Astoria Boulevard ADA and Station Renewal Track Improvements. February 19, 2019

Similar documents
Arts Center Rail Station Accessibility Assessment

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

Canarsie Tunnel Repairs: Planning Ahead for the Crisis

North Avenue Rail Station Accessibility Assessment

2017 Temporary traffic control guidelines for pedestrians. v.2

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

TEMPORARY OCCUPANCY PERMITS. Street Space, Additional Street Space and Temporary Occupancy Permits PUBLIC WORKS CODE : ARTICLE 15, SEC.

Accommodating Pedestrians in the Work Zone

Creating the Future Bruce B Downs Blvd

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Transportation 6. A. Transit Center Circulation and Access. 1. Transit Center Circulation

Midtown Rail Station Accessibility Assessment N4

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

ADA on Construction. Guidance for Section C Plan Preparers

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

7th Street Bridge Project. Public Presentation February 24, :30pm-8pm

Richmond-Adelaide Cycle Tracks

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Route 79/Davol Street Corridor Study

Lee County Department of Transportation

Existing Transportation System

42nd Ave N Reconstruction

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Sloat Blvd. Pedestrian Safety Improvement Project

M14A/D Select Bus Service

Pavement Rehabilitation & Buffered Bike Lane

CITY OF LANCASTER PROPOSED NEW PROJECTS

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access

Capital Beltway HOT Lanes Project

Fulton Market Streetscape

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Campbell Union High School District Revised 4/11/18. Master Plan Construction Schedule Summary Measure AA, QZAB, and Capital Facilities TODAY

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

FDOT Treasure Coast Traffic Report

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

ALTERNATIVE A ONLY. Right Turn Only. BOTH ALTERNATIVES on southbound Mission from 23rd St to 25th St and on northbound Mission from 20th St to 23rd St

ECONOMY PEOPLE ENVIRONMENT

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

PUBLIC INFORMATION MEETING

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

FDOT Treasure Coast Traffic Report

PUBLIC REALM MASTER PLAN

Chapter 3 BUS IMPROVEMENT CONCEPTS

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

19th St/Oakland Station Modernization

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

Walkable Community Workshop

Forest Grove Neighbourhood Traffic Review Minutes

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Lawrence Avenue Streetscape Concepts August 30, 2011

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

APPENDIX E GRADE CROSSING LOCATIONS

Monthly Safety and Security Report March 2018

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

September 22, 2015, 6:30 8:00 p.m. City Hall, City Council Chambers

Pedestrian Road Safety Audit

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

The Millbrae Station is owned and operated by the Bay Area Rapid Transit District and is served by Caltrain

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Tonight is for you. Learn everything you can. Share all your ideas.

Project Advisory Group (PAG) Meeting #2 January 31, SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

KEARNY MESA COMMUNITY PLAN UPDATE

F L E T C H E R A V E N U E

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Central Subway UMS Utility Relocation

Pedestrians Bicycles , , , Change , % Change % -20%

Southside Pilot Proposal

Glebe Neighbourhood Cycling Plan

About the Studio. Edward J. Bloustein School of Planning and Public Policy - Rutgers University

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

RE: Park Plaza Walgreens (P12-016)

Purple Line Extension. La Brea Decking Phase II Bus Detours Metro 720/20, 212/312 LADOT DASH Fairfax, Antelope Valley Transit

Alaskan Way, Promenade, and Overlook Walk Final EIS

Ocean Park Boulevard Green Street Project Community Workshop

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

3/20/2015 VIA . Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811

Proposed Language as approved by the NCUTCD on June 23, 2011, for new section on Pedestrian Channelizing Devices

MBTA Key Bus Route. Community Meeting Route 66 - Boston

Taylor Road Resurfacing Project

RHODE ISLAND TROLLEY TRAIL From Charles Armentrout Dr to Farragut St

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

MBTA Key Bus Route. Community Meeting Route 1 - Cambridge

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Page 1 of 5 11/18/2013 9:17 AM

Transcription:

Astoria Boulevard ADA and Station Renewal Track Improvements February 19, 2019

Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two Mezzanine-to-Platform Elevators Demolish and Rebuild Entire Mezzanine. Raise Underside of Mezzanine and Lower Street Surface to Prevent Future Vehicular Hits Reinforce Street Columns and Foundations For Additional Loads due to Elevators and New Facilities Replace Platform Roofs (Wooden Canopies) and Mezzanine Overpass Walkway Roofs

New Sidewalk bump out Hoyt Avenue South Street Elevator at Columbus Triangle 31 st Street North New Street Elevator

Street Elevator at Columbus Triangle New Street Elevator Locations

Street Elevator at Intersection of 31st Street and Hoyt Avenue North Stairs moved to accommodate elevator North Hoyt Avenue North New Street Elevator Removal of two trees is required for elevator installation 31 st Street

Street Elevator at Intersection of 31st Street and Hoyt Avenue North

Replacement of Street-to-Mezzanine and Mezzanine-to-Platform Stairs

Concrete Slab and Topping Repair

Steel Repair

Replacement of Mezzanine Walkways at Hoyt Avenue North and South

West Elevation Art Glass Panels

East Elevation Art Glass Panels

Platform Scope of Work Work Description ADA Boarding Zone New Platform Edges Replace Damaged Platform Precast Planks and Repair Concrete Cast in Place Slab Repair Damaged Steel Replace Existing Platform Canopies Damaged during Hurricane Sandy Replace Existing Stair Refuge Enclosure with New Glass Enclosure at all Four Platform Stairs Replace Platform Light Posts, Signs, Gates, Railings, Benches, Sandboxes and Refuse Bins

Damaged Platform Precast Panels

Cross Section through New Proposed Mezzanine New Elevator New Canopy New Canopy Platform Mezzanine Reinforce street columns and foundation Section A-A Street Use shallower beam to raise underside of mezzanine

North Fall 2018 March 2019

Traffic Stipulations Work Hours Monday-Friday 9:30 AM to 2:30 PM Saturday-Sunday 7:00 AM to 8:00 PM Traffic Enforcement Agents at these Intersections Hoyt Ave. North at 31 st Street Hoyt Ave. South at 31 st Street Astoria Blvd. at 31 st Street Monday-Friday 9:30 AM to 2:30 PM Saturdays 8:00 AM to 5:00 PM Sundays 9:00 AM to 5:00 PM Travel Lanes 31 st Street One Lane in each direction during Work Hours Two Lanes in each direction during Non-Work Hours Hoyt Ave. North 4 Travel Lanes and One Bus Lane at all times Hoyt Ave. South 5 Travel Lanes at all times

Intersection Closure 31st Street and Hoyt Avenue South Up to 20 Weekends in 2019 Required to demolish and rebuild the mezzanine Signage, Traffic Enforcement Agents, and Crossing Guards will be provided

To be replaced with new map/rendering

Detour During All Track GOs and Complete Intersection Closure

Saturday Traffic Conditions

Detour During Complete Intersection Closure Other maps/renderings of detour

Detour During Complete Intersection Closure Other maps/renderings of detour

Saturday Traffic Conditions

Saturday Traffic Conditions

Detour During Complete Intersection Closure Other maps/renderings of detour

Detour During Complete Intersection Closure Other maps/renderings of detour

Bus Routes

Current Work 39 Av-Dutch Kills and Broadway Reopened January 2019 Finished June 2019 Ditmars Boulevard Station Major work complete March 2019 Ditmars Blvd Major Construction finished March 2019 (Station stays open through construction) Astoria Blvd closed Mar-Dec 2019 (after all other stations reopen) Finished June 2019 Astoria Boulevard Station Closing March 17, 2019 Station Reopens December 2019 (9 months) Elevators Operational August 2020 Finished November 2020

Train Service During the Closure Nine month full closure; March-December During the closure Ditmars Blvd and 30th Av provide alternate subway service During 13 Weekends, N/W service will not run north of Queensboro Plaza. Shuttle buses will be provided during these weekends. (Feb 23-24), March 16-18, March 23-24, April 6-7, April 13-14, June 15-16, and June 22-23. Ditmars Blvd Major Construction finished March 2019 (Station stays open through construction) Astoria Blvd closed Mar-Dec 2019 (after all other stations reopen)

Track Replacement Improves the reliability of the track and signal equipment Fewer delays for customers Replaced 2,496 feet of track and ten track switches since 2017 Queensboro 39 Av Ditmars Astoria Blvd ADA compliant platform gaps

Track Replacement Winter/Spring 2019: Replacing nearly 5,000 feet of track on the northbound track between 36 Av and 30 Av. Track is over 35 years old Work will overlap with station work Requires northbound trains to run express during weekdays, skipping stations in one direction ADA compliant platform gaps Increase reliability and reduce delays

Track Replacement Work Hours Monday-Friday 9:45 AM to 3:30 PM February 4 April 19 (except Presidents Day, Feb 18) Weekends: February 23-24, *March 9-10*, March 16-17, March 23-24, & *March 30-April 1* Service Plan Northbound N trains run express from Queensboro Plaza to Astoria Blvd (express to Ditmars Blvd after Astoria Blvd closure) W Trains run along the Q line to 96 St Traffic Plan During Track work we need to detour some traffic from 31 st St Exact detour will change as the location of the track replacement changes Current detour until March 1: 31 st Street between 31 st Ave and 34 th Ave North Bound: Will run Against the Normal Direction of Traffic, between 31 st Ave & 34 th Ave. South Bound: Will be diverted at 31 st Ave onto Crescent St Work is weather dependent

Work Performed to Date Astoria Blvd

Asbestos Material Removed from the Platform Roofs

Relocated Bus Stop and Detoured Walkway to Facilitate Work

Removed Stair at Hoyt Playground

Relocated M60 Bus Stop From Columbus Triangle to Astoria Blvd.

Removed Stair at Columbus Triangle

New Website: https://new.mta.info /system_modernization /astoria