General Information. Installation Instructions. CP1000 & FCP1000 Folding Markers. Used with: CP1000 FCP1000

Similar documents
! CAUTION! ! WARNING! General Information

Grapple Buckets GB(E)2590, GB(E)2596 & GB(E) P Parts Manual. Copyright 2018 Printed 07/11/18

Operator s Manual. Manufacturing, Inc. NTA Copyright 2001 Printed 6/30/ M

Operator s/parts Manual

Root Grapple AP-RG3068, AP-RG3074, & AP-RG PK Parts Manual. Copyright 2017 Printed 12/20/17

Tube-Line Accelerator Spinner Kit

Skid Steer Rotary Cutters

Manufacturing, Inc. Manual. Series I UT3030, UT5036, UT5042 & UT5052 (S/N KA1096A-) Rolling Spike Update Ultra-Till (Disc & Coulter)

Post Hole Digger AP-SA PK Parts Manual. Copyright 2018 Printed 07/11/18

Post Hole Digger SA P Parts Manual. Copyright 2018 Printed 01/29/18

Installation and Service Manual

General Information. NTA607HD Lift Assist Adjustments. Tools Required. Work Location. Notations and Conventions U B F D R B F L

CULTIVATOR SAFETY SECTION

56 Bypass Mini Grapple

Assembly Instructions for the Rolling Harrow and Board Turbo-Till 6/26/03

HPB25 Hydraulic Paving Breaker

DK ton, Double-acting, Die-type Crimping Tool

Hose Reel Enclosure Retrofit Kit

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

1. SAFETY 2. PREPARATION 3. FRAME 4. TRANSMISSION 5. DRIVE 6. ROW UNIT 7. OPTIONAL EQUIPMENT

Assembly Instructions for the Rolling Harrow and Reel Turbo-Till 6/26/03

Air Intake Snorkel Kit

H4802, H4802-1, H , and Pole Tampers

OWNERS MANUAL MODELS 136/246/286

INSTALLATION INSTRUCTIONS FOR ROLLOVER PROTECTION SYSTEM (ROPS)

GROUP 9 BOOM 1144 EXTENDO PARTS MANUAL

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

Reproduction. Not for 27" & 29" TWO STAGE INTERMEDIATE SNOWTHROWERS Parts Manual for M1227E M1227EX M1529E

Parts Manual STRIKER Striker 2840 Parts List - PN Printed in USA 03/18/08

Assembly Guide ST200 FUNCTIONAL TRAINER

Vac Bagger Wheelhorse 42 and 48 Mowers for Classic Garden Tractors

Installation Guide RHT-380. This Manual Must Be Read Before Operating The Equipment CUSTOMER COPY

INSTRUCTIONS 360 Y-DROP HAGIE STS 2015

MUELLER. Mega-Lite Drilling Machine. Reliable Connections. table of contents PAGE. Equipment 2. Operating Instructions 3-4. Parts Information 5

Yoke Block Instruction Manual

Fontaine Fifth Wheel Ultra LT Rebuild Procedures

Paintball Marker. User s Manual. 530 South Springbrook Road Newberg, OR 97132

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

R152SVBBC. Spare parts Ersatzteile Pièces détachées Reserve onderdelen Repuestos Reservdelar I S E R V I C E

To address this issue, Ariens Company has developed two cradle plates kits:

BASIN AND WALL MIXER INSTALLATION INSTRUCTIONS

Reproduction. Not for. Installation Instructions. Installation Instructions. Part No Installation. 32/36 Bagger 32/36 Kit WARNING

MID-CUT AND FRONT CUT UNITS

SWIRLFLO Refrigerated fountains with FLEXI-GUARD

Only. Gives You the TechLock. System Advantage ASSEMBLY, DISASSEMBLY AND TROUBLESHOOTING INSTRUCTIONS FOR 3000 SERIES FONTAINE

Battery-powered Micro Cutters

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

BRONZE BUSHING REPLACEMENT PROCEDURE DN345 & NL450C

Parts Manual. Scraper Hitches PH:

Model PSI Compressor with 3-Gallon Air Tank 12VDC

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

R152SVH. Spare parts Ersatzteile Pièces détachées Reserve onderdelen Repuestos Reservdelar

PDY TON HYDRAULIC CRIMPING TOOL WARNING

SERVICE INSTRUCTIONS PVWJ A-FRAME PUMPS -011/-014/-022 FOR TYPE P-1NN AND P-LNN PRESSURE COMPENSATING CONTROLS

Booster Pump PB4-60 Replacement Kits

HoldUp Plus2. Safety Kit included: See additional instructions for installation. REAR WHEEL TRAY. BASE (1x) lock WASHER (1x) KEY (2x) SAFETY CLIP (1x)

Technical Bulletin. Parts and Service News. LPG Lock-Off valve replacement procedures for 4.2 Liter Ford V6

LV LOADER DIRECTIONAL CONTROL VALVES INSTALLATION & USER GUIDE

Santa Fe Cycles Assembly Guide Introduction

Detroit Speed, Inc. Rear Coilover Conversion Kit Camaro/Firebird P/N: &

! WARNING. Model PFC-1-G (direct acting) PFC-1-GR (reverse acting) Modulating Pneumatic Liquid Level Controls INSTRUCTION MANUAL MM-110B

Parts & Operators Manual

Steel Spring Driven Reel Instruction Manual

HYDRAULIC WINCH FOR AUGERS UP TO WR10 X 71 / W130 X 41 ASSEMBLY & OPERATION MANUAL

35 TON HYDRAULIC PUNCH WARNING

750 Cable Cutter INSTRUCTION MANUAL

JARVIS. Model CPE Hock and Neck Cutter EQUIPMENT... TABLE OF

VERSA BIKE RACK INSTRUCTIONS

Tripod Setup Guide (M-TPx)

HYDRAULIC PUNCH DRIVER 38456, 38520, 7306 / 7306SB, 7310 / 7310SB, 7506, 7606SB, 7610SB, 7625 / 7625Pg / 7625PgSB, 7646 / 7646Pg / 7646PgSB

DBML-60/80 Squeeze Tool

OPERATOR S MANUAL AND PARTS LISTING FOR THE. CTM Series Mounted Harrow

PVQ 13 A2 R SE 1 S 20 C-11 D

2012 K9100 COMPACT Worldwide Cycling Solutions Through Creative Innovations.

MODEL SWH10 1,000 LB CAPACITY SWIVEL HOIST

CO2 Tank Conversion Kit P.N , P.N , and P.N

Retractable Hose Reel with 3/8" x 50' PVC Hose

Operating Instructions Models and Hydrostatic Test Pumps

PRODUCT SERIES: A-SF-3000BD

Torque Specifications

TOYOTA TACOMA 2005 TOW HITCH Preparation. Part Number: PT

Pressure Dump Valve Service Kit for Series 2300 Units

Detroit Speed, Inc. A-body Rear Coilover Conversion Kit A-body (Moser Rear Axle) P/N: , , , , ,

SIGNATURE DEF REELS Models: Bare Reel Reel Reel Reel

KRAC KC-600 PLOW OPERATOR S MANUAL

Installation Instructions - Electric Steel Drive Systems for Arm Sets to ,

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

Hose Reel Instruction Manual

Operation Manual Guillotine Cutter RC-5

Repair instructions. Pivot bushing replacement. XL-AS10001RM-en-DE Rev B

Replaces Lesco 300 & 500 Parts Cutting Unit

BR-2444 ROWING MACHINE

User's Manual. MixRite TF 10. Edition 05.08

K Page 1 of 48 Air Intake - Pg. 17

FASTENER GRADE/TORQUE N m (22 27 lbf in) N m (40 47 lbf in) 8 12 N m (71 106lbf in)

Replaces Lesco 300 & 500 Parts

KEY PART KEY PART NO. NO. DESCRIPTION NO. NO. DESCRIPTION

Flexfence Swaging Unit. Product Manual. Release 02/16.

2.5 & 5.0 GALLON PRESSURE TANKS

Index Table. Model 794. Installation, Operating and Maintenance Instructions

Transcription:

Installation Instructions CP1000 & FCP1000 Folding Markers Used with: CP1000 FCP1000! When you see this symbol, the subsequent instructions and warnings are serious - follow without exception. Your life and the lives of others depend on it! General Information These instructions explain how to install the dual folding markers. The marker disks leave a line for the drill operator to follow on the next field pass. The markers fold and unfold hydraulically for field operation. The markers are plumbed together through a sequence valve and operated on one hydraulic circuit. These instructions apply to: 148-430A CP1000 and FCP1000 Dual Markers Manual Update Refer to the drill operator s manual for detailed information on safely operating, adjusting, troubleshooting and maintaining the folding markers. Refer to the parts manual for part identification. CP1000 Operator s Manual..................148-358M CP1000 Parts Manual...................... 148-358P FCP1000 Operator s Manual.................148-693M FCP1000 Part Manual...................... 148-693P Before You Start Pages 5 and 6 are detailed listing of parts included in the folding markers package. Use these list to inventory parts received. Definitions The following terms are used throughout this manual. Right and left as used in this manual are determined by facing the direction the machine will travel while in use unless otherwise stated. IMPORTANT: A crucial point of information about the preceding topic. For safe and correct operation, read and follow the directions provided before continuing. NOTE: Useful information about the preceding topic. Copyright 1999 Printed 5/25/06 148-449M 1

Instructions Marker Refer to Figure 1. 1. Secure mounting plates (1) on marker mount (2) as shown. On inside end of mount use 1/2" x 2 3/4" bolts, lock washers and nuts. On outside end use 1/2" x 1 3/4" bolts, lock washers and nuts. 2. U-bolt marker mount and mounting plates to rear coulter toolbar (3). Bolt mount near end of toolbar as coulter spacing allows. Exact placement of marker mount will vary with coulter spacing. Secure u-bolts with lock washers and nuts. 3. Mount marker hinge (4) on marker mount using pivot pin (5) and pin lynch (6). 4. Mount base end of hydraulic cylinder (7) on marker mount. Remove plugs from cylinder ports. Pull cylinder rod out and pin cylinder rod to hinge using pin (8), washers and cotter pins. 5. Secure marker arm (9) to marker hinge. Through top hole use 5/8" x 5" bolt (10) and nylock nut. Through side hole use 5/16" x 1 1/2", grade 5 bolt (11) and lock nut. IMPORTANT: Bolt marker arm to marker hinge with a grade 5 bolt (11) through side that faces direction of marker travel. Failure to bolt the arm to hinge properly can cause marker damage. 6. Slide inner marker arm (12) into marker arm. Secure with u- bolt (13). 7. Install marker disk (14) into mounting bracket (15). Through outside hole use a 1/2" x 3" bolt (16), lock washer and nut. On inside slot, place a 1/2" flat washer (17) on both sides of the mounting bracket before installing bolt, lock washer and nut. 8. Mount bracket (15) to the underside of the inner marker arm (12) with 1/2" x 2 3/4" bolts, lock washers and nuts. 9. Insert 1 1/4" x 7" bolt (19) and secure head of bolt with bolt tab (20), 5/8" x 2" bolts, flat washer, lock washer and nut as shown. Tighten bolt (19) with 1 1/4 lock nut. 21666 Figure 1 Marker Disk 2 CP1000 & FCP1000 Folding Markers 148-449M 5/25/06

Hydraulic 1. Remove hoses from elbows in tongue cylinder. Lay hoses aside for later reinstallation. 2. Remove existing cylinder gauge from tongue cylinder. Discard gauge. Refer to Figure 2. 3. Mount selector valve (1) on new cylinder gauge (2) using 3/8" x 2 3/4" bolts, flat washers, lock washers and nuts provided. Position selector valve as shown. 4. Install new cylinder gauge on tongue cylinder. 5. Mount sequence valve (3) on sequence-valve mount (4). Secure valve on mount with 3/8" x 1" bolts and lock washers provided. 6. U-bolt sequence-valve mount on hitch at location shown. Position sequence valve so four ports point to the rear of the implement and two ports face the tractor. Secure u-bolt with 1/2" nylock nuts. 7. Install elbows with 9/16" outlets (5) in marker-cylinder ports. 8. Use hydraulic hose stamped "811-180C" to connect base ends of marker cylinders to sequence valve. Connect hose from left-hand cylinder (6) to port R1. Connect hose from right-hand cylinder (7) to port R2. 9. Use hydraulic hoses stamped "811-309C" to connect rod ends of marker cylinders to sequence valve. Connect hose from left-hand cylinder (8) to port C1. Connect hose from right-hand cylinder (9) to port C2. 10. Install elbows with one 9/16" outlet and one 3/4" outlet (10) in left-hand ports in selector valve. Install remaining elbows with 3/4" outlets (11) in remaining ports in selector valve. 11. Use two remaining hoses stamped "818-180C" (12) to connect left-hand ports on selector valve to sequence valve. 12. Use hoses stamped "811-272C" (13) to connect right-hand ports in selector valve to tongue cylinder. 13. Connect hoses removed from tongue cylinder in step one (14) to top ports on selector valve. 17876 Figure 2 Marker Hydraulic 5/25/06 CP1000 & FCP1000 Folding Markers 148-449M 3

Bleeding Marker Hydraulics! WARNING! Escaping fluid under pressure can have sufficient pressure to penetrate the skin. Check all hydraulic lines and fittings before applying pressure. Fluid escaping from a very small hole can be almost invisible. Use paper or cardboard, not body parts, and wear heavy gloves to check for suspected leaks. If injured, seek medical assistance from a doctor that is familiar with this type of injury. Foreign fluids in the tissue must be surgically removed within a few hours or gangrene will result.! CAUTION! You may be injured if hit by a folding or unfolding marker. Markers may fall quickly and unexpectedly if the hydraulics fail. Never allow anyone near the drill when folding or unfolding the markers. 1. Check that tractor hydraulic reservoir is full. 2. With both markers lowered into field position, loosen hydraulic-hose fittings at rod and base ends of marker cylinders. Loosen fittings on back side of sequence valve. IMPORTANT: Never bleed an O-ring fitting. Instead, bleed a nearby pipe or JIC fitting. 3. With tractor idling, activate tractor hydraulic valve until oil seeps out around a loosened fitting. Tighten that fitting. IMPORTANT: JIC fittings do not require high torque. JIC and O-ring fittings do not require sealant. Always use liquid pipe sealant when adding or replacing pipe-thread fittings. To avoid cracking hydraulic fittings from over tightening, do not use plastic sealant tape. 4. Reactivate tractor hydraulic valve until oil seeps out around another loosened fitting. Tighten that fitting. Repeat process until all loosened fittings have been bled and tightened. Marker Adjustments Adjust marker folding to a safe speed and adjust marker disk for proper width. Refer to Marker Adjustments, "Adjustments," in the drill operator s manual. 4 CP1000 & FCP1000 Folding Markers 148-449M 5/25/06

Listing of Parts 148-430A CP1000 and FCP1000 Dual Markers 1 148-354V 1000 DUAL MARKER HOSE BDL 1 148-432K CP1000 MARKER ASY 1 148-434K CP1000 MARKER HDWR BDL 1 148-449M MANUAL CP1000 DUAL MARKER 148-432K CP1000 and FCP1000 Marker 2 113-537H MARKER DISC ADJUSTMENT WLM 2 113-547S NO-TILL ARKKER DISK HUB AS 2 148-440H CP1000 MARKER MNT 2 148-444H CP1000 MARKER HNG SEC WLMT 2 148-446H CP1000 MARKER ARM WLMT 2 148-448H CP1000 MARKER LOCK PIN 2 148-605D 1000 MARKER PIVOT PIN 2 148-711D CP1000 MARKER PVT BOLT TAB 2 148-722D CP1000 MARKER ARM TUBE EXT 2 800-001C GREASE ZERK STRAIGHT 1/4-2 4 802-041C HHCS 1/2-13X3 1/2 GR5 2 802-055C HHCS 5/8-11X2 GR5 2 802-062C HHCS 5/8-11X5 GR5 2 802-295C HHCS 5/16-18X1 1/2 GR2 2 802-317C HHCS 1 1/4-7X11 GR5 SPTH 4 802-440C RHSNB 1/2-13X2 3/4 GR5 2 803-011C NUT LOCK 5/16-18 PLT 8 803-020C NUT HEX 1/2-13 PLT 2 803-021C NUT HEX 5/8-11 PLT 2 803-081C NUT HEX 1 1/4-7 NYLON INSE 4 803-147C NUT HEX NYLOCK 1/2-13 2 803-148C NUT HEX NYLOCK 5/8-11 PLT 2 804-010C WASHER FLAT 5/16 USS PLT 8 804-015C WASHER LOCK SPRING 1/2 PLT 4 804-017C WASHER FLAT 1/2 USS PLT 2 804-021C WASHER FLAT 5/8 SAE PLT 2 804-022C WASHER LOCK SPRING 5/8 PLT 4 804-028C WASHER FLAT 1 USS PLT 2 805-015C PIN LYNCH 5/16 X 1 3/4 4 805-017C PIN COTTER 3/16 X 1 3/4 2 806-103C U-BOLT 1/2-13 1 17/32 X 2 2 810-299C CYL 2X8X1.12 ROD (TIE ROD) 4 838-365C DECAL PIC--MARKER PINCH PO 4 838-367C DECAL PIC--OVERHEAD MKR CR 5/25/06 CP1000 & FCP1000 Folding Markers 148-449M 5

148-434K CP1000 and FCP1000 Marker Hardware Bundle 2 148-436H CP1000 MARKER MNT EAR LG 2 148-438H CP1000 MARKER MNT EAR SH 1 148-629D 1000 MARKER SEQUENCE VALVE 6 800-035C CABLE TIE 28 LONG 2 802-017C HHCS 3/8-16X1 GR5 4 802-055C HHCS 5/8-11X2 GR5 4 802-058C HHCS 5/8-11X2 1/2 GR5 16 803-021C NUT HEX 5/8-11 PLT 2 803-178C NUT NYLOCK JAM NUT 1/2-13 2 804-013C WASHER LOCK SPRING 3/8 PLT 16 804-022C WASHER LOCK SPRING 5/8 PLT 1 806-038C U-BOLT 1/2-13 X 8 1/16 X9 4 806-062C U-BOLT 5/8-11 X 4 1/32 X 5 1 810-197C VALVE,SEQUENCE SHOEMAKER 4 811-065C ELN9/16MJIC 9/16MORB 2 811-315C AD 9/16MJIC 148-354V CP1000 and FCP1000 Marker Hose Bundle 4 811-180C HH1/4R1 057 16FJIC 2 811-272C HH1/2R2 096 1/2MNPT 3/4FJI 2 811-309C HH1/4R1 066 9/16FJIC 6 CP1000 & FCP1000 Folding Markers 148-449M 5/25/06