Highway 17 Transportation Improvement Study

Similar documents
The I-680 Southbound Express Lane

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

SUMMARY OF TRANSPORTATION INVESTMENTS

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

101 Corridor Managed Lanes

I-35W Solutions Alliance Project Update July 13, 2017

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

Santa Clara I-280 CORRIDOR STUDY

August 12, The Honorable Edmund G. Brown Jr. Governor, State of California State Capitol Sacramento, CA Dear Governor Brown:

Caltrain Bicycle Parking Management Plan DRAFT PROJECT SCOPE SUBMITTED TO CALTRANS FALL 2014

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Final Project Report. Monterey Bay Area Feasibility Study of Bus on Shoulder Operations on State Route 1 and the Monterey Branch Line

TABLE OF CONTENTS. Executive Summary

Freeway Improvement Project

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

TRANSIT MARKET ANALYSIS OF FREEWAY-ORIENTED EXPRESS BUSES

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

Set of plans containing details for game day operations of the Ballpark. Plans set forth the responsibilities and the specific actions of:

I-25 PEL: CO Springs Denver South Connection. Presentation to Castle Rock Town Council

Regional Transportation Needs Within Southeastern Wisconsin

Key objectives of the survey were to gain a better understanding of:

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

ORANGE COUNTY TRANSPORTATION AUTHORITY. Metrolink Ridership and Revenue Quarterly Report. Staff Report

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Wilshire Boulevard Bus Rapid Transit Project

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Transportation Master Plan Advisory Task Force

Washington DC Section of ITE Project Briefing

Fast Affordable Sustainable Transportation

POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE

DRAFT. Memo. Range of the Alternatives Considered in the EIS

Operational Comparison of Transit Signal Priority Strategies

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Welcome! San Jose Avenue Open House August 25, 2015

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

2.0 LANE WIDTHS GUIDELINE

SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

River Road - Proposed Road Safety Enhancement Measures

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Roadways. Roadways III.

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Preliminary Transportation Analysis

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

1.0 Purpose and Organization of the Update to the Transit Market Analysis of Freeway-Oriented Express Buses (2008)

El Camino Real Bus Rapid Transit Conceptual Engineering. Los Altos Council Workshop January 24, 2012

Bus Rapid Transit Plans

There are traffic jams on Highway 1

San Tomas Expressway

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Dear City Council Members,

Utilizing QR Codes and SurveyMonkey to Generate High School Travel Tally Data

IH 20 RANGER HILL PUBLIC MEETING

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Congestion Reducing Activities. Toby Carr GDOT Director of Planning April 10, 2014

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Unified Corridor Investment Study Draft Preferred Scenario November 2018

DRAFT. The HOV/HOT Alternative: Working Paper #3

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

CHAPTER 1 INTRODUCTION

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

EL CAMINO REAL BUS RAPID TRANSIT PROJECT

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service

The Bay Bridge Corridor Congestion Study

Lincoln Avenue Road Diet Trial

SELECTED ROADWAY CAPACITY ANALYSIS

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

4.7 TRAFFIC & TRANSPORTATION Environmental Setting. Regulatory Setting

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

Chapter 3 BUS IMPROVEMENT CONCEPTS

RED COLORED TRANSIT-ONLY LANES REQUEST TO EXPERIMENT

SANTA MONICA BOULEVARD CORRIDOR

Report to Cabinet. 18 May 2016

3.0 PROJECT DESCRIPTION

Watson Chapel School District. School Bus Safety Plan

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions

2040 RTP. Chapter 6: Investments in our Transportation Future

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

APPENDIX W OFF-MODEL ADJUSTMENTS

Transportation Corridor Studies: Summary of Recommendations

History Recent Problems Alternative Routes

Managed Lanes in California:

Subject: Use of Pull-off Areas in Work Zones Page: 1 of 13. Brief Description: Guidance for the use and placement of pull-off area in work zones.

Strategies to Re capture Lost Arterial Traffic Carrying Capacities

I-105 Corridor Sustainability Study (CSS)

Route 29 Corridor Assessment Update. Development of Possible Solutions

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Berkeley Strategic Transportation Plan A-76

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Transcription:

Final Report Highway 17 Transportation Improvement Study prepared for Santa Cruz County Regional Transportation Commission (SCCRTC) prepared by Planning and Engineering, Inc. 1155 North First Street, Suite 100 San Jose, CA 95 1 12 (408) 282-1 15 1 and Nelson/Nygaard Consulting Associates 833 Market Street, Suite 900 San Francisco, CA 94103 (415) 284-1554 May 5, 2000

TABLE OF CONTENTS SECTION PAGE EXECUTIVE SUMMARY 1 STUDY OVERVIEW Introduction 1-1 Process 1-4 Current Projects Being Implemented 1-5 Presentation Format 1-6 2 HIGHWAY ISSUES, CONSTRAINTS AND IMPROVEMENT OPPORTUNITIES Highway Operations Issues 2-1 Recommended Improvement Options 2-7 Improvement Evaluation 2-21 Summary of Recommended Options 2-21 Implementation 2-21 3 SUGGESTED TRANSIT SERVICE IMPROVEMENTS Introduction 3-1 Issues -3 Preliminary Analysis for Future Expansion 3-4 Summary of Recommendations 3-9 Next Steps 3-16 Cost Allocation Methods 3-17 4 MARKETING 5 FUNDING Potential Fund Sources for Highway Improvements 5-1 Potential Fund Sources for Transit Improvements 5-3 6 CONCLUSION TABLES 1 Improvement Evaluation Matrix 2-22 2 Recommended Improvement Plan 2-23 3 Highway 17 Express Bus Ridership Total: 1990/91-1998/99 3-2 4 Estimate of Santa Cruz County Residents Working in Santa Clara County 3-6 5 Summary of Santa Cruz County Commuters by corridor 3-7 6 Potential Capital Improvements 3-12 Highway 17 Transportation Improvement Study Final Report i Ma. y 5. 2000

TABLE OF CONTENTS (Continued) FIGURES PAGE 1 Vicinity Map 1-2 2 High Accident Locations 2-2 3 Road Closures 2-3 4 Locations of Heavy Congestion 2-4 5 Recommended Localized Improvements 2-25 6 Major Employment Centers 3-5 7 Existing Park and Ride Lots and Transit Centers 3-8 TECHNICAL APPENDIX TO FINAL REPORT (Available as a Separate Booklet) A B C D E Study Participants Caltrans Documentation - Safe on 17 Task Force Corridor Assessment - Caltrans Status of Minor B Projects - Caltrans Highway Safety Improvement Program Highway Operations Issues Marketing Air Pollution Control District Key Service Measurements Highway 17 Transportation Improvement Study Final Report ii May 5. 2000

EXECUTIVE SUMMARY BACKGROUND INFORMATION State Highway 17 -- Santa Cruz s famous over the Hill highway -- is by far the most direct and shortest route between Santa Cruz County and almost all commuting destinations in Santa Clara, Alameda, Contra Costa and much of San Mateo Counties. In addition, Highway 17 is the primary route of choice between the Santa Clara Valley and the recreational areas of Santa Cruz on summer weekends. Congestion occurs both during weekday commute times and on summer weekends. This winding, four-lane road has steep sections, frequent road crossings, and substandard median shoulders and outside shoulders for most of its length. In addition to the challenging roadway configuration, weather-related conditions such as thick fog, heavy rains and mudslides affect roadway operations. Reconstruction of the highway to meet current standards would be both exorbitantly expensive and environmentally destructive. Thus, over the past two decades, the Santa Cruz County Regional Transportation Commission (SCCRTC) has consistently opted to keep Highway 17 a four-lane highway, targeting funds for safety and operational improvements. In the late 1980s and again last year, SCCRTC worked with Caltrans and the California Highway Patrol (CHP) to identify low cost safety and operational improvements and to implement a safety campaign for Highway 17. Median barriers, acceleratioddeceleration lanes, motorist call boxes and changeable message signs are improvements that have been installed over the past decade. The Highway 17 Express Bus service was initiated after the 1989 Loma Prieta earthquake in response to an emergency need for transit over the Hill while Highway 17 was being repaired. This joint project of the Santa Cruz Metropolitan Transit District (SCMTD) and the Santa Clara Valley Transportation Authority (VTA) has been a success since its inception. Nine transit coaches were acquired with Federal Emergency Management Agency (FEMA) funding and were therefore not subject to various contractual and statutory limitations affecting transit vehicles Highway I7 Transportation Improvement Study Final Report ES- I May 5, 2000

purchased through conventional Federal Transit Administration (FTA) transit operator sources. During the course of this study, SCMTD, the Santa Cruz County bus operator, agreed to take over the day-to-day operations of the service using its drivers and facilities, thereby achieving the most important goal of this study - how to continue the existing service. VTA transit is participating in the funding and oversight of the service through a Joint Powers Authority arrangement with SCMTD. With the continued operation of the existing Highway 17 Express Bus service secured, this Highway 17 Transportation Improvement Study focused on optimizing and expanding the Highway 17 Express Bus service. PURPOSE OF THE STUDY In response to the need for safety and reliability improvements in this corridor, the Highway 17 Transportation Improvement Study was conducted to provide SCCRTC, VTA, and SCMTD with a review of available data, past studies and proposals, and to recommend safety and efficiency improvement projects with the following two main objectives: 1) Recommend steps to optimize the Highway 17 Express Bus service reliability. 2) Expand Highway 17 Express Bus ridership in the corridor in order to reduce vehicle trips, miles traveled, and emissions. Recognizing that the roadway and traffic conditions along Highway 17 affect the operation of the Highway 17 Express Bus service, an additional objective was to recommend safety and operational improvements to add reliability, speed and functionality to the project corridor to benefit both the patrons of the Highway 17 Express Bus service and the motorists traveling along this route. STUDY PROCESS A Technical Advisory Committee (TAC) was established to aid in the completion of this study. The TAC consisted of representatives from SCCRTC, SCMTD, VTA, Caltrans Districts 4 and 5, the Monterey Bay Unified Air Pollution Control District (MBUAPCD), the City of Scotts Valley, the Metropolitan Transportation Commission (MTC), the Association of Monterey Bay Area Governments (AMBAG), and the California Highway Patrol (CHP). The TAC provided input, review and guidance in the development of this study. A full listing of study participants is shown in Appendix A. The TAC coordinated with the Safe on 17 Task Force, a task force spearheaded by the California Highway Patrol that emphasizes safety improvements along Highway 17. The Safe on 17 Task Force provided input/responses to suggestions, logs of programmed projects and recently completed improvements, and information from the ongoing Accident Surveillance System, as part of the California Highway Safety Improvement Program. Highway 17 Transportation Improvement Study Final Report ES-2 May 5, 2000

TRANSIT IMPROVEMENT RECOMMENDATIONS The original focus of the transit portion of this study was intended to be in three key areas: 1) Explore means to continue operating the Highway 17 Express Bus service beyond the expiration of the service contract with Discovery Charters in June of 1999. 2) Explore changes to optimize the existing service using current resources. 3) Describe the potential to expand service in the corridor, including reaching out to new markets. The first issue became moot during the course of the study when METRO and VTA formed a Joint Powers Authority to jointly oversee the service, with METRO operating it with its own drivers and vehicles. The JPA agreement establishes a Service Review Committee to set budgets, policy, and fares, and to explore service augmentations, new routes, vehicle funding, procurement and other issues that arise. This arrangement has been extremely successful to date. For the purposes of making service optimization and expansion suggestions, the Study Team analyzed a variety of existing data sources, interviewed agency staff and conducted several reconnaissance trips during the course of the analysis. Based on an analysis of the existing data, the following key recommendations merit further discussion (by the new Service Review Committee established by VTA and METRO for operating the Highway 17 Express Bus service under the new Joint Powers Authority) or investigation: Maintain existing service Consider adding new service to connect with Metro Center Consider incremental improvements to existing services Continue to explore reverse commute potential Begin planning for new service south of Soquel Continue to implement incremental capital improvements Avoid any increase in transit travel time Consider breaking service into different routes Continue to review and refine interconnectivity with other services Continue to promote vanpools and subscription bus services Consider weekend service in corridor Highway Operations and Capital Improvements Regardless of whether the existing Highway 17 Express Bus service is continued, optimized, or expanded, transit services are dependent on the reliability of travel conditions along the Highway 17 corridor. During peak periods, in the peak direction, drivers (both automobile and bus drivers) experience intermittent delays, often 10-20 minutes in length, for a trip of about 20 miles between Santa Cruz and Los Gatos. North of Los Gatos, routine congestion can add another 5-10 minutes to the travel time between Los Gatos and San Jose. Highway I7 Transportation Improvement Study Final Report ES- 3 May 5, 2000

The primary cause of delays on the Highway 17 Corridor is traffic incidents rather than recurrent congestion. Though protected from head-on collisions by a nearly continuous concrete median barrier, the corridor s curves, insufficient superelevation, dips, steep grades and other geometric conditions are associated with localized accident rates. Along some of the mountainous portions of Highway 17, travel lanes are not the standard width for new facilities. The existing lane width in these areas is 11.5 feet, while the current standard for basic lane width is 3.6 meters or 1 1.8 feet. Accidents, stalls and breakdowns in segments without shoulders or pullouts quickly create long queues and subsequent slowdowns lasting long afterwards. Highway 17 is a four-lane facility through the study area. Because of right-of-way constraints and the mountainous terrain, widening Highway 17 would be costly and environmentally prohibitive. Therefore, there is no effective way to significantly increase vehicle capacity on this roadway. Additionally, highway operational problems, including high numbers of accidents and road closures, affect the reliability of the Highway 17 Express Bus service, and general travel along the corridor. These problems are largely attributed to three factors: Excessive speed for geometric condition Excessive speed for weather conditions Congestion at bottlenecks The recommended highway operations and capital improvements for Highway 17 focus on a system-wide approach consisting of the following four major implementation programs: Speeding Prevention and Enforcement Safety Improvements Incident Prevention and Management Geometric Improvements Some of the options for improvement are programmatic and apply to the study area as a whole. Others are project-specific and localized. Caltrans should conduct a consolidated study to define improvement projects along the Highway 17 Corridor. The consolidated study should further evaluate the options recommended in this Study and those arising from the Safe on 17 Task Force. An overall corridor study can best evaluate the feasibility (both engineering and environmental), the potential benefits, impacts and costs for the localized spots and for the corridor as a whole. Such a study would position many of the recommended improvement options for funding. CONCLUSION Implementing the improvements recommended in this study will require a cooperative effort of all the member agencies of the TAC. Lead agencies, as suggested in Section 6 of this report, should continue seeking funding sources to finance the recommended improvement options. Caltrans Districts 4 and 5, SCCRTC, SCMTD, VTA and the new joint VTA/METRO Service Review Committee should continue monitoring evaluation measures, such as the ones listed below, to determine the effectiveness of the recommended improvement options for the project corridor: Highway I7 Transportation Improvement Study Final Report ES- 4 May 5, 2000

Accident and incidents by location, type, and rate Overall travel time and congestion levels experienced by motorists and transit passengers Total transit ridership and cost per passenger ride Person throughput of the corridor Auto occupancy rates While it may not be possible to achieve a significant increase in the motor vehicle capacity of the corridor, this study reaches two positive conclusions: 1) there is the potential to improve the reliability of travel on Highway 17 for all users by reducing accidents and incidents; and 2) there are cost-effective measures to improve the efficiency of the corridor by continuing to encourage vanpools, subscription bus and additional express bus services in the corridor. Highway I7 Transportation Improvement Study Final Report ES- 5 May 5, 2000