Project Name Project Description Authorized Amount

Similar documents
FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Pedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Transportation Planning Division

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

CITY OF LANCASTER PROPOSED NEW PROJECTS

NJDOT Complete Streets Checklist

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Broad Street Bicycle Boulevard Design Guidelines

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

APPENDIX E GRADE CROSSING LOCATIONS

FDOT Treasure Coast Traffic Report

PEDESTRIAN CROSSING SOLUTIONS ANDREA HARTH, PE, PTOE TEC ENGINEERING, INC.

Lynchburg District Update

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

SCOPE Application, Design, Operations,

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

PEDESTRIAN CROSSING TREATMENTS

CY2017 Summary of STP applications

PEDESTRIAN SAFETY STUDY

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

San Pablo High Treatment applied incrementally at each N + ++

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Chapter 5: Crossing the Street

Military Road Safety Improvements

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

City of Scotts Valley CITY COUNCIL STAFF REPORT

FDOT Treasure Coast Traffic Impact Report

Ohio Department of Transportation Edition of the OMUTCD It s Here!

Citywide Sidewalk and Crosswalk Programs

Complete Streets Funding Program Project Prioritization Plan

Freeway ramp intersection study

Engineering Countermeasures for Transportation Safety. Adam Larsen Safety Engineer Federal Highway Administration

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety

FDOT Treasure Coast Traffic Impact Report

2009 Manual on Uniform Traffic Control Devices

5. RUNNINGWAY GUIDELINES

Derby Street. Project Updates. Salem, Massachusetts

FDOT Treasure Coast Traffic Report

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer

Sign Design Manual (TEM 295-2)

Bicycle + Pedestrian Connectivity Gap Analysis

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Now Let s Think Systemic

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

City Avenue Projects

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy

Water Street Promenade Engineering and Design Services

February 11, 2016 TPO Board Presentation

The 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners. Arizona Department of Transportation

Chapter 4: Funding and Implementation

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

Roosevelt Estates Neighborhood Improvements

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

Recent U.S. Research on Safety Evaluation of Low-Cost Road Engineering Safety Countermeasures Lessons for Canada

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

Readington Road (C.R. 637) Construction

FDOT Treasure Coast Traffic Impact Report

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

SECTION V - CIRCULATION PLAN ELEMENT

On-Street Bicycle Facilities

Hennepin County Transportation Department

Active Transportation Facility Glossary

From Mile Zero to Target Zero the Dawson Creek Case Study

including shade trees; Recommend minimum 13 ft total sidewalk

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Off-road Trails. Guidance

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

City Avenue Projects

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

IMPLEMENTATION WORKBOOK

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

PRESS RELEASE San Joaquin Council of Governments

ACTION TRANSMITTAL No

Transportation Corridor Studies: Summary of Recommendations

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Transportation Planning Division

Transcription:

1, 13 Branchville-Lewisburg Road (CR 628) Lewisburg-Creamery Road (CR 565) 2,3 Asbury-Bloomsbury Road/Asbury- Anderson Road (CR 632) Skid-resistant surface treatment, enhanced signage, pavement markings 2 Corridor Sections: ultra-reflective signage, oversized warning signs, pavement markings, roadway delineators $322,000 2010 $238,000 4/12/ 4 Byram-Kingwood Road (CR 651) from CR 519 to SR 29 Road segment: Skid resistant surface treatment, reflective striping, raised pavement markers, chevron signs $380,000 Authorization 2013 5 Cedar Lake Road (CR 616) from CR 655 to Ultra-high reflective signage, high-retroreflectivity pavement Route 94 markings, rumble strips 6 Clove Road (CR 653) from SR 206 to New Road Segment: Type III Micro-surfacing skid resistance Mashipacong Road surface treatment, pavement markings, striping, flexible delineators, regulatory warning signs, bicycle safety grates 7 CR 519 from Rt. 46 to CR 521 Road Segment: Replace existing road signs w/ultra high performance reflective sheeting, wet reflective pavement markings, increase roadway edge line from 4 to 6", roadway delineators at curves 8,9,12,19 Deckertown Turnpike (CR 650) Glen Road (CR 620) Rudetown Road (CR 517) Lewisburg-Creamery Road (CR 565) 10 Great Meadows Road (CR 611) from Route 46 CR 519 11,15 High-Bridge Califon Road (CR 513) Main Street (CR 512) Skid-resistant surface treatment, signage, colored pavement, guide rails w/reflectors Ultra-high reflective signage, high-retroreflectivity pavement markings, rumble strips Single Intersection: pavement widening, left-turn lanes, sidewalks, striping, pavement markers 14 Little York Road (CR 614) One intersections, one RR overpass & one curve: Intersection improvement at Pattenburg Road (CR 57) including reflective pavement markings; two over height vehicle detectors and signage at a railroad overpass; curvature improvements including super elevation improvements, shoulder rumble stripes and berm lines $57,275 11/12/2009 2009 $463,235 2011 $339,000 7/2/ 2011 $237,642 1/28/2011 2009 $596,280 12/16/2010 2009 $223,000 Authorization $300,000 Authorization 2013

16 Milford Mt. Pleasant Road (CR 519) Single Corridor: high friction coarse, pavement markings, crosswalks, centerline rumble strips, raised pavement markers, storm water catch basin curb pieces, LED warning beacons 17 New Centre Road (CR 627) from Auten Corridor: high friction surface course, striping, bicycle safety Road to Roycefield Road grates 18 River Road (CR 625) Road segment: Micro-mill roadway surface, safety edge, striping, rumble strips 20 Siloam Road (CR 527) Reconstruction and resurfacing including coarse pavement treatment, pavement markings and advance warning signage $425,000 Authorization $350,000 Authorization $300,000 Authorization 2013 $150,000 6/19/2011 2010 21,22 Berkshire Valley Road (CR 642) Railroad bridge advanced warning signs and flashers $116,000 11/9/2009 2008 23 Bloomfield Avenue (CR 506) at Roseland Intersection s including new traffic signal, $389,265 8/12/2011 2010 Avenue (CR527) and Westville Avenue modified lane striping, countdown pedestrian signals, left turn lane 24 Broad Street & South Street Single Intersection: New traffic signal, pedestrian countdown signals, curb bulb-outs, striping, signage $500,000 2013 25 Central Avenue from Jefferson Avenue to North Street 26 Centre Street (CR 648) and Franklin Avenue (CR 645) 22 Intersection s: Pedestrian countdown signal heads, curb ramps w/detectable warning surfaces, international crosswalks, textured pavement crosswalks, replacement of regulatory, warning and pedestrian; signs. Total project cost: $515 K, supplemented with $38 K City funds Intersection s including new pedestrian signals and timing adjustments for pedestrian intervals $477,000 2011 $164,069 10/5/2010 2009 27 CR 10 (Front Street/River Road) Road Segment: Minor roadway reconstruction to standardized width lanes and turning lanes; drainage improvements, resurfacing for skid resistance, color pavement for crosswalks, handicap ramps, bulb-outs, solarpowered flashing warning beacons, curb extensions, upgrade to traffic signal, upgrades to pavement markings $500,000 2011

28 CR 29 (a.k.a. Anderson Avenue) at Traffic Signal Upgrade, ped. Signals $125,000 10/23/2007 2006 Columbia Avenue Intersection 29 CR 39 (a.k.a. Mule Road) 6 intersections including traffic signal upgrades and $300,000 12/19/2007 2006 pedestrian signals 30 CR 501 (a.k.a. JFK Boulevard) from 67th Pavement markings including crosswalks, centerlines, stop $135,000 7/17/2006 2005 St. to 91st St. line, cross hatching 31 CR 501 (a.k.a. JFK Boulevard) from Communipaw Avenue to 18th St. (MP 29.37-33.8) Pavement markings including crosswalks, centerlines, stop line, cross hatching; @ 32nd St.: left turn lane, traffic signals, pavement markings $265,000 6/19/2007 2006 32,33 CR 501 (JFK Boulevard) and CR 693 (JFK Boulevard East) 44 Intersection s: Replace existing traffic signals heads to comply with new MUTCD requirements $385,000 6/5/ 2011 34 CR 510 (a.k.a. South Orange Avenue) from Speedway Ave. to Dover Ave. 35 CR 517 from Route 46 to Sussex County line 36 CR 527 (South Main Street) and CR 533 (Main Street) 37 CR 531 (a.k.a. Park Avenue) and CR 601 (a.k.a. 7th Avenue) (MP 8.26; MP 1.57) 10 intersections including new LED traffic signals, ped. signals, ADA ramps, striping, signage, repaving Sign upgrades with high reflective sheeting, retro-reflective pavement markings, shoulder rumble strips 2 Overhead vehicle detector systems w/dynamic signs in advance of 2 railroad overpasses Intersection s including left turn lane, crosswalks, new LED traffic signals, pedestrian signals $2,400,000 7/1/2007 2005 $325,500 10/30/2008 2008 $197,000 2011 $185,000 12/1/2008 2007 38 CR 603 (a.k.a. Springfield Avenue) at Civic Square, Lyons Avenue and Sanford Avenue 39 CR 603 (Springfield Avenue) at 40th Street/Florence Avenue 3 intersections including traffic signal upgrades, pedestrian signals, pavement markings including crosswalks, ADA ramps 1 Intersection : New traffic signal system, new pedestrian countdown indications, paving, lane designations, crosswalks, pedestrian and school signage $670,000 11/10/2008 2007 $450,000 1/23/ 2011 40 CR 622 (a.k.a. Mountain Avenue) at South Street/Glenside Road Dedicated left turn lane, pavement markings, signal upgrades $85,000 5/23/2007 2006

41 Dr. Martin Luther King Jr. Boulevard Intersection s including countdown pedestrian signals, ADA ramps w/detectable warning surfaces, textured pavement crosswalks, warning signs; Total project cost: $953 K, supplemented with $594 K City funds $477,240 2010 42 Eagle Rock Avenue (CR 611) at the Essex Countdown ped. signals, crosswalks, signage, left turn bay $236,393 8/4/2009 2008 County Environmental Center 43 East Broad Street (CR 512) and Summit Avenue (CR 657), Springfield Avenue and Summit Avenue Intersection improvements including upgraded traffic signals, countdown pedestrian signals, aligned left-turn lanes, highvisibility crosswalks $369,639 5/1/2011 2009 44 Easton Avenue (CR 527) and Foxwood Drive Single Intersection: dedicated left-turn lane, traffic signal upgrades, pedestrian countdown signals, signage $271,000 Authorization 45 Fair Lawn Avenue Corridor Safety s - 5+ intersection improvements Fairlawn Avenue (CR 76) from River Road (CR 507) to Saddle River Road (CR 79) 46 Hamilton Street (CR 514) and Franklin Boulevard (CR 617) Corridor: Pedestrian countdown signals, curb bump-outs, solar powered pavement crosswalk delineators, pedestrian curb ramps, crosswalk striping, signage, traffic cameras Intersection improvements including opposing left turn lanes, modified signal operations, signal pole relocation, re-paving, ADA curb ramps, pedestrian signals $511,850 Authorization $188,000 6/3/ 2010 47 Intersection s at Prospect (CR 577) and Eagle Rock (CR 611) Avenues Intersection s including double left-turn lanes, new traffic signals and countdown pedestrian signals, signal retiming, striping $407,500 10/1/2011 2010 48 JFK Boulevard (CR 501) New LED countdown Ped. Signals at 39 intersections $310,000 4/6/2009 2008 49 JFK Boulevard (CR 501) between New LED countdown pedestrian signals $590,000 1/22/2010 2009 Pamrapo Avenue and 15th Street 50 Kinderkamack Road (CR 503) Corridor between New Milford Avenue and Orchard Street Countdown pedestrian signals, crosswalks with ADA ramps, lighted crosswalk with mounted flashers, painted medians $310,257 2009

51 North Bridge Street and Cliff Street Single Intersection: new traffic signals, pedestrian countdown signals, striping, signage 52 Park Avenue (CR 658) & 4th Street Single Intersection: high visibility crosswalks, pedestrian countdown signals, dedicated turn lanes, traffic signal upgrades, driveway consolidation, no turn on red and other signage 53 Park Avenue (CR 658) at High Street and Multiple intersections: traffic signal replacement, high Glenwood Avenue visibility crosswalks, pedestrian countdown signals, school crossing signs 54 Park Avenue (CR 658) at North/South Oraton Parkway and at Park Avenue 2 Intersections: new traffic signals, pedestrian countdown signals, signage, crosswalk striping $203,000 Authorization $470,000 2013 $630,000 2013 $676,748 Authorization 55 Park Avenue (CR 658) Corridor from High Street (CR 638) to 19th Street 12 Intersection improvements including traffic signal upgrades, high visibility crosswalks, countdown pedestrian signals, school crossing signs, median islands $615,000 12/20/2010 2009 56 Patterson Plank Road (CR 681) Traffic delineators and vehicle speed display signs $35,000 6/16/2008 2007 57 Shrewsbury Avenue (CR 13) & W. Bergen Single Intersection: traffic signal replacement, high visibility $225,000 2013 Place crosswalks, ADA compliant curb ramps, signage, striping 58 Springfield Avenue (CR 603) and Ellis Avenue Intersection 59 Stuyvesant Avenue/Chestnut Street (CR 619) and West Chestnut Street (CR 626) Single intersection: Modified lane designations, signage, crosswalk striping, new traffic signal, pedestrian countdown signals Intersection improvements including widening of left turn lane, signal retiming & coordination $441,850 Authorization $250,000 5/1/2011 2008 60 Summit Avenue Corridor Safety s Phases I & II - 54 intersections 26 Intersections (improvements vary by location but include): ADA ramps, pedestrian countdown signals, signage, crosswalk striping, textured pavement crosswalks, traffic cameras, traffic signal upgrade, U-post reflective sheeting $1,023,700 Authorization 61 Toms River Bus Terminal Park N Ride Pedestrian Access s $202,000 7/1/ 2009

62 Various County roadways (Passaic Wet Reflective Centerline Pavement Markings along 100+ $302,613 11/5/2008 2008 County) miles of County roadways 63 Various intersections (City of Newark) LED countdown Ped. Signals at 50+ intersections $127,050 7/8/2010 2008 64 Various intersections (Hudson County) 27 Intersection improvements including new LED countdown pedestrian signals 65 Various Locations (Ocean County) Upgrade School Crossing & Pedestrian Crossing Signs on Unsignalized Intersections (various locations) 66 Various Locations (Passaic County) Upgrade School Crossing & Pedestrian Crossing Signs on Unsignalized Intersections (various locations) 67 Vauxhall Road (CR 630) and Valley Street Single Intersection: traffic signal upgrades, pedestrian (CR638) countdown signals, crosswalk striping, possible signal retiming (addition of left-turn phases) 68 West Blackwell Street (CR 513) 5 Intersections improvements including with new bi-lingual pedestrian signals, video detection traffic flow sensors $280,000 8/15/2011 2010 $82,000 3/1/2006 2004 $157,400 12/1/2006 2004 $298,608 Authorization $156,585 Substantially complete w/ outstanding ADA compliance issues 2010 69,70,71 Wilson Avenue at Lafayette Street, Houston Street, and Avenue L 3 Intersection s: New traffic signal systems, intersection realignment, curb and sidewalk, paving, striping, crosswalks, installation of LED warning signs $500,000 Advertised, bids received, pending contract award 2011