APPENDIX B: SELECTION CRITERIA

Similar documents
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Appendix A. Road Classification Review of Outstanding Issues and Proposed Classifications (All Wards) Staff Report Road Classification System

Devonport City Cycling Network Strategy

Diagonal cycle crossing for signalised intersection. Axel Wilke ViaStrada Matthew Hinton Maunsell Daniel Newcombe Auckland City Council

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Kelowna On the Move. Pedestrian and Bicycle Master Plan

TRANSPORTATION NEEDS ASSESSMENT

Bicycle Master Plan Goals, Strategies, and Policies

Regional Cycle Programme Update

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Public Works and Infrastructure Committee. General Manager, Transportation Services

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

City of San Diego Vision Zero Draft Strategic Plan FY 2017

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

STONY PLAIN ROAD STREETSCAPE

4.1 Introduction. 4.2 Aspects of walkable communities

Regional Cycling Plan

Part B Design Guidance / Principles _

Bicycle Network Submission

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

Strategy for Walking & Cycling Action Plan

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

City of Ottawa s Complete Streets Approach to Transportation Projects

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Durham Region Long Term Transit Strategy

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

ADA TRANSITION PLAN 2013

Appendix B Option 1 Design, Plans and Estimates

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

land transport road assets

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Living Streets Policy

The Value of Technical Peer Reviews

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

Classification Criteria

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

Sixth Line Development - Transit Facilities Plan

Confirmation of Levels of Service for Winter Maintenance of Bikeways, Windrow Opening, Sidewalks and AODA Compliance

Major Bike Routes 102 Avenue Workshop April 21, 2015

APPENDIX 4 PEDESTRIAN FACILITY DESIGN INFORMATION

Bus and Transit Lane Review Update

PEDESTRIAN ACTION PLAN

Dan Andrews. Expert Advisor to the Ontario Ministry of Tourism, Culture & Sport OPA Ed Conference, Burlington, ON March 1, 2018

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

Public Works and Infrastructure Committee. General Manager, Transportation Services. P:\2016\Cluster B\TRA\TIM\pw16009tim.docx

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

Non-Motorized Transportation 7-1

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Downey Road. Transportation Improvement Study

122 Avenue: 107 Street to Fort Road

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

Traffic Calming Policy

GOAL 2A: ESTABLISH AND MAINTAIN A SAFE, CONVENIENT, AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM TO MOVE PEOPLE AND GOODS THROUGHOUT THE CITY.

Section 2 Strategic Alignment. Contents

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

We support the following: Tom Davies Square 200 Brady Street Sudbury, Ontario

Purpose. Process. Recommendations

Transportation Assessment

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Road Safety Trends, Targets and Safety Programs in New Zealand. by Dr Shane Turner

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

MILTON ROAD LLF PROJECT UPDATE

Statewide Pedestrian and Bicycle Transportation Plan and Economic Impact Study. Kick off Meeting November 28, Your Planning Team

Chapter 5. Complete Streets and Walkable Communities.

21. CHRISTCHURCH CYCLE LANES: PROPOSED COLOURED SURFACING CHANGE

IMPLEMENTATION STRATEGIES

Cycle Lanes Dixon Street (Worksop Road to Crayne Street)

General Design Factors

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Alta Planning + Design

Highway 56 Traffic Study Rymal Road to Cemetery Road

DYNAMIC LANES FOR AUCKLAND

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

-Current Get On Board initiative: Existing LTC program to help make LTC accessible, informative, and encourage use of public transit

Auckland Transport Code of Practice 2013

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:

2. TRANSPORTATION ELEMENT.

6.1 Infrastructure and Safety

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop

Rochester Area Bike Sharing Program Study

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Review of Guidelines for Cycleway Safety Fencing

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

EXECUTIVE SUMMARY. Vision

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

City of Charlottesville Bicycle and Pedestrian Master Plan Update

CPC Parking Lot Riverside Drive. Transportation Rationale

Transcription:

APPENDIX B: SELECTION CRITERIA The WCfST Action Plan 2005 2009 Project List is based on best known practice set in the context of national and regional strategies, with a distinct Rodney focus. It has evolved from a range of planning, engineering, education, encouragement, resource and enforcement initiatives into a comprehensive range of projects, intended to bring about a change in walking and cycling behaviors. It is apolitical in nature. The list of projects attached is the Preliminary Project List. This is the initial master project list for the 20 year implementation period of the WCfST. The Project List is a work in progress, which will be continuously updated with the addition and deletion of sites and fine tuned in relation to; the Annual Plan; available funding; and practicality of sites. The Selection Criteria for determining whether a project should be added to the Project List is generally, amongst others, as follows: Meets the Strategy Objectives and needs. Actual and potential walking and cycling generator locations e.g. schools, businesses, places of work, commercial centers, public transport facilities. School Rolls number of users and potential users. Current walking and cycling patronage. Patronage potential. Council and LTNZ funding allocation and criteria. Economic criteria i.e. benefit / cost ratios. Connectivity i.e. completing missing links to provide connectivity between existing walkways and cycleways. School Travel Plan needs. Workplace Travel Plan needs. Safety issues. Engineering costs / land purchase / end point facilities. Construction cost fluctuations. Post implementation learnings. * User feedback * Design standard * Patronage actual versus expectations 24

APPENDIX C: DESIGN GUIDELINES Principles for Encouraging Use The eight principles adopted to encourage use and to maximize safety, are as follows: Concentrate in centers District Plan (Pre Project Phase) Mix uses in centers District Plan (Pre Project Phase) Link public transport with landuse strategies Provide safe routes and facilities (Project Phase) Connect streets Connect culde sacs, use of parks etc. (Project Phase) Improve pedestrian and cycle access Remove obstacles for pedestrians and cyclists (Project Phase) Manage parking supply Secure and safe bike parking (Project Phase) Improve road management Improved safety (Project Phase) Implement good urban design make every street a walking and cycling street (Project Phase) Guidelines and Standards Rodney District Council uses the following guides and standards for Walking and Cycling facilities: Austroads Part 13, Pedestrians, Guide to Traffic Engineering Practice, 1999 Austroads Part 14, Bicycles, Guide to Traffic Engineering Practice, 1999 New Zealand Cycle Design Guide, 2004 (to be used in conjunction with Austroads Part 14) Manuals of Traffic Signs and Marking, Part 1 and 2, Transit New Zealand (MOTSAM) Rodney District Council Engineering Standards (November 2005) LTSA RTS 14 Guidelines for facilities for blind and visually impaired pedestrians (2003) Cycle Route Network Planning Guide (Land Transport New Zealand) Pedestrian Planning & Design Guide (Land Transport New Zealand) Land Transport NZ Research Report 274 (2005) New Zealand walking and cycling strategies best practice NZ Urban Design Protocol Reference has been made to: NZ Government s CPTED (Crime Prevention through Environmental Design) and IPTED (Injury Prevention through Environmental Design). Providing for pedestrians: Principles and Guidelines to Destinations and Urban Spaces, July 2003 (www.doi.vic.gov.au). Cycle Action Auckland Designing for Cycling...a one page introduction and the suggested approach document (2 pages). Guidelines and standards alone do not ensure safe solutions for cyclists and pedestrians and NZ and Industry Best Practices should be applied. Sitespecific factors, such as existing road width, footpath widths, constraints for cycle paths and parking requirements need to be considered carefully. Facilities should be audited and regularly maintained for cyclist and pedestrian. Utility Service company s activities and plant and equipment needs to be coordinated to ensure that cesspits, manholes, water fittings, boxes, Telecom surface boxes, power poles and similar obstacles are designed, located, relocated where necessary, and monitored so as not to present a safety risk for cyclists and pedestrians. Minimum and Desirable The guidelines for cycleway are generally: Minimum: Desirable: 2.2 metre width with white road markings to divide cycle and walking and the standard signs. 3 metre width with white road markings to divide cycle and walking and secure end point facilities like lockable bike racks or secure shelters; shower facilities at place of employment or club. 25

APPENDIX D: PROJECT LIST NOTES Key project details are contained in the 20 year project lists in Appendices F, G and H. The project lists for 2005/2006 and 2006/2007 are included as these projects were identified in the initial draft Action Plan issued in 2005. Most of these projects have now been completed. At this stage the estimates are Rough Order of Cost estimates. Some of the project sites (e.g. onroad cycleways) will be less than estimated. In other cases, estimates may increase when the extent of retaining structures, watercourse crossings and utility services protection / relocation is defined. In several cases, the scope of work has still to be defined. The maps accompanying the 20 year project lists are only to indicate the locations of the various projects. 26

APPENDIX E: PROJECT LIST 2005 2009 Project ID Project Name Combined Cycleway (c) / Walkway (w) Ward 2005/2006 Completed Projects 1ES Centreway Road from Milton Road to Weiti Road (400m) Eastern 2ES Whangaparaoa Road from Red Beach Road to Hibiscus Coast Highway (SH1) Eastern (1500m) 3ES D Oyly Reserve from D Oyly Avenue to Brightside Road (1000m) Eastern 2EC Whangaparaoa Road from Link Crescent to Town Plaza (300m) Eastern 1NC Matheson Road from SH1 to Railway Bridge (Wellsford) (200m) Northern 2NC Broadlands Drive from Omaha Drive to western end of causeway Stage 1 Northern completed (1300) 2006/07 Travel Wise Plan 06/07, Cycleway / Walkway Stage 1 Design & Consultation DistrictWide Completed 1EA Beach Rd, Manly Deferred Eastern 2EA Stanmore Bay Road from Glanville Close to Whangaparaoa Town Centre Eastern (1000m) Completed 1EC Hibiscus Coast Highway (SH1) from Kohu Street to Marine View (600m) Eastern Completed 8WC Kumeu Walkway SH16 from Weza Lane to Riverhead Road Deferred Western 2007/08 4ES HBC Highway from Jelas Road to Moffat Road (350m) Eastern 1WS Kahikatea Flat Road Waitoki School (1000m) Western 1WC Muriwai Motutara Road (550m) Western 2WC Muriwai Oaia Road (1200m) Western 4WC Huapai Oraha Road (120m) Deferred Western 5WC Huapai Koraha Road / Weza Lane (400m) Deferred Western Estimate (March 2007) $80,000 $300,000 $80,000 $550,000 $50,000 $170,000 $200,000 $73,000 $350,000 $300,000 $100,000 $250,000 2NC Broadlands Drive from Omaha Drive to western end of causeway (Stage 2 Bridge Crossing) 2008/09 Design (SH1) and Consultation, Helensville / Parakai W&C Facilities Northern $250,000 3EA Cycleway Gulf Harbour Drive and Shakespeare Road (3650m) Eastern 6EC West Orewa Walkway (Stage1) (1700m) Eastern $950,000 $350,000 27

APPENDIX F: PRELIMINARY PROJECT SUMMARY (2005 2025) Item Eastern Ward (HBC) Western Ward Northern Ward W&C (Km) W&C (Km) W&C (Km) Schools Timeline 15 years 9.40 8.50 7.40 610 years 0.00 14.60 4.00 1120 years 0.00 0.80 2.80 Subtotal 9.40 23.90 14.20 Commercial Centres Timeline 15 years 15.50 12.40 6.80 610 years 5.00 1.50 6.30 1120 years 0.00 0.00 5.10 Subtotal 20.50 13.90 18.20 Arterials / SH's RODNEY DISTRICT COUNCIL Walkways and Cycleways (W&C) Preliminary Project Summary (20052025) Timeline 15 years 32.10 2.30 0.00 610 years 11.30 11.70 0.00 1120 years 0.00 30.10 33.10 Subtotal 43.40 44.10 33.10 Totals 73.30 81.90 65.50 Totals: HBC Western Northern Grand Total: 73.30 Km 81.90 Km 65.50 Km 220.70 Km 28