GENESIS FACILITY, EASTERN CREEK COMPLAINTS REGISTER (updated monthly) Genesis Complaints Register Page 1

Similar documents
Vermin, Insects and Scavenging Birds Management Plan

Awaba Waste Pollution Incident & Emergency Response Plan

Pollution Incident Response Management Plan (PIRMP)

Pollution Incident. Response. Management Plan

Emergency Response Plans

SOPAN O & M COMPANY PVT. LTD.

CERTIFYING DRAINLAYER

Bogo Operations Pollution Incident Response Management Plan

Pollution Incident. Response. Management Plan

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

PETERSONS QUARRY POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Pollution Incident Response Management Plan

CAPRAL LIMITED PENRITH SITE

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

Amec Foster Wheeler 2016.

Pollution Incident Response Management Plan PEATS RIDGE QUARRY. Version Eight: 18 th July Peats Ridge Quarry PIRMP_V8.

IESI Bethlehem Landfill Committee Meeting Minutes

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Boral Building Products. Pollution Incident Response Management Plan Narooma. Version 1 Revision 4: 13 th October 2016

Pollution Incident Response Management Plan EMU PLAINS ROOFING. Version Five: 18 April Emu Plains Roofing PIRMP-V5. 1 of 36

Pollution Incident Response Management Plan

School Traffic Management Plan

FUGITIVE DUST CONTROL PLAN

Work Health & Safety Inspection Checklist Office Environment

MINE SAFETY MANAGEMENT SYSTEM Pollution Incident Response Management Plan

Pollution Incident Response Management Plan EMU PLAINS QUARRY. Version Eight: 5 th July Emu Plains Quarry PIRMP-V8. 1 of 39

Pollution Incident Response Management Plan Austrak Wagga Wagga

2760 Cameron Road, West Kelowna, BC V1Z 2T6 Tel.: ; Fax:

City of Cerritos SWIMMING POOL, SPA AND EQUIPMENT APPLICATION. (Please print or type) Name: Phone: ( )

Pollution Incident Response Management Plan HALL QUARRY. Version Seven: 31st August Hall Quarry PIRMP_V7. 1 of 37

Rumpke Sanitary Landfill Odor Complaint Hotline Summary/Analysis 2014

Pollution Incident Response Management Plan

FUGITIVE DUST CONTROL PLAN

WESTERN PLACERVILLE INTERCHANGES PHASE 2 PROJECT CIP # 41828

NSW Rugby League Limited Privacy Policy

Be our partner in safe, reliable natural gas delivery

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

To comply with the OHS Act, the responsible manager must carry out and document the following:

School Traffic Management Plan

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

SOP - LIFT RESCUE PROCEDURES

CCR Fugitive Dust Control Plan

METHODOLOGY RISK TABLES TABLE 1 - QUALITATIVE MEASURES OF CONSEQUENCE OR IMPACT TABLE 2 - QUALITATIVE MEASURES OF LIKELIHOOD

ACTIVITY 1.1 QUESTIONS

A MESSAGE FROM THE MD

HIGH PRESSURE WATER JETTING ARE YOU OPERATING SAFELY?

September Sept ember 18,

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

unable to summon help as a result of injury, ill health or an emergency. unable to carry out a task safely while alone.

IESI Bethlehem Landfill Committee Meeting Minutes

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual)

Policy No: 45. Legionella Emergency Action Plan

Developing Safety Guidelines for Cryogenic Liquids.

EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

Contractor / Exhibitor Handbook

CONTRACTOR SAFETY RULES

Laboratory Preparedness Checklists for Advanced Planning, Preparing to Close & Safe Re-Entry

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

TRADESMAN DRAINLAYER

Control of Work. Introduction This procedure describes the management of Asbestos. Definitions

Don t cross his path! CROSS BORES. from your hometown natural gas company.

IL Route 71 Construction Update

Life Smart Spas Frequently Asked Questions LS600DX

8. Fall Protection Procedures WAC

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

Water Hygiene Chlorination Water Treatment Legionella Control

SAFE WORK METHOD STATEMENT

Theory Assessment CS Confined Space Entry

Confined Space Hazard Identification & Risk Assessment Form

CONFINED SPACE PROGRAM

Confined Space Entry Appendix - Sewerage Transfer. 1. Purpose Sewerage Transfer Assets. 2. Scope. 3. Procedure

c/o Fairway Holiday Park, The Fairway, Sandown, Isle of Wight, PO36 9PS Tel: +44(0) Fax: +44(0) PARK RULES THE PARK

Health and Safety Policy

EQUIPMENT AND MATERIALS

! Subpart D - Contingency Plans and Emergency Procedures (40 CFR to ) (EPA regulations adopted by NJDEP); and

HAZARDOUS INCIDENT SITE SAFETY PLAN

Our commitment to safety

Town of Brunswick. Hazard Communication and Global Harmonization System (GHS) Plan

Safe Operating Procedure Site Safety Orientation and Agreement

Site Traffic Management Plan - January 2018

FALL DATA COLLECTION INSTRUMENT

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

Lincoln County Environmental Health Department 302 North Academy Street, Suite B Lincolnton, NC Phone: Fax:

Ionising Radiations Code of Practice & Guidance Contingency Arrangements

Carbon Dioxide The Other Silent Killer. George Lomax Heath Consultants Incorporated

MNCON00E1. Deer Hunting - May Not Hunt with Aid or Use of Bait. Hunt deer with aid of bait/see report MNCON00E1

Life Smart Spas Frequently Asked Questions

CAUTION Hard copies of this document may not be the current version. Refer to the "I Am The Key" verify the current version,

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

Confined Space Entry Written Program

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

Risk Assessment. Location. School. Class Room. Class

UNIVERSITY OF NEBRASKA AT KEARNEY EMERGENCY PLAN AND PROCEDURES (CONTINGENCY PLAN)

SCOTTISH WATER. Waste Water Treatment Works. Typical WWTW Ellipse Equipment No: XXXX Ellipse Plant No: STW00XXXX

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

Drain Splash Back Burns Operator

Transcription:

Method and Nature Matter Investigated Matter Resolved or Outstanding 28/02/2019 Nil N/A N/A N/A N/A 31/01/2019 Nil N/A N/A N/A N/A 31/12/2018 Nil N/A N/A N/A N/A 30/11/2018 Nil N/A N/A N/A N/A 31/10/2018 Nil N/A N/A N/A N/A 30/09/2018 Nil N/A N/A N/A N/A 31/08/2018 Nil N/A N/A N/A N/A 31/07/2018 Nil N/A N/A N/A N/A 30/06/2018 Nil N/A N/A N/A N/A 25/05/2018 ~ 8.10 pm 29/05/2018 Notification by the Licensee to the EPA Environment line Fire in landfill area Yes Yes On 25 May 2018 a fire was reported to NSW Fire department via 000. The Fire Brigade attended site. The fire was located in a tipping face cell of non-putrescible waste. The area on fire and surrounding area were covered with dirt and compacted. The Licensee ensured that the area was under constant observation for a further 10 hours to ensure no further spot fires. The Licensee has engaged with NSW Fire to facilitate review of site procedures and management of such events by both parties. 25-29/05/2018 30/04/2018 Nil N/A N/A N/A N/A 31/03/2018 Nil N/A N/A N/A N/A 28/02/2018 Nil N/A N/A N/A N/A 31/01/2018 Nil N/A N/A N/A N/A 31/12/2017 Nil N/A N/A N/A N/A 30/11/2017 Nil N/A N/A N/A N/A 31/10/2017 Nil N/A N/A N/A N/A 30/09/2017 Nil N/A N/A N/A N/A 31/08/2017 Nil N/A N/A N/A N/A Genesis Complaints Register Page 1

Method and Nature 31/07/2017 Nil N/A N/A N/A N/A 28/06/2017 Between 1 3 pm 28/06/2017 30/05/2017 3 pm 03/04/2107 3.30 pm Tracking material from site to the road EPA received a call about material being tracked from the site s driveway onto the road making conditions slippery. EPA unable to provide precise details of time of call. Fire EPA called to enquire if there was a fire at the premises. Tracking material from site to the road EPA received a call about material being tracked from the site s driveway onto the road making conditions slippery. Yes Yes The Licensee inspected the driveway and the section of Honeycomb Drive between the end of the common driveway and the first roundabout, although there was rainfall during the day, there was no sediment tracking observed from the DADI premises onto Honeycomb Drive. The Licensee provided the EPA with photographic evidence showing the condition of the driveway and road. Yes Yes EPA were advised that no fire had occurred at the premises. Yes Yes Very heavy rainfall occurred at this time.the Licence-holder advised that barriers had been placed some 3 weeks prior to prevent trucks driving on the dirt section at the top of the site. Photos were provided to the EPA showing condition of the area and the barriers. 30/05/2017 Mid March 2017 31/03/2017 Nil N/A N/A N/A N/A 28/02/2017 Nil N/A N/A N/A N/A 31/01/2017 Nil N/A N/A N/A N/A 31/12/2016 Nil N/A N/A N/A N/A 30/11/2016 Nil N/A N/A N/A N/A 31/10/2016 Nil N/A N/A N/A N/A 30/09/2016 Nil N/A N/A N/A N/A 24/08/2016 10.30 am EPA received a call alleging that at approximately 10:30 am there was a sewer like odour in Minchinbury. Yes Yes The Licence-holder investigated practices at the site and confirmed (to the EPA) that the offensive odour in the area did not originate from the Genesis facility. 24/08/2016 to 25/08/2016 Genesis Complaints Register Page 2

Method and Nature Matter Investigated Matter Resolved or Outstanding Normal activities of recycling and landfilling non-putrescible waste, in accordance with EPL conditions were being undertaken but at a reduced volume due to the wet weather. 31/07/2016 Nil N/A N/A N/A N/A 30/06/2016 Nil N/A N/A N/A N/A 31/05/2016 Nil N/A N/A N/A N/A 30/04/2016 Nil N/A N/A N/A N/A 31/03/2016 Nil N/A N/A N/A N/A 29/02/2016 Nil N/A N/A N/A N/A 31/01/2016 Nil N/A N/A N/A N/A 31/12/2015 Nil N/A N/A N/A N/A 30/11/2015 Nil N/A N/A N/A N/A 31/10/2015 Nil N/A N/A N/A N/A 30/09/2015 Nil N/A N/A N/A N/A 31/08/2015 Nil N/A N/A N/A N/A 31/07/2015 Nil N/A N/A N/A N/A 27/06/2015 7.50 pm 28/06/2015 7.30 pm After hours call to EPA @ 19h50 advising of overpowering smell, making caller and family feel unwell. Caller alleged it appeared to be coming from Dial-A-Dump. EPA officer reported odour on 28/06/2015 @ 19h30 in the vicinity of Eastern Creek and expressed view it may have been generated from the Genesis premises. Yes Yes The Licence-holder investigated practices at the site on 27 and 28 June 2015 and confirmed (to the EPA) that the offensive odour in the area did not originate from the Genesis facility. The Genesis facility was closed at the time of the complaint to the EPA environment line and on 23 June 2015. However, as part of the investigation, onsite security guards and independent parties entering and exiting the site preceding and post those dates have been contacted and confirmed no evidence of odour at the Genesis premises. One of the transport companies highlighted the 29/06/2015 to 09/07/2015 Genesis Complaints Register Page 3

Method and Nature Matter Investigated Matter Resolved or Outstanding offensive odour at the intersection of Old Wallgrove Road and Wallgrove Road Eastern Creek. No issues have occurred with the management of leachate at the Genesis Facility. 31/05/2015 Nil N/A N/A N/A N/A 30/04/2015 Nil N/A N/A N/A N/A 31/03/2015 Nil N/A N/A N/A N/A 28/02/2015 Nil N/A N/A N/A N/A 31/01/2015 Nil N/A N/A N/A N/A 31/12/2104 Nil N/A N/A N/A N/A 30/11/2014 Nil N/A N/A N/A N/A 31/10/2014 Nil N/A N/A N/A N/A 30/09/2014 Nil N/A N/A N/A N/A 31/08/2014 Nil N/A N/A N/A N/A 02/07/2014 10 pm After hours call to EPA @ 22h00 advising of pungent smell like rotting food coming across the landfill site in Eastern Creek. The wind direction is South Easterly and caller alleged it appears to be coming from Dial-A-Dump. Yes Yes On 7 July 2014 when Licence-holder was advised of complaint an investigation was undertaken which confirmed there has been no odour arising from the landfill. All dams, leachate tanks and the mulch area are routinely inspected daily. South East of our site is another waste facility that accepts food however on this day there was no odour coming across our site. 30/06/2014 Nil N/A N/A N/A N/A 31/05/2014 Nil N/A N/A N/A N/A 30/04/2014 Nil N/A N/A N/A N/A 31/03/2014 Nil N/A N/A N/A N/A 28/02/2014 Nil N/A N/A N/A N/A 31/01/2014 Nil N/A N/A N/A N/A 31/12/2013 Nil N/A N/A N/A NA/ 30/11/2013 Nil N/A N/A N/A N/A 7/07/2014 Genesis Complaints Register Page 4

4/10/2013 1.20 pm Method and a Minchinbury resident Nature Shuddering A Minchinbury Representative advised several residents in Barossa Drive, Minchin Drive and side streets off those roads had experienced shuddering in their homes the previous two nights between 9.30 pm and 10.30 pm. Yes Yes Licence-holder investigated complaint and confirmed no major or extraordinary activity was undertaken on the site. Possibility of seismic activity in the area as reported in the media. 4/10/2013 30/09/2013 Nil N/A N/A N/A N/A 31/08/2013 Nil N/A N/A N/A N/A 31/07/2013 Nil N/A N/A N/A N/A 30/06/2013 Nil N/A N/A N/A N/A 31/05/2013 Nil N/A N/A N/A N/A 09/04/2013 No specific time provided Emails on 11-12/04/2013 From Local residents complain of a chemical-like / garbage-like odour in the St Clair and Erskine Park area on evening of 9 April 2013. EPA contacted a number of facilities to ascertain cause. Yes Yes Licence-holder investigated complaint and confirmed (to EPA) that no odour of that description left the facility. Senior manager (local to the area) observed strong garbage-like odours from another facility in the St Clair area on the evening of 9 April 2013 not in the vicinity of the licence-holder s facility. 11-12/04/2013 31/03/2013 Nil N/A N/A N/A N/A 18/02/2013 4.58 pm a Minchinbury resident Yes Yes Investigated incident and reviewed leachate treatment practices. 18/02/2013 A Minchinbury Resident advised they had noticed an odour from Sydney Water sewer vent pipes following a heavy rain event and had been advised that it may be sewage from Genesis. 31/01/2013 Nil N/A N/A N/A N/A 31/12/2012 Nil N/A N/A N/A N/A 30/11/2012 Nil N/A N/A N/A N/A 30/09/2012 Nil N/A N/A N/A N/A 31/08/2012 Nil N/A N/A N/A N/A Genesis Complaints Register Page 5

Method and Nature 31/07/2012 Nil N/A N/A N/A N/A 30/06/2012 Nil N/A N/A N/A N/A 31/05/2012 Nil N/A N/A N/A N/A 30/04/2012 Nil N/A N/A N/A N/A 31/03/2012 Nil N/A N/A N/A N/A 29/02/2012 Nil N/A N/A N/A N/A 31/01/2012 Nil N/A N/A N/A N/A 31/12/2011 Nil N/A N/A N/A N/A 30/11/2011 Nil N/A N/A N/A N/A 31/10/2011 Nil N/A N/A N/A N/A 30/09/2011 Nil N/A N/A N/A N/A 31/08/2011 Nil N/A N/A N/A N/A 31/07/2011 Nil N/A N/A N/A N/A 30/06/2011 Nil N/A N/A N/A N/A 31/05/2011 Nil N/A N/A N/A N/A 30/04/2011 Nil N/A N/A N/A N/A 31/03/2011 Nil N/A N/A N/A N/A 09/02/2011 4.50 pm Minchinbury Resident Noise Minchinbury Resident advised LHBC of single loud banging noise in the early morning, sounded like dump truck door banging. Yes Yes Review of site daily reports regarding construction progress. Premises best described as building site with concrete pouring of footings and laying of drain pipes. No construction work undertaken after 6.00pm each work day Monday to Friday. Site is locked and secured when Site personnel not present. No waste is being received at premises. 10 February 2011 Email to Resident, as we were unable to reach them by telephone. 01/01/2011 Nil N/A N/A N/A N/A 31/12/2010 Nil N/A N/A N/A N/A 30/11/2010 Nil N/A N/A N/A N/A 31/10/2010 Nil N/A N/A N/A N/A 30/09/2010 Nil N/A N/A N/A N/A 31/08/2010 Nil N/A N/A N/A N/A Genesis Complaints Register Page 6

Method and Nature 31/07/2010 Nil N/A N/A N/A N/A 30/06/2010 Nil N/A N/A N/A N/A 31/05/2010 Nil N/A N/A N/A N/A 30/04/2010 Nil N/A N/A N/A N/A 31/03/2010 Not recorded Dept. of Planning Officers Noise Minchinbury Resident advised Dept. of Planning this has been ongoing since Christmas. Yes Yes Stage 1 works recommenced on LHBC site on or about 4 March 2010 with Contractors working strictly within approved operating hours; limited works undertaken prior to this date. Other site works in the neighbourhood have been ongoing since the New Year. 1 April 2010 Offer to Dept. of Planning for Site Manager to meet with complainant and facilitate site visit. 28/02/2010 Nil N/A N/A N/A N/A 31/01/2010 Nil N/A N/A N/A N/A Genesis Complaints Register Page 7