ARTICLE IN PRESS. Nuclear Instruments and Methods in Physics Research A

Similar documents
Performance of a triple-gem detector for high rate charged particle triggering

arxiv: v1 [physics.ins-det] 16 Aug 2014

arxiv: v1 [hep-ex] 18 Sep 2012

Analysis of RPC Performance with Different Gas Mixture

ATLAS RPC QA results at INFN Lecce

Preliminary results of Resistive Plate Chambers operated with eco-friendly gas mixtures for application in the CMS experiment

arxiv: v1 [physics.ins-det] 6 May 2016

The Resistive Plate Chamber detectors at the Large Hadron Collider experiments. Danube School, September 8-13, 2014 Novi Sad

ARTICLE IN PRESS. Nuclear Instruments and Methods in Physics Research A

Design and Construction of a GEM-TPC Prototype for R&D Purposes

Long term stability tests of INO RPC prototypes

EFFECTS OF OUTGASSING FROM SOME MATERIALS ON GAS CHAMBER AGEING

arxiv: v1 [physics.ins-det] 4 May 2016

GAS ANALYSIS AND MONITORING SYSTEMS

Additives that prevent or reverse cathode aging in drift chambers with Helium-Isobutane gas *

THE development of more advanced techniques in radiotherapy,

ETCHING OF COPPER COATED MYLAR TUBES WITH CF4 GAS. Karl M. Ecklund, Keith W. Hartman, Michael J. Hebert, Stanley G. Wojcicki

Development of small, easy to build and low gas consumming timing RPCs

Assembly and Testing of RPCs in Pakistan. Hafeez Hoorani National Centre for Physics

EUROPEAN LABORATORY FOR PARTICLE PHYSICS STUDY OF AGEING AND GAIN LIMITS OF MICROSTRIP GAS CHAMBERS AT HIGH RATES

Study of Mixed Gas Flow Pattern Inside RPC

Experience with the ZEUS central tracking detector

A Longterm Aging Study of the Honeycomb Drift Tubes of HERA-B Using a Circulated and Purified CF -Gas Mixture

Extension of the operational lifetime of the proportional chambers in the HERMES spectrometer

Sensoric 4-20 ma Transmitter Board Operation Manual

Assembly and measurements of a mechanical prototype of the BIS MDT chamber

GIF++ A New Gamma Irradiation Facility

Study of the IBF of Double/Triple THGEM

Profile LFR-43 HELENA ITALY. Italian National Agency for New Technologies, Energy and Sustainable Economic Development, C.R. ENEA Brasimone, Italy

Circuit model of medical equipment for electrical safety purposes

Vibration Analysis and Test of Backup Roll in Temper Mill

Total Ionization Dose (TID) Test Results of the RH1028MW Ultralow Noise Precision High Speed Operational Low Dose Rate (LDR)

Aging Effects in Cathode Strip Chambers of CMS at Large Hadron Collider: Chemistry and Recovery

On the possibilities for the readout of gas scintillation detectors for neutron scattering applications

Yoke Instrumentation: ILD Muon System / Tail Catcher. Valeri Saveliev IAM, RAS, Russia DESY, Germany 3 June, 2016

Instruction and Maintenance Manual

Columbus Instruments

ELEVATION CORRECTION FACTORS FOR RADON MONITORS*

WP2 Fire test for toxicity of fire effluents

Effects of the electric field on the electron drift velocity in a double-gem detector in different gas mixtures

Geant4 Electromagnetic Physics for HEP Applications

TPC Report. D. Karlen T2K ND280m meeting December 7, 2004 Rome

The Transition Radiation Detector of the AMS-02 Experiment

QUALIFICATION OF SUB-ATMOSPHERIC PRESSURE SENSORS FOR THE CRYOMAGNET BAYONET HEAT EXCHANGERS OF THE LARGE HADRON COLLIDER

PERFORMANCE OF THE GAS GAIN MONITORING

Instruction and Maintenance Manual

Resist round robin ELETTRA

Characteristics and Production of Gas Sealed, Radiation Hard, Small Ionization Chambers

Nuclear Associates

The TOTEM Gas System

GEANT4 SIMULATION OF AN ACCELERATOR HEAD FOR INTENSITY MODULATED RADIOTHERAPY

DESIGN OF REMOTE CONTROL SYSTEM FOR FAR-INFRARED LASER INTERFEROMETER

PHENIX RPC in China. Xiaomei LI. Science and Technology on Nuclear Data Laboratory China Institute of Atomic Energy

Relative Dosimetry. Photons

Effects of materials on aging rates in wire chambers operated with DME

TG-119 IMRT Commissioning Tests Instructions for Planning, Measurement, and Analysis Version 10/21/2009

Badan Jadrowych Nuclear Research Institute. Report INR No. 739/XIX/D CERN LIBRARIES, GENEVA CM-P Differential Recombination Chamber

Troxler Electronic Laboratories, Inc.

Drift-Chamber Gas System Controls Development for the CEBAF Large Acceptance Spectrometer

UK Opportunities in SiD Calorimetry

PRESSURE DISTRIBUTION OF SMALL WIND TURBINE BLADE WITH WINGLETS ON ROTATING CONDITION USING WIND TUNNEL

Numerical Tools for LCLS-II Vacuum Systems

RADIATION PROCEDURES MANUAL Procedure Cover Sheet

INTERACTION BETWEEN WIND-DRIVEN AND BUOYANCY-DRIVEN NATURAL VENTILATION Bo Wang, Foster and Partners, London, UK

HYDROGEN - METHANE MIXTURES : DISPERSION AND STRATIFICATION STUDIES

EXPERIMENTAL STUDY ON THE DISCHARGE CHARACTERISTICS OF SLUICE FOR TIDAL POWER PLANT

The FLUX-METER: implementation of a portable integrated instrumentation for the measurement of CO 2 and CH 4 diffuse flux from landfill soil cover.

Transmitter CS 21 Operation Manual

Constancy checks of well-type ionization chambers with external-beam radiation units

AIR BEARINGS IN HIGH PRECISION SYSTEMS

Annex 1 Gas circulation / purification system

Monitored Drift Tubes in ATLAS. Michele LIVAN 1. Dipartimento di Fisica Nucleare e Teorica, Universita di Pavia

TOTAL-IONIZING-DOSE RESPONSE OF 65 nm MOSFETS IRRADIATED TO ULTRA- HIGH DOSES. GIULIO BORGHELLO

Experimental Analysis of Inclined Narrow Plate-Fins Heat Sink under Natural Convection

PERME- OX2/230 Oxygen Transmission Rate test system

ACCURATE PRESSURE MEASUREMENT FOR STEAM TURBINE PERFORMANCE TESTING

Operating Procedures for Metal Evaporator I

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

Total Ionization Dose (TID) Test Results of the RH117H Positive Adjustable Low Dose Rate (LDR) LDR = 10 mrads(si)/s

Customer Responsibilities

Development of a new bench for puncturing of irradiated fuel rods in STAR hot laboratory

A high-sensitivity large volume cryogenic detector for radon in gas

MIL-STD-883G METHOD

This test shall be carried out on all vehicles equipped with open type traction batteries.

MODEL WEIGH MODULE

Technical Data Sheet MF010-O-LC

Supplementary Operator s Manual 42/24-14 EN Rev. 3

Coriolis Mass Flow Meter

13 QUALITY ASSURANCE OF A LINEAR ACCELERATOR 13.1 COLLIMATOR ISOCENTER, JAWS, LIGHT FIELD VS INDICATORS, COLLIMATOR ANGLE INDICATORS.

DISSOLVED GAS ANALYSIS OF NATURAL ESTER FLUIDS UNDER ELECTRICAL AND THERMAL STRESS

WIND-INDUCED LOADS OVER DOUBLE CANTILEVER BRIDGES UNDER CONSTRUCTION

Nemoto Sensor Engineering Company Ltd

The ATLAS Tile Calorimeter LVPS hardware upgrade and testing.

Variable Depth Bragg Peak Test Method

A Study of Spatial Resolution of GEM TPC with Ar-CF 4 -ic 4 H 10 Gas Mixtures

Genesis MX SLM-Series

Simrad GD10P Extended On-site Maintenance

2 Switching off ECRIS 3. 4 Acquire Beam Spectrum 4. 6 Vent Instrument Chamber 5. 7 Pump down Chamber 5. 8 Baking out Chamber 5.

EMISSION CHAMBERS. Bulk and Surface Emission Detection for the RAD7 User Manual

CHAPTER 4 PRE TREATMENT PATIENT SPECIFIC QUALITY ASSURANCE OF RAPIDARC PLANS

Transcription:

Nuclear Instruments and Methods in Physics Research A 599 (29) 7 75 Contents lists available at ScienceDirect Nuclear Instruments and Methods in Physics Research A journal homepage: www.elsevier.com/locate/nima High radiation tests of the MWPCs for the LHCb Muon System M. Anelli a, S. Baccaro b, P. Campana a, E. Dané c, C. Forti a, G. Lanfranchi a, G. Penso c,e, D. Pinci c, R. Rosellini a, M. Santoni a, A. Saputi a, A. Sarti a,d,, A. Sciubba a,d a INFN-Laboratori Nazionali di Frascati, Italy b ENEA-FIS/ION, C.R. Casaccia, S.Maria di Galeria (Roma), Italy c INFN, Sezione di Roma, Italy d Dip. Energetica, Sapienza Università di Roma, Roma, Italy e Dip. Fisica, Sapienza Università di Roma, Roma, Italy article info Article history: Received 29 September 28 Received in revised form November 28 Accepted 24 November 28 Available online 3 December 28 Keywords: Gas detectors MultiWire Proportional Chambers Tracking and position-sensitive detectors Elementary-particle and nuclear physics experimental methods and instrumentation abstract The MultiWire Proportional Chambers (MWPCs) for the LHCb Muon Detector were subjected to an ageing test, performed in the high-radiation environment of the Calliope Gamma Facility of the ENEA- Casaccia Research Centre. The test showed that the MWPCs can safely operate for many years in a high intensity particle flux. An additional test, performed with the CERN Gamma Irradiation Facility (GIF), confirmed these conclusions. & 28 Elsevier B.V. All rights reserved.. Introduction The aim of the LHCb experiment is to acquire a precise measurement of CP violation and of rare decays in the b b system. The LHCb Muon Detector [,2] consists of five stations (M M5) located along the beam axis and interspersed with iron filters (see Fig. ). Each station is divided into four regions (R ) of increasing distance from the beam (see Fig. 2). Station M is equipped with 2 Gas Electron Multiplier (GEM) detectors [3 5] and 264 two-gap MultiWire Proportional Chambers (MWPCs). The other stations comprise 4 four-gap MWPCs. The chambers are of different dimensions and read-out granularity. The geometry is projective and optimised in order to identify muons in the first level trigger (L) with a p T resolution of 2%. The L Muon trigger is designed to operate at an efficiency level of at least 95% within a 25 ns time window. This is achieved, in M2 M5, by using MWPCs with two OR-ed double-gaps, with all the corresponding pads of a double-gap ganged together (see Fig. 3). A time resolution lower than 4 ns (rms) is obtained [6,7] at 2.6 2.65 kv and with a gas mixture of Ar=CO 2 =CF 4, 4/55/5% in volume. The MWPCs must have a stable performance during the lifetime of the experiment, when they will operate in conditions of high radiation. To check this requirement two different tests were performed: an ageing test, carried out at the Calliope Gamma Facility [8] of the ENEA-Casaccia Research Centre and an operational test, performed at the CERN Gamma Irradiation Facility (GIF) [9]. 2. The ageing test 2.. Experimental setup The experimental setup for the ageing test is shown in Fig. 4. Two different chambers were used: the chamber (T) to be tested and a reference chamber (REF). Chamber T was exposed to the g flux coming from an 8 TBq (at the time of the test) 6 Co radioactive source. The REF chamber was shielded from the radioactive source by a concrete wall, and hence exposed to a Corresponding author at: Dip. Energetica, Sapienza Università di Roma, Roma, Italy. Tel.: +396 943 866; fax: +39 6943 2427. E-mail address: asarti@lnf.infn.it (A. Sarti). The position of chamber T in relation to the radioactive source was chosen in order to optimise the g flux through the chamber and to perform the ageing test within a reasonable time interval. 68-92/$ - see front matter & 28 Elsevier B.V. All rights reserved. doi:.6/j.nima.28..92

6 mrad 72 M. Anelli et al. / Nuclear Instruments and Methods in Physics Research A 599 (29) 7 75 M M2 M3 M4 M5 Detector GND nf CALORIMETERS Muon filter Muon filter 2 Muon filter 3 Muon filter 4 258 mrad Gap D kω Polyurethane foam supplies Shielding/Safety GND HV power Fig. 3. Sketch of a four-gap chamber. nf k Ω Gold plated pad Gold plated wire R R2 R3 T 4.5 m y Pool water purification system REF 2 m Pool 6 Co source Shielded window z Fig.. Side view of the muon system. R3 R2 R VERTICAL STRIP LOGICAL PAD R R2 R3 BEAM PIPE HORIZONTAL STRIP Fig. 2. Front view of one quadrant of stations M2 and M3 showing the partitioning into sectors. In one sector of each region a horizontal and a vertical strip are shown. much lower g flux than chamber T. The 6 Co source can be shielded so that the gamma flux can be switched ON and OFF. Chamber T had an area of 2 cm 2 (2.4 l of gas) and a wire pitch of 2 mm. The REF chamber had an area of 5 cm 2 ( l of gas) with a wire pitch of.5 mm. The geometrical characteristics of the chambers are described in detail elsewhere [,2]. Both chambers Gas bottles Gas rack had four gaps 2 (A, B, C and D) with the anode wire (3 mm in diameter) planes placed in the centre of the 5 mm gas gaps. The materials used to build these prototypes were identical to those used for the final chambers of the LHCb Muon System. During the test the T and REF chambers were flushed in series in open-loop mode, with a gas mixture of Ar=CO 2 =CF 4 4/4/2% in volume. 3 The gas flow ð3 Volumes=hÞ was larger than that foreseen during the LHCb experiment, in order to take into account the accelerated ageing due to the higher particle flux. The ageing test was performed on gaps A, B and C of chamber T. To accelerate the ageing process the high voltage (HV) of these gaps was kept at 2.75 kv, a value 5 V higher than the normal working voltage []. With this HV the current in gaps A, B and C was about..5 ma with the source ON. In order to avoid a large voltage drop the current-limiting resistors placed on the HV lines were removed. Gap D of chamber T was used as a reference, in addition to the chamber REF. Starting from day 5 and for most of the duration of the test the HV of gap D was set to 2.5 kv to avoid ageing in this gap. HV PC Console Control room Fig. 4. Experimental setup at the Calliope Facility. The positions of the T and REF chambers are shown together with the other elements of the setup. 2 Only gaps A and B of the REF chamber were used for this test. 3 The final operating gas mixture (Ar=CO 2 =CF 4, 4/55/5% in volume) was chosen later.

M. Anelli et al. / Nuclear Instruments and Methods in Physics Research A 599 (29) 7 75 73.5 Integrated charge (C/cm) <I A / I D >.3. 5 5 2 25 3 Fig. 5. Integrated charges in gaps A, B, C and D of chamber T during the 3 days of the test..8.6 B A C D <I A / I REF > <I C / I REF > <I B / I REF >.8.6.8.6.8.6 5 5 2 25 3 Fig. 7. Ratios between the currents in gaps A, B and C of chamber T and the average current of gaps A and B of chamber REF. The average value of these ratios has been normalised to. <I C / I D > <I B / I D >.8.6.8.6 5 5 2 25 3 Fig. 6. Ratios between the currents in gaps A, B, C and that in gap D of chamber T. The average value of these ratios has been normalised to. The HV of the REF chamber was set at 3: kv. This higher voltage was chosen to compensate [,2] the lower wire pitch of that chamber so that its gain is roughly equal to the gain of gaps A, B and C of chamber T. With the source ON the current per gap in the REF chamber was 2 ma. During the ageing test each gap in each chamber was powered by a different channel of a CAEN 4 SY2527 power supply having a current offset varying between and ma and a sensitivity of :2 ma in the measurement of the output current. LabVIEW-based software was used to manage the HV system and to acquire the currents of the different gaps. 2.2. Test results In order to assess the ageing properties of gaps A, B and C of chamber T, a large charge was accumulated over one month of exposure to the 6 Co source and the relative gain of each gap was constantly monitored during this period. In Fig. 5 we report the cumulative time distribution of the charge recorded in the four gaps of chamber T. At the end of the test the charge per unit 4 CAEN, 5549 Viareggio (LU), Italy.

74 M. Anelli et al. / Nuclear Instruments and Methods in Physics Research A 599 (29) 7 75 Table Current density (na/cm of wire) in the MWPCs expected at the LHC with a luminosity of 2 32 cm 2 s and no safety factor. Average current density (na/cm of wire) in the most irradiated chamber (in the most irradiated cm 2 ) R R2 R3 M 3: :8 :37 :9 :637 :7 ð6:48 :36Þ ð2:54 :5Þ ð:238 :89Þ M2 :8 :82 :392 :37 :85 :5 :282 :76 ð2:44 :4Þ ð:943 :62Þ ð:336 :3Þ ð:39 :8Þ M3 :277 :24 :78 : :24 :67 :87 :27 ð:7 :73Þ ð:295 :29Þ ð:48 :8Þ ð:98 :7Þ M4 :22 :23 :6 : :8 :56 :56 :9 ð:886 :6Þ ð:33 :29Þ ð:48 :8Þ ð:9 :7Þ M5 :3 :4 :355 :6 :69 :58 :42 :7 ð:599 :44Þ ð:254 :28Þ ð:56 :8Þ ð:98 :7Þ The current densities are averaged on the most heavily irradiated chambers (the most heavily irradiated cm 2 ) of the different regions (R ) and stations (M M5) of the muon system. The data refer to a gas mixture of CO 2 =Ar=CF 4, 55/4/5% in volume and to a gain of 7: 4 corresponding [] to an HV of 2.6 kv. In region R of station M the muon detector is composed of GEM chambers. wire length accumulated in gaps A and B was about.5 C/cm. The small difference between the charges integrated in gaps A and B is due to slight geometrical differences in the gap (e.g. nonperfect panel planarity) that affect the gain. During the 22nd day the HV of gap C was turned off when one of the wires in it broke. This was most probably caused by the absence of the currentlimiting resistors. In gap D, which was used as a reference gap, the charge integrated per unit wire length was about one sixth of that in gaps A and B. To measure the gain stability of gaps A, B and C of chamber T independently of the variation in gas conditions (pressure, temperature and composition of the gas mixture), the currents in these three gaps were compared every 2 4 days with that in gap D. During these measurements the HV of gap D was raised to 2.75 kv (i.e. the same as gaps A, B and C) for the time necessary to stabilise and measure its current. In Fig. 6 we report the ratio of the current in gaps A, B and C to that in gap D during the ageing test. Within 5% the currents (and therefore the gain) in gaps A, B and C behave in the same way as that in gap D, independently of the charge accumulated during the test. During the same exposure to the 6 Co source another test was performed to compare the currents of gaps A, B and C of chamber T with the current drawn by gaps A and B of chamber REF. In Fig. 7 we show the ratio between the currents in gaps A, B and C of chamber T and the average current of gaps A and B of chamber REF. During the test period the measured variation of the ratios was less than %. These results allow us to conclude that no evident gain variation is observed within the accumulated charge. To evaluate the significance of this result, the charge integrated during the test must be compared with the values expected at the LHC, in the different regions of the muon detector. These values were calculated taking into account the local particle rate, the ionisation produced by a charged particle crossing the gas gap and the gain of the chambers. The local particle rate was estimated [3] from a Monte Carlo sample of minimum bias events, assuming a luminosity of 2 32 cm 2 s and no safety factor. 5 The ionisation of a minimum ionising particle traversing the 5 mm gas gap, calculated [] with HEED [4,5], is, for the final gas mixture, 36 2 electrons ions pairs. The gain of an MWPC, with the final gas mixture, was measured precisely [] as a function of the HV. At the working voltage of the chamber (2.6 2.65 kv) the gain varies from 7: 4 to 9:7 4. The results of these calculations, summarised in Table, show that the largest charge accumulated in gap B of chamber T (:44 C=cm, Fig. 5) corresponds to about 7 years 6 of run in the most heavily irradiated cm 2 of the most heavily irradiated chamber of region R2 in station M. If the current density averaged in the most heavily irradiated chamber (rather than the most heavily irradiated cm 2 ) of MR2 is considered (see Table ) the charge accumulated during the test in gap B of chamber T is equivalent to 5 years of run. No significant gain variation is therefore expected for the MWPCs of the muon detector during their expected lifetime at the LHC. Ten days after completion of the test, the dark currents were measured with a CAEN N47A HV power supply with a sensitivity of na, and were all found to be lower than na. After the ageing test, chamber T was opened and visually inspected. In Fig. 8 a picture of a cathode plane shows the etching of the epoxy on the F board due to the ageing process. This etching was present in all the gaps but was not correlated with the direction of the gas flow. No traces of discharges were observed on the cathode plane and the anode wires appeared clean. 3. The operational test The aim of the operational test was to check the behaviour of the chamber when the intense particle flux crossing it is first removed and then restored, so as to verify the possible on set of long-term self-sustaining currents, even in the absence of radiation. The test was performed at the CERN GIF [9], in experimental conditions (chamber HV and irradiation) similar [6] to those expected at the LHCb collider. Six different chambers (four MR3 chambers, one M3R3 and one M5), were placed in the gamma flux coming from the 63 GBq (at the time of the test) 37 Cs radioactive source of the GIF. Special absorbers, placed in front of the source, allowed the gamma flux to be switched ON and OFF. The chambers were tested with the final gas mixture (Ar=CO 2 =CF 4, 4/55/5% in volume) and at different HV. 5 The multiplicative safety factor is 2 in M and 5 in M2 M5. 6 One year of run is conventionally equivalent to 7 s.

M. Anelli et al. / Nuclear Instruments and Methods in Physics Research A 599 (29) 7 75 75 The test was initiated at an HV of 2.2 kv with the source OFF. The HV was then raised to 2.3 kv for about 5 min. During this period the source was switched OFF for several minutes and then turned ON again. This enabled us to check that the current in the chamber returned to zero when the source was OFF. This procedure was repeated at HV ¼ 2:4, 2.5, 2.6 and 2.65 kv. Between each step the HV was brought down to 2.3 kv and then increased in steps of V to the next HV value in order to train the chamber gradually in the high-rate environment. The full procedure is reported in Fig. 9, together with the current measured in one of the chambers tested (belonging to M5). Similar results were obtained for the other five chambers. For all the chambers tested the current dropped to zero when the source was turned OFF and returned to its original value when the source was turned ON again. Fig. 8. Etching of epoxy layer on F glass epoxy: the arrows indicate the border of the etched area. Below the line the glue that seals the gap protects the F and no etching is observed. HV (kv) 2.7 2.6 2.5 2.4 2.3 2.2 2. 5 4. Conclusion An ageing test of an MWPC of the LHCb Muon System was performed in the high-radiation environment of the Calliope Facility. The results show that the gain of the chamber does not vary after accumulating a charge of 4 C/cm of wire, i.e. a similar amount to that expected over 5 years (without safety factors) of operation at the LHC. This result is in agreement with previous data obtained [7] with an Ar=CO 2 =CF 4 gas mixture. An operational test performed at the GIF showed that the good behaviour of the chambers can also be satisfactorily reproduced in a high-radiation environment. It also showed that no long-term self-sustaining currents are generated after the chambers are exposed to the high-radiation environment. Acknowledgements We would like to thank the staff of the Calliope Facility and, in particular, A. Pasquali and F. Zarbo for their generous help in the preparation and performance of the test. Current (μa) 5 2 4 6 8 Time (minute) Fig. 9. Lower chart: measured current as a function of time during the operational test at the GIF. The upper chart shows the setting of the chamber HV during the test. The source was turned OFF during the time intervals corresponding to the shaded zone, and was ON at all other times. They were powered with a CAEN N47 HV module and currents in the na ma range were read and acquired with a custom nanoammeter. References [] LHCb Collaboration, LHCb Muon System TDR, CERN/LHCC 2-, 2; Addendum to the Muon System TDR, CERN/LHCC 23-2, 23; Second Addendum to the Muon System TDR, CERN/LHCC 25-2, 25. [2] LHCb Collaboration, J. Instrum 3 (28) S85. [3] F. Sauli, Nucl. Instr. and Meth. A 386 (997) 53. [4] G. Bencivenni, et al., Nucl. Instr. and Meth. A 53 (23) 264. [5] M. Alfonsi, et al., IEEE Trans. Nucl. Sci. NS-5 (24) 235. [6] M. Anelli, et al., IEEE Trans. Nucl. Sci. NS-53 (26) 33; D.E. Hutchcroft, et al., Results obtained with the first four gap MWPC prototype chamber, LHCb Note, CERN-LHCb-2-24, 2.; M. Anelli et al., Test of MWPC prototypes for region 3 of station 3 of the LHCb muon system, LHCb Note, CERN-LHCb-24-74, 24. [7] R. Antunes Nobrega, et al., in: 27 IEEE Nuclear Science Symposium Conference Record, vol., 27, p. 564, DOI:.9/NSSMIC.27.4436395. [8] A. Tata, et al., Radiation technology facilities operating at the Italian ENEA- Casaccia research center, ISSN/2-557, available on CERN Document Server: LAL-RT-INN-98-, 998. [9] S. Agosteo, et al., Nucl. Instr. and Meth. A 452 (2) 94. [] E. Dané, et al., Nucl. Instr. and Meth. A 572 (27) 682. [] W. Riegler, Detector physics and performance simulations of the MWPCs for the LHCb muon system, LHCb Note, CERN-LHCb-2-6, 2. [2] W. Riegler, Crosstalk, Cathode structure and electrical parameters of the MWPCs for the LHCb muon system, LHCb Note, CERN-LHCb-2-6, 2. [3] G. Martellotti, et al., LHCb Note, CERN-LHCb-25-75, 25. [4] I.B. Smirnov, Nucl. Instr. and Meth. A 554 (25) 474. [5] I.B. Smirnov, CERN Comput. Newslett. 226 (996) 3 Available: hhttp:// consult.cern.ch/writeups/heed/i. [6] M. Anelli, et al., Nucl. Instr. and Meth. A 593 (28) 39.6/j.nima. 28.5.46. [7] For a review, see A.S. Schwartz, Nucl. Instr. and Meth. A 55 (23) 239.