COA-F17-F-1343 YEAR END REPORT

Similar documents
Cheakamus River IR 11 Floodplain Restoration Final Report Project Number 13.CMS.01

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

Squamish Estuary / Mamquam Blind Channel Restorations 2007/2008 Final Report Project Number 07.CMS.01

Council should be aware of the progress made in the Cheakamus Ecosystem and funding opportunities not fully subscribed at this time.

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

Lagoon Spawning Bed Rehabilitation

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

MCCAW REACH RESTORATION

Project Completion Abstract Fish Passage Activity ( Engineering Activities)

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Firth Creek Habitat Enhancement Project 1993

The Salmonid Species. The Salmonid Species. Definitions of Salmonid Clans. The Salmonid Species

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

Lakelse Sockeye Recovery Program

P.O. Box 65 Hancock, Michigan USA fax

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

The Blue Heron Slough Conservation Bank

UNIT 4E. SALMON SUPPLEMENTAL INFORMATION

California Steelhead: Management, Monitoring and Recovery Efforts

Sub-watershed Summaries

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Okanagan Sockeye Reintroduction

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

Don Pedro Project Relicensing

FWCP External Projects Delivered by Stakeholders and First Nations

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

Ecology of Place: What salmon need Eric Beamer Skagit River System Cooperative. November 2010

SALMONID ACTION PLAN FINAL DRAFT

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

Rivers Inlet Salmon Initiative

Hydraulic Modeling of Stream Enhancement Methods

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #

Fish Passage Culvert Inspection (FPCI) Nicklen Creek Watershed

STEELHEAD SURVEYS IN OMAK CREEK

South Fork Chehalis Watershed Culvert Assessment

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

Big Spring Creek Habitat Enhancement and Fishery Management Plans

ADOPT-A-STREAM WATERSHED APPROACH COMMUNITY-BASED STEWARDSHIP. Nova Scotia Salmon Association March 2005

Nechako white sturgeon are an Endangered Species

TESTIMONY OF THE COLUMBIA RIVER TREATY TRIBES BEFORE PACIFIC FISHERIES MANAGEMENT COUNCIL

Identifying and Executing Stream Projects Kristin Thomas, Aquatic Ecologist MITU

Shovelnose Creek Off-Channel Complex Berm Repair

Prescription to Restore Stream 11 (Orphan Channel) in the Burman River Watershed, March 2007

Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River,

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report

1998 Willow Creek Downstream Migrant Trap Report. Draft. Prepared By: C. A. Walker. Lower Trinity Ranger District. Six Rivers National Forest

Study Update Tailrace Slough Use by Anadromous Salmonids

Ned Currence, Nooksack Indian Tribe

Tuolumne River Gravel Introduction

Campbell River Elk Falls #3 Intake and Connector Channel Construction Summary

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR

COQUITLAM RIVER WATERSHED: KWIKWETLEM SIDE-CHANNEL HABITAT RESTORATION, PUBLIC AWARENESS, AND REPORT mstory

California Steelhead: Management, Monitoring and Recovery Efforts

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #

PRE- PROPOSAL FORM - Lewis River Aquatic Fund

2012 Bring Back the Natives Awarded Projects

WEST VANCOUVER STREAMKEEPER SOCIETY PRESIDENT S REPORT ON BEHALF OF THE DIRECTORS MAY 10, 2012

State of San Francisco Bay 2011 Appendix O Steelhead Trout Production as an Indicator of Watershed Health

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

DEADWOOD CREEK FISH PASSAGE IMPROVEMENT PROJECT

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011.

FACT SHEET I. LOCATION

Proposed 2018 Fisheries Management Measures to Support Recovery of Interior Fraser River Steelhead

WFC 50 California s Wild Vertebrates Jan. 11, Inland Waters (Lakes and Streams) Lisa Thompson

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP

Fish Tech Weekly Outline January 14-18

Puntledge River Hatchery Summer Chinook Rearing Consolidation Project

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

STREAM SURVEY File form No..

East Kitsap Peninsula WRIA 15 Salmon Habitat Restoration Strategy Summary

San Lorenzo Valley Water District, Watershed Management Plan, Final Version Part I: Existing Conditions Report

Union Pacific Railroad

Staff, Organizations Directly Affected (including but not limited to):

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.

OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT

LIFE HISTORY DIVERSITY AND RESILIENCE

USDI Bureau of Land Management Roseburg, Oregon District. Larry Standley Hydrologist Cory Sipher Fisheries Biologist Rick Shockey District Engineer

Michigan Department of Natural Resources Status of the Fishery Resource Report Page 1

Perspectives of a State Director Selective fisheries as a tool in fisheries management and salmon recovery

Searsville Dam Removal

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA

FWCP Coastal Region Project Summary Learn more at fwcp.ca

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

middle deschutes progress in restoration

Alberta Conservation Association 2009/10 Project Summary Report. Project Name: North Saskatchewan and Ram Rivers Bull Trout Spawning Stock Assessment

Coquitlam/Buntzen Project Water Use Plan

Draft Central Valley Salmon and Steelhead Recovery Plan

Eastern Brook Trout. Roadmap to

2012 Summary Report on the Juvenile Salmonid and Stream Habitat Monitoring Program

COLUMBIA LAKE DAM REMOVAL PROJECT

Blue Creek Chinook Outmigration Monitoring Technical Memorandum

Improving Summer Chinook Hatchery Broodstock Survival Lower Puntledge Hatchery Chilled Acclimation System

Benchmark Statement Respecting the Fish, Fish Habitat and Fisheries of Fish and Little Fish Lake, within the Taseko River Watershed.

City of Burnaby Environmental Review Committee (ERC) Guide for Applicants

Transcription:

DAVE MARSHALL SALMON RESERVE RESTORATION, MAINTENANCE, AND UPGRADES YEAR END REPORT Prepared for: Fish and Wildlife Compensation Program Prepared by: Edith Tobe, RPBio, Executive Director Box 1791, Squamish, BC, V8B 0B3 Prepared with the financial support of the Fish and Wildlife Compensation Program on behalf of its program partners: BC Hydro, the Province of BC, Fisheries and Oceans Canada, First Nations, and Public Stakeholders May 11, 2017 1 P age

Executive Summary The Dave Marshall Salmon Reserve Restoration project focused on restoring, upgrading, and maintaining several ground water and river intake channels of the Cheakamus River. The project is located at the Cheakamus Centre (School District #44) in Squamish, British Columbia. The project targeted habitat improvements for coho, chum, pink, Chinook, and steelhead salmon. As well, benefits extend to other salmonid, amphibian, bird and wildlife species. The project fits within the directives identified in the Cheakamus Watershed Salmonid Action Plan as noted in Table 2 under Habitat Based Actions: a) Maintain existing constructed habitat enhancements for all salmonids; and b) Improve existing side channels and offchannel areas for all salmonids. This project builds upon the work undertaken in the 3 phases of Evans Creek Re-watering projects funded by FWCP and links to and benefit the Evans Creek Re-watering project but is a standalone project in that it concentrates on upgrades and improvements to the Dave Marshall Salmon Reserve. There were slight modifications to the works schedule in the 2016/2017 season. The intake at Far Point was upgraded to a 3 diameter pipe along with a new intake structure and the Far Point head pond was cleaned out early in 2016. The field season concentrated on upgrades to weir structures and flow split upgrades at Coho Connector and Birth of a Stream North and South, removal of obstructions and woody debris in Wountie Channel and Mykiss Channel, and bridge upgrades at various locations including Birth of a Stream North and South. Cleanup of Gorbuscha Channel and Duck Pond head ponds were also completed. The valve replacement of Eagle Point Intake was also completed replacing the butterfly valve with a more robust flow control structure. The extension of Kiwi Channel now ties directly into the downstream Evans Creek Re-watering project. 2 P age

Contents Executive Summary... 2 1.0 Introduction... 4 2.0 Goals and Objectives... 4 3.0 Study Area... 5 4.0 Methods... 5 5.0 Results and Outcomes... 5 6.0 Discussion... 6 7.0 Recommendations... 6 8.0 Acknowledgement... 6 9.0 References... 7 8.0 Photos... 9 3 P age

1.0 Introduction The Dave Marshall Salmon Reserve Restoration and Upgrades project included improvements to flow structures, in-stream diversions, and upgrades to weirs and bridge structures along with extension of channels to connect downstream into the Evans Creek Rewatering project. This project resulted in direct benefits to salmonids, in particular focusing on rearing and overwintering habitat as well as spawning habitat for coho, chum, pink, and steelhead salmon. This project is a partnership of the Cheakamus Centre (School District #44), Fisheries and Oceans Canada, Squamish Nation, and the Squamish River Watershed Society, along with BC Hydro and is the direct result of collaboration from all these parties with a commitment towards healthy salmon stocks. 2.0 Goals and Objectives Upgrading the intakes, wooden flow structures, culverts and bridge crossings; cleaning out debris clogging the intakes; extending and restoring river fed and ground water channels; and overall maintaining the overall function of the channels Tasks: Far Point intake upgraded to 3 diameter pipe and new intake structure. Far Point head pond cleanout. Coho Connector primary flow split restructured. Birth of a Stream North flow split restructured and new bridges installed. Birth of a Stream South flow split restructured and new bridges installed. Upper end of Wountie Channel restructured and re-watered. Upper end of Mykiss Channel restructured and re-watered. Gorbuscha intake head pond cleanout. Duck Pond intake head pond cleanout. Eagle Point intake valve replacement. Kiwi Channel Extension The results from the project have helped to provide improved and year-round base flows from the Far Point intake into the off-channel habitat on the west side of Paradise Valley Road resulting in over 5,500 m 2 in spawning habitat and 25,000 m 2 in rearing and over-wintering habitat. The addition of over native riparian plants will, in time, provide shade and streamside protection for juvenile salmonids. The new structures and weirs will provide better passage for adult fish and improved flows into the side-channels creating over 2,000 m 2 of improvements to pool riffles, by-pass channels, habitat complexing, and removal of nuisance vegetation. This project benefits primarily coho, chum, pink, steelhead salmonid in all their life stages and, to a lesser degree, juvenile Chinook salmon. Rainbow trout, char, and other salmonids also benefit from these upgrades, improvements, and channel extensions. 4 P age

3.0 Study Area The salmon habitat restoration sites are located on the west bank of the Cheakamus River downstream of the Paradise Valley Road Bailey Bridge. The project is within the lands managed by the Cheakamus Centre, School District 44 (North Vancouver) designated as District Lots 1245 and 1244 within the New Westminster Land District. The project is within the Squamish Nation territorial lands. Maps covering the site are Natural Resources Canada National Topographic System 92G/14 and GeoData British Columbia Terrain Resource Information Management 92G.085 (see map/drawing at end of report). This portion of the Cheakamus River floodplain is within the Dave Marshall Salmon Reserve and contains an extensive network of restored fish habitats that have been constructed over the past thirty years. The area is separated from the main river by dikes, which provide a degree of protection to the restored habitats during significant floods. 4.0 Methods Most of the work was undertaken using 200 series excavators to access the site, remove the old weirs and install the new structures. Gravel and aggregate were trucked into the sties to improve trails, roads, and provide spawning gravels within the streams. State of the art new bridge decking was used to replace the old wooden structures. Most of the larger bridge upgrades and replacements were undertaken with manual labour and on-site construction. 5.0 Results and Outcomes The results include: Improved water flows to over 5,500 m 2 of spawning habitat; Benefits and improvements for over 25,000 m 2 rearing and over-wintering habitat; Riparian planting of over 500 native riparian trees and shrubs (see detailed planting summary below); Engagement of 25 volunteers from Squamish Nation, Cheakamus Centre and the larger Streamkeeper community; Over 2,000 m 2 of improved habitat from weir upgrades, improvements to pool riffles, by-pass channels, and removal of nuisance vegetation. Physical results include: Far Point intake upgraded to 3 diameter pipe and new intake structure. Far Point head pond cleanout. Coho Connector primary flow split restructured. Birth of a Stream North flow split restructured and new bridges installed. Birth of a Stream South flow split restructured and new bridges installed. Upper end of Wountie Channel restructured and re-watered. Upper end of Mykiss Channel restructured and re-watered. Gorbuscha intake head pond cleanout. Duck Pond intake head pond cleanout. Eagle Point intake valve replacement. Kiwi Channel extension extending 300 m south into Moody s Channel. Riparian grass seeding. 5 P age

6.0 Discussion This project was the result of natural changes within streams and watercourses which alter base flows, overwintering and spawning habitat as well as natural weathering of structures, such as bridges, weirs, and intakes. The project began with improved flows entering into the Far Point intake and structural changes to that intake and intake channels, including removal of silt and debris from the intake and intake channel. Replacement of older bridges and weirs and improvements to trails have resulted in overall improvements to the function of the offchannel habitat. Bridge upgrades were undertaken at Birth of a Steam South and North channel, Coho Intake Channel, and Far Point Channel intake. The head ponds at Gorbuscha Channel intake and Duck Pond Intake were cleaned out of silt and debris. Woody debris build up at Wountie Channel and Mykiss Channel was cleared up and removed, thereby opening up the channel flows and improving access for salmonids. Works on Kiwi Channel South extension channel have increased over 300 linear metres of new channel habitat for rearing, spawning, and overwintering salmonids. This project has involved partnerships with Squamish Nation and Cheakamus Centre (School District #44) along with Fisheries and Oceans staff to continue long-term benefits for the Dave Marshall Salmon Reserve and downstream Evans Creek and Moody s Channel restoration project. Some of the challenges faced this year was the overly long winter period that extended from early December until late March which prevented access to the site due to unprecedented accumulation of snow. With the extension into May the final bridge upgrades, channel extensions, and culvert replacements were completed. 7.0 Recommendations The Cheakamus Centre is an important educational facility that provides hands-on learning opportunities for thousands of students annually to learn about salmon, our streams, and the importance of a clean environment. Due to the limited access by salmonids downstream of the Daisy Reservoir, projects such as this one which provide valuable off-channel habitat for spawning and rearing salmonids allows for healthy salmon populations and stocks to return to the Cheakamus River. Long-term monitoring and on-going upgrades to the existing structures, channels, rearing ponds, and flow are all important to ensuring healthy salmon stocks in the watershed for years to come. The project was impacted by the early winter conditions that began in early October and extended until late March resulting in delays in completing the works as per the intended scheduling. An extension by FWCP allowed the project to be completed as originally intended. 8.0 Acknowledgement We would like to thank Fisheries and Oceans Canada and the financial support of the Fish and Wildlife Compensation Program for this project. We would also like to take this time to thank: Cheakamus Centre Squamish Nation 6 P age

Dave Nanson, Al Johnson and other Fisheries and Oceans Canada for all of their assistance; and Whistler Excavating Ltd, Atwell Contracting, & John Hunter Company 9.0 References BC Hydro Fish and Wildlife Compensation Program Cheakamus Watershed Salmonid Action Plan. Final Draft. October 2011. Department of Fisheries, Canada 1957. A report on the fisheries problems related to the power development of the Cheakamus River system. Vancouver B.C. 39p. + appendices. Melville, M. and D. McCubbing. 2000. Assessment of the 2000 Juvenile Salmon Migration from the Cheakamus River, using Rotary Screw Traps (draft). Prepared for BC Hydro, Burnaby. 36 p. + appendices Northwest Hydraulic Consultants. 2001. Analysis of channel morphology and sediment transport characteristics of the Cheakamus River. Prepared for BC Hydro, Burnaby. 40p. + appendices. 7 P age

Site Map of Cheakamus Centre Off-Channel Habitat 8 P age

8.0 Photos June 7, 2016 Representatives from Fisheries and Oceans Canada visit the site August 11, 2016 Facing west towards Birth of a Stream South (note weir in foreground and bridge in background) 9 P age

Facing north towards Birth of a Stream North foot bridge Facing north towards Birth of a Stream North weir 10 P age

Facing west towards foot bridge to be replaced/upgraded (south of Coho Connector) Rock weir hand built due west of foot bridge (just south of Coho Connector) 11 P age

Facing west towards Coho Connector Weir August 23, 2016 Eagle Point Valve Looking down into Eagle Point Valve (prior to upgrade) 12 P age

February 28, 2017 Completed Works Birth of a Stream South replaced foot bridges and weir and improvements to flow structures Birth of a Stream South replaced foot bridges, replaced weir, in-stream flow diversion structures 13 P age

Coho Connector replaced weir with lock blocks and new in-stream flow structure Mykiss Channel (east side of Bailey bridge facing downstream on Cheakamus River) removal of log jam and woody debris build-up 14 P age

Close up of Mykiss Channel woody debris has been removed 15 P age