RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016

Similar documents
Remainder to be County Route Begin MP End MP Length Item Number Funding Type* Description Type of Work Phase*

Annual Listing of Obligated Projects In the Louisville/Jefferson County, KY-IN MPA. Fiscal Year 2016 (October 1, September 30, 2016)

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

FY 2013 Annual Listing of Obligated Projects In the Louisville/Jefferson County, KY-IN MPA

Culpeper District. Albemarle County Monthly Report October, 2011

A: PLANNED P ROJECTS PROJECTS

Annual Listing of Obligated MPO Projects

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FDOT Treasure Coast Traffic Impact Report

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Oldham County Major Thoroughfare Plan

Appendix A: Grouped Projects Projects by Grouping (FHWA Format)

A summary of Federal transportation obligations in the Knoxville TPO Planning Area between October 1, 2012 and September 30, 2013

Culpeper District. Albemarle County Monthly Report September, 2011

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Design Criteria. Design Criteria

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

Kentucky Highway District 7

FDOT Treasure Coast Traffic Impact Report

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

FDOT Treasure Coast Traffic Report

ExpressFall/Winter 2017

FDOT Treasure Coast Traffic Report

Legislative Update Williamsburg Residency

2012 PRIORITY TRANSPORTATION PROJECTS

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

FY Regional Transportation Improvement Program

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE

Route 29 Solutions Projects

Transportation and Air Quality Committee GEL Project Briefing and Update

DeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights

City of Moorhead Committee of the Whole Meeting

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

ACTION TRANSMITTAL No

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Route 58 Corridor Development Fund

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Technical Advisory Committee (TAC)

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

A Comprehensive HCM 2010 Urban Streets Analysis Using HCS 2010 US 31W in Elizabethtown, KY

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

Pavement Rehabilitation & Buffered Bike Lane

FY 2006 TRANSPORTATION CAPITAL PROGRAM

SFY Transportation Improvement Program Highway and Bikeway Element Amendments

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018

2040 Long Range Plan Projects Draft October 2011

Nevada s Transportation Infrastructure and Future Transportation Needs

APPENDIX D COST SUMMARY TABLES

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Review of DRAFT STIP. January 18, 2017 MPO Meeting

Basalt Creek Transportation Refinement Plan Recommendations

Eayrestown Road. East Eay restown Road E EAYRESTOWN RD EAYRESTOWN RD (0.25) County Road (1.79) CULVERT. Road Overpass

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station


OKI Awards More Than $41 Million to Transportation Projects Across the Region

Roadway Project Recommendations:

County of Fairfax, Virginia. Department of Transportation

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

SC 41/Joe Rouse Intersection Improvements

WHANGAREI IMPROVEMENTS

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

Project changes are summarized below and highlighted in yellow on the attached copy of the TIP. Federal Aid Type. Federal Funds

LIST OF PRIORITY PROJECTS 2020/ /35

information, please contact the District 9 Offices at or

Iowa Highway 58 Corridor Improvement Study

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

NJTPA DRAFT Transportation Improvement Program Fiscal Years

The Transportation Improvement Program

Fairfax County Parkway Widening Fairfax County

US 31W Access Management Study

UNFUNDED PRIORITY PROJECTS

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN

Taylor Road Resurfacing Project

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WALKABLE COMMUNITIES COALITION

PURCHASE ADD KYTC UNSCHEDULED PROJECTS LIST DECEMBER 2010


Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

Transcription:

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION OBLIGATIONS REPORT JULY 1, 2015 - JUNE 30, 2016 DECEMBER 2016 LINCOLN TRAIL AREA DEVELOPMENT DISTRICT P. O. BOX 604 613 COLLEGE STREET ELIZABETHTOWN, KENTUCKY 42702-0604

KENTUCKY FEDERAL-AID HIGHWAY FUNDING OBLIGATIONS BEGIN MP END MP LENGT H FUNDING TYPE DESCRIPTION OBLIGATED TIP REMAINDER TO BE OBLIGATED Hadin Nelson US 62 28.157 28.193 0.139 01093.00 STP REPLACE ON US 62 OVER ROLLING FORK AT THE -NELSON CO LINE. (SR=49.3) 047B00023N D $800,000 $800,000 $0 Hardin I 65 96 97.5 0.8 00934.00 HSIP INSTALL HIGH FRICTION SURFACE ON I-65 FROM 0.676 MI N OF TUNNEL HILL RD UNDERPASS AT (MP 96.0), EXTENDING N TO (MP 97.5). (2014BOP) SAFETY D $75,000 $553,000 $478,000 Hardin US 31 36.4 36.8 0.4 00199.00 STP REPLACE OVER P&L AND CSX RAILS (MP 36.4 TO 36.8 IN WEST POINT) (047B00007N).(16CCR) R $100,000 $7,800,000 $7,700,000 Hardin US 62 8.894 8.934 0.4 REPLACE ON US 62 OVER UNNAMED STREAM STPR 0.65 MILE SW OF KY 1375 (S LONG GROVE RD)(SR 48.5) 01077.00 047B00052N U $17,000 $17,000 $0 Hardin US 62 8.894 8.934 0.4 REPLACE ON US 62 OVER UNNAMED STREAM STPR 0.65 MILE SW OF KY 1375 (S LONG GROVE RD)(SR 48.5) 01077.00 047B00052N R $35,000 $375,000 $340,000 Hardin PL METROPOLITAN PLANNING ORGANIZATION UNIFIED PLANNING PROGRAM (UPWP) FUNDING N $108,000 - - INSTALLATION OF CABLE MEDIAN BARRIER ON I-65 Hardin I 65 100.509 102.2 1.691 FROM 2.024 MI SOUTH OF KY 313 UNDERPASS (MP HSIP 09001.00 100.509) TO 0.333 MI SOUTH OF KY 313 UNDERPASS (MP 102.200). (2014BOP) SAFETY C $318,582 $300,000 $0 Hardin 99-0352.10 RHPD RAIL PROTECTION ON VARIOUS S SAFETY-RR PROTECTN C -$13,369 * $0 Hardin 99-0352.10 RHPD RAIL PROTECTION ON VARIOUS S SAFETY-RR PROTECTN C $222,427 * $0 Hardin 99- SAFETY-RR RHPD RAIL PROTECTION ON VARIOUS S 00352.10 PROTECTN C $234,387 * $0 Hardin I 65 81.95 82.05 0.1 I-65 SOUTHBOUND PORT OF ENTRY FOR A NHPP COMMERCIAL VEHICLE MONITORING 00286.10 STATION.(10CCR) WEIGH STA REHAB D $555,000 $10,140,000 $9,585,000 Hardin INTERSECTION IMPROVEMENTS AT VARIOUS INTERSECTION Nelson HSIP LOCATIONS IN, NELSON, AND TAYLOR 09003.00 SAFETY Taylor COUNTIES. D $120,000 $300,000 $180,000 TENN. STATE LINE-ELIZABETHTOWN; WIDEN TO 6 Larue LANES FROM 0.7MI N OF KY 224 TO 0.6MI N OF OLD U I 65 76.6 78.661 5.6 NHPP MAJOR WIDENING Hardin 00017.00 SONORA. (NH SHARE)(AR/W)(U C $16,378,478 $59,700,000 $43,321,522 ADVANCE FROM 99-337.08)(14CCR) Meade KY 79 9.912 10.286 0.374 BRANDENBURG, KY - MAUCKPORT, IN. OVER STP THE OHIO RIVER (TB1); JOINT PROJECT WITH INDIANA PAINTING 00101.00 TO PAINT THIS. D $125,000 * $0 *These projects are identified as Grouped Projects in the MPO TIP.

00198.00 00198.00 02059.00 08103.10 08103.30 08103.40 INITIAL RIGHT OF WAY FUNDS FOR KY 3005 RING PRELIMINARY ENGINEERING FOR THE PROJECT AND ADDITIONAL EXTEND RING FROM THE THE EXTENSION OF RING DESIGN FUNDS TO COMPLETE FINAL WESTERN KENTUCKY PARKWAY TO I- FROM THE WESTERN KENTUCKY DESIGN FOR THE PROJECT. APRIL 65.(12CCR)(14CCR) PARKWAY TO I-65. 2014 GENERAL ASSEMBLY SCHEDULED SPP FUNDS FOR THIS PROJECT. LC. INITIAL RIGHT OF WAY FUNDS FOR KY 3005 RING PRELIMINARY ENGINEERING FOR THE PROJECT AND ADDITIONAL EXTEND RING FROM THE THE EXTENSION OF RING DESIGN FUNDS TO COMPLETE FINAL WESTERN KENTUCKY PARKWAY TO I- FROM THE WESTERN KENTUCKY DESIGN FOR THE PROJECT. APRIL 65.(12CCR)(14CCR) PARKWAY TO I-65. 2014 GENERAL ASSEMBLY SCHEDULED SPP FUNDS FOR THIS PROJECT. LC. ASPHALT SURFACING ON KY 1500 ASPHALT SURFACING ON KY 1500 KY-1500 KNOX AVENUE FROM LINE FROM LINE EXTENDING EAST TO KY 144. EXTENDING EAST TO KY 144. (2014BOP) (2014BOP) ENGINEERING SECTION 1: CONSTRUCT A FROM BYPASS TO FROM KY-313 THIS MOD. RELEASES: $3,200,000 CECILLIANA DRIVE INCLUDING AT RADCLIFF WEST OF US-31W FROM.10 (02C), $1,100,000 FROM.30 INTERCHANGE WITH TO THE ELIZABETHTOWN (03C), $1,400,000 FROM.50 (04C) BYPASS. (04CCR)(2004BOPC)(BRAC)(10CCR) CONSTRUCT A FROM KY-313 THIS MOD. RELEASES: $3,200,000 SECTION 2: AT RADCLIFF WEST OF US-31W FROM.10 (02C), $1,100,000 FROM.30 FROM CECILLIANA DRIVE TO KY-220. TO THE ELIZABETHTOWN (03C), $1,400,000 FROM.50 (04C) (BRAC)(10CCR) CONSTRUCT A FROM KY-313 THIS MOD. RELEASES: $3,200,000 SECTION 3: FROM KY-220 TO KY-313. (BRAC) AT RADCLIFF WEST OF US-31W TO THE ELIZABETHTOWN FROM.10 (02C), $1,100,000 FROM.30 (03C), $1,400,000 FROM.50 (04C) PAVEMENT REHAB-PRI D $900,000 R $5,880,000 C $86,689 C -$3,200,000 C -$1,100,000 C -$2,100,000

CONSTRUCT A 08103.50. SEE REMARKS SEE REMARKS. KY 361 PATRIOT PKWY... MULDRAUGH ELIZABETRTOWN AREA ELIZABETRTOWN AREA FROM KY-313 THIS MOD. RELEASES: $3,200,000 FROM VETERAN'S AT RADCLIFF WEST OF US-31W FROM.10 (02C), $1,100,000 FROM.30 PKWY (KY 1646) TO KY-313. TO THE ELIZABETHTOWN (03C), $1,400,000 FROM.50 (04C) (BRAC)(10CCR) IS RESPONSIBLE FOR ALL S OF (SEE AGREEMENT). 7-WEST RHUDES CRK RD (CR-1222) 8- SEE ATTACHMENT. HOGAN RD (CR-1276) 9-PIERCE MILL RD (CR-1338) 10-FELIX CT (CR-1507) 11- CRISP RD (CR-1395) 12-DAWSON LN (CR-1074D) SIGNAL INSTALLATION AT THE CONSTRUCTION FUNDS FOR THE INTERSECTION OF KY 361 AND PROJECT. TO BE COMPLETED ROBINBROOKE BLVD/ANTHEM WITH STATE FORCES/PRICE LN. CONTRACT. REQUIRED REPORTING ON THE MULDRAUGH TIGER PROJECT. $9,900 OF FD04 FUNDS FOR THE PROJECT. SAC SUPPORT FOR PLANNING THE TOTAL METRO PROGRAM ACTIVITIES IN THE RADCLIFF- ESTIMATE IS $135,000, HOWEVER THE ELIZABETHTOWN METRO AREA LOCAL MATCHING FUNDS $20,250 AS SPECIFIED IN THEIR WILL NOT FLOW THROUGH THE APPPROVED "UNIFIED PLANNING CABINET AND ARE NOT INCLUDED PROGRAM". ABOVE. SUPPORT FOR PLANNING THE TOTAL METRO PROGRAM ACTIVITIES IN THE RADCLIFF- ESTIMATE IS $135,000, HOWEVER THE ELIZABETHTOWN METRO AREA LOCAL MATCHING FUNDS $20,250 AS SPECIFIED IN THEIR WILL NOT FLOW THROUGH THE APPPROVED "UNIFIED PLANNING CABINET AND ARE NOT INCLUDED PROGRAM". ABOVE. C -$1,400,000 C $353,656 C $50,000 D $9,900 N $6,750 N $108,000

00297.65 00297.65 00297.65 VINE GROVE- KY 313 EXT BRANDENBURG VINE GROVE- KY 313 EXT BRANDENBURG VINE GROVE- KY 313 EXT BRANDENBURG CONSTRUCT A AS KY-313 EXTENSION FROM THE AN EXTENSION OF KY-313 FROM NORTHERN KY-448 BUCK GROVE VINE GROVE TO BRANDENBURG. TO KY-1638. (SECTION SECTION II - FROM NORTHERN II) (FORMERLY 98 SYP NO. 4- KY 448-BUCK GROVE 53.00)(12CCR) TO KY 1638 CONSTRUCT A AS KY-313 EXTENSION FROM THE AN EXTENSION OF KY-313 FROM NORTHERN KY-448 BUCK GROVE VINE GROVE TO BRANDENBURG. TO KY-1638. (SECTION SECTION II - FROM NORTHERN II) (FORMERLY 98 SYP NO. 4- KY 448-BUCK GROVE 53.00)(12CCR) TO KY 1638 CONSTRUCT A AS KY-313 EXTENSION FROM THE AN EXTENSION OF KY-313 FROM NORTHERN KY-448 BUCK GROVE VINE GROVE TO BRANDENBURG. TO KY-1638. (SECTION SECTION II - FROM NORTHERN II) (FORMERLY 98 SYP NO. 4- KY 448-BUCK GROVE 53.00)(12CCR) TO KY 1638 ENGINEERING. ALSO INCLUDES $25,755 FOR EQUIPMENT TO BE SUPPLIED BY THE CABINET AND INSTALLED BY THE CONTRACTOR ($7,316,205). APRIL 2014 GENERAL ASSEMBLY SCHEDULED SPP F THIS MODIFICATION RELEASES $2,000,000 OF FD04 FUNDS FROM THE R/W AS REQUESTED BY THE PROJECT MANAGER. SAC THIS MODIFICATION PROVIDES ADDITIONAL UTILITY FUNDS TO COVER RELOCATION COST. TJ C $7,316,205 R -$2,000,000 U $265,000 02058.00 KY-1500 KNOX AVENUE ASPHALT SURFACING WITH ALTERNATES ON KY 1500 FROM KY 1816 EXTENDING EAST TO LINE. (2014BOP) ASPHALT SURFACING WITH ALTERNATES ON KY 1500 FROM KY 1816 EXTENDING EAST TO LINE. (2014BOP) ENGINEERING. PAVEMENT REHAB-PRI C $62,090 KY 79 08702.00 IRVINGTON- BRANDENBURG RECONSTRUCT KY 79 FROM KY 428 TO KY 144.(12CCN)(14CCR) RECONSTRUCT KY 79 FROM KY 428 TO KY 144.(12CCN)(14CCR) INITIAL 1 DESIGN FUNDS TO CONDUCT PE/ENVIRONMENTAL SERVICES ON THE PROJECT. APRIL 2014 GENERAL ASSEMBLY SCHEDULED SPP FUNDS FOR THIS PROJECT. TJ RECONSTR UCTION D $1,040,000

IS RESPONSIBLE FOR ALL S OF (SEE AGREEMENT). 05 GREER RD (CR-1247) 06.. SEE REMARKS SEE REMARKS SEE ATTACHMENT. 3-FROM KY 144 (MP 3.119) EXTENDING NORTH TO KY 1051 SEE (MP 7.066) - 3.95 MI 4-FROM 2.0 SEE REMARKS REMARKS MILES NE OF KY 144 (MP 2.000) EXTENDING NORTHEAST TO KY 228 (MP 4.083) - 2.08 MI (MP 15.713) FROM KY 1844 EXTENDING EAST TO KY 448 (MP BATTLETOWN RD- 23.812), ASPHALT RESURFACING.. KY 228 LAWRENCE (MP 7.066) FROM KY 1051 STREET\ EXTENDING NORTH TO KY 448 (MP 8.243), ASPHALT RESURFACING. (MP 15.713) FROM KY 1844 EXTENDING EAST TO KY 448 (MP BATTLETOWN RD- 23.812), ASPHALT RESURFACING.. KY 228 LAWRENCE (MP 7.066) FROM KY 1051 STREET\ EXTENDING NORTH TO KY 448 (MP 8.243), ASPHALT RESURFACING. THOMPSON LN N (CR-1110) 07 BETHEL CHURCH RD (CR-1024) 08 VESSELS RD (CR-1134) 09 OTTER HAVEN DR (CR-1074) 10 JORDAN AVE (CR-1278) 11 SINGLETON RD (CR- 1340) 12 KE THIS MOD REFLECTS ADDITION OF $11,006 DUE TO CHANGE ORDER #1. 3- OLD STATE RD (KY 710) 4-LIBERTY RD (KY 1844) ENGINEERING. PAYMENT TO THE CONTRACTOR WILL BE DEFERRED UNTIL JULY 15 2016. 10% FOR ENGINEERING PROVIDED FROM FY 2016 FUNDS. ENGINEERING. PAYMENT TO THE CONTRACTOR WILL BE DEFERRED UNTIL JULY 15 2016. 10% FOR ENGINEERING PROVIDED FROM FY 2016 FUNDS. C $286,556 C $11,006 C $62,896 C $628,953