Item No. 14 Town of Atherton

Similar documents
AGENDA ITEM G-2 Public Works

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Omaha s Complete Streets Policy

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Ravenswood Avenue Railroad Crossing Project Community Outreach Meeting Presentation May 2, Ravenswood Avenue Railroad Crossing Project

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

CITY OF LOMITA CITY COUNCIL REPORT

COMMUNITY MEETING AGENDA

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

PRESS RELEASE San Joaquin Council of Governments

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

ARLINGTON COUNTY, VIRGINIA

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Living Streets Policy

Feasibility Study. Expo-Downtown Bicycle Connector

Cycle Track Design Best Practices Cycle Track Sections

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

4. Mobility and Transportation Element. Page Bikes and Pedestrians

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

Multi-Modal Traffic Analysis. Parisi and Associates

RZC Appendix 8A Marymoor Subarea Street Requirements

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

TRAFFIC CALMING POLICY & PROCEDURES

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Citywide Sidewalk and Crosswalk Programs

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Recommendations For Oak Grove Bike Project Field Trial

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Lynchburg District Update

Community Bicycle Planning

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

TRANSPORTATION MASTER PLAN Review Citywide Recommendations, Updated List and Scoring Methodology December 6, 2018

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Glebe Neighbourhood Cycling Plan

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Safe Routes to School Action Plan Aberdeen, Idaho

Classification Criteria

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Monterey Road Complete Streets

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Executive Summary Route 30 Corridor Master Plan

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Chapter 4: Funding and Implementation

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

Public Information Centre

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Subject: Bike Project Field Trial Must Validate Bike Safety Claims

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Bellevue Downtown Association Downtown Bike Series

Montclair s Complete Streets Experience

City of Seattle Edward B. Murray, Mayor

Chapter 2: Standards for Access, Non-Motorized, and Transit

5 CIRCULATION AND STREET DESIGN

Memorandum. Sunday, July 13, Saturday, July 19, 2014

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY

/ ARLINGTON COUNTY, VIRGINIA

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Final Sidewalk Feasibility Study

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

June 29, Dear Mr. Walter:

Pre-Construction Meeting

Color your stress away

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

TRANSPORTATION COMMISSION Agenda Staff Report

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

Appendix D: Planning Level Cost Calculator

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Transcription:

Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY HANNEMAN, CITY ENGINEER DATE: SEPTEMBER 21, 2016 SUBJECT: AMEND THE PEDESTRIAN AND BICYCLE MASTER PLAN TO DESIGNATE PORTIONS OF OAK GROVE AS A CLASS II BIKE ROUTE RECOMMENDATION Accept the attached amendment to the Atherton Bicycle and Pedestrian Master Plan (BPMP) to: Designate Oak Grove Avenue, between Laurel Street and Middlefield Road (within Town limits) as a Class II route; and Remove the Class II bike route designation on Glenwood Avenue between Laurel Street and Middlefield Road. BACKGROUND In November 2014, Atherton City Council accepted the Atherton Bicycle and Pedestrian Master Plan. The Master Plan identified the need for safe pedestrian and bicycle facilities and recommended priority projects. In March 2015, the Town authorized Mark Thomas & Company (MTCo) to study and develop preliminary engineering concepts and cost estimates for Class I and Class II bicycle facilities as well as pedestrian accommodations. The purpose of this study was to: Identify constraints for implementation of the priority bicycle and pedestrian improvements included in the BPMP; Evaluate the feasibility of the routes selected and identify potential improvements to overcome the constraints; and Prepare conceptual cost estimates to seek funding.

The Pedestrian and Bicycle Master Plan Amendment September 21, 2016 Page 2 of 3 In the BPMP, Oak Grove Avenue between Laurel Street and Middlefield Road is currently not designated as a bike facility. As part of their scope of work, MTCo was asked to evaluate whether it is beneficial to designate Oak Grove Avenue within these limits as a bike route. The findings and recommendations are included in the MTCo memorandum (Attachment 1). The recommendation to designate Oak Grove Avenue, between Laurel Street and Middlefield Road as Class II Bike route was presented to the Town of Atherton Bicycle and Pedestrian Committee at its April 28, 2016 meeting and was unanimously supported and approved. FINDINGS/ANALYSIS There are currently two east-west bike routes east of Middlefield Road; Marsh Road and Ringwood Avenue. Users can travel along the Encinal Avenue bike lane to reach Marsh Road or Encinal Elementary. MTCo evaluated two possible east-west bike routes to connect the Valparaiso Avenue bike lane to the Ringwood bike lane: Glenwood Avenue and Oak Grove Avenue. Ravenswood Avenue is an existing Class II facility. Glenwood Avenue provides the most direct connection from Valparaiso Avenue to Middlefield Road. Glenwood Avenue is currently designated as a Class II facility in the BPMP. To access Glenwood Avenue, bicyclists have to cross Middlefield Road at an uncontrolled crossing to the Lindenwood neighborhood. Glenwood Avenue is approximately 25-feet wide, which is not enough to accommodate a Class II facility (dedicated). To accommodate a Class II facility, a minimum width of 28 feet is needed (two 10-foot lanes with two 4-foot bike lanes). There are large trees in proximity to the edges of pavement. Pavement widening will likely result in the loss of parking, relocation of signs, and modification of landscaping. Glenwood Avenue offers less interaction between bicyclists and motor vehicles (fewer crossing of vehicular lanes), bicyclists currently choose Oak Grove Avenue over Glenwood Avenue by a significant margin for their east-west maneuvers. This is due to the direct link Oak Grove Avenue provides between major destinations in the area (downtown Menlo Park, Caltrain station, and Menlo-Atherton High School). Despite the higher bicycle volumes on Oak Grove Avenue, evaluation of accident records does not indicate any markedly higher frequency of bicycleinvolved collisions on Oak Grove Avenue compared to the other alternate routes. In addition, Menlo Park s BPAC has proposed designating Oak Grove Avenue as a Class II facility. In consideration of the above factors, staff recommends the following: Designate Oak Grove Avenue, between Laurel Street and Middlefield Road (within Town limits) as a Class II route; and Remove the Class II bike route designation on Glenwood Avenue between Laurel Street and Middlefield Road. POLICY FOCUS Amending the Bicycle and Pedestrian Master Plan continues the Council s focus on enhancement

The Pedestrian and Bicycle Master Plan Amendment September 21, 2016 Page 3 of 3 of the use Town streets as bicycle routes and seeks to improve safe routes to school. Physical improvements will be prioritized within the Town s Capital Improvement Program. FISCAL IMPACTS The Council has approved $200,000 in the Capital Improvement Program (CIP) for the integration of Oak Grove Avenue within town limits as a Class II facility for fiscal year 2017/18. PUBLIC NOTICE Public notification was achieved by posting the agenda, with this agenda item being listed, at least 72 hours prior to the meeting in print and electronically. Information about the project is also disseminated via the Town s electronic News Flash and Atherton Online. There are approximately 1,200 subscribers to the Town s electronic News Flash publications. Subscribers include residents as well as stakeholders to include, but be not limited to, media outlets, school districts, Menlo Park Fire District, service provides (water, power, and sewer), and regional elected officials. ATTACHMENTS Attachment 1: Mark Thomas & Company Memorandum

MARK THOMAS & COMPANY, INC. Providing Engineering, Surveying and Planning Services Attachment Memorandum To: Andrew Poster, PE, TE Town of Atherton Project Manager From: Admas Zewdie, PE Date: File: SJ-15107 RE: Atherton BPMP: Consideration of Oak Grove Avenue for a bike route PURPOSE In the Bicycle and Pedestrian Master Plan (Master Plan) prepared by the Town of Atherton in 2014, Oak Grove Avenue between Laurel Street and Middlefield Road is not designated as a bike facility. In this memorandum, we evaluate whether it is beneficial to designate Oak Grove Avenue within these limits as a bike route. A. Background West of Laurel Street, Valparaiso Avenue serves as a primary eastwest facility designated for bike travel. East of Middlefield Road, Ringwood Avenue serves the same purpose (see Figure 1). Encinal Avenue, Glenwood Avenue, Oak Grove Avenue and Ravenswood Avenue are all east-west streets that connect Laurel Street and Middlefield Road. In this area, the Menlo Park/Atherton jurisdictional boundary zigzags between Laurel Street and Middlefield Road, crossing the above streets at varying distances between these two northsouth streets. Approximately twothirds of Oak Grove Avenue Figure 1 - Existing and Proposed Bicycle Network between Laurel Street and Middlefield Road is within the Menlo Park city limits. Both municipalities identify Encinal Avenue and Ravenswood Avenue as existing Class II bike facilities. However, the bicycle circulation plans for the two municipalities show some inconsistencies. The Atherton Master Plan only shows Glenwood Avenue as a proposed bike facility 1960 Zanker Road San Jose, CA 95112 www.markthomas.com Tel: (408) 453-5373 Fax: (408) 453-5390

Page 2 (Class II) since it is entirely within Atherton. Menlo Park s Bike/Ped Master Plan shows Oak Grove Avenue as a Class III facility. However, the Menlo Park s Bicycle Pedestrian Advisory Committee (BPAC) has presented a proposal to the Transportation Commission to designate Oak Grove Avenue as a Class II facility. The Transportation Commission had no objection on the proposal. B. Description of Alternative East-West Routes The only two east-west bike routes are Marsh Road and Ringwood Avenue. Users can travel along the Encinal Avenue bike lane to reach Marsh Road or Encinal Elementary. We have evaluated two possible east-west bike routes to connect the Valparaiso Avenue bike lane to the Ringwood bike lane: Glenwood Avenue and Oak Grove Avenue. Ravenswood Avenue is an existing Class II facility. We have included it in this evaluation to assess whether either of the above two potential routes offer a better choice for bicyclists than this existing facility. These three routes are depicted in Figure 2 below. Figure 2 - Potential East-West Bike Routes between Laurel Avenue and Middlefield Road 1. Glenwood Avenue Glenwood Avenue provides the most direct connection from Valparaiso Avenue to Middlefield Road. Glenwood Avenue is designated as a Class II facility in the Bicycle Pedestrian Master Plan. To access Glenwood Avenue, bicyclists have to cross Middlefield Road at an uncontrolled crossing to the Lindenwood neighborhood. Glenwood Avenue is approximately 25 foot wide (see Figure 3), which is not enough to accommodate a Class II facility. To accommodate a Class II facility, a minimum width of 28 feet is needed (two 10-foot lanes with two 4-foot bike lanes). There are large trees in Figure 3 - Glenwood Avenue (Facing East) proximity to the edges of pavement. Pavement widening will likely result in the loss of parking, relocation of signs, and modification of landscaping. Glenwood Avenue can be designated as a Class III facility without any widening. 2. Oak Grove Avenue Oak Grove Avenue currently serves as the primary vehicular access to/from the west to the Menlo- Atherton High School passenger-loading zone. In addition, two bus stops near Middlefield Road serve the high school students. The Oak Grove Avenue/Middlefield Road intersection is signalized, with crosswalks across all four legs. The Town is in the initial design stages of a project to improve bicycle/pedestrian access at this intersection.

Page 3 Oak Grove Avenue has a pavement width of 34 feet with two 3 foot valley gutters. Approximately 800 feet of Oak Grove Avenue immediately west of Middlefield Road is within Town limits; the remaining segment is within Menlo Park city limits. Within Atherton, parking is allowed on both sides of the street. West of Laurel Street, Menlo Park plans to remove parking on one side of Oak Grove Avenue to accommodate bike lanes without widening the road. Between Laurel Street and the city limits near Middlefield Road, Menlo Park s BPAC has proposed designating Oak Grove Avenue as a Class II facility. Oak Grove Avenue, within Atherton town limits, can be converted to a Class II facility by removing parking between Laurel Street and the Middlefield Road Intersection approach. Near the intersection with Middlefield Road, there is not sufficient width to accommodate Class II lanes due to the presence of a left-turn lane. There are two options to accommodate cyclists: Option 1: Widen the pavement to accommodate a Class II facility. By removing the valley gutter, the pavement can be widened to accommodate 10-foot vehicular lanes and 4-foot bike lanes without the need to remove trees. Any additional widening would require removal of trees and relocation of 36 Overhead/Underground utilities. Option 2: Make the intersection into a Class I/III facility. On both sides of Oak Grove Avenue, five-foot wide side paths can be added between the line of trees and the fence to provide separate facilities for Figure 4 - Oak Grove Avenue (Facing East) pedestrians and bicyclists. The path will be ADA compliant and act as a sidewalk and staging area at the intersection. This can be supplemented with a Class III designation on the through lanes. Table 1: Preliminary Cost Comparison New pavement area OPTION 1 Widen to 4 Class II Bike lane with 10 vehicle lanes Six feet of widening for OPTION 2 Add 5 side path and Sharrows 10 feet of new pavement for approximately 260 feet approximately 260 feet Roadway Excavation (CY) 75 125 Striping (LF) 520 0 Marking (EA) (10 SF) 2 4 Asphalt Concrete (SF) 1566 2601 Aggregate Base (CY) 56 93 Valley Gutter Removal (LF) 520 0 Driveway Modification (EA) 3 3 Green Thermoplastic Paint (SF) 400 0 Pullbox Adjust to Grade (EA) 0 4 Storm Drain Modification (EA) 1 0 APPROXIMATE COST $60,000 - $65,000 $55,000 - $60,000

Page 4 3. Ravenswood Avenue Ravenswood Avenue has pedestrian facilities and a buffered Class II bike lane. The bike lane provides the most convenient access to/from the southwest to the central bike parking on the high school campus. Ravenswood Avenue has sidewalks and traffic signals. Ravenswood Avenue carries users to Downtown Menlo Park. Ravenswood Avenue has a curb to curb width of 44 feet whicch includes 6-foot bike lanes and 2-foot buffers. 44 C. Comparison of Alternatives We used the following factors to compare the alternatives: 1. Vehicular Conflict Points The potential for conflict with motor vehicles was compared by counting the number of through vehicular lanes that bicyclists will need to cross to traverse between Valparaiso Avenue and Ringwood Avenue using the three alternative east-west routes shown in Figure 2. These counts are shown in Table 2. For these counts, we assumed that bicyclists would make two-stage left turns at intersections (similar to pedestrians). Fewer lane crossings are preferable. The table also shows the number of turns bicyclists will need to perform to traverse between Laurel Street and Middlefield Road. Fewer turns are preferable. Table 2 - Potential Vehicular Conflict Points Route GLENWOOD OAK GROVE RAVENSWOOD Figure 5 - Ravenswood Avenue (Facing East) No. of Lanes Crossed at Intersections (Eastbound) No. of Lanes Crossed at Intersections (Westbound) TOTAL NO. OF LANES Crossed at Intersections NUMBER OF TURNS 13 11 24 2 17 10 27 4 19 14 33 4

Page 5 Glenwood Avenue crosses the fewest number of lanes and requires the fewest turns to travel between the two east-west arterials. 2. Traffic Count The Town performed bicycle traffic counts in September 2015 at two intersections Glenwood Avenue/Middlefield Road and Oak Grove Avenue/Middlefield Road. The 24-hour bicycle count data was consolidated to show the number of cyclists riding to and from Middlefield Road (Figure 6). The count data suggests that most bicyclists choose Oak Grove Avenue over Glenwood Avenue for their east-west travels. Some possible reasons include: There is a signalized crossing at the Oak Grove Avenue/Middlefield Road intersection, but not at the Glenwood Avenue/Middlefield Road intersection; Oak Grove Avenue provides a direct connection between two potentially signficant generators of bicycle traffic downtown Meno Park and Menlo-Atherton High School; Oak Grove Avenue serves as the primary access point to the Caltrain station. Review of traffic count data suggests that Oak Grove Avenue experiences slightly higher traffic volumes than Glenwood Avenue. 1 16 25 150 98 Figure 6: Bicycle riding towards Middlefield Rd (Green) and away from Middlefield Rd (Blue) 3. Accident Data Accident data was generated from the UC Berkeley Traffic Injury Mapping System (TIMS). Accidents involving motor vehicles and bicyclists on both sides of the streets were counted along the three routes during a 10-year period (January 1, 2004 to December 31, 2013) (see Table 3). 1 Average Daily Traffic (ADT) on Oak Grove Avenue is 4,800 (2014 count by Menlo Park; ADT on Glenwood Avenue is 4,300 (2015 count by Atherton)

Page 6 Table 3- Accident Counts ROUTE GLENWOOD OAK GROVE RAVENSWOOD NO. OF MOTOR VEHICLE - BICYCLE ACCIDENTS 12 11 11 The accident data does not reflect meaningful variation between the three routes. Oak Grove Avenue/Middlefield Road and Glenwood Avenue/Middlefield Road intersections had five bicycle accidents each during the 10-year period. D. Summary and Recommendation Although Glenwood Avenue offers less interaction between bicyclists and motor vehicles (fewer crossing of vehicular lanes), bicyclists currently choose Oak Grove Avenue over Glenwood Avenue by a significant margin for their east-west maneuvers. This is probably due to the direct link Oak Grove Avenue provides between major destinations in the area (downtown Menlo Park, Caltrain station, and Menlo-Atherton High School). Despite the higher bicycle volumes on Oak Grove Avenue, evaluation of accident records does not indicate any markedly higher frequency of bicycle-involved collisions on Oak Grove Avenue compared to the other alternate routes. In addition, Menlo Park s BPAC has proposed designating Oak Grove Avenue as a Class II facility. In consideration of the above factors, we recommend the following: Designate Oak Grove Avenue, within Town limits, as a Class II route. This will require coordination with the City of Menlo Park to maintain continuity of the Class II facility west of the Town limits. It should be noted that such a designation requires the removal of parking and pavement widening near the intersection with Middlefield Road. Should removal of parking be unpalatable to the community, or if the widening is determined not to be feasible, designate Oak Grove Avenue as a Class III facility and implement traffic calming measures, such as striping/ sharrows, to increase safety and comfort for bicyclists. In conjunction with the Class III designation, we recommend that separate 5-foot wide paths be provided in the space between the lines of trees and the property lines near Oak Grove Avenue s intersection with Middlefield Road. If either of the above alternatives are implemented, do not designate Glenwood Avenue as a bike route. If neither of the above alternatives are deemed feasible on Oak Grove Ave, then we recommend Glenwood Ave be converted into a Class III route.