ASSOCIATION OF POWER BIOLOGISTS 2017 Meeting Agenda August 29 th 31 st, Centralia, Washington

Similar documents
ASSOCIATION OF POWER BIOLOGISTS

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Downstream Fish Passage Reports from the Field

PLEASE BRING YOUR LUNCH

october 2013 A few things inside Collecting young fish Mayfield Dam turns 50 Understanding Mayfield Lake

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Lewis River Hydroelectric Projects Settlement Agreement Lewis River Recreation Coordination Committee (LRC) Meeting Agenda

Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting March 8, 2012 Meeting at Merwin


Yale Reservoir Kokanee (Oncorhynchus nerka) Escapement Report 2016

FINAL Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting September 14, 2006 Ariel, WA

August 7, SUBJECT: Briefing on Surface Collectors in the Pacific Northwest: Operating Characteristics and Collection Success

TABLE OF CONTENTS LIST OF TABLES NONE LIST OF FIGURES NONE

2007 Adult Returns and 2008 Expectations Columbia River

APPENDIX D: LEWIS RIVER HATCHERY REVIEW

P U B L I C U T I L I T Y D I S T R I C T N O.

Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell:

2015 Adult Returns and 2016 Expectations Columbia River Preliminary Draft December 14, 2015

Rugraw, LLC is the Applicant for FERC Project No Lassen Lodge Hydroelectric Project (LLHP).

Electronic Filing. Thank you for your assistance. Please call if you have any questions or need additional information.

Youngs Creek Hydroelectric Project (FERC No. P 10359)

2008 Adult Returns and 2009 Expectations Columbia River

Report from the Council

Capitol Volkssport Club

4.4 ASSESSMENT OF POTENTIAL ANADROMOUS FISH HABITAT UPSTREAM OF MERWIN DAM (AQU 4)

PLEASE BRING YOUR LUNCH

Endangered Species Act and FERC Hydroelectric Projects. Jeff Murphy & Julie Crocker NHA New England Meeting November 16, 2010

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

2018 Adult Returns and 2019 Expectations Columbia River Revised Draft December 12, 2018

JOINT STAFF REPORT WINTER FACT SHEET NO. 9 Columbia River Compact March 18, 2004

PLEASE BRING YOUR LUNCH

Survival Testing at Rocky Reach and Rock Island Dams

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT - WINTER FACT SHEET NO.

2017 Adult Returns and 2018 Expectations Columbia River Updated Draft January 11, 2018

Final Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) December 18, 2017

Attachment 6. Public Correspondence. Public correspondence received as of July 2, 2008

SUMMARY OF AVAILABLE FERC SITE INFORMATION FOR CISPUS RIVER NO 4 NW POWER PLANNING COUNCIL, FISH &WI LOLl FE DATABASE DIVISION, MAR-I0-1995

Final Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) December 20, 2018

Clackamas River Hydroelectric Project Flows and whitewater recreation: Updated information about Three Lynx and Bob s Hole boating

Lewis River Upstream Transport Plan Interim Final. Prepared by Frank Shrier Principal Fish Biologist PacifiCorp Energy.

Lake Oroville Coho Salmon Stocking Program Present. California Department of Water Resources (DWR) December 2009

Subject: Wells Hydroelectric Project FERC Project No Bull Trout Management Plan and Incidental Take Annual Report

State of Washington Dept. of Fish and Wildlife invites applications for the position of: Permanent Fisheries Biologist 4 *

Lewis River Fish Passage Program 2014 Annual Report (30-day review Draft)

MERWIN UPSTREAM ADULT TRAP EFFICIENCY. Peter M. Stevens Science Operations Manager March 10, 2016

Cowlitz River Fisheries and Hatchery Management Plan (FHMP)

COMMENTS Draft Environmental Impact Statement McCloud Pit Hydroelectric Project (FERC No. 2106) P Applicant: Pacific Gas & Electric Company

145 FERC 62,070 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

September 4, Update on Columbia basin Salmon and Steelhead Recovery Planning

PACKWOOD LAKE HYDROELECTRIC PROJECT FERC DOCKET NO. P APPLICATION FOR NEW LICENSE

Packwood Lake Hydroelectric Project (FERC No. P-2244) Anadromous Salmonid Habitat and Spawner Survey Report

2016 Annual Work Plan

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT - SPRING FACT SHEET NO.

FALL FACT SHEET NO. 2 Columbia River Compact August 13, 2004 MANAGEMENT GUIDELINES

Todd R. Seamons and Kenneth I. Warheit Washington Department of Fish and Wildlife Science Division

BULL TROUT OPERATIONAL PLAN

Biological Opinion. Magnuson-Stevens Fishery Conservation and Management Act Consultation

Final Bull Trout Redd Monitoring Report for the Wallowa Falls Hydroelectric Project

Youngs Creek Hydroelectric Project

Final Bull Trout Genetics Monitoring Plan for the Wallowa Falls Hydroelectric Project. (FERC No. P-308) June 2017

CONTENTS. AQU 7 Appendix 1 Pathology Results for Fish Examined from Swift Reservoir in 2000 LIST OF TABLES

Clackamas River Hydroelectric Project Whitewater Kayaking on the Oak Grove Fork

Meeting Minutes FINAL. Aquatic Settlement Work Group. I. Summary of Action Items. To: Aquatic SWG Parties Date: February 15, 2018

THREATENED, ENDANGERED, AND SENSITIVE SPECIES 2010 ANNUAL REPORT

Perspectives of a State Director Selective fisheries as a tool in fisheries management and salmon recovery

Cowlitz Hydroelectric Project FERC No Cowlitz Fisheries Technical Committee Final FHMP Meeting Summary September 7, 2017 from 9:30 AM 2:00PM

FINAL Fish Salvage Plan for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) April 19, 2017

Integrated Pest Management (IPM) workshop: with particular reference to grasshopper management

Okanagan Sockeye Reintroduction

REC 6 FISHERIES HABITAT EVALUATION

Pat DeHaan and Brice Adams. Sam Brenkman and Pat Crain

CONNECTICUT RIVER WATERSHED COUNCIL The River Connects Us

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT SUMMER FACT SHEET NO. 1 June 10, 2010

Please be advised that the following participants were in attendance at the special conference call at 2:00pm yesterday:

The Role of River Advisory Councils

Chapter and Membership Attendance:

Successful downstream passage of juvenile salmonids at a run-of-river hydro project in the Pacific Northwest

Honorable City Council i. A / Richard A. Leahy, City Manager \~v Thomas E. Hansen, P.E., Public Works Director/ ;?:?-

FINAL Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting November 8, 2007 Ariel, WA

Charter Boat Fishing in Lake Michigan: 2017 Illinois Reported Harvest

FINAL Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting February 8, 2007 Ariel, WA

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

CUSHMAN RESERVOIRS. Skokomish Watershed Monitoring Conference - Public Meeting Florian Leischner 9/17/2015

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT SUMMER FACT SHEET NO.

Charter Boat Fishing in Lake Michigan: 2015 Illinois Reported Harvest

PRE-FILED DIRECT TESTIMONY AND EXHIBITS OF F. ALLEN WILEY PART II

SALMON MANAGEMENT ALTERNATIVES HEARING SUMMARY

PACIFIC NORTHWEST COWBOY DRESSAGE SHOW & GATHERING August 24 and 25, 2016 Washington Horsemen's Tacoma Unit #1, Spanaway, Washington

LEWIS RIVER FISH PLANNING DOCUMENT

Flowing from Mount Katahdin to the Gulf of

AUDIT REPORT. Report No. R-GR-FWS

Columbia River Salmon Harvest Sport and Commercial Sharing Facts and Relationships

LIFE HISTORY DIVERSITY AND RESILIENCE

Feather River Fish Hatchery spring run Chinook salmon Program: moving toward conservation. Ryon Kurth, Jason Kindopp, Anna Kastner, and A.J.

Presented to Idaho Washington Aquifer Collaborative February 11, Spokane River Project License

CHAPTER X: PORTAGES AROUND DAMS

PACIFIC NORTHWEST COWBOY DRESSAGE SHOW & GATHERING August 23 and 24, 2017 Washington Horsemen's Tacoma Unit #1, Spanaway, Washington

April 14, Subject: Rocky Reach Hydroelectric Project, FERC No Rock Island Hydroelectric Project, FERC No

Transcription:

ASSOCIATION OF POWER BIOLOGISTS 2017 Meeting Agenda August 29 th 31 st, Centralia, Washington Tuesday, August 29 th, 2017 Location Holiday Inn Express and Suites, Chehalis - Centralia 11:30 am Registration 12:30 pm President s Opening Remarks 12:45 pm 4 pm APB Meeting Presentations 8:00 pm APB Opening Night Bowling at Fairway Lanes, Centralia, WA Wednesday, August 30 th, 2017 APB Meeting Tours: Cowlitz Hydroelectric Project Summary: The 2017 APB Annual Meeting Tour will be take place at the Cowlitz Hydroelectric Project. The tour will begin at the Cowlitz Salmon Hatchery located about 45 minutes southeast of Centralia, WA. The Project consists of three dams, one barrier dam at the Cowlitz Salmon Hatchery and two high head dams in Mayfield and Mossyrock. Upstream from those facilities is Cowlitz Falls Dam which is operated by Lewis County PUD where Tacoma has built a new downstream fish collection facility. Since the new FERC license became effective in 2003 Tacoma Power has been extremely active in implementing improvements in fish, wildlife and recreational activities. Some of the largest projects have included the Cowlitz Salmon Hatchery remodel, and the design and construction of the Cowlitz Falls North Shore Collector which will undergo its first season of operation in 2017 as part of Tacoma Power s commitment to connect populations in the upper and lower Cowlitz River. You will get an up-close look at the Project, improvements, and will be able to select a tour for various terrestrial or aquatic monitoring programs during the APB Tour. 7:30 am 3:30 pm Tour of the Cowlitz River Hydroelectric Project 5-9 pm APB Social Banquet at McMenamins Olympic Club 112 N Tower Ave, Centralia, WA 98531

Cowlitz Salmon Hatchery Thursday, August 31 st, 2017 Location Holiday Inn Express and Suites, Chehalis - Centralia 2017 APB Business Meeting 9:00 am Bowling Results 9:15 am 10:30 am APB Meeting Presentations 10:30 am Business Meeting 11:15 am President s Closing Remarks and Adjourn

Meeting Fee The Edison Electric Institute has once again offered to provide financial support to our organization. With their support, the annual meeting fee will be only $65. Please visit http://www.powerbiologists.org/register/ to register with paypal online. If you would like to pay at the meeting please bring cash or a check to registration on Tuesday. Presentations and New Membership If you would like to be a presenter at the 2017 APB Annual Meeting, please start thinking about topics to present. We encourage existing and potential members to step forward to discuss topics relevant to utility relicensing and compliance. A lot of new and interesting challenges have been met by utility resource managers in recent years and APB membership are anxious to hear about your successes (and failures). If you are interested in presenting, please contact Matt Bleich at 253-502-8794 or MBleich@cityoftacoma.org. New members are encouraged to apply and are welcome to attend the 2017 APB Annual Meeting. An application and membership requirements are appended to this announcement. New applications can be mailed to Matt Bleich, APB Secretary (Tacoma Power, 3628 South 35 th Street, Tacoma, WA 98409 or MBleich@cityoftacoma.org).

Lodging Holiday Inn Express & Suites Chehalis-Centralia 730 NW Liberty Place, Chehalis, WA 98532 The Holiday Inn Express & Suites Chehalis Centralia is holding a limited number of rooms for the APB for the nights of August 29 th 31 st, 2017 at the discounted rate of $126.00/night (plus taxes and fees). To make a reservation, please follow this link: https://www.ihg.com/holidayinnexpress/hotels/us/en/chehalis/seach/hoteldetail?cm_mmc=googlemaps- _-EX-_-USA-_-SEACH

Please note that the social events on Tuesday and Wednesday nights are not within walking distance of the hotel. Please plan accordingly for responsible transportation. APB will be arranging transportation from the hotel to the Lewis River Hydro Project for the tour on Wednesday. ASSOCIATION OF POWER BIOLOGISTS 2017 Annual Meeting Announcement We look forward to seeing you in August! Dan Cramer President/Treasurer Portland General Electric Co. 33831 S. Faraday Rd. Estacada, OR 97023 (503) 630-8232 Dan.cramer@pgn.com Chris Karchesky VP PacifiCorp 105 Merwin Village Ct. Ariel, WA 98603 (360) 225-4432 chris.karchesky@pacificorp.com Matt Bleich Secretary Tacoma Power 3628 South 35 th Street Tacoma, WA 98409 (253) 502-8794 mbleich@cityoftacoma.org