Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

Similar documents
Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

CCR Fugitive Dust Control Plan

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

FUGITIVE DUST CONTROL PLAN

CCR Fugitive Dust Control Plan

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.

FUGITIVE DUST CONTROL PLAN

D.B. Wilson Station CCR Landfill

TABLE OF CONTENTS LEGAL NOTICE

Closure Plan for CCR Surface Impoundments

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

TABLE OF CONTENTS LEGAL NOTICE

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

CCR Closure Plan Ash Impoundment

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

2018 Annual Inspection Report

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

TABLE OF CONTENTS LEGAL NOTICE

2016 Annual Inspection Report

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

2017 Annual Inspection Report

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

2016 Annual Inspection Report

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

Mine Dust Management Plan

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

Amended Written Closure Plan

CSU Channel Islands Lead Operations and Maintenance Program

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

Managing worker exposure to dust in mines and quarries

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public

CHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

2016 Annual Landfill Inspection Report. SCE&G Wateree Station Class III Landfill

LEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure

CCR Unit Closure and Post-Closure Plan. The business of sustainability. Texas Municipal Power Agency Gibbons Creek Steam Electric Station

Excavations and Trenches

Geotechnics, Face and Stockpile Operations

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

CONFINED SPACE WRITTEN PROGRAM

SILICA EXPOSURE CONTROL PLAN

ABSTRACT PLANT FILES SHOULD BE REVIEWED PERIODICALLY TO ASSURE COMPLIANCE. IF A PROBLEM EXISTS, PLEASE NOTIFY THE TACA SAFETY COMMITTEE.

Consulting Engineers and Scientists Annual Landfill Inspection Report. for the. Williams Station Highway 52 Class III Landfill

ROAD MAINTENANCE. Back to Basics. Duane A. Blanck, P.E MAT Spring Short Course

Confined Space Entry Program

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

Coal Combustion Residuals Closure Plan

Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE

SCHEDULE 08 Public Safety Plan

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

ORDINANCE NO AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

OSHA s Proposed Silica Rule Randy Nicholls Northwestern Energy

TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER EL PASO

Respirable Crystalline Silica

Notice of Intent to Close Inactive CCR Surface Impoundments

1.0 Scope and Application. 2.0 Definitions. Cal Poly Risk Management Confined Space Program Page 1

Highlights of Respirable Crystalline Silica. Jim Shelton, CAS Houston North Area Office

Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B

University of Delaware Respirable Crystalline Silica Dust Program June 2018

Silica Dust Safety Program

SECTION LEAD-PAINT REMOVAL

Northern Kentucky University Issue Date: 11/02/2018 Revised Date: Title: PERSONAL PROTECTIVE EQUIPMENT PROCEDURE OBJECTIVE AND PURPOSE

Confined Space Entry Safety Program

Green CCR Surface Impoundment

Compliance with OSHA s Silica Rule

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Explosive gas migration monitoring for a sanitary landfill facility.

OSHA's New Silica Rule Everything You Need to Know. Defined. Respirable Crystalline Silica Dust

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

Abrasive Blasting Removal Systems

The Johns Hopkins University/The Johns Hopkins Hospital Health, Safety and Environment Manual Safety Policies:

First Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01

Start-up, Shutdown and Malfunction Plans. Norman L. Morrow Fresh Air Consulting

A. Evaluation of the written program

ENVIRONMENTAL HEALTH AND SAFETY PERSONAL PROTECTIVE EQUIPMENT HAZARD ASSESSMENT AND CERTIFICATION GUIDELINES

INTEROFFICE MEMORANDUM

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

Rule s obligations and implementation dates NAPA s guidance documents and other assistance Milling and brooming equipment

2018 INSPECTION REPORT

General Safety and Health Provisions for Construction Self Inspection Checklist

Transcription:

Big Rivers Electric Corporation - D.B. Wilson Generating Station Fugitive Dust Control Plan for Coal Combustion Residuals Prepared For: Big Rivers Electric Corporation 201 3rd Street Henderson, KY 42419 (270) 827-2561 Prepared By: Associated Engineers, Inc. 2740 North Main Street Madisonville, KY 42431 (270) 821-7732 August 25, 2015 Revised October 5, 2017 Projects 15-0141 & 17-0154A

Table of Contents Glossary of Terms... 1 1.0 Introduction... 2-3 2.0 Plan Objectives... 4 3.0 Potential Fugitive Emissions Sources... 5-6 3.1 Unpaved Haul Roads and Service Roads in CCR Handling Areas... 5 3.2 Paved Roads in CCR Handling Areas...5 3.3 CCR Stockpiles...5 3.4 CCR Materials Transfer Points...5 3.5 CCR Surface Impoundments...5 3.6 CCR Landfills...6 4.0 Operating Practices and Control Measures... 7-11 4.1 Unpaved Haul Roads and Service Roads in CCR Handling Areas... 7-9 4.2 Paved Roads in CCR Handling Areas...9 4.3 CCR Stockpiles...9 4.4 CCR Material Transfer Points... 9-10 4.5 CCR Surface Impoundments... 10 4.6 CCR Landfills... 10-11 5.0 Recordkeeping and Citizen Complaint Log-in... 12 6.0 Training and Periodic Plan Review... 13 Tables Potential Fugitive Emission Sources... 14 Checklists Self-Inspection Visible Emissions Check Log... 15 Self-Inspection Fugitive Dust Control Log... 16 Self-Inspection Weather Log... 17 Figures Location Map... 18 Site Map... 19 Professional Engineer Certification... 20

Glossary of Terms Best Management Practice (BMP): a recommended technique designed to assist industries to comply with environmental regulations. Coal Combustion Residuals (CCR): means fly ash, bottom ash, boiler slag, and flue gas desulfurization materials generated from burning coal for the purpose of generating electricity by electric utilities and independent power producers. CCR fugitive dust or emissions: solid airborne particulate matter that contains or is derived from CCR, emitted from any source other than a stack or chimney. CCR landfill: area of land or an excavation that receives CCR and which is not a surface impoundment, an underground injection well, a salt dome formation, a salt bed formation, an underground or surface mine, or a cave. For purposes of this subpart, a CCR landfill also includes sand and gravel pits and quarries that receive CCR, CCR piles, and any practice that does not meet the definition of a beneficial use of CCR. CCR pile or stockpile: any non-containerized accumulation of solid, non-flowing CCR that is placed on the land. CCR that is beneficially used off-site is not a CCR pile. CCR surface impoundment: a natural topographic depression, man-made excavation, or diked area, which is designed to hold an accumulation of CCR and liquids, and the unit treats, stores, or disposes of CCR. Particulate matter: any material, except water in uncombined form, which exists as a liquid or a solid at standard conditions. Paved roadway: a roadway with a surface of asphalt or concrete. Trackout: the deposition of mud, dirt, or similar debris onto the surface of a paved road from tires and/or undercarriage of any vehicle associated with the operations of a facility. Transfer point: a point in a conveying operation where CCR material is transferred to or from a belt conveyor, except where the CCR material is being transferred to a stockpile. Truck dumping: the unloading of CCR material from movable vehicles designed to transport CCR material from one location to another. Movable vehicles include, but are not limited to, trucks, front-end loaders, skip hoists, and railcars. Unpaved haul road: an unsurfaced roadway within the physical boundary of the facility that is used as a haul road, access road, or similar means of ingress or egress. 1

1.0 Introduction The Fugitive Dust Control Plan describes the control measures and practices that the Big Rivers Electric Corporation D.B. Wilson Generating Station (D.B. Wilson Station) will implement to minimize and control fugitive dust as required by the USEPA Final Rule: Disposal of Coal Combustion Residuals from Electric Utilities 40 CFR Section ( ) 257.80 (Air Criteria). Specifically the rule requires the following which is incorporated into the plan by reference: (a) The owner or operator of a CCR landfill, CCR surface impoundment, or any lateral expansion of a CCR unit must adopt measures that will effectively minimize CCR from becoming airborne at the facility, including CCR fugitive dust originating from CCR units, roads, and other CCR management and material handling activities. (b) CCR fugitive dust control plan. The owner or operator of the CCR unit must prepare and operate in accordance with a CCR fugitive dust control plan as specified in paragraphs (b)(1) through (b)(7) of this section. This requirement applies in addition to, not in place of, any applicable standards under the Occupational Safety and Health Act. (1) The CCR fugitive dust control plan must identify and describe the CCR fugitive dust control measures the owner or operator will use to minimize CCR from becoming airborne at the facility. The owner or operator must select, and include in the CCR fugitive dust control plan, the CCR fugitive dust control measures that are most appropriate for site conditions, along with an explanation of how the measures selected are applicable and appropriate for site conditions. Examples of control measures that may be appropriate include: locating CCR inside an enclosure or partial enclosure; operating a water spray or fogging system; reducing fall distances at material drop points; using wind barriers, compaction, or vegetative covers; establishing and enforcing reduced vehicle speed limits; paving and sweeping roads; covering trucks transporting CCR; reducing or halting operations during high wind events; or applying a daily cover. (2) If the owner or operator operates a CCR landfill or any lateral expansion of a CCR landfill, the CCR fugitive dust control plan must include procedures to emplace CCR as conditioned CCR. Conditioned CCR means wetting CCR with water to a moisture content that will prevent wind dispersal, but will not result in free liquids. In lieu of water, CCR conditioning may be accomplished with an appropriate chemical dust suppression agent. (3) The CCR fugitive dust control plan must include procedures to log citizen complaints received by the owner or operator involving CCR fugitive dust events at the facility. (4) The CCR fugitive dust control plan must include a description of the 2

1.0 Introduction procedures the owner or operator will follow to periodically assess the effectiveness of the control plan. (5) The owner or operator of a CCR unit must prepare an initial CCR fugitive dust control plan for the facility no later than October 19, 2015, or by initial receipt of CCR in any CCR unit at the facility if the owner or operator becomes subject to this subpart after October 19, 2015. The owner or operator has completed the initial CCR fugitive dust control plan when the plan has been placed in the facility s operating record as required by 257.105(g)(1). (6) Amendment of the plan. The owner or operator of a CCR unit subject to the requirements of this section may amend the written CCR fugitive dust control plan at any time provided the revised plan is placed in the facility s operating record as required by 257.105(g)(1). The owner or operator must amend the written plan whenever there is a change in conditions that would substantially affect the written plan in effect, such as the construction and operation of a new CCR unit. (7) The owner or operator must obtain a certification from a qualified professional engineer that the initial CCR fugitive dust control plan, or any subsequent amendment of it, meets the requirements of this section. (c) Annual CCR fugitive dust control report. The owner or operator of a CCR unit must prepare an annual CCR fugitive dust control report that includes a description of the actions taken by the owner or operator to control CCR fugitive dust, a record of all citizen complaints, and a summary of any corrective measures taken. The initial annual report must be completed no later than 14 months after placing the initial CCR fugitive dust control plan in the facility s operating record. The deadline for completing a subsequent report is one year after the date of completing the previous report. For purposes of this paragraph, the owner or operator has completed the annual CCR fugitive dust control report when the plan has been placed in the facility s operating record as required by 257.105(g)(2). (d) The owner or operator of the CCR unit must comply with the recordkeeping requirements specified in 257.105(g), the notification requirements specified in 257.106(g), and the internet requirements specified in 257.107(g). The Fugitive Dust Control Plan also considers the intent of the Kentucky Fugitive Emissions requirements per 401 KAR 63:010 and as specifically identified in the facility Clean Air Act Title V permit, as applicable to the storage, handling and disposal of CCR material. 3

2.0 Plan Objectives The plan defines the following objectives: Procedures that D.B. Wilson Station personnel will follow to control emissions. Fugitive dust levels requiring corrective actions. Steps that will be followed to bring emissions within appropriate ranges. Steps that D.B. Wilson Station will take to demonstrate that corrective procedures are followed and to verify the facility is controlling avoidable fugitive emissions from CCR sources. To meet these objectives, the Fugitive Dust Control Plan: Identifies all applicable fugitive emission CCR sources at the facility. Identifies the primary and contingent control measures and practices to control and minimize fugitive emissions. Identifies visible emissions observation and corrective action requirements. Identifies fugitive dust control recordkeeping requirements. Identifies fugitive dust control notification requirements. Describes fugitive dust control training elements. 4

3.0 Potential Fugitive Emission Sources Applicable CCR fugitive emission sources are identified in the Table of Potential Fugitive Emission Sources and describe the measures and practices employed to control fugitive emissions at each. These sources are further described below. 3.1 Unpaved Haul Roads and Service Roads in CCR Handling Areas Potential unpaved haul road and service road fugitive dust sources subject to the plan include: Haul road fugitive emissions from trucks hauling CCR materials on unpaved roads. The materials being hauled include fly ash, bottom ash, boiler slag, and flue gas desulfurization materials generated from burning coal. Service road fugitive emissions from light vehicles traveling on unpaved roads within areas of the facility where CCR is handled. Controlling haul road and service road fugitive dust is important for employee safety, equipment maintenance, as well as protecting the air quality of the area. D.B. Wilson Station is committed to minimizing haul road emissions. Haul road dust suppression activities are described in Section 4. 3.2 Paved Roads in CCR Handling Areas Potential paved road fugitive dust sources subject to the plan include emissions from paved roads in CCR handling areas assumed to be traveled by cars and light trucks and by service and freight trucks. 3.3 CCR Stockpiles Potential fugitive dust sources are related to stockpiles of CCR materials including fly ash, bottom ash, boiler slag, and flue gas desulfurization materials generated from burning coal. 3.4 CCR Materials Transfer Points Potential fugitive dust sources are related to the conveying and transfer of CCR materials including fly ash, bottom ash, boiler slag, and flue gas desulfurization materials generated from burning coal. 3.5 CCR Surface Impoundments There are no CCR surface impoundments at the D.B. Wilson Station. 5

3.0 Potential Fugitive Emission Sources 3.6 CCR Landfills There is one potential fugitive dust source associated with a CCR landfill: Wilson Landfill where moist/dry CCR material is delivered for storage and disposal. The elevation of the landfill creates exposure to wind erosion prior to dust control measures. Also, mobile equipment (trucks and bull dozers, etc.) working on the landfill and service and access roads adjacent to the landfill that are accessible by light vehicle traffic for personnel and maintenance purposes are potential fugitive dust sources. 6

4.0 Operating Practices and Control Measures The operating practices and control measures that will be implemented and recorded for the potential fugitive dust sources identified in Section 3 are described below. D.B. Wilson Station trains and assigns appropriate personnel the responsibility to control fugitive emissions in their areas of operation. 4.1 Unpaved Haul Roads and Service Roads in CCR Handling Areas Primary Controls: Watering and other dust suppressant application, road maintenance including crushed rock surfacing, grading and scarifying. Contingent Controls: Increased application of primary controls. Practices: The operating practices D.B. Wilson Station will use include, but are not limited to, the following: D.B. Wilson Station will perform daily visible emissions checks on all active haul roads at the beginning shifts that start during daylight hours. Haul truck drivers will also observe for visible emissions during the shift and report as needed. If visible emissions are observed during the visible emissions check or are reported by an equipment operator, D.B. Wilson Station employees will investigate the condition and take appropriate corrective action to address the visible emissions. The observation of visible emissions does not, in and of itself, demonstrate noncompliance with any applicable requirement but is a signal to trigger investigation and, if necessary, reasonable and appropriate corrective action. D.B. Wilson Station will maintain daily visible emission reports based on the visible emissions checks. An exception report will be filed if visible emissions cannot be controlled by usual control strategies. Examples of such exceptions may be water truck breakdown, extraordinary weather events (extremely hot, dry) etc. Employees will inform their supervisor of an exception condition at the end of their shift so that the report can be filled out. In non-freezing conditions, dust will be controlled by the following strategies: o Water will be applied to the active haul roads during the day and afternoon shifts, as required by weather, traffic and road conditions. Water trucks will be dispatched and unpaved roads will be watered if excessive dusting is encountered. Some weather conditions during the summer months, such as low humidity and high winds, require a higher water frequency. The frequency and amount of water application will be adjusted depending on weather conditions. Runoff will be controlled so it does not saturate the surface of the adjacent unpaved haul road and enhance trackout. If runoff is not or cannot be 7

4.0 Operating Practices and Control Measures controlled, gravel may be applied to the surface of the adjacent unpaved haul road over an area sufficient to control trackout. o Haul roads will be graded as required. o Crushed rock will be added to the road surface to minimize fugitive dust generation. o Liquid chemical dust suppressant may also be applied to some high traffic areas for dust control as needed (as is permissible per other environmental permits associated with the site). In freezing conditions, dust will be controlled by the following strategies: o Solid or liquid chemical dust suppressant may be applied to the haul road in late fall prior to freeze up. Haul roads will be scarified as necessary. o New haul road material will be applied as needed D.B. Wilson Station will maintain adequate watering capacity, including backup in the event of breakdown, to control dust during typical summer conditions. D.B. Wilson Station will maintain daily watering records and chemical dust suppressant application records. The records will include the watering truck identification and the number of water loads applied per shift. D.B. Wilson Station will rely on site specific weather information or reports from the closest National Weather Service (NWS) station to provide a record of daily temperature, wind speed/direction and precipitation readings. D.B. Wilson Station, as necessary, will evaluate new technologies or methods in dust suppression for their technical and economic feasibility as they become commercially available. Recordkeeping: D.B. Wilson Station will maintain the following records on site: Self-Inspection Visible Emissions Check Log Self-Inspection Fugitive Dust Control Log Daily Watering Reports. 8

4.0 Operating Practices and Control Measures Site specific weather information or reports for the closest National Weather Service (NWS) station The application of chemical dust suppressants will be recorded and reported from D.B. Wilson Station purchase records. 4.2 Paved Roads in CCR Handling Areas Primary Controls: Street watering as needed. Contingent Controls: Increased application of primary controls. Practices: The operating practices that D.B. Wilson Station will use include, but are not limited to, watering of the paved roads as needed to prevent fugitive emissions. 4.3 CCR Stockpiles Primary Controls: Natural moisture content of stockpiled materials. Contingent Controls: Water spray as needed during non-freezing conditions. Practices: The operating practices that D.B. Wilson Station will use include, but are not limited to, the following: D.B. Wilson Station will perform visible emissions checks on all stockpiles of CCR materials once per day during daylight hours. D.B. Wilson Station will minimize the drop distances onto each stockpile as much as practicable. Recordkeeping: D.B. Wilson Station will maintain the following records on site: Self-Inspection Visible Emissions Check Log Self-Inspection Fugitive Dust Control Log 4.4 CCR Material Transfer Points Primary Controls: Natural moisture content of materials, minimized drop distances when possible. Contingent Controls: Natural moisture content of stockpiled materials. 9

4.0 Operating Practices and Control Measures Practices: The operating practices that D.B. Wilson Station will use include, but are not limited to, the following: D.B. Wilson Station will perform visible emissions checks on all CCR material transfer points once per day during daylight hours. D.B. Wilson Station will minimize the drop distances onto each stockpile as much as practicable. Recordkeeping: D.B. Wilson Station will maintain the following records on site: Self-Inspection Visible Emissions Check Log Self-Inspection Fugitive Dust Control Log 4.5 CCR Surface Impoundments There are no CCR surface impoundments at the D.B. Wilson Station. 4.6 CCR Landfills Primary Controls: Disturbance area minimization, mulching, vegetation, systematic dumping. Contingent Controls: Water spray as needed during non-freezing conditions. Practices: The operating practices that D.B. Wilson Station will use include, but are not limited to, the following: Selective dumping, grading and covering of CCR material can be timed to minimize generation of dust. Upwind berms can prevent CCR material movement and wind erosion. Application of water and/or a stabilizing agent in sufficient quantities to prevent the generation of dust (apply water to materials to stabilize and maintain materials in a crusted condition). Maintain effective cover over materials to stabilize sloping surfaces using soil binders until vegetation or ground cover can effectively stabilize the slopes. Plant or hydroseed prior to dry season to establish vegetation. 10

4.0 Operating Practices and Control Measures Recordkeeping: D.B. Wilson Station will maintain the following records on site: Self-Inspection Fugitive Dust Control Log 11

5.0 Recordkeeping and Citizen Complaint Log-in The following records will be maintained at D.B. Wilson Station: o Self-Inspection Visible Emissions Check Log o Self-Inspection Fugitive Dust Control Log o Self-inspection Weather Log o Daily road and material watering reports* o Site specific weather information or reports from the closest National Weather Service (NWS) station o Employee Training Records * Some records are anticipated to be reports generated from the plant process control systems. All citizen complaints will be logged in and reviewed by facility personnel. Pertinent information, if provided by the complainant or otherwise available, should include: o Name of complainant o Date and time of complaint o How complaint was received (telephone, written correspondence, verbal correspondence, etc. o Contact information for complainant (address, telephone number, etc.) o Reason for complaint o Follow-up action and/or response by facility 12

6.0 Training and Periodic Plan Review An integral part of the implementation of the Fugitive Dust Control Plan is appropriate training for the personnel involved. Training will be provided for all levels of personnel at the facility and will cover a subset of the following subjects as needed for individual levels of responsibility: o Employee Responsibilities o Forms and Record Keeping o Reporting o Corrective Actions o Maintenance o Dust Observation and Visibility Training o Weather Observations o Location of Information D.B. Wilson Station will provide training in the areas listed above to new employees as their job function demands. Refresher training will be provided to existing employees on an annual basis. This Fugitive Dust Control Plan will be reviewed periodically by BREC personnel to assess the effectiveness of the control plan and updated or revised as necessary. The assessment will consist of a review of all records maintained in accordance with this plan and a review of all operating processes and procedures pertinent to fugitive dust management at this facility. 13

Potential Fugitive Emission Sources Fugitive Dust Source Fugitive Dust Source Description Operating/Control Practice CCR haul roads CCR service roads CCR stockpiles Dust from haul trucks and mobile equipment Dust from light vehicles and trucks Dust from stockpiles Watering and other dust suppressant application; road maintenance Watering and other dust suppressant application; road maintenance Limit pile size; natural moisture; water spray as needed during non-freezing temperatures CCR silos Dust from silo systems Manage silo spillage and drop heights CCR conveying, transfer (including truck loadouts) and storage systems CCR landfill Dust from conveying, transfer and storage systems Dust from landfill and mobile equipment Manage conveyor spillage and drop heights Watering and other dust suppressant application; manage during high wind conditions 14

Self-Inspection Visible Emissions Check Log Fugitive Dust Source: Date Time Visible Emissions (Yes or No) Action Taken 15

Self-Inspection Fugitive Dust Control Log Fugitive Dust Source: Date Time Control Method Comments 16

Self-Inspection Weather Log Date Temperature Degrees F Wind Speed and Direction Amount of Precipitation Comments 17

Location Map Google Maps 18

Site Map 19

Professional Engineer Certification Professional Engineer Certification [40 CFR Part 257.80 Air Criteria] I hereby certify that myself or an agent under my review has prepared this Fugitive Dust Control Plan (Plan), and being familiar with the provisions of the final rule to regulate the disposal of coal combustion residuals (CCR) as solid waste under subtitle D of the Resource Conservation and Recovery Act (RCRA), attest that this Plan has been prepared in accordance with good engineering practices and meets the intent of 40 CFR Part 257.80. To the best of my knowledge and belief, the information contained in this Plan is true, complete, and accurate; therefore, the Plan shall be implemented as herein described. This certification in no way relieves the owner or operator of the facility of their duty to fully implement this Plan in accordance with the requirements of the stated regulation. This Plan is valid only to the extent that the facility owner or operator follows the provisions prescribed herein. David A. Lamb, P.E. State of Kentucky License No. 17822 Seal: Date: 10/5/2017 20