PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

Similar documents
I-90 Exit 406 Interchange Modification Study and Environmental Assessment. Public Involvement #2

I-90 Exit 406 Interchange Modification Study and Environmental Assessment. Public Involvement #1

Financial Project ID No(s).: and ETDM No(s).: and 14181

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Freeway System Considerations

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Access Routes from US 101 to the Richmond San Rafael Bridge

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Meeting Minutes. I-29 Exit 77 (41 st Street) Interchange Study and Environmental Assessment Carolyn Avenue Landowners

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Interstate 89 Exit 17 Scoping Study. Study Team Meeting #3 Notes

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016

Frequently Asked Questions

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

DDI s Can Move More Than Cars! 2016 Western ITE Conference Albuquerque, NM July 12, 2016 Alex Ariniello, P.E. Public Works Director, Town of Superior

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

List of Display Boards

Mark Malone, P.E. SD DOT

Meade Street Bridge Design Alternative Study

INNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Design Criteria. Design Criteria

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Casablanca Boulevard & GO Station Access

VT15 / Allen Martin Drive Intersection Scoping Study

Tunnel Reconstruction South 5 th Street Association October 16, 2018

APPENDIX L. Design Criteria

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Iowa Highway 58 Corridor Improvement Study

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

A: PLANNED P ROJECTS PROJECTS

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

Intersection Design. Leah Ness, Craig Hardy and Eric Sorensen

League City Parkway at Brittany Lakes/Fennigan Intersection Evaluation/ Traffic Study. Second Public Meeting February 6, 2018

PennDOT ICE Policy An Introduction

Route 7 Corridor Study

Safety Evaluation at Innovative Geometric Designs Gilbert Chlewicki, PE Advanced Transportation Solutions

INTERSECTION CONTROL NOVEMBER 2018

Intersection Control Evaluation Report. This report conforms to the Caltrans Traffic Operations Policy Directive

APPENDIXB. Traffic Operations Technical Memorandum

Design Public Hearing MassDOT Project # February 19, 2015 Chatham Town Hall Annex 7:00 P.M.

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

Arterial Management Plan for US Route 250 and State Route 623

Fairfax County Parkway Widening Fairfax County

Southcote Road Improvements Class Environmental Assessment Study

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

INNOVATIVE INTERSECTION DESIGN

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

State Route 160 (Blue Diamond Highway)

Memorandum. Sunday, July 13, Saturday, July 19, 2014

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

Intersection Traffic Control Feasibility Study

Welcome to the Quebec Alternatives Analysis Public Meeting

Making the Right Call in Sisseton. Mark Malone, PE SD DOT

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

Pedestrian Safety at Interchanges

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

Highway 111 Corridor Study

I-290 Phase I Study Village of Forest Park November 9, of 25

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

COMPLETE STREETS DURING CONSTRUCTION

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Station 1: Street & Sidewalk Upgrades

Project Description Form 8EE

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Basalt Creek Transportation Refinement Plan Recommendations

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

A number of inferences have been drawn from the observations, each of which is discussed below.

Traffic Signs and Signals

CTH M Reconstruction

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Road Diets FDOT Process

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

General References Definitions. (1) Design Guidance. (2) Supporting Information

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

RED BANK CORRIDOR. Community Partners Committee Meeting Madisonville Recreation Center. May 21,

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Conversion of One-Way Couplet Streets to Two-Way

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Transcription:

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. MARKET I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT JANUARY 23, 2017 Public Meeting & Open House #2

TODAY S MEETING Purpose: Gather feedback for further refinement and screening of Build Alternatives. 1. Overview of study 2. Interchange and Corridor Alternatives development process 3. Presentation of Interchange and Corridor Build Alternatives No preferred alternatives have been identified at this point

STUDY TEAM Study Advisory Team South Dakota Department of Transportation (SDDOT) Federal Highway Administration (FHWA) Sioux Falls Metropolitan Planning Organization (MPO) City of Brandon Study Consultant HR Green Short Elliott Hendrickson (SEH) 106 Group

INTERCHANGE IMPROVEMENTS TIMELINE Study 2016-2017 Design Construction letting in FY 2022-2025

ENVIRONMENTAL ASSESSMENT A. To determine the significance of impacts from proposed action A. Establish Purpose and Need B. Develop and evaluate alternatives C. Identify significance of environmental outcomes D. Resource agency consultation and public involvement B. Conclusion - EIS or FONSI

INTERCHANGE MODIFICATION JUSTIFICATION REPORT (IMJR) A. 8 policy requirements for new or change in access A. Sufficient design and support to substantiate request B. Detailed technical analysis B. Concurrent with and feeds into Environmental Assessment

STUDY AREA I-90 Exit 406 Interchange SD 11 / Splitrock Blvd

STUDY ACTIVITIES AND SCHEDULE A. Establish issues and needs B. Concept development and initial screening C. Refine Build Alternatives and analysis D. IMJR and EA development; identify proposed Preferred Alternative Complete Complete In progress February 2017 February 2017 July 2017

ALTERNATIVES DEVELOPMENT Future-year traffic volumes NB to WB movement EB to SB movement Ramp terminal intersection sight angles Vehicle-vehicle conflict locations Large truck turning movements Continuous pedestrian/bicycle accommodations On- and off-ramp lengths

ALTERNATIVES DEVELOPMENT Maintenance of traffic Full closure with detour routes Temporary bridge Existing bridge

PRELIMINARY CONCEPT SCREENING A. Interchanges: 11 B. Corridors: 4 C. Notable differentiators Transmission tower impacts Right-of-way needs Bridge area Cost Cultural resources 4 Build Alternatives Carried Forward 3 Build Alternatives Carried Forward

BUILD ALTERNATIVES Interchange Alternatives Corridor Alternatives

STANDARD DIAMOND I-90 EXIT 406 INTERCHANGE Signalized ramp terminals Dual NB to WB left-turn lanes Free EB to SB right-turn Maintain traffic via temporary bridge or detours

STANDARD DIAMOND SHIFTED WEST I-90 EXIT 406 INTERCHANGE Similar to Standard Diamond Maintain traffic via existing bridge

STANDARD DIAMOND W/ ROUNDABOUTS SHIFTED WEST I-90 EXIT 406 INTERCHANGE Roundabout intersections Dual NB to WB lanes Free EB to SB right-turn Maintain traffic via existing bridge

DIVERGING DIAMOND I-90 EXIT 406 INTERCHANGE Similar to Standard Diamond Free NB to WB left-turn Free EB to SB left-turn Maintenance of traffic on existing bridge or temporary bridge

5-LANE UNDIVIDED Full access intersections Proposed access modifications SD 11/SPLITROCK BLVD CORRIDOR Sidewalk & bicycle accommodations on both sides

4-LANE DIVIDED SD 11/SPLITROCK BLVD CORRIDOR ¾ access TBD intersections Raised TBD median Similar sidewalk & bicycle accommodations as 5-lane 9 th Avenue and Redwood Blvd

BACKAGE ROADS SD 11/SPLITROCK BLVD CORRIDOR Provide business access via Express Avenue Varying levels of reconstruction

NORTH OF I-90 Retain existing corridor Access modifications SD 11/SPLITROCK BLVD CORRIDOR Potential shared-use path Hemlock Blvd intersection

HEMLOCK INTERSECTION SD 11/SPLITROCK BLVD CORRIDOR Ease truck turn No conflicts avoided in NB direction

HEMLOCK INTERSECTION SD 11/SPLITROCK BLVD CORRIDOR Widened to the west No conflict with NB thru traffic Property impact

HEMLOCK INTERSECTION SD 11/SPLITROCK BLVD CORRIDOR No conflict with NB thru traffic

HEMLOCK INTERSECTION SD 11/SPLITROCK BLVD CORRIDOR No conflict with NB thru or left-turn traffic

HEMLOCK INTERSECTION SD 11/SPLITROCK BLVD CORRIDOR Traffic control/warning alternative, examples include: Intersection conflict warning system Signalized control

TODAY S INVOLVEMENT OPPORTUNITIES No preferred alternative has been selected yet Please provide feedback on the developed alternatives Will help in further refinement and screening Comments Leave comment form at entryway Mail/email comment form to project contact Discuss with project representatives Submit comment via project website Due by February 6

THANK YOU! Project Website www.sehinc.com/online/406 Next Public Meeting: Spring/Summer 2017 Project Contacts Jon Wiegand, PE, PTOE Consultant Project Manager HR Green, Inc. 605-221-2656 jwiegand@hrgreen.com Steve Gramm, PE SDDOT Project Manager South Dakota Department of Transportation 605-773-6641 steve.gramm@state.sd.us