1, 13 Branchville-Lewisburg Road (CR 628) Lewisburg-Creamery Road (CR 565) 2,3 Asbury-Bloomsbury Road/Asbury- Anderson Road (CR 632) Skid-resistant surface treatment, enhanced signage, pavement markings 2 Corridor Sections: ultra-reflective signage, oversized warning signs, pavement markings, roadway delineators $322,000 2010 $238,000 4/12/ 4 Byram-Kingwood Road (CR 651) from CR 519 to SR 29 Road segment: Skid resistant surface treatment, reflective striping, raised pavement markers, chevron signs $380,000 Authorization 2013 5 Cedar Lake Road (CR 616) from CR 655 to Ultra-high reflective signage, high-retroreflectivity pavement Route 94 markings, rumble strips 6 Clove Road (CR 653) from SR 206 to New Road Segment: Type III Micro-surfacing skid resistance Mashipacong Road surface treatment, pavement markings, striping, flexible delineators, regulatory warning signs, bicycle safety grates 7 CR 519 from Rt. 46 to CR 521 Road Segment: Replace existing road signs w/ultra high performance reflective sheeting, wet reflective pavement markings, increase roadway edge line from 4 to 6", roadway delineators at curves 8,9,12,19 Deckertown Turnpike (CR 650) Glen Road (CR 620) Rudetown Road (CR 517) Lewisburg-Creamery Road (CR 565) 10 Great Meadows Road (CR 611) from Route 46 CR 519 11,15 High-Bridge Califon Road (CR 513) Main Street (CR 512) Skid-resistant surface treatment, signage, colored pavement, guide rails w/reflectors Ultra-high reflective signage, high-retroreflectivity pavement markings, rumble strips Single Intersection: pavement widening, left-turn lanes, sidewalks, striping, pavement markers 14 Little York Road (CR 614) One intersections, one RR overpass & one curve: Intersection improvement at Pattenburg Road (CR 57) including reflective pavement markings; two over height vehicle detectors and signage at a railroad overpass; curvature improvements including super elevation improvements, shoulder rumble stripes and berm lines $57,275 11/12/2009 2009 $463,235 2011 $339,000 7/2/ 2011 $237,642 1/28/2011 2009 $596,280 12/16/2010 2009 $223,000 Authorization $300,000 Authorization 2013
16 Milford Mt. Pleasant Road (CR 519) Single Corridor: high friction coarse, pavement markings, crosswalks, centerline rumble strips, raised pavement markers, storm water catch basin curb pieces, LED warning beacons 17 New Centre Road (CR 627) from Auten Corridor: high friction surface course, striping, bicycle safety Road to Roycefield Road grates 18 River Road (CR 625) Road segment: Micro-mill roadway surface, safety edge, striping, rumble strips 20 Siloam Road (CR 527) Reconstruction and resurfacing including coarse pavement treatment, pavement markings and advance warning signage $425,000 Authorization $350,000 Authorization $300,000 Authorization 2013 $150,000 6/19/2011 2010 21,22 Berkshire Valley Road (CR 642) Railroad bridge advanced warning signs and flashers $116,000 11/9/2009 2008 23 Bloomfield Avenue (CR 506) at Roseland Intersection s including new traffic signal, $389,265 8/12/2011 2010 Avenue (CR527) and Westville Avenue modified lane striping, countdown pedestrian signals, left turn lane 24 Broad Street & South Street Single Intersection: New traffic signal, pedestrian countdown signals, curb bulb-outs, striping, signage $500,000 2013 25 Central Avenue from Jefferson Avenue to North Street 26 Centre Street (CR 648) and Franklin Avenue (CR 645) 22 Intersection s: Pedestrian countdown signal heads, curb ramps w/detectable warning surfaces, international crosswalks, textured pavement crosswalks, replacement of regulatory, warning and pedestrian; signs. Total project cost: $515 K, supplemented with $38 K City funds Intersection s including new pedestrian signals and timing adjustments for pedestrian intervals $477,000 2011 $164,069 10/5/2010 2009 27 CR 10 (Front Street/River Road) Road Segment: Minor roadway reconstruction to standardized width lanes and turning lanes; drainage improvements, resurfacing for skid resistance, color pavement for crosswalks, handicap ramps, bulb-outs, solarpowered flashing warning beacons, curb extensions, upgrade to traffic signal, upgrades to pavement markings $500,000 2011
28 CR 29 (a.k.a. Anderson Avenue) at Traffic Signal Upgrade, ped. Signals $125,000 10/23/2007 2006 Columbia Avenue Intersection 29 CR 39 (a.k.a. Mule Road) 6 intersections including traffic signal upgrades and $300,000 12/19/2007 2006 pedestrian signals 30 CR 501 (a.k.a. JFK Boulevard) from 67th Pavement markings including crosswalks, centerlines, stop $135,000 7/17/2006 2005 St. to 91st St. line, cross hatching 31 CR 501 (a.k.a. JFK Boulevard) from Communipaw Avenue to 18th St. (MP 29.37-33.8) Pavement markings including crosswalks, centerlines, stop line, cross hatching; @ 32nd St.: left turn lane, traffic signals, pavement markings $265,000 6/19/2007 2006 32,33 CR 501 (JFK Boulevard) and CR 693 (JFK Boulevard East) 44 Intersection s: Replace existing traffic signals heads to comply with new MUTCD requirements $385,000 6/5/ 2011 34 CR 510 (a.k.a. South Orange Avenue) from Speedway Ave. to Dover Ave. 35 CR 517 from Route 46 to Sussex County line 36 CR 527 (South Main Street) and CR 533 (Main Street) 37 CR 531 (a.k.a. Park Avenue) and CR 601 (a.k.a. 7th Avenue) (MP 8.26; MP 1.57) 10 intersections including new LED traffic signals, ped. signals, ADA ramps, striping, signage, repaving Sign upgrades with high reflective sheeting, retro-reflective pavement markings, shoulder rumble strips 2 Overhead vehicle detector systems w/dynamic signs in advance of 2 railroad overpasses Intersection s including left turn lane, crosswalks, new LED traffic signals, pedestrian signals $2,400,000 7/1/2007 2005 $325,500 10/30/2008 2008 $197,000 2011 $185,000 12/1/2008 2007 38 CR 603 (a.k.a. Springfield Avenue) at Civic Square, Lyons Avenue and Sanford Avenue 39 CR 603 (Springfield Avenue) at 40th Street/Florence Avenue 3 intersections including traffic signal upgrades, pedestrian signals, pavement markings including crosswalks, ADA ramps 1 Intersection : New traffic signal system, new pedestrian countdown indications, paving, lane designations, crosswalks, pedestrian and school signage $670,000 11/10/2008 2007 $450,000 1/23/ 2011 40 CR 622 (a.k.a. Mountain Avenue) at South Street/Glenside Road Dedicated left turn lane, pavement markings, signal upgrades $85,000 5/23/2007 2006
41 Dr. Martin Luther King Jr. Boulevard Intersection s including countdown pedestrian signals, ADA ramps w/detectable warning surfaces, textured pavement crosswalks, warning signs; Total project cost: $953 K, supplemented with $594 K City funds $477,240 2010 42 Eagle Rock Avenue (CR 611) at the Essex Countdown ped. signals, crosswalks, signage, left turn bay $236,393 8/4/2009 2008 County Environmental Center 43 East Broad Street (CR 512) and Summit Avenue (CR 657), Springfield Avenue and Summit Avenue Intersection improvements including upgraded traffic signals, countdown pedestrian signals, aligned left-turn lanes, highvisibility crosswalks $369,639 5/1/2011 2009 44 Easton Avenue (CR 527) and Foxwood Drive Single Intersection: dedicated left-turn lane, traffic signal upgrades, pedestrian countdown signals, signage $271,000 Authorization 45 Fair Lawn Avenue Corridor Safety s - 5+ intersection improvements Fairlawn Avenue (CR 76) from River Road (CR 507) to Saddle River Road (CR 79) 46 Hamilton Street (CR 514) and Franklin Boulevard (CR 617) Corridor: Pedestrian countdown signals, curb bump-outs, solar powered pavement crosswalk delineators, pedestrian curb ramps, crosswalk striping, signage, traffic cameras Intersection improvements including opposing left turn lanes, modified signal operations, signal pole relocation, re-paving, ADA curb ramps, pedestrian signals $511,850 Authorization $188,000 6/3/ 2010 47 Intersection s at Prospect (CR 577) and Eagle Rock (CR 611) Avenues Intersection s including double left-turn lanes, new traffic signals and countdown pedestrian signals, signal retiming, striping $407,500 10/1/2011 2010 48 JFK Boulevard (CR 501) New LED countdown Ped. Signals at 39 intersections $310,000 4/6/2009 2008 49 JFK Boulevard (CR 501) between New LED countdown pedestrian signals $590,000 1/22/2010 2009 Pamrapo Avenue and 15th Street 50 Kinderkamack Road (CR 503) Corridor between New Milford Avenue and Orchard Street Countdown pedestrian signals, crosswalks with ADA ramps, lighted crosswalk with mounted flashers, painted medians $310,257 2009
51 North Bridge Street and Cliff Street Single Intersection: new traffic signals, pedestrian countdown signals, striping, signage 52 Park Avenue (CR 658) & 4th Street Single Intersection: high visibility crosswalks, pedestrian countdown signals, dedicated turn lanes, traffic signal upgrades, driveway consolidation, no turn on red and other signage 53 Park Avenue (CR 658) at High Street and Multiple intersections: traffic signal replacement, high Glenwood Avenue visibility crosswalks, pedestrian countdown signals, school crossing signs 54 Park Avenue (CR 658) at North/South Oraton Parkway and at Park Avenue 2 Intersections: new traffic signals, pedestrian countdown signals, signage, crosswalk striping $203,000 Authorization $470,000 2013 $630,000 2013 $676,748 Authorization 55 Park Avenue (CR 658) Corridor from High Street (CR 638) to 19th Street 12 Intersection improvements including traffic signal upgrades, high visibility crosswalks, countdown pedestrian signals, school crossing signs, median islands $615,000 12/20/2010 2009 56 Patterson Plank Road (CR 681) Traffic delineators and vehicle speed display signs $35,000 6/16/2008 2007 57 Shrewsbury Avenue (CR 13) & W. Bergen Single Intersection: traffic signal replacement, high visibility $225,000 2013 Place crosswalks, ADA compliant curb ramps, signage, striping 58 Springfield Avenue (CR 603) and Ellis Avenue Intersection 59 Stuyvesant Avenue/Chestnut Street (CR 619) and West Chestnut Street (CR 626) Single intersection: Modified lane designations, signage, crosswalk striping, new traffic signal, pedestrian countdown signals Intersection improvements including widening of left turn lane, signal retiming & coordination $441,850 Authorization $250,000 5/1/2011 2008 60 Summit Avenue Corridor Safety s Phases I & II - 54 intersections 26 Intersections (improvements vary by location but include): ADA ramps, pedestrian countdown signals, signage, crosswalk striping, textured pavement crosswalks, traffic cameras, traffic signal upgrade, U-post reflective sheeting $1,023,700 Authorization 61 Toms River Bus Terminal Park N Ride Pedestrian Access s $202,000 7/1/ 2009
62 Various County roadways (Passaic Wet Reflective Centerline Pavement Markings along 100+ $302,613 11/5/2008 2008 County) miles of County roadways 63 Various intersections (City of Newark) LED countdown Ped. Signals at 50+ intersections $127,050 7/8/2010 2008 64 Various intersections (Hudson County) 27 Intersection improvements including new LED countdown pedestrian signals 65 Various Locations (Ocean County) Upgrade School Crossing & Pedestrian Crossing Signs on Unsignalized Intersections (various locations) 66 Various Locations (Passaic County) Upgrade School Crossing & Pedestrian Crossing Signs on Unsignalized Intersections (various locations) 67 Vauxhall Road (CR 630) and Valley Street Single Intersection: traffic signal upgrades, pedestrian (CR638) countdown signals, crosswalk striping, possible signal retiming (addition of left-turn phases) 68 West Blackwell Street (CR 513) 5 Intersections improvements including with new bi-lingual pedestrian signals, video detection traffic flow sensors $280,000 8/15/2011 2010 $82,000 3/1/2006 2004 $157,400 12/1/2006 2004 $298,608 Authorization $156,585 Substantially complete w/ outstanding ADA compliance issues 2010 69,70,71 Wilson Avenue at Lafayette Street, Houston Street, and Avenue L 3 Intersection s: New traffic signal systems, intersection realignment, curb and sidewalk, paving, striping, crosswalks, installation of LED warning signs $500,000 Advertised, bids received, pending contract award 2011