MEMORANDUM INTRODUCTION/PURPOSE/OVERALL FINDINGS

Similar documents
Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Preliminary Transportation Analysis

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

Lincoln Avenue Road Diet Trial

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Pedestrian & Bicycle Safety Innovations & Applications

Simulation Analysis of Intersection Treatments for Cycle Tracks

THIS PAGE LEFT BLANK INTENTIONALLY

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

C C C

Existing Transportation System

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Project Description Form 8EE

TRAFFIC IMPACT ANALYSIS

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

DUNBOW ROAD FUNCTIONAL PLANNING

Grant Avenue Streetscape

4.0 TRANSPORTATION SYSTEMS

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Henderson Avenue Mixed-Use Development

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Road Conversion Study Plumas Street

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Alaskan Way, Promenade, and Overlook Walk Final EIS

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

McGrath Boulevard Project Development Public Meeting #2 May 28 th, 2015 East Somerville Community School

Rightsizing Streets: The Seattle Experience

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation

Highway 111 Corridor Study

Shockoe Bottom Preliminary Traffic and Parking Analysis

Employment 8,881 17,975 9,094. Households 18,990 31,936 12,946

MEMORANDUM. Study Purpose. Figure 1: Study Area. DATE: February 24, Christina Robertson-Gardiner, City of Oregon City

Highway 217 Corridor Study. Phase I Overview Report

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY

Bay to Bay Boulevard Complete Streets Project

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

Welcome! San Jose Avenue Open House August 25, 2015

City of Seattle Edward B. Murray, Mayor

CONNECTING PEOPLE TO PLACES

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Duwamish Way-finding and CTR Report

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Waterford Lakes Small Area Study

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Proposed Action, Purpose and Need Technical Memorandum

MEMORANDUM. Our project study area included the following locations:

RM 620 FEASIBILITY STUDY

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

Central Freeway and Octavia Circulation Study

ITE Northeastern District Meeting

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Giles Run Connector Road

INNOVATIVE INTERSECTION DESIGN

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Developing Bikeways in South Denver

Chapter 5. Complete Streets and Walkable Communities.

Draft North Industrial Area-Wide Traffic Plan

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President

LOOP 360 IMPROVEMENT STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

Chapter 2: Standards for Access, Non-Motorized, and Transit

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

102 Avenue Corridor Review

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

180 Grand Avenue, Suite x117 Dowling Associates, Inc.

Cycle Track Design Best Practices Cycle Track Sections

CITY OF LOMITA CITY COUNCIL REPORT

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Chapter 4: Transportation Systems

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

Albany Shaker Road Corridor Study Public Meeting # 2

Blair/Williamson Intersection Expressed Needs

Broad Street Bicycle Boulevard City Council Study Session Summary

Moving Towards Complete Streets MMLOS Applications

Interim Transit Ridership Forecast Results Technical Memorandum

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Route 7 Corridor Study

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Washington DC Section of ITE Project Briefing

Transcription:

MEMORANDUM Date: To: From: Subject: Steve, City of Tacoma Dan Grayuski and Will Lisska, Fehr & Peers Schuster Corridor Trail Project SE12-0265.00 INTRODUCTION/PURPOSE/OVERALL FINDINGS The City of Tacoma Mobility Master Plan and Shoreline Public Access Alternatives Plan envision a waterfront shared-use trail through the Schuster Corridor, connecting the northern terminus of Pacific Avenue to Ruston Way near McCarver Street. This facility would provide an active transportation connection between Downtown and the historic Old Town neighborhood. While the exact alignment of the trail is yet to be determined, the Schuster Corridor Trail is intended to improve the link between the Thea Foss Walkway, the Tacoma Chinese Reconciliation Park, Downtown, and the Ruston Way promenade for bicyclists and pedestrians. As part of a second phase of the project, the City will be exploring options for trail alignment and developing a preferred design alternative for the Schuster Corridor. Other options include the extension of a water-side or over-water esplanade and improvements to the Bayside Trail that runs along the slope above Schuster Parkway. The proposed trail project and the surrounding context are shown on Figure 1. Because points along Schuster Parkway have limited right-of-way constrained by BNSF railroad tracks to the east and the natural vegetated slope to the west one of the trail alignment options the City will be evaluating is a Schuster Parkway road diet, where at least one travel lane would be removed from the roadway to provide room for the proposed shared-use trail. This memorandum analyzes the feasibility of a road diet along Schuster Parkway in which a southbound travel lane between Old Town and Downtown is replaced with a shared-use trail. Safeco Plaza, 1001 4 th Avenue, Suite 4120, Seattle WA, 98154 (206) 576-4220 www.fehrandpeers.com

Page 2 of 10 FIGURE 1 PROPOSED SCHUSTER PARKWAY TRAIL AND SURROUNDINGS Ruston Way N 30 th Street Mc Car ver Stre et N Sch ust er Par kwa y N N 21 st Street N 21 st Street N Tacoma Avenue Legend Proposed Trail S Sta diu m Wa S 4 th Street Existing paths Division Avenue Major roadway

Page 3 of 10 The road diet evaluation is predicated on the removal of a southbound travel lane of Schuster Parkway. However, we believe that a removal of a northbound travel lane would yield similar results as are discussed herein. The southbound lane removal was chosen for evaluation for the following reasons: Simpler logistics of roadway/trail tie-ins and transition points compared to the northbound travel lanes. Better trail connectivity to/from Downtown compared to the northbound lane. Public testimony during the Shoreline Master Program indicating the west side of the Parkway as more desirable for the trail compared to the water side. Our evaluation indicates that: Corridor travel time for southbound motorists along Schuster Parkway would increase by about 50 seconds during the AM peak hour with the road diet compared to conditions without the road diet. Increased traffic congestion due to the road diet could only be expected by motorists for the duration of the AM peak hour (and only in the southbound direction). Increased travel time is mostly due to the two likely transition points of the trail: 1) Ruston Way Viaduct and 2) S 4 th Street (Dock Street) intersection. The lane removal would provide other benefits, such as slowing parkway traffic to meet the posted 40 mph speed limit and would provide bicyclists and pedestrians with a formal travel path between the important areas of Tacoma mentioned in the first paragraph. While existing bicycle and pedestrian usage is relatively low along Schuster Parkway (mainly due to the undesirable and unsafe biking and walking conditions in the corridor), bicycle ridership and pedestrian activity is expected to increase due to the infrastructure changes that would benefit pedestrian and bicycle users and the completion of the missing link in the shared-use waterfront trail between Downtown and Old Town. Also, part of the increase in usage could result from some motorists shifting to other modes of travel to commute to the Downtown area. Similar projects in Seattle (Burke Gilman Trail and Alki Trail) have resulted in regionally significant well-used multi-modal trails and are widely used by bicycle commuters. To keep this analysis at the feasibility level, specifics about the design of the Schuster Corridor were not assumed or accounted for, excepting the road diet between the Ruston Way viaduct and

Page 4 of 10 S 4 th Street. Conceptual design alternatives will be developed as a next step in the project, and more in-depth analysis with regards to these design alternatives will accompany the work. More refined traffic congestion and delay information is contingent upon final design of the two identified transition points and whether the City pursues the Road Diet option or a different trail alignment. BENEFITS OF A ROAD DIET/TRAIL CONVERSION The specific focus of this evaluation was to address the feasibility of a road diet concept on Schuster Parkway as a possible option for accommodating the Schuster Corridor Trail. Other options, or variations thereof, may also be considered as part of the formal project concept and design effort. The following sections outline the benefits of the road diet option along Schuster Parkway and provide bicycle user estimates for the proposed shared-use trail. TRAFFIC CALMING BENEFITS Research by the Federal Highway Administration (FHWA) cites increased safety via speed reduction as one of the most significant benefits of a road diet. While many motorists on Schuster Parkway currently drive in excess of the posted 40 mph limit, a road diet would encourage driving speeds closer to the posted limit on the portion of the roadway that includes the auto travel lane reduction. This speed reduction would result in a safer driving environments as well as a more comfortable setting for bicyclists and pedestrians. TRAIL USER ESTIMATES The number of bicyclists using a shared-use path or trail varies significantly based on a number of factors, including season, weather, and connectivity with other bicycle facilities. Fehr & Peers developed Schuster Parkway Trail user estimates using the following: Two-hour bicycle counts taken in October 2012 on the Ruston Way Walking Path near the northern terminus of Schuster Parkway (provided by the Puget Sound Regional Council [PSRC]). Future travel demand generated by the Point Ruston development.

Page 5 of 10 Seasonal and temporal adjustment factors from the National Bicycle and Pedestrian Documentation Project (NBPDP), a joint effort of the Institute of Transportation Engineers and Alta Planning & Design. Based on this analysis, the Schuster Parkway Trail could expect 350 390 daily weekday bicycle trips and 200,000 220,000 annual trips. As a point of comparison, the popular Alki Trail that connects Alki Beach with Downtown Seattle (via the Elliott Bay Trail) carries about 420 bicycle trips on a typical weekday and 260,000 trips annually. The Burke Gilman Trail serves up to 500 bicyclists and 300 pedestrians per peak hour. AVERAGE DAILY TRAFFIC AND ROAD DIET CASE STUDIES Average daily traffic (ADT) volumes along the Schuster Corridor have declined over the past decade and have leveled out to approximately 23,500 ADT over the past five years. Conventional practice generally avoids removing travel lanes on four-lane roadway facilities with ADT in excess of 20,000. Generally speaking, a facility with fewer than four lanes would not have adequate capacity to meet this demand, causing many trips to divert to other routes. However, a two-lane road diet can accommodate up to 30,000 ADT in certain cases. For example, Lake Washington Boulevard in Kirkland, Washington, actually carried more daily traffic (23,000 to 25,900) after twolane road diet implementation. In Portland, Oregon, a four-lane roadway with 30,000 ADT, Southeast Tacoma Street, underwent a two-lane road diet with only minimal diversion. These case studies are summarized in Table 1. TABLE 1 ROAD DIET CASE STUDIES Street Cross Section ADT Before ADT After Lake Washington Boulevard Kirkland, WA South of NE 60 th Street 4 lanes to 2 + TWLTL 1 + bike lanes 23,000 25,913 2 Lake Washington Boulevard Kirkland, WA North of NE 60 th Street 4 lanes to 2 + bike lanes + parking 11,000 12,610 SE Tacoma Street Portland, OR West of SE 11 th Avenue 4 lanes to 2 + TWLTL 1 + parking (one side) ~30,000 29,500 Source: Walkable Communities, Inc. and City of Portland, OR 1 Two-way left-turn lane

Page 6 of 10 2 ADT as much as 30,000 during closure/reconstruction of nearby roadway Schuster Parkway is a unique case compared to most road diet projects. Many arterial and collector roadways with fewer than four travel lanes have a capacity ceiling in the range of 20,000 to 25,000 ADT due to traffic control, intersecting streets, on-street parking, speed control, and access management needs. Schuster Parkway, however, has a 40 mph posted speed, median separation of the northbound and southbound travel lanes, no on-street parking, and no access points between S 4 th Street and the Ruston Way Viaduct. Consequently, the daily traffic capacity of a three-lane Schuster Parkway would be significantly higher than that of a three-lane arterial or collector. TRAFFIC CORRIDOR TRAVEL TIME EVALUATION The following sections discuss the process and results of our traffic delay evaluation. We evaluated AM and PM peak operations for Schuster Parkway for existing year 2012 and two future-year scenarios: a No Action Scenario where no geometric changes are assumed along Schuster Parkway and a Road Diet Scenario the conversion of a southbound travel lane into a multi-use trail. Future-year 2022 was chosen to capture mid-term traffic growth that may occur independent of the trail project, including full build-out of the Point Ruston mixed-use development at the northern terminus of Ruston Way. EVALUATION METHODOLOGY Fehr & Peers used traffic operations software and traffic engineering judgment to develop a baseline model representing the existing AM and PM conditions along the Schuster Parkway corridor. Volumes and signal timings were provided by the City of Tacoma, and additional counts were commissioned in April 2012. The model was then calibrated to match field observations. Subsequently, this model was modified to test the future year No Action and Road Diet Scenarios. Multiple model simulations were averaged to provide travel times along the corridor. As mentioned, the future year scenario was based on 2022 conditions, assuming full build-out of the Point Ruston mixed-use development combined with 1% annual traffic growth. Ingress and egress traffic volumes from Point Ruston via Ruston Way/Schuster Parkway were taken from the Point Ruston EIS.

Page 7 of 10 Existing and future peak hour traffic volumes are summarized in Table 2. As would be expected, the highest 2022 volumes are carried northbound in the PM and southbound in the AM. The southbound AM volume, however, is slightly lower than the northbound PM volume, lending some support for a southbound lane removal. TABLE 2 PEAK HOUR VEHICLE VOLUMES Route Existing Year 2012 Future Year 2022 AM PM AM PM Northbound 458 1,408 715 1,858 Southbound 1,449 712 1,828 1,067 Source: City of Tacoma and Fehr & Peers. EVALUATION RESULTS The results of the existing conditions and future year scenarios are presented in the following subsections. Two travel paths were analyzed: S 4 th Street to/from McCarver Street via the Ruston Way viaduct and S 4 th Street to/from McCarver Street via N 30 th Street. Average travel time results for all scenarios are compared in Tables 3 and 4. Existing Conditions Currently, southbound travel between S 4 th Street and McCarver Street on Schuster Parkway takes an average of 150 to 165 seconds, depending on time of day and route. Likewise, northbound travel time averages 130 to 160 seconds. 2022 No Action Conditions Under 2022 No Action conditions, northbound PM travel times would increase by less than 20 seconds. On the other hand, southbound AM travel times would increase by 10 to 30 seconds. As would be expected, travel times in the off-peak directions would not change much.

Page 8 of 10 2022 Road Diet Conditions Under 2022 Road Diet conditions during the PM peak, northbound travel times would not be significantly different than under No Action conditions. The off-peak southbound direction would experience a small travel time increase of about 15 seconds due to the lane removal. The impact to the AM peak would be more significant due to the higher volume of southbound traffic. Compared to No Action conditions, average southbound travel time along the Ruston Way/Schuster Parkway route between McCarver Street and S 4 th Street would increase by about 50 seconds. Likewise, southbound travel along the N 30 th Street/Schuster Parkway route between McCarver Street and S 4 th Street route would increase by approximately 50 seconds. Corridor delay impacts would originate at the following two locations: 1. Northern Transition Point at Ruston Way Viaduct and N 30 th Street merge area This merge area would become a point of constraint due to the southbound lane removal two converging lanes would need to transition into just one. 2. S 4 th Street Intersection Assuming the Road Diet would reduce the number of southbound through lanes entering and exiting the intersection from two to one, the traffic signal would not be able to process as many southbound vehicles per cycle compared to No Action conditions. The AM and PM travel times within the corridor are shown in Tables 3 and 4. Despite the increase in delay, Schuster Parkway would only experience increased congestion for the duration of the AM peak hour (and only in the southbound direction). Even during this period of increased delay, drivers would not likely divert to other routes.

Page 9 of 10 TABLE 3 PM PEAK TRAVEL TIME EXISTING AND FUTURE YEAR WITH SB LANE DROP (IN SECONDS) Route Schuster Pkwy via Ruston Way Schuster Pkwy via N 30 th Street Existing 2022 No Action 2022 Road Diet SB NB SB NB SB NB 152 159 158 176 175 177 149 140 153 142 169 143 Source: Fehr & Peers. TABLE 4 AM PEAK TRAVEL TIME EXISTING AND FUTURE YEAR WITH SB LANE-DROP (IN SECONDS) Route Schuster Pkwy via Ruston Way Schuster Pkwy via N 30 th Street Existing 2022 No Action 2022 Road Diet SB NB SB NB SB NB 165 150 178 152 227 150 158 129 175 133 226 129 Source: Fehr & Peers CONCLUSION Currently, travel between S 4 th Street and McCarver Street on Schuster Parkway takes approximately two and half minutes by automobile during both the AM and PM peak travel periods. In the future, with the full completion of the Point Ruston mixed-use development and no changes to Schuster Parkway, travel time between S 4 th Street and McCarver Street would increase by less than 20 seconds due to additional traffic congestion. With implementation of the road diet, Schuster Parkway travel time would increase by an additional 50 seconds during the AM peak period for a total corridor travel time of approximately three minutes and 40 seconds.

Page 10 of 10 Traffic flow during the PM peak hour would generally not be impacted by the road diet, and drivers could expect a total travel time of approximately two minutes and 50 seconds. Overall, Schuster Parkway would only experience increased congestion due to the road diet for the duration of the AM peak hour (and only in the southbound direction). The following transition points are primary factors in the projected congestion for Schuster Parkway under the Road Diet scenario and could be further analyzed as part of the phase two conceptual design to identify strategies for mitigating travel time delay at these locations: 1. Northern Transition Point at Ruston Way Viaduct and N 30th Street merge area This merge area would become a point of constraint due to the southbound lane removal two converging lanes would need to transition into just one. 2. S 4 th Street Intersection Assuming the Road Diet would reduce the number of southbound through lanes entering and exiting the intersection from two to one, the traffic signal would not be able to process as many southbound vehicles per cycle compared to No Action conditions. Furthermore, while we do not believe that the expected travel time delay will result in significant traffic diversion into adjacent neighborhoods this analysis was not within the scope of our modeling and could be revisited upon completion of the conceptual design. The removal of a southbound lane along Schuster Parkway to accommodate a multi-use trail should not result in significant increases in traffic congestion, cause major diversions of traffic to other City streets, and will likely lead to traffic calming benefits. Lastly, bicycle ridership and pedestrian activity is expected to increase due to the infrastructure changes also resulting in an improved travel and safety experience for those users.