LIST OF PRIORITY PROJECTS

Similar documents
UNFUNDED PRIORITY PROJECTS

LIST OF PRIORITY PROJECTS 2020/ /35

LAKE COUNTY CONSTRUCTION IN PROGRESS

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

2012 PRIORITY TRANSPORTATION PROJECTS

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

DeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Chapter 5. Financial Analysis

DIRECTIONS ARE FROM ESPN S WIDE WORLD OF SPORTS TM COMPLEX

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN

FDOT Northern US 19 - Pinellas County Strategic Intermodal System (SIS) Projects Updates

2017 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON, AMELIA ISLAND August 10-13, 2017

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

DIRECTIONS ARE FROM DISNEY S WIDE WORLD OF SPORTS TM COMPLEX

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Orange County, Florida Public Works Department's 10-Year Roadway Program

City of Bartow Comprehensive Plan. Transportation Element

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

STAGE #1 SWIM 2 Laps = 2 Miles

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2023

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

::~-~ w ANNUAL LIST OF PALM BEACH MPO PRIORITY PROJECTS FY Adopted July 20, '"',, - ==~"'c;;f'";~":?:'!""

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2024

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012

Osceola County Expressway Authority. Alternatives Public Meeting

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE

State Road (S.R.) 61 (U.S. 319) FPID s and

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009

Technical Advisory Committee (TAC)

FM #: ETDM #: 11241

Capital Beltway HOT Lanes Project

Gandy Connector: Travel Demand. Policy Committee August 2013

SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) FY 2018 TRANSPORTATION PROJECT PRIORITIES FY FY 2023 (ADOPTED JULY 13, 2017) A(1)

2. TRANSPORTATION ELEMENT.

LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018

Review of DRAFT STIP. January 18, 2017 MPO Meeting

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Orlando Regional REALTOR Association Monday Morning Quarterback - 06/26/ /02/2011 Lake, Orange, Osceola & Seminole Counties

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

CFI TEAM AVAILABLE PROPERTIES

PRESENTATION OUTLINE

U-4918A Research Park Boulevard Transportation Improvements from Rams Drive to Third Street 1.0

Financial Project ID No(s).: and ETDM No(s).: and 14181

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

Review of DRAFT STIP. January 5, 2017 TCC Meeting

CHARLOTTE COUNTY PUNTA GORDA MPO

US 1 Express Lanes Public Kick-Off Meeting

CFI TEAM AVAILABLE PROPERTIES

2016 TELL THE TPO SURVEY

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

FY Regional Transportation Improvement Program

[THIS PAGE INTENTIONALLY LEFT BLANK]

ATTACHMENT "A" ULTIMATE IMPLEMENTATION DESCRIPTION

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION. Tel: (941) AGENDA

Orlando International Airport (MCO) transfers

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

Florida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer

Orange County s Transportation Planning and Multimodal Corridor Plan

Capital Beltway HOT Lanes Project

Status February Transportation Priority Projects in Chester County

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016

Transit Workshop with MPO Board

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

US 301 Resurfacing, Restoration, and Rehabilitation

TSTC s analysis of federal transportation data reveals that in the three years from 2010 through 2012:

Amendment to the Summary of Regional Strategic Investments included in the Regional Transportation Plan

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

BOARD ACTION AGENDA ITEM #VI PROJECT PRIORITIES

Waterford Lakes Small Area Study

NEED FOR ADDITIONAL FUNDING

7.0 Preferred Alternative with Service Road Concept

Monday Morning Quarterback Summary

Mobility Plan Status Report 2012 Average Annual Daily Traffic

CITY ZIP COUNTY ALTAMONTE SPRINGS SEMINOLE ALTAMONTE SPRINGS SEMINOLE ALTAMONTE SPRINGS SEMINOLE ALTAMONTE SPRINGS SEMINOLE

Hillsborough MPO List of Priority Projects 2016/2017 Transportation Improvement Program Table 1: EXISTING PRIORITIES FUNDED FOR CONSTRUCTION

Status April Transportation Priority Projects in Chester County

Chapter 9: Public Participation

FAMPO RESOLUTION 18-34

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Performance Criteria for 2035 Long Range Transportation Plan

(This page intentionally left blank.)

Prepared For: DIRECTION 2035 SHAPING OUR FUTURE SUMMARY REPORT JULY Prepared By: Staff to Bay County TPO

Transcription:

LIST OF PRIORITY PROJECTS THROUGH 2013/14 Adopted August 27, 2008 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part by the Federal Highway Administration, Federal Transit Administration, Florida Department of Transportation and local participating governments.

TABLE 1A - PRODUCTION STATE ROADS - OTHER ARTERIALS FROM TO LOCATION PROJECT DESCRIPTION PRODUCTION 1 2 1.28 2384293 SR 50 GRAND HIGHWAY W OF HANCOCK RD CLR WIDEN TO 6 LANES ROW 2009/10 CST 2 A 1A 0.89 2383954 SR 25/500 (US 27/441) MLK JR BLVD LAKE ELLA RD FP WIDEN TO 6 LANES ROW 2009/10 CST 2 B 1B 1.32 2383955 SR 25/500 (US 27/441) LAKE ELLA RD AVENIDA CENTRAL LL WIDEN TO 6 LANES ROW 2009/10 CST 2 2 C 1C 1.00 2383957 SR 25/500 (US 27/441) BUENOS AIRES MARION CO LINE SC WIDEN TO 6 LANES PE 2012/13 ROW, CST 2 D 1D 0.95 2383943 SR 500/US 441 PERKINS ST SR 44 LEES WIDEN TO 6 LANES ROW 2010/11 CST 2 E 1E 0.68 2383944 SR 25/500 (US 27/441) N OF GRIFFIN RD MLK JR BLVD LEES CORRIDOR IMP ROW 2011/12 CST 1.02 4112573 SR 35/US 301 N OF CR 232 N OF NE 110 RD WW WIDEN TO 4 LANES ROW 2009/10 CST 4 4 1.50 4098701 SR 44 (1) SR 500/US 441 SR 44/ORANGE AVE EUS, MD WIDEN TO 4 LANES ENV 2007/08 ROW, CST 5 5 0.72 2404182 SR 48 W RAMPS OF SR 93/I-75 CR 475/MAIN ST BUSH WIDEN TO 4 LANES ROW 2012/13 CST NOTES: S: ENV = ENVIRONMENTAL (1) FORMERLY CR 44B PD&E = PROJECT DEVELOPMENT AND ENVIRONMENTAL STUDY ROW = RIGHT-OF-WAY August 27, 2008 MPO Staff Recommendation Page 1 of 9

TABLE 1B - PLANNING STATE ROADS - OTHER ARTERIALS PLANNING FROM TO LOCATION PROJECT DESCRIPTION 1 2 1 4-2382751 SR 46 WEKIVA PKWY SR 500/US 441 SEMINOLE CO LINE MD, LC BELTWAY PD&E 2007/08 PE, ROW, CST 0.88 SR 500/US 441 SR 44 (1) SR 46 MD WIDEN TO 6 LANES N/A PD&E WIDEN TO 4 3 A 3 A 0.90 SR 19 CR 561 N END OF LK HARRIS BR TAV, HOW 3 LANES/BRIDGE N/A PD&E 3 B 3 B 1.16 SR 19 N END OF LK HARRIS BRGCR 48 HOW WIDEN TO 4 LANES N/A PD&E 4 2 - US 27 RELIEVER SR 44 SR 25/US 27 LEES NEW RELIEVER FOR US 27/SR 44 INT N/A PD&E 5 7 0.49 SR 50 SR 50 W MERGE SR 33 GRV CAPACITY/REALIGN N/A PD&E 6 5 0.57 SR 19 SR 25/US 27 SR 50 GRV WIDEN TO 4 LANES N/A PD&E 7 6 098 0.98 SR 19 SR 500/US 441 CR 561 TAV WIDEN TO 6 LANES N/A PD&E 8 8 A 12 A 0.84 SR 19 CR 48 CENTRAL AVE HOW WIDEN TO 3 LANES N/A PD&E 8 B 12 B NC SR 19 CENTRAL AVE CR 455 HOW WIDEN TO 3 LANES N/A PD&E 9 11 0.77 SR 19 CR 455 SR 25/US 27 GRV WIDEN TO 4 LANES N/A PD&E 10 A 10 A 0.57 SR 25/US 27 CR 44A/GRIFFIN RD SR 44 LEES WIDEN TO 6 LANES N/A PD&E 10 10 B 10 B 0.90 SR 25/US 27 SR 44 CR33 LEES WIDEN TO 6 LANES N/A PD&E 10 C 10 C 0.51 SR 25/US 27 CR 33 PLANTATION DR LEES WIDEN TO 6 LANES N/A PD&E 10 D 10 D 0.50 SR 25/US 27 PLANTATION DR FLORIDA TURNPIKE (N) LEES WIDEN TO 6 LANES N/A PD&E 11 11 A 13 A 0.46 SR 35/US 301 CR 468 SR 91/FL TPK SC, WW WIDEN TO 4 LANES N/A PD&E 11 B 13 B 0.45 SR 35/US 301 CR 470 CR 468 SC, WW WIDEN TO 4 LANES N/A PD&E 12 9 0.84 SR 50 SR 33 BLOXHAM AVE GRV WIDEN TO 6 LANES N/A PD&E 13 8 0.87 SR 50 SUMTER CO LINE MASCOTTE MAS WIDEN TO 4 LANES N/A PD&E 14 15 0.61 SR 50 HERNANDO COUNTY LAKE COUNTY SC WIDEN TO 4 LANES N/A PD&E 15 NA 0.63 SR 44 ORANGE AVE CR 46A EUS WIDEN TO 4 LANES N/A PD&E NOTES: S: ENV = ENVIRONMENTAL (1) FORMERLY CR 44B PD&E = PROJECT DEVELOPMENT AND ENVIRONMENTAL STUDY ROW = RIGHT-OF-WAY NC = NO COUNT August 27, 2008 MPO Staff Recommendation Page 2 of 9

TABLE 2 TRANSPORTATION REGIONAL INCENTIVE PROGRAM (TRIP) PRODUCTION 2 3 3 2 4 5 6 PLANNING 4 1 PLAN 5 1 2 2 3 3 4 4 7 5 14 6 9 7 12 8 6 9 5 10 8 13 12 10 13 11 FROM TO LOCATION PROJECT DESCRIPTION 1.25 2384293 SR 50 GRAND HIGHWAY W OF HANCOCK RD CLR WIDEN TO 6 LANES ROW 2009/10 CST 0.47 CR 466A SUMTER CO LINE SR 25/US 27 FP WIDEN TO 4 LANES ROW (3) 2010/11 CST 0.17 CR 468 SR 91/FL TURNPIKE SR 44 SC WIDEN TO 4 LANES CST 0.39 CR 48/470 SUMTER CO LINE SR 25/US 27 LEES WIDEN TO 4 LANES PE 2007/08 ROW, CST - SR 91/FL TPK HILLS OF MINNEOLA MIN NEW INTERCHANGE PD&E, PE (4) CST - VILLAGES BUS TRI-COUNTY TRANSIT INITIATIVE LL, SC BUS ACQUISITION N/A PURCHASE - HANCOCK RD EXT SR 50 SR 91/FL TPK CL, MIN 4 LANES & REALIGN PD&E 2007/08 PE, ROW, CST 0.61 CR 561 REALIGN CR 455 SR 91/FL TPK LC 4 LANES & REALIGN N/A PD&E 0.79 CR 561 SR 19 CR 455 TAV, AST WIDEN TO 4 LANES PD&E 2008/09 PE, ROW, CST 0.62 CR 470 SR 93/I-75 LAKE CO LINE SC, WW WIDEN TO 4 LANES PD&E 2008/09 PD&E - SR 25/US 27 NEW RELIEVER FOR SR 44 SR 25/US 27 LEES RELIEVER US 27/SR 44 N/A PD&E 1.15 CR 44 SR 500/US 441 SR 19 LEES, EUS WIDEN TO 4 LANES PD&E PE 0.14 CR 468 SR 35/US 301 SR 91/FL TPK WW WIDEN TO 4 LANES N/A PD&E 0.57 SR 19 SR 25/US 27 SR 50 GRV WIDEN TO 4 LANES N/A PD&E 0.17 CR 48 SUMTER CO LINE SR 25/US 27 LC, LEES WIDEN TO 4 LANES N/A PD&E 0.48 CR 33 SR 25/US 27 SR 50 LEES, MAS WIDEN TO 4 LANES N/A PD&E - 4150271 SR 93/I-75 AT CR 466 SC NEW INTERCHANGE N/A PD&E 0.45 CR 466 SR 93/I-75 SR 35/US 301 SC WIDEN TO 4 LANES N/A PD&E 0.51 CR 466A US 301 CR 462 SC, WW WIDEN TO 4 LANES N/A PD&E NOTES: S: ENV = ENVIRONMENTAL (3) LAKE COUNTY TRANSPORTATION CONSTRUCTION PROGRAM PD&E = PROJECT DEVELOPMENT AND ENVIRONMENTAL STUDY ROW = RIGHT-OF-WAY (4) HILLS OF MINNEOLA TO PAY FOR PD&E AND DESIGN August 27, 2008 MPO Staff Recommendation Page 3 of 9

PRODUCTION TABLE 3 STRATEGIC INTERMODAL SYSTEM (SIS) FROM - SR 25/US 27 AT SR 50 CLR INTERCHANGE IMP ROW CST 2 N/A 0.63 2384231 SR 25/US 27 1000' N OF LAKE LOUISA RSR 50 (CLUSTER OAKS CLR WIDEN TO 6 LANES PE 2009/10 ROW, CST 3 2 0.46 2384221 SR 25/US 27 BOGGY MARSH RD LAKE LOUISA RD LC WIDEN TO 6 LANES PE 2009/10 ROW, CST 4 3 1.22 2426262 SR 93/I-75 HERNANDO CO LINE SR 470 SC WIDEN TO 6 LANES ROW 2012/13 CST 5 4 1.24 2426263 SR 93/I-75 SR 470 SR 91/FL TPK SC WIDEN TO 6 LANES ROW 2012/13 CST 6 4 PLAN - SR 93/I-75 AT SR 91/FL TPK SC INTERCHANGE IMP PE, ROW, CST PLANNING 0.85 SR 25/US 27 CR 561 (S) (5) CR 561 (N) MIN WIDEN TO 6 LANES N/A PD&E 2 2 0.67 SR 25/US 27 CR 561 (N) SR 91/FL TPK (N) LC WIDEN TO 6 LANES N/A PD&E 3 10 1.34 SR 93/I-75 SR 91/FL TPK MARION COUNTY SC WIDEN TO 8 LANES N/A PD&E 4 9 SR 91/FL TPK SR 25/US 27 (S) ORANGE CO LINE LC WIDEN TO 6/8 LANES PD&E 2012/13 PE 5 8 SR 91/FL TPK SR 25/US 27 (N) SR 25/US 27 (S) LC WIDEN TO 6/8 LANES PD&E 2012/13 PE 6 7 SR 91/FL TPK CR 470 SR 25/US 27 (N) LC WIDEN TO 6/8 LANES PD&E 2012/13 PE 7 6 0.74 SR 91/FL TPK SR 35/US 301 CR 470 SC WIDEN TO 6/8 LANES PD&E 2012/13 PE 8 5 1.10 SR 91/FL TPK SR 93/I-75 SR 35/US 301 SC WIDEN TO 6/8 LANES PD&E 2012/13 PE 9 14 OTHER 0.30 SR 44 CR 475 I-75 SC/WW WIDEN TO 6 LANES N/A PD&E TO LOCATION PROJECT DESCRIPTION NOTES: S: ENV = ENVIRONMENTAL O.C. = OVER-CAPACITY PD&E = PROJECT DEVELOPMENT AND ENVIRONMENTAL STUDY ROW = RIGHT-OF-WAY (5) FORMERLY CR 561A (MINNEOLA) August 27, 2008 MPO Staff Recommendation Page 4 of 9

TABLE 4 SMALL COUNTY OUTREACH PROGRAM (SCOP) FROM TO LOCATION PROJECT DESCRIPTION RESURFACE 1 3 2 4 0.50 CR 476 CR 616 WITHLACOOCHEE RIVER 0.41 CR 48 SR 471 BUSHNELL SC SC REHABILITATION AND RESURFACE REHABILITATION AND RESURFACE NOTES: S: ENV = ENVIRONMENTAL NONE PD&E = PROJECT DEVELOPMENT AND ENVIRONMENTAL STUDY ROW = RIGHT-OF-WAY August 27, 2008 MPO Staff Recommendation Page 5 of 9

PRODUCTION 2 2 PLANNING 2 2 4 4 1.16 0.48 048 0.48 PICCIOLA BRG LC PE CST LAKESHORE DR BRG LC PE ROW, CST LOIS DRIVE BRG LC PE CST SR 19 LK HARRIS BRG CR 48 WITHLACOOCHEE RIVER BRG CR 475 JUMPER CREEK BRG CR 48 JUMPER CREEK BRG FROM TABLE 5 BRIDGES TO LOCATION PROJECT DESCRIPTION LC N/A PD&E SC REPLACE BRIDGE N/A PD&E SC REPLACE BRIDGE N/A PD&E SC REPLACE BRIDGE N/A PD&E NOTES: S: ENV = ENVIRONMENTAL NONE PD&E = PROJECT DEVELOPMENT AND ENVIRONMENTAL STUDY ROW = RIGHT-OF-WAY August 27, 2008 MPO Staff Recommendation Page 6 of 9

TABLE 6 ENHANCEMENT PROJECTS FROM LOCATION PROJECT DESCRIPTION PRODUCTION 4108251 S LAKE TRL CLERMONT GROVELAND CLR MIXED USE TRAIL PE 2008/09 CST 2 2 4161111 GARDENIA TRAIL GRIFFIN RD LAKE ELLA RD LEES, FP MIXED USE TRAIL PE 2009/10 CST 4154321 GARDENIA TRAIL EAGLES NEST RD SUMTER CO LINE LL MIXED USE TRAIL PE 2008/09 CST 4 2 PLAN 4176001 LEE-WILD TRL SUMTER CO LINE SR 500/US 441 LEES MIXED USE TRAIL PE 2007/08 CST PLANNING WEKIVA TRL MOUNT DORA CR 437 (N) MD MIXED USE TRAIL N/A PD&E 2 3 S LAKE TRL CLERMONT CLR TRAIL HEAD N/A PD&E/PE 3 4 PROD 4154311 TAV-LEE TRL CANAL ST LAKES BLVD LEES MIXED USE TRAIL PD&E PE, CST 4 4 A 4 A 4108251 S LAKE TRL GROVELAND MASCOTTE GRV MIXED USE TRAIL PD&E PE 4 B 4 B 4108251 S LAKE TRL MASCOTTE VAN FLEET TRL MAS MIXED USE TRAIL PD&E PE 5 5 WILD-LEE TRL WILDWOOD LAKE CO LINE SC MIXED USE TRAIL N/A PD&E 6A 6A WEKIVA TRL TAVARES MOUNT DORA TAV, MD MIXED USE TRAIL N/A PD&E 6 6 B 6 B WEKIVA TRL CR 437 (N) SEMINOLE CO LINE LC MIXED USE TRAIL N/A PD&E 6 C 6 C WEKIVA TRL CR 437 (N) ORANGE COUNTY LC MIXED USE TRAIL N/A PD&E 7 7 A 7 A LK-APK TRL S LAKE TRL N OF LAKE APOPKA LC MIXED USE TRAIL N/A PD&E 7 B 7 B LK-APK TRL N OF LAKE APOPKA ORANGE CO LINE LC MIXED USE TRAIL N/A PD&E TO NOTES: S: ENV = ENVIRONMENTAL NONE PD&E = PROJECT DEVELOPMENT AND ENVIRONMENTAL STUDY ROW = RIGHT-OF-WAY August 27, 2008 MPO Staff Recommendation Page 7 of 9

FDOT FIVE- WORK PROGRAM DEVELOPMENT ( S 2008/09-2012/13) TABLE 7 PUBLIC TRANSPORTATION - TRANSIT CAPITAL PROJECTS 2 2 4 4 FROM TO MOBILITY CTR BUSES PARATRANSIT VANS SHELTERS MOBILITY CENTER LAKEXPRESS LAKE COUNTY LAKEXPRESS LOCATION PROJECT DESCRIPTION PLANNING STUDIES 1 1 COMMUTER RAIL ORLANDO TAV, EUS, MD SERVICE DEVELOPMENT GRANTS 1 2 2 1 4 4 5 5 6 6 7 7 8 8 9 10 10 11 12 12 13 LAKEXPRESS-LYNX ALTOONA ZELLWOOD DISNEY CONN CLERMONT WALT DISNEY WORLD SR 50 SPINE RTE MASCOTTE ORANGE COUNTY US 441 SPINE ROUTE LADY LAKE ENHANCE MOUNT DORA SR 50 SPINE ROUTE ENHANCE MASCOTTE ORANGE COUNTY TRIANGLE CIRC ENHANCE MOUNT DORA TAVARES, EUSTIS VILLAGES CIRC VILLAGES US 27 CONN LEESBURG CLERMONT CLERMONT CIRC CLERMONT CIRCULATOR GROVELAND CIRC CLERMONT GROVELAND WILDWOOD CONN LEESBURG WILDWOOD WATER TAXI TAVARES NOTES: S: ENV = ENVIRONMENTAL NONE PD&E = PROJECT DEVELOPMENT AND ENVIRONMENTAL STUDY ROW = RIGHT-OF-WAY August 27, 2008 MPO Staff Recommendation Page 8 of 9

TABLE 8 AIRPORTS SERVICE DEVELOPMENT GRANTS 2 2 FROM TO LOCATION PROJECT DESCRIPTION SEAPLANE BASIN TAVARES AIRPORT LAKE COUNTY SUMTER COUNTY GROVELAND GROVELAND MUNICIPAL NOTES: S: ENV = ENVIRONMENTAL NONE PD&E = PROJECT DEVELOPMENT AND ENVIRONMENTAL STUDY ROW = RIGHT-OF-WAY August 27, 2008 MPO Staff Recommendation Page 9 of 9