NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

Similar documents
NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

VESSEL DESIGNS HUISMAN PRODUCT BROCHURE

Introduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc

Marine Technology Society

The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by

Global Floating Rig (Floater) Market: Trends and Opportunities ( ) February 2014

Dynamic Positioning: Method for Disaster Prevention and Risk Management

The SPE Foundation through member donations and a contribution from Offshore Europe

RIGID RISERS FOR TANKER FPSOs

RPSEA UDW Forum June 22 & 23, Secure Energy for America

Learn more at

Subsea Wellhead and Conductor Fatigue

Learn more at

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Trine Risøy, Bergen,

POWER TAKE-OFF SYSTEMS OF OFFSHORE RIG POWER PLANTS

Global Service Sector Trends

Safety of DP Drilling Operations in the South China Sea

Minimal Structures for Marginal Nova Scotia Developments

A Novel Platform for Drilling in Harsh High-Latitude Environments.

Site-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures

Faculty of Science and Technology MASTER S THESIS

Fully Submersible Heavy Lift Vessel

From the Wellhead to the Tanker Offshore Production Systems. 28/03/2014 Instituto Superior Técnico

Lachlan John Walsh. Candidate Submission form

Analysis of Offshore Drilling's Vertical Load Using Semi-Submersible Rig

Deepwater Horizon Incident Internal Investigation

RIG CAPABILITIES For Multi Well/Pad Development

OVERVIEW. Capabilities & Services

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development

HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR

Learn more at

OFFSHORE SURVEY IN DEVELOPMENT PROJECTS. Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe

The Impact of Composites on Future Deepwater Riser Configurations

OIL & GAS DRILLING PROGRAM

GLS New Technology Rising to the Challenge of Subsea lifting. Subsea 2012 Paddy Collins

BUCCANEER ALASKA OPERATIONS, LLC. BUCCANEER ALASKA OPERATIONS, LLC Cook Inlet Exploratory Drilling Program. Community Outreach: KPB Assembly

Deepwater Horizon, by Metin Çakanyıldırım and references cited therein.

SUBSEA KILL SHEET EXERCISE No. 5

DRILLING HOSE SOLUTIONS

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

Computational Analysis of Oil Spill in Shallow Water due to Wave and Tidal Motion Madhu Agrawal Durai Dakshinamoorthy

Caltec. The world leader in Surface Jet Pump (SJP) and compact separation systems for upstream oil and gas production enhancement

OFFSHORE. Trasfor OFFSHORE

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

TARPON A Minimal Facilities Platform

Offshore exploration in the arctic Alain Wassink GustoMSC

THE DEEP OFFSHORE MARKET

Evaluation of deepwater kicks and future countermeasures

TECHNICAL SPECIFICATION SCHILLING UHD III WORK CLASS ROV SYSTEM

Subsea Safety Systems

Managing Dynamic Positioning (DP) Operations

Deepwater Floating Production Systems An Overview

R. Randall Center for Dredging Studies Texas A&M University

Chapter 5 HORIZONTAL DRILLING

Planning of Drilling Operations in Extreme Ocean Currents

National Maritime Center

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE

DECOMMISSIONING. Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017

Shell Castor & Pollux Rig Equipment Primary Items

Learn more at

The Developing Design of the Blowout Preventer in Deep Water

Feasibility of Steel Lazy Wave Risers in the North Sea

Offshore Oil and Gas Platforms for Deep Waters

INSTRUCTIONS FOR THE USE OF ROTARY DRILLING, VIBRATOR AND CEMENT HOSES

3.9 MW-30JD Mooring Winch. Technical Parameter

RAMSTM. 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs

The SDS Skip. Subsea Deployment Systems Ltd.

Abstract. 1. Introduction. 2. Design Requirements. Naval Engineer - INTERMOOR DO BRASIL 2. Petroleum Engineer INTERMOOR DO BRASIL 3

D RILLING L I RIG EQUIPMENT N G CONTRACTOR

Protecting People and the Environment during Stimulation Treatments in Offshore Settings

FMB12329 Accommodation Work Barge

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific

IMCA Competence Assessment Portfolio June 2013

Barging in on Trent. Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab

IMCA Competence Assessment Portfolio June 2013

A DECADE OF EXPERIENCE

IWCF Equipment Sample Questions (Surface Stack)

ANALYSIS OF OFFSHORE DRILLING S VERTICAL LOAD USING SEMI SUBMERSIBLE RIG

AUTOMATED MONITORING EQUIPMENT FOR ACIP AND DD PILES

2007 Gas-Lift Workshop

Marine Technology Society

Challenges in Ship Design to Maintain Thrusters inside Ship

Commentary on the book by Andrew Hopkins. By Graham Dalzell

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7

Heron s Application for Wind Industry - Gorillas Need Not Apply

Marine Technology Society

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Why Do Not Disturb Is a Safety Message for Well Integrity

DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project)

Rig move Code of Practice (COP) and Scope of Work (SOW)

Platelets & Plasma The Management of Unplanned Flow

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement

Casing Design. Casing Design. By Dr. Khaled El-shreef

International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008

Transcription:

Presentation JB AG JCN JR 1

Presentation JB AG JCN JR 2

RIG TYPES Land rigs in 2012... total (approx) 3200 Jack Up,... in 2012... total (approx) 485 units 300 * in drilling mode 130 for WD > 350 ft Floaters,... in 2012 total > 400 SS 240 DS 160 Land rig Barge Platform rig Tender rig Jack-Up Semi-sub. moored Semi-sub. DP mode Drillship DP-mode Presentation JB AG JCN JR 3

RIG TYPES Onshore/Land rigs Wheel/truck mounted Standard/conventional rig Type Drilling depth range (ft) Light 4000-8000 ft Medium 8000-12000 ft Heavy 12000-16000 ft Ultra heavy 18000-25000 ft Offshore / bottom supported Barges: 8 to 25 ft WD Special arctic Posted Submersible: 30 to 150 ft WD Jack-Up: 100 up to 500 ft WD Mat supported / Independent leg Platform Rig Self-contained (compact rig) Tender supported (tender rigs) Offshore / floaters Semi-submersible Conventional moored (up to 7650 ft WD) Dynamic positioning system (5000 to 12 000 ft WD) Drillships Conventional moored Dynamic positioning system (5000 to 12 000 ft WD) Presentation JB AG JCN JR 4

RIG SIZES: POWER AND CAPABILITIES - some figures (approx) Rig types derricks /mast drawworks total power drilling depths LR Light (/ truck) < 300 000 lbs < 500 HP < 8 000 ft (w/ 3 ½ DP) LR Medium duty < 600 000 lbs < 900 HP < 3000 HP < 12 000 ft (w/ 3 ½ DP) LR Heavy duty < 1 000 000 lbs < 1500 HP < 4000 HP < 16 000 ft (w/ 5in DP) LR Ultra H. duty < 1 300 000 lbs < 3000 HP < 5000 HP < 25 000 ft (w/ 5in DP) Offshore (modern units) 1.3 to 2 MMlbs 2000 to 6600 HP > 8 000 HP 25 000 ft Presentation JB AG JCN JR 5

Conventional land rig Presentation JB AG JCN JR 6

Conventional land rig Presentation JB AG JCN JR 7

Land rig in arctic zone Presentation JB AG JCN JR 8

Land rig on A-island Kazakhstan field land rig; winterized option Presentation JB AG JCN JR 9

Land rig in arctic zone Source / Illustrations: TOTAL Presentation JB AG JCN JR 11

Drilling and well operations on Kharyaga field (Russia) Source: TOTAL EP Russie Presentation JB AG JCN JR 12

Truck mounted land rig Presentation JB AG JCN JR 13

Drilling operations with heli-rig Presentation JB AG JCN JR 16

RIG TYPES Onshore/Land rigs Wheel/truck mounted Standard/conventional rig Type Drilling depth range (ft) Light 4000-8000 ft Medium 8000-12000 ft Heavy 12000-16000 ft Ultra heavy 18000-25000 ft Offshore / bottom supported Barges: 8 to 25 ft WD Special arctic Posted Submersible: 30 to 150 ft WD Jack-Up: 100 up to 500 ft WD Mat supported / Independent leg Platform Rig Self-contained (compact rig) Tender supported (tender rigs) Offshore / floaters Semi-submersible Conventional moored (up to 7650 ft WD) Dynamic positioning system (5000 to 12 000 ft WD) Drillships Conventional moored Dynamic positioning system (5000 to 12 000 ft WD) Presentation JB AG JCN JR 17

Inland water drill barge Source: IADC Drilling Contractor Axxis Drilling Co Presentation JB AG JCN JR 18

Drilling barge (in a swamp area) Presentation JB AG JCN JR 19

Drilling barge in a swamp area East Kalimantan Presentation JB AG JCN JR 21

Wellheads (in a swamp area) Source / Illustrations: TOTAL Presentation JB AG JCN JR 22

Drilling barge (for arctic conditions) Presentation JB AG JCN JR 23

8.1.2000 Presentation JB AG JCN JR 24

For operations with a Jack-Up. Some points to verify, - spud cans, leg length vs seabed survey - leg length vs water depth, height of wellhead platform - cantilever extensions vs well bay on wellhead platform - preloading procedures vs seabed survey, rig operating manual Presentation JB AG JCN JR 25

Jack-UP (IC) Cantilever type Independent leg Jack-UP (MS) slotted type mat supported type Presentation JB AG JCN JR 26

Jack-Up operation on wellhead platform Jack-Up (drilling unit) Wellhead platform Animation Presentation JB AG JCN JR 27

Jack-Up (drilling unit) Wellhead platform seabed Presentation JB AG JCN JR 28

Presentation JB AG JCN JR 29

Characteristics of some big JU In 2011 129 Jack Up for WD > 350 ft Some characteristics JU Name Year WD / leg Total power HP VL elevated st Drawworks Drlg. Pattern ft x ft Pumps Nb. & psi BOP WP Diverter diameter inches ft HP psi Maersk Inspirer 2001 492 / 673 14 420 10 000 4 600 86 x 66 4 x 7500 15 000 49,5 Maersk Innovator 2003 492 / 673 14 420 10 000 4 600 86 x 66 4 x 7500 15 000 49,5 Rowan Gorilla VI 2000 450 / 607 16 975 12 462 5000 100 x 40 4 x 7500 15 000 28 Ensco 109 2008 400 / 486 12 250 7 980 4 600 70 x 30 3 x 7500 15 000 49,5 Noble Scott Marks 2009 400 / 548 17 750 5 000 4 600 75 x 30 3 x 7500 15 000 In 2011. 129 Jack-Up for WD > 350 ft Presentation JB AG JCN JR 30

Maersk Innovator Maersk Inspiror Presentation JB AG JCN JR 31

Jack-Up operation on wellhead platform Presentation JB AG JCN JR 32

Presentation JB AG JCN JR 33

Typical (IC*) Jack-Up over a WHP * Independent leg / Cantilever Presentation JB AG JCN JR 34

Conventional Jack-Up ( stand alone operations) Jack-Up towed over short distances Jack-Up moved over long distances Presentation JB AG JCN JR 35

Additional offshore operations which can be performed with a JU Jack-Up Topside Jacket 36 Presentation JB AG JCN JR 36

compact rig installed on a WP Compact rig Wellhead platform Presentation JB AG JCN JR 37

Wellhead platform drilling (assisted by a conventional tender rig ) Hoisting, safety Rotary functions Derrick set Pumping, power functions Source/ Courtesy: Transocean Presentation JB AG JCN JR 38

Wellhead platform drilling (assisted by a conventional tender rig ) Presentation JB AG JCN JR 39

Wellhead drilling platform assisted by a new deep-water tender rig Presentation JB AG JCN JR 40

RIG TYPES Onshore/Land rigs Wheel/truck mounted Standard/conventional rig Type Drilling depth range (ft) Light 4000-8000 ft Medium 8000-12000 ft Heavy 12000-16000 ft Ultra heavy 18000-25000 ft Offshore / bottom supported Barges: 8 to 25 ft WD Special arctic Posted Submersible: 30 to 150 ft WD Jack-Up: 100 up to 500 ft WD Mat supported / Independent leg Platform Rig Self-contained (compact rig) Tender supported (tender rigs) Offshore / floaters Semi-submersible Conventional moored (up to 7650 ft WD) Dynamic positioning system (5000 to 12 000 ft WD) Drillships Conventional moored Dynamic positioning system (5000 to 12 000 ft WD) Presentation JB AG JCN JR 41

For operations with a floater Some points to verify, - anchors type vs seabed survey - riser design, floating elements vs water depth - booster line vs water depth - heave response curves vs meteo-oceano survey Presentation JB AG JCN JR 43

DW floaters: Relative heave motion response vs. Wave period Source: TOTAL Offshore Reference Book Presentation JB AG JCN JR 44

OFFSHORE ENVIRONMENT WITH. -- Action of winds, -- Action of waves, Drilling floating unit (semi-submersible) Telescopic joint Drilling riser -- Action of currents and, Kill & choke lines Guide Guide lines lines -- impact of water depth, -- impact of seabed (formation) wellhead TGB & PGB Subsea BOP s Subsea wellhead Presentation JB AG JCN JR 45

Tensioning devices Floater response to wind, wave Impact of waves Non-linear current profile Drilling riser (w/ buoyancy modules) Water Depth Flex-joint Subsea equipment seabed Presentation JB AG JCN JR 46

WELL CONSTRUCTION: the basics Rig move on location Running WH Running BOP and riser Drilling msl Semi-submersible Flow line Drillstring WD Drilling riser Sub sea BOP Mud line = Sea bed Sub sea wellhead Presentation JB AG JCN JR 47

Conventional semi-submersible. In operation. deballasted In transit: dry tow Presentation JB AG JCN JR 48

Semi-submersible Leiv-Eiriksson (in drilling conditions) Presentation JB AG JCN JR 49

SEMI SUBMERSIBLE Aker Spitsbergen The new Aker H-6e is the world's biggest and most advanced drilling semi. It have features that make them particularly well suited for drilling under extreme conditions Presentation JB AG JCN JR 50

DRILLSHIP * PACIFIC SANTA ANNA * Drilling Contractor: Pacific Drilling year built / delivered: 1Q 2012 The drillship owned by Pacific Drilling is thought to be the first of its kind in the world equipped to perform dual gradient drilling (DGD). DGD uses a subsea mud pump (Chevron design) to withdraw the drilling mud from the well at the seabed and return it through a separate line to the drillship. It is equipped with a DGD riser, a mud lift pump handling system, six mud pumps three for drilling fluid and three for seawater extensive fluid management system enhancements. Presentation JB AG JCN JR 51

DYNAMIC POSITIONING SYSTEM (DYPO) A computer controlled system to automatically maintain a ship s position and heading by using its own thrusters (propellers). (Thruster system: gives a thrust to counter the environment condition, so that the drillship or the semi-sub. can be in desired position) Presentation JB AG JCN JR 52

DYNAMIC POSITIONING SYSTEM Presentation JB AG JCN JR 53

Drillship (ultra deep water) SAIPEM 12000 Drillship (ultra deep water) DEEPWATER DISCOVERY Some sizes : 228 m x 42 m x 12 m Total installed power 48 000 kw dual activities Source / illustration: Transocean Presentation JB AG JCN JR 54

Rig SS «Polyarnaya Zvezda» Presentation JB AG JCN JR 55

SEMI-SUB. vs. DRILLSHIPS.... SS DS - variable loads + + + - transit/moving speed + + + - stability + + ANCHOR-MOORING vs DYPO.... CONV. MOORING DYPO - time for rig positionning - sensitive weather areas + + + - fuel consumption + + + - field development + + + Presentation JB AG JCN JR 56

Driller s dog house Offshore new offshore unit Rig onshore Presentation JB AG JCN JR 57

Rig rental costs (approx.) Operational daily costs (approx.) Land rig 30 to 45 K$ / d 65 000 $/d Drilling barge 45 to 100 K$ / d 130 000 $/d Tender rig (conventional) 50 to 120 K$ / d 160 000 $/d Jack-Up (300 ft) 100 to 250 K$ / d 170 to 425 000 $/d Semi-submersible (5000 < WD < 7500 ft) 200 to 250 K$ / d 380 to 475 000 $/d Drillships (5000 < WD < 7500 ft) 300 + K$ / d 570 000 $/d ( 7500 < WD < 10 000 ft) + / - 600 K$ /d 1 200 000 $/d Figures vary with type of contract (short/long term), market conditions, geographical area... Presentation JB AG JCN JR 58

COST TO BUILD A NEW RIG (approx. in 2011 cost in million $) Presentation JB AG JCN JR 59

Slides were prepared for presentation and information to Students of Schools and Universities only. References Slides presented were prepared with illustrations from the following referenced documents: - API Standards and Recommended Practices, - Neal J. Adams, Drilling Engineering, PennWell Books, Tulsa, Oklahoma, 1985, - (Halliburton) - Petroleum Well Construction J Willey & Sons - Miscellaneous books from Chambre Syndicale de la Recherche et de la Production du Pétrole et du gaz naturel - IFP Drilling data handbook - Miscellaneous documentation from TOTAL Drilling Division - Halliburton Completion Services - Miscellaneous books from IFP - Leading Edge Advantage Ltd (Under Balance Drilling). - Miscellaneous documentation from web-sites: O&GJ, World Oil, SPE - Transocean, Saipem, Pride Drilling Contractors - Baker Hughes, Schlumberger, Weatherford, Wild Well Control Service Companies - Cameron, Hydril, Companies. Presentation JB AG JCN JR 60