain Survey Duration: 4 Hrs. Survey Hours: 73-93 & 3-173 Eastbound Westbound Northbound Southbound Time E/B W/B Street N/B S/B Street Grand Period al al al 73-8 1 1 1 1 8-9 2 2 2 2 9-93 3-16 2 2 2 2 16-17 8 8 8 8 17-173 2 2 2 2 als Equivalent 12-hour vehicle volumes. These volumes are calculated by multiplying the 8-hour totals by the 8 12 expansion factor of 1.39 Equ. 12 Hr n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Average daily 12-hour vehicle volumes. These volumes are calculated by multiplying the equivalent 12-hour totals by the AADT factor of:.9 AADT 12-hr n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 24-Hour AADT. These volumes are calculated by multiplying the average daily 12-hour vehicle volumes by the 12 24 expansion factor of 1.31 AADT 24 Hr n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a AM Peak Hour Factor. Highest Hourly Vehicle Volume between 7h & 1h AM Peak Hr LT ST RT UT TOT LT ST RT UT TOT S.TOT LT ST RT UT TOT LT ST RT UT TOT S.TOT G.TOT 745-845 3 3 3 3 OFF Peak Hour Factor ### Highest Hourly Vehicle Volume between 113h & 133h Off Peak Hr LT ST RT UT TOT LT ST RT UT TOT S.TOT LT ST RT UT TOT LT ST RT UT TOT S.TOT G.TOT 123-133 PM Peak Hour Factor.67 Highest Hourly Vehicle Volume between h & 18h PM Peak Hr LT ST RT UT TOT LT ST RT UT TOT S.TOT LT ST RT UT TOT LT ST RT UT TOT S.TOT G.TOT 16-17 8 8 8 8 Notes: Equivalent 12 & 24-hour Vehicle Volumes Including the Annual Average Daily Traffic (AADT) Factor Applicable to the Day and Month of the Expansion factors are applied exclusively to standard weekday 8-hour turning movement counts Comments AM portion of the traffic count conducted on Friday, 17 November 217. Weather conditions clear and sunny and temperature was -5C during this time period. 1. Includes all vehicle types except bicycles and electric scooters. 2. Expansion factors are not applied to turning movement counts if they are less than 8-hours in duration. 3. When expansion and AADT factors are applied, the results will differ slightly due to rounding. Disclaimer: The information contained in this data summary is for information purposes only, and may not apply to your situation. Every effort is made to ensure the traffic count information is accurate for the survey date provided on the summary and flow diagram forms. The author, publisher, and distributor provide no warranty about the content or accuracy of either the data summary or flow diagrams. Information provided is subjective. The author, publisher, and distributor shall not be liable for any loss of profit or any other commercial damages resulting from use of this data..9 Printed on: 11/17/217 Prepared by: thetrafficspecialist@gmail.com All Veh