Fish Passage from the Tidewater to the Sierras Workshop - Fish Passage at High Dams - Part 3

Similar documents
Shasta Dam Fish Passage Evaluation. Public Stakeholder Webinar

Fish Passage from the Tidewater to the Sierras Workshop - Fish Passage at High Dams - Part 1

COMMENTS Draft Environmental Impact Statement McCloud Pit Hydroelectric Project (FERC No. 2106) P Applicant: Pacific Gas & Electric Company

AMERICAN FISHERIES SOCIETY HUMBOLDT CHAPTER CALIFORNIA-NEVADA CHAPTER 1990 NORTHEAST PACIFIC CHINOOK & COHO SALMON WORKSHOP PROCEEDINGS

Meeting Summary Fisheries Management Technical Feedback Group Meeting Friday, November 2, 2012

29.0 CALIFORNIA CENTRAL VALLEY STEELHEAD ESU

Draft Central Valley Salmon and Steelhead Recovery Plan

California Steelhead: Management, Monitoring and Recovery Efforts

ESCA. Endangered Species Conservation Act of 1969 Changed in 1973 to ESA Amended several times

Volume I: Ecological Attributes of the San Francisco Bay-Delta Watershed

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #

Summary of the Pilot Assessment of Three Potential Fish Barriers on Battle Creek

Monitoring of Downstream Fish Passage at Cougar Dam in the South Fork McKenzie River, Oregon February 8, By Greg A.

Cushman Hydro Project Public Meeting. Cushman Fire Hall Dec. 6, 2018

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

Columbia Lake Dam Removal Project

Upper Columbia Salmon Restoration: Breakout session: Columbia River Treaty Review Conference Castlegar, BC March 22 nd, 2013

Past, Present and Future Activities Being Conducted in the Klamath River Basin Related to the Protection and Recovery of Fish and Their Habitat

EXHIBIT ARWA-700 TESTIMONY OF PAUL BRATOVICH

Reevaluation Process and Hatchery Management Alternatives Analysis

Case 6:17-cv MC Document 1 Filed 05/22/17 Page 1 of 12

COLUMBIA LAKE DAM REMOVAL PROJECT

Subject: Wells Hydroelectric Project FERC Project No Bull Trout Management Plan and Incidental Take Annual Report

Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River,

Battle Creek Salmon and Steelhead Restoration Plan

Don Pedro Project Relicensing

Chinook Salmon Escapement Sacramento River Natural Areas

Spring-run Chinook Salmon Reintroduction Experimental Population Designation Elif Fehm-Sullivan National Marine Fisheries Service

California Steelhead: Management, Monitoring and Recovery Efforts

MEMORANDUM. July 2, Council members. Tony Grover, Fish and Wildlife Division Director SUBJECT:

Columbia Lake Dam Removal Project

NMFS salmon management support projects presented by Steve Lindley and Pete Lawson

TAY DISTRICT SALMON FISHERIES BOARD POLICY ON SALMON STOCKING

Covered Species Accounts Green Sturgeon

Endangered Species Act and FERC Hydroelectric Projects. Jeff Murphy & Julie Crocker NHA New England Meeting November 16, 2010

Project Award Presentation

Fisheries Framework: Spring-run and Fall-run Chinook Salmon

Segregation Weir Placement, Monitoring and Objective

Integrated Pest Management: Application in the Sea Lamprey Control Program

Kirt Hughes Washington Department of Fish and Wildlife Region 6 - Fish Program Manager

Hatchery Scientific Review Group Review and Recommendations

Ned Currence, Nooksack Indian Tribe

Okanagan Sockeye Reintroduction

Feather-Yuba River Interactions and Management Implications. Yuba Accord River Management Team 5 th Annual Symposium

California Hatchery Review Project. Appendix VIII. Coleman National Fish Hatchery Steelhead Program Report

CAPTURE AND TRANSPORT OF LOWER COLUMBIA RIVER FALL CHINOOK SALMON DURING THE YEAR OF CONDIT DAM REMOVAL.

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Perspectives of a State Director Selective fisheries as a tool in fisheries management and salmon recovery

Chinook Salmon. The Yukon River Panel

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA

Conditions affecting the 2011 and 2012 Fall Chinook Adult Returns to Spring Creek National Fish Hatchery.

Odessa Subarea Special Study, Final Environmental Impact Statement

The following language describing the performance standards was taken from the Reasonable and Prudent Alternative Table of Actions in the 2008 BIOP:

Little Kern Golden Trout Status:

BIOLOGICAL ASSESSMENT ON THE EFFECTS OF COLEMAN NATIONAL FISH HATCHERY OPERATIONS ON WINTER-RUN CHINOOK SALMON

A.19 CENTRAL VALLEY SPRING-RUN CHINOOK SALMON (ONCORHYNCHUS TSHAWYTSCHA)

Juvenile Salmonid Emigration Monitoring in the Middle Sacramento River. Diane Coulon California Department of Fish and Wildlife

Attachment 6. Public Correspondence. Public correspondence received as of July 2, 2008

Council CNL(15)26. Annual Progress Report on Actions Taken Under Implementation Plans for the Calendar Year EU Spain (Navarra)

U. S. Fish and Wildlife Service Connecticut River Coordinator s Office. Ken Sprankle Connecticut River Coordinator

Mountain Snake Province

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

Hatchery Scientific Review Group Review and Recommendations

May 1, 2018 MEMORANDUM. Council Members. John Harrison, Information Officer

Draft Plan of Actions to Restore Salmon and Steelhead Populations in the Lower Calaveras River

107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Backgrounder and Frequently Asked Questions

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT - WINTER FACT SHEET NO.

LEAVENWORTH COMPLEX HATCHERY PROGRAMS. Presentation to the Independent Science Advisory Board

Executive Summary. Map 1. The Santa Clara River watershed with topography.

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Downstream Fish Passage Reports from the Field

Throughout the Pacific Northwest, salmon and steelhead have been listed under the Endangered Species Act because their existence is either threatened

1998 Willow Creek Downstream Migrant Trap Report. Draft. Prepared By: C. A. Walker. Lower Trinity Ranger District. Six Rivers National Forest

UNITED STATES OF AMERICA BEFORE THE FEDERAL REGULATORY ENERGY COMMISSION

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

THE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON

Black Sturgeon Regional Plan

UPDATE: Ktunaxa Nation Council efforts to restore anadromous salmon to the Canadian Columbia River basin. Lake Roosevelt Forum April 2018

Escapement of unclipped (spring) chinook salmon (Oncorhynchus tshawytscha) to Battle Creek, California from March through October 1996.

Development and Investigation of Downstream Passage Alternatives for Cougar Dam, South Fork McKenzie River, OR

State of Washington Dept. of Fish and Wildlife invites applications for the position of: Permanent Fisheries Biologist 4 *

Jamie Laatsch, Conservation & Outreach Coordinator Christina Morrisett, Research Assistant Dr. Rob Van Kirk, Senior Scientist

Recreational Sturgeon Commercial Shad MANAGEMENT GUIDELINES

COA-F17-F-1343 YEAR END REPORT

September 4, Update on Columbia basin Salmon and Steelhead Recovery Planning

Hatchery Scientific Review Group Review and Recommendations

Life History Study of the Alligator Gar in the Ouachita River, Arkansas

Potlatch River Drainage: Salmonid Presence: Largest lower Clearwater River tributary

Yakima/Klickitat Fisheries Project

Gold Action #1: Instream and Floodplain Habitat Restoration

San Joaquin River Chinook Salmon Trap and Haul Donald E. Portz, PhD Bureau of Reclamation Fisheries & Wildlife Resources Group

Covered Species Accounts Central Valley Spring-Run Chinook Salmon

Lewis River Upstream Transport Plan Interim Final. Prepared by Frank Shrier Principal Fish Biologist PacifiCorp Energy.

Chapter 4. Flow Measurements at and Around the Head of Old River

Council CNL(16)30. Annual Progress Report on Actions Taken Under the Implementation Plan for the Calendar Year EU - Spain (Navarra)

Rugraw, LLC is the Applicant for FERC Project No Lassen Lodge Hydroelectric Project (LLHP).

Elkhorn Creek Westslope Cutthroat Restoration Efforts

Transcription:

+ Fish Passage from the Tidewater to the Sierras Workshop - Fish Passage at High Dams - Part 3 35 th Annual Salmonid Restoration Conference held in Davis, CA from March 29 April 1, 2017.

Case Study II: Downstream Fish Passage at Shasta Dam John Hannon US Bureau of Reclamation 82 82

Case Study: Downstream Fish Passage at Shasta Dam John Hannon US Bureau of Reclamation Salmonid Restoration Federation Conference 3/30/2017

Location

Project Driver 2009 NMFS Biological Opinion (ESA) Fish Passage Program at Shasta, Folsom, and New Melones dams Authority: Rivers and Harbors Act of 1937 and 1940 Authorized the construction and operation of the Central Valley Project 3

Stepwise Evaluation Near Term - Pilot Fish Passage Program Habitat Assessment Biological Productivity Technical Feasibility Pilot Juvenile Collectors Head of Reservoir In-river Feasibility Determination Long Term - Fish passage program OR other actions

Project Purpose Evaluate feasibility of passage for ESA-listed Chinook around Shasta Dam to make a well informed decision about initiating a long-term fish passage program.

Participating Agencies and Project Organization US Bureau of Reclamation CA Dept of Fish and Wildlife US Fish and Wildlife Service CA State Water Board National Marine Fisheries Service CA Dept of Water Resources US Forest Service US Geological Survey Leadership Group Steering Committee Habitat Technology Health Genetics Regulatory/ Policy Planning Outreach Field Work

USFWS Photo

Shasta Dam, 523 ft. Hydraulic height 10 miles Hatchery Shasta Temperature Control Device Keswick Dam, 118 ft. Hydraulic height Keswick Trap

Shasta Dam

Box Canyon Dam McCloud Dam

Land Ownership

Public and Stakeholder Engagement McCloud River CRMP Siskiyou County Board of Supervisors Public Meeting Stakeholder Questionnaire Caltrout Water Talk Habitat Assessment webinar Local timber managers Winnemem Wintu Sweetbriar Cabin Owners CA Board of Forestry Project Update Webinars Professional society talks Fishing groups

USFWS Red Bluff data Winter-run emigrate in the fall when weather is still warm

Shasta Lake Salmon Pictures from Sacriverguide.com

May 2006 Head of Reservoir at Full Reservoir Drawn down

Floating Trap Randy Beckwith, CDWR

Proposed In-River Collection Site

Head of Reservoir Juvenile Collection

Head of Reservoir Trap Randy Beckwith, CDWR

Randy Beckwith, CDWR

August Temperature Curtain Evaluation Katherine Clancy, UNR October

Temperature Curtain at Whiskeytown Lake

Winter-run Chinook Lifecycle Model Noble Hendrix (2017) R2 Resource Consultants (2016)

Pilot Program Timeline Experimental Population and EIS 2017 Test juvenile collection device(s) 2017? First winter-run Chinook release 2018 Annual reports of findings - 2019, 2020, 2021 Feasibility Determination - TBD

44 entries to juv. passage prize competition

Thank You Jhannon@usbr.gov http://www.usbr.gov/mp/baydeltaoffice/shasta-damfish-pass.html

Salmon trucked to tributary release sites in McCloud and/or Sacramento River Pilot Juvenile Collectors Shasta Fish Passage Captive Broodstock and New Water Treatment Salmon Migration Tests through Reservoir Feasibility Evaluation Trap and Haul fish passage around dam Pilot juvenile collectors at head of Shasta Reservoir Captive broodstock and New Water Treatment at Livingston Stone NFH Experimental Chinook Salmon Population Biological Studies of success Juvenile Release Adult Salmon Trap New Zealand Salmon?