Secondary System Albemarle County Construction Program Estimated Allocations

Similar documents
Secondary System Albemarle County Construction Program Estimated Allocations

Appendix A: Grouped Projects Projects by Grouping (FHWA Format)

Culpeper District. Albemarle County Monthly Report October, 2011

Projects in bold are in the Development Area. Projects in bold and in italics are new on this year's priority list

Culpeper District. Albemarle County Monthly Report September, 2011

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP

Project Development & Environment (PD&E) Study JUNE 22, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Safe Routes to School Engineering Study

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

State Road (S.R.) 61 (U.S. 319) FPID s and

Route 29 Solutions Projects

APPENDIX D COST SUMMARY TABLES

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City of Camas Six Year Street Priorities

Knox Street Complete Streets Project

REIMAGINING YONGE STREET SHEPPARD AVENUE TO FINCH AVENUE

ENSLEY LEVEE CLEARING

TREASURE VALLEY WEST industrial park

Villa Rica Trail Master Plan

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Short and Long Term Needs

Route 15 Congestion Report Findings

Welcome to the Sellwood Bridge Project Open House!

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

SHENANDOAH FARMS SANITARY DISTRICT

New Mexico Transportation Funding Challenges

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

CHAPTER 5 TRANSPORTATION GOAL

APPENDIX L: COST ESTIMATING TOOLS

Henderson Ave. Complete Streets Project

Designing with the Railroad

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

Upcoming City of Bellevue Projects in Your Neighborhood

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

Project Budget and Schedule Status

Route 58 Corridor Development Fund

Enhancing Downtown

3.0 Future Conditions

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Reams Road RCA Study. Board of County Commissioners Public Hearing

Project Description Form 6V

Chapter 5 Future Transportation

BIKE ON ROAD NETWORKS: URBAN & RURAL. Non-motorized Transportation Networks. Madison County Council of Governments

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3

Malabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)

Appendix A: Special Routing Studies

Regional Goals. The UnJAM process also developed regional mobility goals including:

EXECUTIVE SUMMARY Roaring Fork and Colorado River Valleys Regional Travel Patterns Study. Transportation Analysis Zone Map of the Region

Old Woodward Ave & W Maple Road. Streetscape Design Presentation February 2, 2017

Secondary Road Program

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Rio Intersection Traffic Restrictions Begin Monday

BRR Leg 25 (4.3 miles, Moderate)

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

TRANSPORTATION COMMISSION East 19 th St, Harper to O Connell Thursday, March 29, :00 PM City Commission Room, City Hall, 6 E.

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE

ENFIELD TOWN THE REVISED DESIGN

Bicycle and Pedestrian Master Plan Status Update (as of Dec. 2017)

MARTA Expansion Update

S/TIP LIST OF PROJECTS

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Fairfax County Parkway Widening Fairfax County

CTH M HIGHWAY PROJECT CTH Q to STH 113

Route 47 (North Main Street) Reconstruction

RESOLUTION NO. 123A-94

Staff Report Text Amendment Case #: TA

Design Criteria. Design Criteria

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

The Year Ahead: Virginia Department of Transportation Northern Virginia District

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

Highway 56 Traffic Study Rymal Road to Cemetery Road

Long Island Rail Road Expansion Project Floral Park to Hicksville

County of Fairfax, Virginia. Department of Transportation

2012 Capital Budget Capital Improvement Program

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Parks, Open Space, Trails and Recreation Master Plan

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

draft 5.2 CITY OF LARKSPUR

FY Candidate Sidewalk Projects. Sidewalk Advisory Committee

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM,

West End Connectivity Master Plan

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Street Paving and Sidewalk Policy

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

CHAPTER 7 STREET DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

APPENDIX L. Design Criteria

Ocean Park Boulevard Green Street Project Community Workshop

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

CORE MPO Non-motorized Transportation Plan. Appendix F. Technical Report on Cost Estimation Methodology

Rideau Canal Corridor Pedestrian Crossing Study. Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave.

Off-road Trails. Guidance

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Transcription:

econdary ystem Albemarle County Construction Program Estimated Allocations Fund FY29 FY21 FY211 FY212 FY213 FY214 econdary Unpaved Roads $642,951 $545,67 $596,222 $519,924 $44,932 $44,932 $3,186,28 TeleFee $219,987 $317,61 $317,61 $317,61 $317,61 $317,61 $1,88,37 TP Converted from IM Federal TP - Bond Match $31,78 $37,958 $314,263 $32,696 $327,262 $327,262 $1,899,221 Formula TP $95,488 $38,537 $38,425 $38,181 $37,795 $37,795 $286,221 MG Formula $163,197 $162,655 $159,489 $21,172 $191,8 $191,8 $1,68,673 BR Formula $186,621 $186,621 Formula TP - Match $111,327 $5,298 $49,479 $59,838 $57,219 $57,219 $385,38 tate Funds $2,15,81 $2,54,13 $2,117,62 $2,27,569 $1,712,544 $1,712,544 $11,729,542 Federal TP $1,27,119 $1,231,831 $1,257,5 $1,282,784 $1,39,46 $1,39,46 $7,596,876 $5,34,28 $4,77,969 $4,849,6 $4,767,774 $4,393,488 $4,393,488 $28,146,599 Board Approval Date: Allan D. umpter Residency Administrator Date Robert W. Tucker County Administrator Date Page 1 of 8

631 253 EDARY - TWO HEARING DEIGN 1. 691 11129 TP EDARY - ONE HEARING DEIGN 2. 656 12982 TP/REV EDARY - ONE HEARING DEIGN 3. 649 54415 TP EDARY - ONE HEARING DEIGN 4. 1165 82245 TATE FORCE/HIRED EDARY - TWO HEARING DEIGN 5. 743 77273 BRO EDARY - ONE HEARING DEIGN 7. Page 2 of 8 Meadow Creek Parkway - Rio Road 6312128 RTE 631-2 LANE ON 2 LANE ROW; 4 LANE ON RELOCATED RIO ROAD INTERECTION MELBOURNE ROAD 863 MILE NORTH OF NORFOLK OUTHERN RAILWAY 1.3 JARMAN GAP ROAD 6912258 RTE 691 - WIDEN & IMPROVE ALIGNMENT.597 Mi. E. IINT. ROUTE 684 ROUTE 24 GEORGEWN ROAD 6562254 RTE 656 - POT IMP., IDEWALK & AFETY FEATURE ROUTE 654 ROUTE 743 PROFFIT ROAD 6492158 RTE 649 - RETRUCTION ( & ONLY IN YP) 1.6 MILE EAT ROUTE 29 ROUTE 29 1.6 OUTHERN PARKWAY 11652298 ROUTE 1165 OUTHERN PARKWAY AVON TREET (RT. 742) FIFTH TREET (631) 7432282 RTE 743 - BRIDGE & APPROACHE OVER NORTH FORK RIVANNA (4 MILE OUTH OF ROUTE 641) TRUCTURE # 614.2 $2,3, $1,925,18 $12,235,13 $25,46,283 6/1/28 $1,69, $5,943,7 $7,21,92 $14,654,792 11/9/21 $5, $1,499,987 $1,18,313 $3,18,3 $324,827 $63,99 $252,4 $3,135,377 $4,17,516 5/1/211 $324,827 NEW TRUCTION 3I1 Previous Funding W/ Rev. haring $26,161,815 Allocation 8-9 $4, Rev. haring 7-8 $2,5, $28,71,815 2118 RETRUCTION 143 2-lane Urban W/W & Bike Lanes Previous Funding W/ Rev. haring $7,756,67 135 AFETY/TRAFFIC OR/TM 3I12 Previous Funding W/ Rev. haring $2,658,127 6 RETRUCTION 3I3 From: Rte 29 To: Baker-Butler Elem. chool NEW TRUCTION 231 159 Updates due to reduce scope are pending

78 77274 BRO EDARY - ONE HEARING DEIGN 8. 649 77276 BR EDARY - ONE HEARING DEIGN 9. 66 82123 BRO EDARY - ONE HEARING DEIGN 1 66 82128 BRO EDARY - ONE HEARING DEIGN 11. 66 54429 NO PLAN,EDARY 12. 643 54418 NO PLAN,EDARY 13. 782283 RTE 78 - BRIDGE & APPROACHE OVER CX RAILROAD (9 MILE OUTH OF ROUTE 738) TRUCTURE #684.2 6492284 RTE 649 - BRIDGE & APPROACHE OVER NORFOLK OUTHERN RR 1 NORTH OF ROUTE 819 (TRUCTURE #649).2 662297 BRIDGE REPLACE DICKERON RD OVER NORTH FORK RIVANNA RIVE BRIDGE AND APPROACHE 662296 DICKERON ROAD OVER JACOB RUN BRIDGE AND APPROACHE DICKERON ROAD 662P75 RTE 66 - RETRUCT & URFACE TREAT NON-HARDURFACED ROAD ROUTE 85 ROUTE 13 2. RIO MILL ROAD 6432P76 RTE 643 - RETRUCT & URFACE TREAT NON-HARDURFACE ROAD ROUTE 29 1.1 MILE WET ROUTE 29 1.1 $54,79 $252,4 $1,96,91 $2,717,29 $55, $2, $1,75, $2,5, $693,19 $126,2 $4,25,332 $5,69,461 1/15/215 $258,45 $126,2 $1,789,792 $2,174,217 5/14/214 $148, $44, $128,347 $2,65,318 $3,218,665 12/11/215 $2,169,255 $2,317,255 12/11/215 169 Dry Bridge Road 149 Complete schedule required. Additional funds to be provided by the econdary ystem. 2J9 Revised schedule required. 2J9 Additional funds to be provided by the econdary ystem. Revised schedule required. 17 RETRUCTION Gravel Road - No R/W $698,8 transferred from Rt. 72 915 RETRUCTION $1, from Rte. 72 Page 3 of 8

784 59275 NO PLAN,EDARY 14. 688 72514 NO PLAN,EDARY 15. 787 72515 NO PLAN,EDARY 16. 647 72513 TATE FORCE/HIRED NO PLAN,EDARY 17. 76 8754 TATE FORCE/HIRED NO PLAN,EDARY 18. 722 72524 TATE FORCE/HIRED NO PLAN,EDARY 19. DOCR CROING 7842P RTE 784 - RETRUCT & URFACE TREAT NON-HARDURFACED ROAD ROUTE 6 ROUTE 64 2.1 MIDWAY ROAD 6882P RTE 688 - RETRUCT & URFACE TREAT NON-HARDURFACED ROAD ROUTE 635 ROUTE 824.4 GILLUM RIDGE RD 7872P RTE 787 - RETRUCT & URFACE TREAT NON-HARDURFACED ROAD ROUTE 682 ROUTE 78 MAXFIELD ROAD 6472P77 RTE 647 - RETRUCT & URFACE TREAT NON-HARDURFACED ROAD ROUTE 22 END OF TATE MAINTENANCE.8 RED HILL CHOOL ROAD 762P95 RTE 76 -RURAL RUTIC-GRADE, DRAIN, PAVE ROUTE 29 ROUTE 712 OLD GREEN MTN RD 7222P29 RTE 722 - RURAL RUTIC ROAD (URFACE TREAT NON-HARDURFACE) ROUTE 6 ROUTE 723 2.2 8/8/27 $29,762 $19,524 $1,73,569 $1,842,855 8/9/211 $36, $224, $5,629 $5,69 $5,69 $216,686 $222,376 12/28/27 $125,179 $13,869 12/28/27 $177,513 $213,513 $1,23,288 $1,427,288 $9,66 $95,695 36 RETRUCTION 36 RETRUCTION 36 RETRUCTION 36 RETRUCTION Gravel Road $2, from Rte. 72 17 RETRUCTION 15 REURFACING 167 Page 4 of 8

86 82243 TATE FORCE/HIRED NO PLAN,EDARY 2 668 82246 TATE FORCE/HIRED NO PLAN,EDARY 21. 765 8811 TATE FORCE/HIRED No Plan 22. 672 82248 TATE FORCE/HIRED NO PLAN,EDARY 23. 68 82244 TATE FORCE/HIRED NO PLAN,EDARY 24. 74 82241 TATE FORCE/HIRED NO PLAN,EDARY 25. ETE RIDGE RD 862P3 ROUTE 86 - RURAL RUITC ROAD - GRADE, DRAIN & PAVE ROUTE 663 DEAD END.3 WALNUT LEVEL ROAD 6682P99 ROUTE 668 - WALNUT LEVEL RD. FROM RT. 81 DEAD END ROUTE 81 ROUTE 765 1.6 WALNUT LEVEL ROAD 7652785 Rte 765 - RURAL RUTIC ROAD (URFACE TREAT NON-HARD URFACE) Rte 668 End tate Maint. 1. BLUFN ROAD 6722P ROUTE 672 - BLUFN ROAD - FROM RT. 81 DEAD END ROUTE 81 DEAD END 1.9 HAPPY CREEK RD 682P4 ROUTE 68 - GRADE, DRAIN & PAVE ROUTE 645 ROUTE 646 1.1 FORTUNE LANE 742P1 ROUTE 74 - GRADE, DRAIN & PAVE ROUTE 715 DEAD END $5, $1, $15, 5/3/28 $5,89 $5, $55,89 12/28/27 $141,854 $141,854 $92,17 $92,17 $5,952 $12,381 $18,333 $697 $141,746 $142,443 RETRUCTION RETRUCTION RETRUCTION - URFACE TREATMENT 1616 RETRUCTION RETRUCTION RETRUCTION Page 5 of 8

762 82242 TATE FORCE/HIRED NO PLAN,EDARY 26. 625 63912 TATE FORCE/HIRED BUDGET ITEM 999. 8888-2375 ROE HILL CHURCH 7622P2 ROUTE 762 - RURAL RUTIC ROAD - GRADE, DRAIN & PAVE ROUTE 732 DEAD END.1 HATN FERRY 6252BI RTE 625 - ORATE HATN FERRY - BUDGET ITEM ORATING BUDGET FUTURE BUDGET ITEM & PLANT MIX VARIOU LOCATION IN COUNTY $97,596 $97,596 RETRUCTION 22 RETRUCTION FUND PLANNED FOR INCIDENTAL TRUCTION WORK IN YR3-YR6. 49-2374 1249 COUNTYWIDE TRAFFIC CALMING VARIOU LOCATION IN COUNTY TRAFFIC CALMING MEAURE A DETERMINED BY REIDENCY AND DITRICT TRAFFIC ENGINEER 48-2373 1248 COUNTYWIDE RIGHT OF WAY ENGR. VARIOU LOCATION IN COUNTY UE WHEN IMPARTICAL ON A PROJECT: ATRNEY FEE and ACQUIITION COT. 47-2372 1247 COUNTYWIDE TRAFFIC ERVICE VARIOU LOCATION IN COUNTY TRAFFIC ERVICE INCLUDE EDARY ED ZONE, ED TUDIE, OTHER NEW EDARY IGN Page 6 of 8

46-2371 45-237 44-2369 43-2368 42-2367 1427 71722 COUNTIE, DEVELOR, ETC. TP MIN PLAN,FED- AID,EDARY 1246 COUNTYWIDE FERTILIZATION & EEDING VARIOU LOCATION IN COUNTY 1245 COUNTYWIDE ENGINEERING & URVEY VARIOU LOCATION IN COUNTY 1244 COUNTYWIDE - UBDIVIION PLAN REVIEW VARIOU LOCATION IN COUNTY 1243 COUNTYWIDE RURAL ADDITION VARIOU LOCATION IN COUNTY 1242 COUNTYWIDE PI & ENTRANCE VARIOU LOCATION IN COUNTY 1427274 RTE 1427 - RAIED MEDIAN XWALK, RETRI, LIGHTING, ETC. ROUTE 631 (RIO ROAD) ROUTE 866 (GREENBRIER DRIVE) 1/8/28 $5,4 $294, $299,4 FERTILIZATION AND EEDING IMPROVE LO TABILIZATION ON EDARY YTEM MINOR URVEY & PRELIMINARY ENGINEERING FOR BUDGET ITEM AND INCIDENTAL TY WORK. UBDIVIION PLAN REVIEW - INCLUDE MILENE INCTION & INCTION FOR FINAL ACCEPTANCE. RURAL ADDITION - ECTION 33.1-72.1. ROLLOVER OF FUND CAN BE FOR FIVE YEAR. INTALLATION CHARGE FOR PI AT PRIVATE ENTRANCE AND OTHER MINOR DRAINAGE IMPROVEMENT. AFETY/TRAFFIC OR/TM 3J12 Bicycle/Pedestrian Improvement -HE limited to $296,265. per MMD. Page 7 of 8

29 75815 NOT APPLICABLE TUDIE ONLY (CORR, F, I, ETC) 292134 RTE 29 - CORRIDOR AND ACCE MANAGEMENT TUDY GREENBRIER ROAD GREENE COUNTY LINE 1 $6, $6, TUDIE ONLY 22114 Only Page 8 of 8