BLEED DOWN OF THE HIGH GMA PRESSURE

Similar documents
INTERNAL LEAKAGE CHECK OF THE FLIGHT GMA

STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA

GMA SLEEP PROCEDURE AT VAFB

TEST OF GMA SPINUP ASSEMBLY PRESSURE SENSOR CALIBRATION

GDS OPERATING PROCEDURE

BLEED DOWN OF THE GMA HIGH PRESSURE AT VAFB

SCRUB LAUNCH RECOVERY PROCEDURE FOR THE GMA

CALIBRATING THE GMA PRESSURE SENSORS AND THE ECU ENGINEERING UNIT

GMA VENT EXTENSION SERVICE PROCEDURE

GMA FUNCTIONAL TEST SETTING & TESTING OF SPIN UP PARAMETERS. P0586 REV -- 20, June 2000 GPB SCIENCE MISSION PROCEDURE

GMA PREPARATION FOR E28 TESTING

STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA

GMA TO SPACE VEHICLE PLUMBING HOOKUP

LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE HVA BOARD October 28, P0938 Rev

DESIGN VERIFICATION AND QUALIFICATION OF NEW POPPET AND BUSHING ON GMA FLIGHT SOLENOID VALVES

GSE CAGING BALLAST SYSTEM INSTALLATION

GSE CAGING AND SPINUP BUFFER LINE INSTALLATION

Vibration/leak Test 2.5 and 6 Vatterfly Valves (3179 and 3223) spare units. GP-B Engineering Procedure P0761 Rev.-

PROCEDURE FOR THERMAL CYCLING IN LIQUID NITROGEN

(PTP) PROBE PRESSURE MEASUREMENT SYSTEM INSTALLATION AND LEAK CHECK PROCEDURE

GUARD TANK PRESSURIZATION FOR TRANSPORT

CHECK READOUT LOOP CONTINUITY IN PROBE C

CLEANLINESS TEST OF PROBE SPINUP EXHAUST LINES

Proton Monitor Thermal Vacuum Test Procedure GP-B P0635

ASSEMBLY OF GAS FLOW HARDWARE INTO SM GMA

PROCEDURE TO MEASURE READOUT LOOP RESISTANCE

POROUS PLUG CHARACTERIZATION TEST

PROBE-C CAGING VALVE INSTALLATION

PREPARE FOR CRYO OPS FOLLOWING TRANSPORT TO B1610 To be performed at Vandenberg Air Force Base building 1610

IEP SENSOR BRACKET CHECKOUT AND VERIFICATION. This is a non-hazardous test.

(PTP) REMOVE PROBE SPINUP GAS/VAC. LINES (HORIZ.)

Proto-qual Vibration Test Procedure 2.5 and 6 Vacuum Valves (3179 and 3223) Retest of Flight Spare Valves. GP-B P0735 Rev.-

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR REGULATE GUARD TANK PRESSURE

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Spacecraft Battery Magnetic Field Survey

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Install Fill Line Burst Disk on SMD

NPDGamma LH2 Target OJT Lesson Plan: Senior Operator for the NPDGamma LH2 Target Operators

Pressurize Well to One Atmosphere with Probe Installed

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR DISCONNECT MAIN TANK VENT LINE FROM GAS MODULE MAIN TANK SUBATMOSPHERIC

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Install Fill Line Relief Assembly on SMD

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Prepare Payload for Mass/CG Measurements and Condition Payload During Spin Balance Test

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR STOP PUMPING ON SMD VACUUM SHELL / DISCONNECT VACUUM MODULE

CERTIFICATION OF THE TEMPERATURE MONITOR AND ALARM

Reduce Liquid Level in Main Tank- Liquid at NBP To be performed at Vandenberg Air Force Base building 1610

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Configure SMD for Transport to SLC-2W To be performed at Vandenberg Air Force Base building 1610

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR CONNECT VACUUM MODULE / PUMP ON SMD VACUUM SHELL

HYDROSTATIC LEAK TEST PROCEDURE

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

Linde Hydraulics Corporation, P.O. Box 82, Canfield, Ohio 44406

STANDARD OPERATING PROCEDURES

PUMP DOWN MAIN TANK TO SUBATMOSPHERIC CONDITION

OPERATION OF LIQUID PARTICLE COUNTER. GP-B P0045 Rev -

TABLE OF CONTENTS PART 2 - CONFINED SPACES

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR MAIN TANK SUBATMOSPHERIC FILL FROM NBP SUPPLY DEWAR GUARD TANK PRECOOL

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR

SEMASPEC Test Method for Determination of Cycle Life of Automatic Valves for Gas Distribution System Components

Significant Change to Dairy Heat Treatment Equipment and Systems

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Upright SMD (Rotate from Horizontal to Vertical Orientation)

The Discussion of this exercise covers the following points:

(PTP) Un-vented Rate of Temperature Rise Using Guard Tank

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

Lockout/Tagout Training Overview. Safety Fest 2013

Piped Air SCBA Refilling System Standard

Gettysburg College. Energy Control Program

GUARD TANK LIQUID LEVEL REDUCTION To be performed at Vandenberg Air Force Base building 1610

LOCKOUT/TAGOUT PROGRAM

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1

Manual Solvent Purification System. Innovative Technology, Inc.

CO 2. (R744) Service Station Presentation. Contents. Goals Basic functions Specification Recovery R477 Vacuum Charge Safety Other features Prototype

Ag Leader Technology Proportional Valve

Inert Air (N2) Systems Manual

FAULT CODE TROUBLESHOOTING INDEX

LAKOS Waterworks. PWC Series Sand Separators. Installation & Operation Manual LS-829 (10/12)

MASSACHUSETTS STATE POLICE CRIME LABORATORY. Certificate of Calibration Procedure for the Alcotest 9510

Annual Inspection and Calibration Checklist VAF Oilcon MK-6(M) MEPC.108(49) Page 1 of 5

STANDARD OPERATING PROCEDURES

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR MAIN TANK SUBATMOSPHERIC FILL FROM NBP SUPPLY DEWAR GUARD TANK PRECOOL.

Constant Pressure Inlet (CCN) Operator Manual

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

(PTP) Un-vented Rate of Rise of Main Tank w/ Gas in Well

Early evap monitors. Photo courtesy Toyota Motor Sales, U.S.A., Inc.; diagram courtesy University of Toyota

SECRETARY OF THE AIR FORCE 17 APRIL 2000 LOADMASTER MAFFS CHECKLIST. Summary of Revisions: Redundant pages removed.

IMPROVED XENON LOADING EQUIPMENT WITH LOADING CAPACITY UP TO 1200 KG FOR ALPHABUS

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No

FX134, FX1234, FX3030 Problem and Solutions

PERFORMANCE SPECIFICATION PROPELLANT, HYDROGEN

ASSE International Product (Seal) Listing Program. ASSE Performance Requirements for Air Valve and Vent Inflow Preventer

1811G/H PITOT-STATIC TEST SET

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

KJ1000 Operating Instructions & Parts Manual NSN

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator

Warning: NEVER ALTER TEST EQUIPMENT

1020 Industrial Drive, Orlinda, TN fax

TR Electronic Pressure Regulator. User s Manual

Operation & Service Manual

Transcription:

SU/GP-B STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA 94305-4085 BLEED DOWN OF THE HIGH GMA PRESSURE GP-B ENGINEERING PROCEDURE 1 October, 2002 PREPARED R. Stephenson, GMA Engineer Date APPROVED C. Gray, GMA REE Date APPROVED D. Ross, Quality Assurance Date APPROVED R. Brumley, Hardware Manager Date

TABLE OF CONTENTS A SCOPE 3 B SAFETY 3 C QUALITY ASSURANCE 3 C.1 QA Notification 3 C.2 Red-line Authority 3 C.3 Discrepancies 3 D TEST PERSONNEL 4 E REQUIREMENTS 4 E.1. Electrostatic Discharge Requirements 4 E.2. Lifting Operation Requirements 4 E.3. Hardware/Software Requirements 4 E.4. Instrument Pretest Requirements 4 E.5. Configuration Requirements 4 E.6. Optional Non-flight Configurations 4 E.7. Verification/ Success Criteria 4 E.8. Constraints and Restrictions 4 F REFERENCE DOCUMENTS 5 F.1. Drawings 5 F.2. Supporting documentation 5 F.3. Additional Procedures 5 G OPERATIONS 5 G.1. Verify Appropriate QA Notification 5 G.2. Verify Configuration Requirements 5 G.3 Setting up the GMA 5 G.4 Bleed down of GMA Downstream Pressure 6 G.5 GMA Tank Bleed Down 6 G.6 GMA Final Configuration 7 G.7 Diagrams 8 G.9 PRE-TEST CHECKLIST 10 G.10 POST-TEST CHECKLIST 11 H PROCEDURE SIGN OFF 12 Page 2 of 12

REVISION RECORD REVISION ECO PAGES DATE A 1382 Removal of pressure gauge from plumbing. 9/11/02 Manual valve operations overlooked in Rev- Change of GMA safe state from launch configuration to all valves closed. Additional minor corrections B 1389 Every section specifies starting configuration OMVent operations added 10/03/02 A SCOPE This procedure is used to bleed excess pressure from the Gas Management Assembly (GMA). It starts by bleeding the pressure from the downstream portion of the system through the GMA Vent. Optionally, the supply tanks may be bled down as well. This procedure assumes that the areas of the GMA below the Gyroscope Valves (s 6 and 7 on Diagram 2) are at the correct pressure and therefore leaves them untouched. B SAFETY The GMA is a gas pressure vessel. Under normal operations, the GMA requires no safety measures or equipment beyond those required for the use of a supply gas cylinder. When any of the systems are pressurized and connected to a vacuum system, be cautious not to vent high pressure through the pumping portions of the system. Only allow high pressure to vent through approved ports and make sure that these are open at time of venting. Note that the GMA is an extremely high value piece of space flight equipment. The GMA tanks are also fracture critical items, so care must be taken not to damage them in any way. C QUALITY ASSURANCE C.1 QA Notification This test will be conducted on a formal basis to approved and released procedures. The QA program office and ONR representative shall be notified 24 hours prior to the start of this procedure. A Quality Assurance Representative, designated by D. Ross shall be present during the procedure and shall review any discrepancies noted and approve their disposition. Upon completion of this procedure, the QA Program Engineer, D. Ross or her designate, will certify her concurrence that the effort was performed and accomplished in accordance with the prescribed instructions by signing and dating in the designated place(s) in this document. C.2 Red-line Authority Authority to redline (make minor changes during execution) this procedure is given solely to the Test Director or his designate and shall be approved by the QA Representative. C.3 Discrepancies Discrepancies will be recorded in a D-log or as a DR per Quality Plan P0108. Page 3 of 12

D TEST PERSONNEL The Test Director shall be Chris Gray or an alternate that he shall designate. The Director has overall responsibility for the implementation of this procedure and shall sign off the completed procedure and relevant sections within it. E REQUIREMENTS E.1. Electrostatic Discharge Requirements N/A E.2. Lifting Operation Requirements N/A E.3. Hardware/Software Requirements ECU Flight Equivalent Unit Appropriate software for controlling GMA, this includes a null script which enables command-line control of the GMA. Flight GMA Vacuum system (Alcatel pump cart or equivalent) Plumbing lines, cleaned consistently with Class 100 practices Clean check valve Clean manual valves (2) CSTOL Scripts VCR gender changers, elbows, etc. as required, cleaned consistently with Class 100 practices Class 100 down flow hood, if required Hand held particle counter, if required E.4. Instrument Pretest Requirements All test equipment used in taking data shall be in calibration at time of test. E.5. Configuration Requirements GMA work will be performed under Class 100 flow hood or in clean room. E.6. Optional Non-flight Configurations N/A E.7. Verification/ Success Criteria N/A E.8. Constraints and Restrictions Normal clean room practices apply under down flow hood and in clean room. Page 4 of 12

F REFERENCE DOCUMENTS F.1. Drawings GMA Schematic, Dwg. Number 26273 F.2. Supporting documentation S0681 CSTOL Scripts for GMA Testing F.3. Additional Procedures P0930 GMA Sleep Procedure G OPERATIONS G.1. Verify Appropriate QA Notification QA Notified G.2. Verify Configuration Requirements ONR Notified Verify GMA is situated in a Class 1000 or better clean room or under a Class 100 or better flow hood. If GMA is under flow hood, verify the environment with a hand held particle counter. Counts under the hood must average better than 5 per 0.1 liter measured of size 0.5 micron or greater. Quality G.3 Setting up the GMA Started on: Note: Mark off each step of procedure as it is completed. WARNING HELIUM USED IN THE GRAVITY PROBE-B PROGRAM REPRESENTS A HAZARDOUS MATERIAL FOR THE PERSONNEL INVOLVED IN TESTING AND CRYOGENIC SYSTEM OPERATIONS. EXTREME CARE SHOULD BE USED WHEN WORKING AROUND OR WITH HELIUM. 3.1 Connect the ECU FEU to the GMA and start up the ECU and gma_null.prc. 3.2 Use the ECU to close all GMA solenoid valves. 3.3 Connect plumbing to the GMA vent per Diagram 1. If OMVent 2 is connected, verify that it is closed. 3.4 With BV1, and BV2 fully open, and OMVent closed start the vacuum system and evacuate the new plumbing. 3.5 Slowly open OMVent and evacuate up to the GMA solenoid valves. 3.6 Close BV2. Page 5 of 12

3.7 Read the GMA pressure transducers and fill in the table below. Table 1, GMA pressures, PSIA: GP1 GP2 GP3 GP4 GP5 GP6 Expected >29 Actual 9 >299 >29 9 railed railed railed G.4 Bleed down of GMA Downstream Pressure Started on: Note: Mark off each step of procedure as it is completed. 4.1 Verify that GMA solenoid valves are all closed. 4.2 Verify that BV1 and OMVent are open and that BV2 is closed. 4.3 Open GMA solenoid valves V27 and V29. 4.4 Open OMvent a small amount to slowly bleed the pressure from the GMA. Quality 4.5 When flow stops, close BV1 and open BV2 (Vacuum system is still operating). 4.6 Open GMA solenoid valve V4. Open V6 if necessary. 4.7 Monitor GP3. 4.8 When the pressure drops at GP3, close GMA solenoid valve V4 (and V6, if necessary) and record pressure at GP3 here. 4.9 Open GMA solenoid valve V3. Open V5 if necessary. 4.10 Monitor GP2. 4.11 When the pressure drops at GP2, close OMvent and record pressure at GP2 here. 4.12 Close GMA solenoid valves V29, V27, V3 and V5. 4.13 Determine if GMA tanks are to be vented as well. If not, skip to section G.6. G.5 GMA Tank Bleed Down Started on: Note: Mark off each step of procedure as it is completed. 5.1 Verify that sections G.3 and G.4 have been successfully completed. Page 6 of 12 Quality 5.2 Read the GMA pressure sensors and verify that GP2, GP3, GP4, GP5, and GP6 are all at about 20 psia. 5.3 Determine desired final GMA tank pressure and record it here (300 psia if preparing for shipping).

5.4 Verify that GP1 reads above the pressure recorded in 5.3. 5.5 Verify that vacuum pump is running and open BV2. 5.6 Open OMVent. 5.7 Open GMA solenoid valves V1, V2, V3, V4, V5, V6, V27, and V29. 5.8 Monitor pressure at GP1. 5.9 When pressure reaches desired level (300 psia if preparing for shipping) close OMVent and record final pressure at GP1 here. 5.10 Close GMA solenoid valves V29, V27, V6, V5, V4, V3, V2, and V1. Quality G.6 GMA Final Configuration Started on: Note: Mark off each step of procedure as it is completed. 6.1 Verify that sections G.4 and G.5 (if necessary) have been successfully performed. 6.2 Verify that OMVent is closed. 6.3 Run GMA sleep procedure, P0930, if required. 6.4 Disconnect the vacuum system and GSE from the GMA. (Note: leave OMVent connected to the GMA if desired.) 6.5 Cap the GMA vents, if necessary. 6.6 Shut down the ECU FEU. Quality Page 7 of 12

G.7 Diagrams Diagram 1: Bleed Manifold Vacuum Pump Manual valve Page 8 of 12

Diagram 2: GMA Schematic II IV V VI VII I GAS SUPPLY BOTTLE 2000 PSI GAS SUPPLY BOTTLE 2000 PSI III Page 9 of 12

G.9 PRE-TEST CHECKLIST DATE PROCEDURE # CHECKLIST ITEM COMPLETED REMARKS 1. VERIFY THE TEST PROCEDURE BEING USED IS THE LATEST REVISION. 2. VERIFY ALL CRITICAL ITEMS IN THE TEST ARE IDENTIFIED AND DISCUSSED WITH THE TEST TEAM. 3. VERIFY ALL REQUIRED MATERIALS AND TOOLS ARE PRE- STAGED AND AVAILABLE IN THE TEST AREA. 4. VERIFY ALL HAZARDOUS MATERIALS INVOLVED IN THE TEST ARE IDENTIFIED TO THE TEST TEAM. 5. IF HELIUM IS TO BE USED VERIFY THAT A BLUE HELIUM TAG IS AROUND THE NECK OF THE HELIUM CYLINDER. 6. VERIFY ALL HAZARDOUS STEPS TO BE PERFORMED ARE IDENTIFIED TO THE TEST TEAM. 7. VERIFY EACH TEAM MEMBER KNOWS THEIR INDIVIDUAL RESPONSIBILITIES. 8. CONFIRM THAT EACH TEST TEAM MEMBER CLEARLY UNDERSTANDS THAT HE/SHE HAS THE AUTHORITY TO STOP THE TEST IF AN ITEM IN THE PROCEDURE IS NOT CLEAR. NOTE: DURING A HAZARDOUS OPERATION THE TEST WILL ONLY BE STOPPED WHEN IT IS SAFE TO DO SO. 9. CONFIRM THAT EACH TEST TEAM MEMBER CLEARLY UNDERSTANDS THAT HE/SHE HAS THE AUTHORITY TO STOP THE TEST IF THERE IS ANY ANOMALY OR SUSPECTED ANOMALY NOTE: DURING A HAZARDOUS OPERATION THE TEST WILL ONLY BE STOPPED WHEN IT IS SAFE TO DO SO 10. NOTIFY MANAGEMENT OF ALL DISCREPANCY REPORTS OR D-LOG ITEMS IDENTIFIED DURING THE PROCEDURE. IN THE EVENT AN INCIDENT OCCURS DURING PROCEDURE PERFORMANCE, MANAGEMENT WILL BE NOTIFIED IMMEDIATELY. 11. CONFIRM THAT EACH TEST TEAM MEMBER UNDERSTANDS THAT THERE WILL BE A POST-TEST TEAM MEETING. TEAM LEAD SIGNATURE: Page 10 of 12

G.10 POST-TEST CHECKLIST DATE PROCEDURE # CHECKLIST ITEM COMPLETED REMARKS 1- VERIFY ALL STEPS IN THE PROCEDURE WERE SUCCESSFULLY COMPLETED. 2- VERIFY ALL MINOR/MAJOR DISCREPANCIES DISCOVERED DURING TESTING ARE PROPERLY DOCUMENTED. 3- ENSURE MANAGEMENT HAS BEEN NOTIFIED OF ALL MINOR/MAJOR DISCREPANCIES. 4- ENSURE THAT ALL STEPS THAT WERE NOT REQUIRED TO BE PERFORMED ARE PROPERLY IDENTIFIED. 5- IF APPLICABLE SIGN-OFF TEST COMPLETION. TEAM LEAD SIGNATURE Page 11 of 12

H PROCEDURE SIGN OFF The results obtained in the performance of this procedure are acceptable: Test Director date: Discrepancies if any: Approved: date: C. Gray, GMA REE Approved: date: QA Representative Approved: date: D. Ross, QA Page 12 of 12