Will Kempton, Chief Executive Officer. Update on Proposed Implementation of a Wayside Horn System Along the San Clemente Beach Trail

Similar documents
Salem City Council November 9, 2009

ORANGE COUNTY GRAND JURY

ITE 2013 Annual Meeting Session 36. Utah Statewide Pedestrian Treatment Guidance Manual Standards for At-Grade Crossings F-ST99(180)

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

Ann Arbor, Michigan Quiet Zone Assessment

Quiet Zones: Silencing Train Horns at Railroad Crossings

Members of the Board of Directors. Wendy Knowles, Clerk of the Board

Is Train Horn Noise a Problem in your Town? By: John P. Redden, P.E., senior railroad engineer, Hanson Professional Services Inc.

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Welcome! CHICAGO TO ST. LOUIS HIGH-SPEED RAIL Public Meeting.

Is Train Horn Noise a Problem in your Town?

For Signals Training Consortium Use Only

Pedestrian Issues and Safety Initiatives in Railroad Corridors

Traffic Calming Policy

Bicycle Master Plan Goals, Strategies, and Policies

Members of the Board of Directors. Wendy Knowles, Clerk of the Board. Metrolink Ridership and Revenue Annual Report

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Senate Amendment to Senate Bill No. 354 (BDR ) Amends: Summary: Yes Title: Yes Preamble: No Joint Sponsorship: No Digest: Yes

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study

The Florida Bicycle and Pedestrian Partnership Council

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Affects of Tides on Lateral Coastal Access at. Las Varas Ranch. Gaviota, California. Photos Courtesy of California Coastal Records Project

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Appendix H RESPONSES TO PUBLIC COMMENTS

Public Information Meeting

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects

GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL

Rapid City Quiet Zone Assessment

8 th Annual Spring Transportation. April 9, 2010

SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing

PISMO BEACH COUNCIL AGENDA REPORT

Non-Motorized Transportation 7-1

Access Management in the Vicinity of Intersections

Designing Safety into Highway-Rail Grade Crossing Projects

Solana Beach Comprehensive Active Transportation Strategy (CATS)

European Student Competition VOICE Vulnerable Road Users Organizations in Cooperation Across Europe

5. RUNNINGWAY GUIDELINES

122 Avenue: 107 Street to Fort Road

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Bus and Transit Lane Review Update

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Carbondale to Murphysboro Bike Route JACKSON COUNTY

WHEREAS, the New Jersey Department of Transportation' s Complete Streets

3.9 Recreational Trails and Natural Areas

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Traffic Calming Policy

PEDESTRIAN ACTION PLAN

Golden s Plan. For the Highway 6 & 93 Corridor

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Traffic Impact Analysis (TIA) Process and Procedures Manual. September 2017

Wyoming Quiet Zone Study

Meeting Summary Public Information Meeting #1 Warren County Pathway Corridor Project September 27, 2018

Operational Comparison of Transit Signal Priority Strategies

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

PUBLIC,UTILITIES COMMSSION OF THE

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

Item B1 November 19, 2009

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

TECHNICAL COMMITTEE: Railroad and Light Rail Transit and Signals Technical Committees

Referred to Committee on Transportation. SUMMARY Authorizes the use of motorized wheelchairs in bicycle lanes. (BDR )

HARVEST RIDGE COOPERATIVE CHARTER SCHOOL TRANSPORTATION SAFETY PLAN

Citizens Advisory Committee March 26, 2014

Complete Streets: Policy to Pavement

CHAPTER Committee Substitute for Committee Substitute for Committee Substitute for House Bill No. 41

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

TRANSPORTATION NEEDS ASSESSMENT

DIRECTION REGARDING WEHO PEDALS BIKE SHARE PROGRAM AND DOCKLESS BIKE SHARE PILOT MAYOR PRO TEMPORE JOHN D' AMICO COUNCILMEMBER LAUREN MEISTER

PRELIMINARY DRAFT FIRST AMENDMENT TO VISION 2050: A REGIONAL LAND USE AND TRANSPORTATION PLAN FOR SOUTHEASTERN WISCONSIN

Subject: Front Street Pedestrian Improvement and Roadway Revitalization Project

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

TABLE OF CONTENTS. Executive Summary

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

MEMORANDUM. Background

ADVANCED TRANSIT OPERATIONS AND MODELING

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

Perryville TOD and Greenway Plan

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Train Horn Noise Mitigation

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

CITY MANUALS AND STANDARDS REVIEW

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

Traffic Calming Policy

TRAFFIC IMPACT STUDY CRITERIA

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

GRANDFORKS MILSPURFEASIBILITYSTUDY. GrandForksandEastGrandForksMPO. FINALReport. August2010

August 12, The Honorable Edmund G. Brown Jr. Governor, State of California State Capitol Sacramento, CA Dear Governor Brown:

Transcription:

May 27, 2010 To: From: Subject: Transit Committee Will Kempton, Chief Executive Officer System Along the San Clemente Beach Trail Overview The Orange County Transportation Authority and City of San Clemente have been working collaboratively to develop a wayside horn system pilot program to offer relief from train horn noise. The wayside horn system is a stationary horn that warns drivers and pedestrians of oncoming trains. The program is being analyzed for possible implementation in San Clemente along the coastal beach trail. This report provides an update on progress made to date. Recommendations A. Direct staff to continue to work with the City of San Clemente and other stakeholders on project development activities for the implementation of a wayside horn system at seven pedestrian grade crossings along the San Clemente beach trail. B. Direct staff to develop a funding plan for the implementation of a wayside horn system along the San Clemente Beach Trail. Background The City of San Clemente (City) has a license to construct and maintain a beach trail along the Orange County Transportation Authority (OCTA)-owned railroad right-of-way within the City limits. The beach trail serves to control and channel the many pedestrians and bicyclists who use the existing railroad corridor as a pathway. The implementation of the beach trail has reduced the amount of trespassing and unsafe passage that occurred along this corridor by fencing the trail and creating formal pedestrian at-grade railroad crossings at various locations along the trail. The formal pedestrian crossings include warning bells and grade crossing arms which close the path when trains are approaching. Federal Railroad Administration (FRA) and California Public Orange County Transportation Authority 550 South Main Street / P.O. Box 14184 / Orange / California 92863-1584 / (714) 560-OCTA (6282)

Page 2 Utilities Commission (CPUC) regulations require train locomotive horns be sounded as trains approach grade crossings. Consequently, the new pedestrian grade crossings that were constructed as part of the beach trail require trains to sound their horns when traversing this area. Over the past few years the City has pursued several measures aimed at reducing or eliminating train horn noise along this beach trail corridor. Such measures have included: Quiet Zone Efforts to establish a quiet zone through this area Grade separation of pedestrian crossings Implementation of a wayside horn system (WSH) On November 9, 2007, the City issued a Notice of Intent to create a quiet zone along the San Clemente beach trail. However, due to FRA regulations a majority of the pedestrian grade crossings are not eligible for inclusion in the proposed quiet zone. The City also completed a memorandum of understanding with the City of Oceanside to pursue a multi-jurisdictional quiet zone extending from San Clemente through the Marine Corps Base Camp Pendleton into the City of Oceanside. This multi-jurisdictional quiet zone would meet FRA regulations, but requires significant safety improvements at grade crossings in the City of Oceanside. The City of Oceanside does not currently have adequate funding to pursue these safety improvements. Grade Separation The City has also evaluated grade separating several of the pedestrian grade crossings to eliminate the need for trains to sound their horns. Concerns with environmental impacts, cost, trail maintenance, and the trail becoming impassable during high tides due to flooding have ruled out the possibility of grade separating the pedestrian grade crossings. The City has concluded that the grade separation option is not cost effective and has a considerable environmental impact. Wayside Horn The City and OCTA are currently working together to evaluate the possibility of installing an automated WHS as a measure to reduce train horn noise until it is possible to implement a quiet zone. The WHS is a stationary audible system, which warns vehicles and pedestrians of approaching trains at grade crossings. The WHS is mounted at the grade crossing rather than on the

Page 3 locomotive and is activated by the grade crossing warning system. The FRA considers the WHS to be a one-for-one substitute for the train horn. On September 3, 2009, the City performed site demonstrations of a WHS at two pedestrian grade crossings on the San Clemente beach trail. The horns were sounded per FRA requirements for grade crossings, which dictate a minimum horn volume of 92 decibels (dba) at a distance of 100 feet. Based on the feedback received by the City, community acceptance of a WHS is unlikely unless the horn volumes are significantly lower than 92 dba at 100 feet from the horn. The City, in cooperation with OCTA, has been in discussions with the CPUC to get a determination if a reduced volume (potentially between 75 and 92 dba) would be acceptable for a WHS at pedestrian and private grade crossings along the beach trail. The FRA has indicated that since it only requires the sounding of a horn at public grade crossings, sounding of horns at pedestrian-only and private grade crossings in California is regulated by the CPUC. A formal CPUC site diagnostic meeting was held on September 24, 2009, to review the pedestrian and private grade crossings along the San Clemente beach trail. Recommendations for further safety enhancements were noted by CPUC, these recommendations conform to the Southern California Regional Rail Authority (SCRRA) Grade Crossing Design Criteria Manual and include installation of emergency exit pedestrian swing gates, pedestrian channelization and fencing, additional tactile warning tiles, and widening the crossing surface and walkway approaches. The recommended improvements are consistent with those being constructed under the current grade crossing safety enhancement program. It is SCRRA s policy to upgrade grade crossings to current standards when other grade crossing modifications are performed. The CPUC has indicated that these additional safety enhancements will be required if a WHS is constructed at each pedestrian crossing. In an effort to gain approval of reduced wayside horn volumes, two additional wayside horn demonstrations, sponsored and coordinated by OCTA, were conducted on December 15, 2009 and February 2, 2010. The horns were sounded at three noise levels; 75 dba, 85 dba, and 95 dba, measured 12 feet from the face of the horn. During these demonstrations dba readings were recorded at multiple locations; at the grade crossing approximately 12 feet from the horn, on the beach trail 100 feet from the face of the horn, and in a residential area on the bluff top above the vicinity of the horn. These sound measurements were used to complete a three-dimensional noise model along the entire railroad corridor through San Clemente. The model depicts the sound affects along the beach trail and in the surrounding community. A technical noise study report, which included the results of the noise model

Page 4 was completed on March 31, 2010, and distributed to all stakeholders for review and comment. Discussion On March 24, 2010, the CPUC sent a letter to OCTA and all the affected railroad agencies identifying a formal application process for the review and approval of the use of a WHS at reduced volumes at the pedestrian and private grade crossings in San Clemente. The letter stated that since the FRA has indicated it only requires the sounding of the train horn at public grade crossings, and state law (Public Utilities Code 7604) requires sounding an audible device at pedestrian-only and private grade crossings, the matter is a state issue. Therefore, since these grade crossings do not meet FRA criteria for consideration of inclusion in a FRA quiet zone, under Title 49 Code of Federal Regulations, Part 222, the review and approval will come from the CPUC. The CPUC has since recommended that the City and OCTA work to assure all involved parties are in agreement to the use of a WHS at reduced volumes prior to filing the application so as to avoid any protests or interventions in the proceeding, which would cause the case to be assigned to an administrative law judge, possibly resulting in hearings and a more lengthy process. In an effort to gauge each stakeholder s position on the CPUC letter, a kick off meeting was held on March 31, 2010, with representatives from the Burlington Northern and Santa Fe (BNSF) Railway, City, CPUC, FRA, OCTA, and SCRRA in attendance. The approval process, criteria, and timeline for implementation of a WHS were discussed. On April 21, 2010, the FRA issued a letter stating that the FRA does not regulate the use of a WHS at pedestrian and private grade crossings outside of quiet zones. However, the FRA did recommend that, unless State law provides otherwise, the FRA standards for a WHS should be followed unless data analysis has determined that a variation does not reduce safety. This issue is currently being addressed through meetings between legal counsel representatives. Pending the outcome of these meetings, the City and OCTA will collaboratively develop a plan to address the reduction of train horn noise along the beach trail at the pedestrian grade crossings. In anticipation of resolution on the issues, staff will also work to devlop a funding plan for implementation of the wayside horns along the beach trail. This funding plan will be consistent with the existing Rail-Highway Grade Crossing Safety Enhancement and Quiet Zone Program, including a requirement for City participation of 12 percent and OCTA participation of 88 percent, and is anticipated to be funded with Measure M2.

Page 5 Next Steps OCTA will continue working with all involved agencies to coordinate and gain consensus on the appropriate path to implement a WHS along the San Clemente beach trail. Summary OCTA staff is in the process of assisting the City obtain relief from train horn noise at the pedestrian and private grade crossings along the San Clemente beach trail. OCTA will continue to lead the coordination efforts of all stakeholders in order to galvanize support for the implementation of a wayside horn system at reduced volumes at these grade crossings. Attachment None. Prepared by: Approved by: Mary Toutounchi Project Manager (714) 560-5833 Darrell Johnson Deputy Chief Executive Officer (714) 560-5343