Angela Lane, Lowe Environmental Impact / Karen Akuhata (WDC) The Wairoa wastewater treatment system requires a replacement consent by May 2019.

Similar documents
Charlottetown Marine Terminal Pipeline Decommissioning Project Description

TECHNICAL MEMORANDUM 002 EMORANNO. 001

APPENDIX D Oil Loading Pipeline - Options

Provisions for Moorings

REPORT OF INITIAL SURVEY OF AN UNKNOWN BARGE OFF OF CEDAR POINT, SANDUSKY, OHIO. July 26-27, Submitted to Cleveland Underwater Explorers, Inc.

GOM Diving Safety Work Group

DUAL-VORTEX SEPARATOR. Inspection and Maintenance Guide

BUTTERFLY VALVES Series 800

IPSWICH. Port Safety Notice

FLOWMETERING STORAGE TANKS FROM THE INSIDE

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

CLEANING, INSPECTION, AND TESTING OF SEWERS

Annex E Bridge Pier Protection Plan

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015

HEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS

Lecture 10 : Sewer Appurtenances

Jiiiioaorno Michael Pacholok, Chief Purchasing Officer Purchasing and Materials Management Division Sabrina Dipietro City Hall, 18th Floor, West Tower

Work Permit Help Document For changes introduced in ShIPS Revision 7.1 (Released 11/12/2008)

MLS Series Liquid Level Switches. Installation and Operations Manual Section 15

With a team of highly qualified divers Vision offers a wide range of services including;

UNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY

Dive Operations Plan for Personal Submersibles. Revision

Cook Inlet pipeline crossing is about making the best choices

Survey Technique for Underwater Digital Photography with Integrated GPS Location Data

Annacis Island Wastewater Treatment Plant OUTFALL PROJECT

Certified Professionals in Hydrographic Solutions

PERKFILTER. Inspection and Maintenance Guide

Golf ball diving Risk Assessment

Emergency Response Plans

6.7 Aircraft Protection

VERTICAL BLADDER TANK

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

7. TDI Advanced Wreck Diver Course

Hot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS

Ammonia Purge Near Miss. Jason Clarke, Gulf Power Co.

Implications of proposed Whanganui Port and lower Whanganui River dredging

Installation, Operation and Maintenance Manual for Back Pressure Regulator

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

Combination Air Valve

SECTION PRESSURE TESTING OF PIPING

APPENDIX G DREDGING STUDIES. G.1: Fish Related Dredgi g I pacts a d Mitigatio

Grit chambers are basin to remove the inorganic particles to prevent damage to the pumps, and to prevent their accumulation in sludge digestors.

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions

Version 1.0 March 2016

DREDGING. with particular emphasis on Oil and Gas activities in Canada

GOM Diving Safety Work Group. Recommended Minimum Dive Team Manning 3/18/2016

TECHNICAL DATA. Q = C v P S

FOAM FRACTIONATORS. Also Known As. Phoam Phraxtionators Protein Skimmers Air Strippers

Siting and Installation Manual

TABLE OF CONTENTS PART 2 - CONFINED SPACES

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

TP1 and TP2 Temporary Cone Shaped Strainers

3 CONSTRUCTION. 3.1 Construction Methods and Sequence. 3.2 Construction Sequence

Essentials of Fire Fighting

HOW TO NOT MEASURE GAS - ORIFICE. Dee Hummel. Targa Resources

QUALIFICATIONS OF GRADUATES

Installation Operation Maintenance

Regulation PM-10.0: Ships Ballast Water Management


SECTION BUTTERFLY VALVES

API Study on Detection and Recovery of Sunken Oil. API Study Objectives

HORIZONTAL BLADDER TANK

TECHNICAL DATA. Q = C v P S

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

TECHNICAL DATA. Q= Cv S

Platelets & Plasma The Management of Unplanned Flow

Surface Supplied Mixed Gas Diving Operations

SECTION 25 TESTING AND DISINFECTING WATER MAINS General

NORMAL OPERATING PROCEDURES Operating Parameter Information

Quantitative Freshwater Mussel Survey Date Prepared: 11/20/2017

ISE Subsea Tools and Toolsleds

Suppression Pool Diving Dose Reductions at Limerick Generating Station. January 2015 Tom Mscisz Exelon Nuclear Limerick Generating Station

Dredging Keeping Our Underwater Highways Open

COA-F17-F-1343 YEAR END REPORT

R. Randall Center for Dredging Studies Texas A&M University

Saskatchewan Health S A WHIRLPOOL DESIGN/OPERATIONAL T C H E W STANDARDS. Updated 02/00

All information correct as of 25 th September 2013 and subject to change without notice. 6 inch HURRICANE modular dredge equipment operations manual.

TRENCH AND EXCAVATION COLLAPSE

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S

WALL MOUNTED EMERGENCY EYE & EYE/FACE WASH HAND OPERATED

Wastewater combination air valve in stainless steel AISI 316 Mod. SCS

Digester Processes. 1. Raw Sludge Pumping System

Aquatic Facilities Water Spray/Play Ground Application, Design & Operating Requirements Environmental Health Guide

Free Surface Flow Simulation with ACUSIM in the Water Industry

TECHNICAL DATA. Page 1 of 12

22. Specialty Valves.

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY

Casing Spacer Technology Leaders

Beavers are particularly adept at manipulating their

TECHNICAL DATA. Pressure Regulation 531a. April 24, 2009

Stability of Pipeline and details of Anchor blocks

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

EQUIPMENT AND MATERIALS

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES

QUALIFICATIONS OF GRADUATES

CERTIFYING DRAINLAYER

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

Transcription:

MEMORANDUM Job No.10292 To: From: Jamie Cox, Wairoa District Council Angela Lane, Lowe Environmental Impact / Karen Akuhata (WDC) Date: 11 September 2017 Subject: Task A2I2 Current Outfall Pipe Description Background The Wairoa wastewater treatment system requires a replacement consent by May 2019. In order to assess any requirement to upgrade the Wairoa WWTP, the capabilities, limitations, and environmental effects of the current outfall piping system needs to be assessed. Purpose To provide a description of the current outfall system, its design, and recent inspections. Also, to identify and assess the benefits and limitations of such a system to: Assess any risk to current discharge flow rates Effects of pluming and obstruction of flow at the outfall This memo has been produced as background information to consider the current ocean outfall system and the recent modifications made to this system only and is not intended to provide any recommendations to the future system at this stage. Introduction This memo describes the current outfall pipe of the Wairoa wastewater treatment plant and issues associated with its recent operation. Greenfield Diving Services conducted a site investigation in April and May 2016 outlining the issues and recommendations associated with the backlog on the outlet and restrictions on the outflow (Appendix 1, Appendix 2). Location The outfall was constructed in 1981, concurrent to the Council Pilot Hill oxidation ponds. Effluent exits the final stage aerobic pond and is gravity fed to the outfall discharge port. The discharge port is located sub-tidally, approximately 150 m from the nearest shoreline. Materials The outfall is constructed of High Density Polyethylene (HDPE) with an internal Ø 300mm. Overtime this has become buried under up to 3 m of sediment.

A2I2 Current Outfall Pipe Description Page 2 of 3 Discharge Issues Council has a consent to discharge domestic, commercial and industrial wastewater into the Lower Wairoa River Estuary (Consent Number CD940404W). The estuarine/riverine environment in the vicinity of the Wairoa outfall has been the subject of several studies over the last 20 years. The most recent study was done in 2016 where dive crews were engaged to investigate the problems associated with a restricted discharge, and a surge chamber over flow. It was discovered that the shifting river channel had resulted in high riverbed sediment levels over the pipe. Divers were then engaged to suction dredge the outfall to stop any overflows of the onshore surge chamber (Appendix 2). Some time was taken to locate the outfall pipe. The outfall was uncovered with dredging and debris removal, but this was seen as a shortterm solution with recommendations to install a stand pipe with a T junction to the current riverbed level (Figure 1), or to extend the pipeline into a deeper area of the river. Figure 1: Description of the T-Section riser that was suggested to be installed to avoid overflows of the onshore surge chamber (source: WDC) Summary and Recent Advances On completion of the dive investigation in May 2016, the outfall had been exposed and its exact location confirmed. A large amount of debris including trees, mud and foreign matter were still present over top of the outfall diffuser. The outfall is located approximately 3.5 m below the seabed.

A2I2 Current Outfall Pipe Description Page 3 of 3 On 21 March 2017, a diffuser tee was installed, as per the recommendations and Figure 1 above, to prevent further issues with overflows and a backlog of discharging wastewater. However, in April 2017 the diffuser T was removed as back pressure issues emerged. Although the diffuser T has been removed, further back pressure issues are still being experienced especially during high flows. Opus Consultants have been approached by Wairoa District Council to investigate options to improve this system and minimise back pressure. This is currently a work in progress as of September 2017. Appendices 1. Greenfield Diving Services Letter (18 April 2016) Report for Wairoa Wastewater Treatment Outfall 2. Greenfield Diving Services Letter (30 May 2016) Report for locating and suction dredging outfall

Abyss Ltd t/a Greenfield Diving Services Abyss Ltd t/a Greenfield Diving Services, 55 Winchester Terrace, Bethlehem, TAURANGA, 3110. Ph. 07 5781332 Mobile. 027 2499923 Email: brendon@greenfielddiving.co.nz Website: www.greenfielddiving.co.nz 18 th April 2016 Wairoa District Council, P.O. Box 54, Wairoa, 4160, New Zealand. Email: quentin@wairoadc.govt.nz Attention: Quentin Adams Report for Wairoa Waste Water Treatment Outfall G.P.S location: 39º 03.527, 177º 25.203 The dive team located the outfall with the assistance of Wairoa Council staff, opening the valve to locate an effluent discharge plume. Diving commenced at the location using SSBA with the water depth of approximately 1.2m in the hole and 0.9m in the surrounding riverbed. The hole, approximately 3m x 3m, was lined with timber debris that was manually excavated to a water depth of approximately 2.9m. At this point the outfall pipe was not physically identified. It is highly probable that the problems associated with the resistance of discharge is caused by a shift in the river channel resulting in high riverbed level over the pipe. This discharge has opened a scour hole in the riverbed, approximately 3m x 3m that is continually accumulating timber debris in the hole similar to a bird s nest. Recommendations: We do not believe that dredging and debris removal from the hole would be a suitable long term solution to the problem. Locating the pipe termination point and installing a stand pipe with a T junction to the current riverbed level would provide a permanent solution, as long as the riverbed does not raise further. The stand pipe would be secured to a small steel pile to ensure satisfactory strength. Another option would be to extend the pipeline into a deeper area. Page 1 of 2

Abyss Ltd t/a Greenfield Diving Services Please do not hesitate to call me if you have any queries regarding this report. Regards, Brendon Cappely Managing Director Abyss Ltd t/a Greenfield Diving Services Page 2 of 2

Abyss Ltd T/a Greenfield Diving Services Abyss Ltd t/a Greenfield Diving Services, 55 Winchester Terrace, Bethlehem, TAURANGA, 3110. Ph. 07 578 1332 Mobile. 027 2499923 Email: brendon@greenfielddiving.co.nz www.greenfielddiving.co.nz 30 th May 2016 Wairoa District Council, P.O. Box 54, Wairoa, 4160, New Zealand. Email: jamie@wairoadc.govt.nz Attention: Jamie Cox Report of Locating and Suction dredging Outfall. Objective: Suction dredge outfall to expose diffuser and open discharge area to stop back pressure from overflowing surge chamber onshore. Site Considerations: This site is classed as a contaminated work environment and extra care to hygiene to be considered. SSBA diving used to not directly expose diver to contaminants. Entrapment due to zero visibility possible and therefore hard wired communication as well as a standby diver available to reduce risk of entrapment outcome. Personnel and Equipment: 1 supervisor 3 man dive team Underwater camera 4 inch Suction Dredging equipment SSBA diving equipment Lifting and safety recovery equipment. Decontamination wash and fresh drinkable water. Page 1 of 3

Abyss Ltd T/a Greenfield Diving Services Report Physical works completed on the 16 th of April and 19 th 20 th May 2016 Day 1 Arrived on site at 8:00am. All safety briefs and Work Method Statements completed 8:00-8:30. Site setup started at 8:30 and all suction and diving equipment was setup and ready for diving at 9:30. Travel to site via vessel (Lulu) and a circular search for the outfall was conducted and found ready for first dive at 11:40. First dive was completed between 11:49 13:59. The findings for the dive were as follow: The outfall diffuser was not reached due to buildup of sticks tree trunks and mud/silt. Dredging of the silt and removal of sticks conducted for the duration of the dive was unsuccessful as no pipe was found. A second dive was completed from 14:34 16:02 and still no sign of the outfall was achieved. Recommendations were made to come back to do more suction dredging to expose the hole and find the outfall as this was buried under a large amount of debris and therefore blocked. Day 2 Arrived on site at 7:30am on the 19 th of May to conduct more suction dredging. First dive completed at 9:29 11:29. The discharge hole was exposed and still no sign of the outfall was achieved. Lots of sticks and mud was removed. Second dive completed at 11:35 13:35. More suction dredging was done and a hole of approximately 3m in depth was created. Third dive completed at 13:42 14:45. The 3m hole was widened to locate pipe in the perimeter surrounding the 3m hole. Dredging towards the shore was achieved but still no visual on the outfall pipe. Day 3 First dive completed at 8:46 10:46. Proceedings with a continuation of exposing the surrounding area took place and an area of thick dark mud was exposed indicating the correct area dredged. Second dive completed at 10:52 12:51. The outfall was turned on and a lot of debris within the hole was present. Upon isolation of the outfall a large horizontal cavity was exposed to an approximate size of 2m wide 300mm high and the depth unknown. At this stage the cavity was exposed from the side. Third dive completed at 13:02 15:00. A continuation of the exposure of the cavity was completed and at 14:00 the outfall located within the cavity. A large tree above the outfall discharge was found and prepared for Page 2 of 3

Abyss Ltd T/a Greenfield Diving Services removal. At the end of the day the tree was still in position with a large amount of debris above, but a clear discharge path was present although not direct to the surface. The outfall was clear and flowing. Overview The outfall is currently exposed and the location known. There is a large amount of debris including trees, sticks, mud and foreign matter still present over top of the outfall diffuser. A horizontal cavity at the same level as the pipe is present and discharge through the cavity is clear. The outfall is approximately 3.5m below the seabed and in future needs some attention. A riser is recommended to be installed to reduce the possibility of the outfall being buried and therefore getting blocked. Removal of the cavity would be needed for this works to be completed. Flange Specifications: These are the actual measurements gathered on the day of the survey ID = 360 mm OD = 440 mm Bolt spacing crs = 70 mm Bolts across face crs = 400mm (PCD) No of bolts = 16 This is the closest flange I could find to the specs above as the PCD is the same and the number of bolts and the outside diameter of the flange. DN 300 (12 inch) JIS10K 445mm OD 400mm PCD 16 bolts M24 bolts 25mm holes Flange thickness -cast iron =32mm - carbon steel= 24mm Please do not hesitate to call me if you have any queries regarding this report. Regards, Martin Beukes Abyss Ltd t/a Greenfield Diving Services Page 3 of 3