It would be an active transportation link to the Metroparks and downtown for Lakewood and the West side of Cleveland.

Similar documents
Our vision for Chicago s bike network focuses on three types of routes:

Major Bike Routes 102 Avenue Workshop April 21, 2015

Franklin Boulevard Traffic Calming Study. Public Meeting #1 October 11, 2017

Plant City Walk-Bike Plan

MASTER BICYCLE AND PEDESTRIAN PLAN

City of Birmingham Draft Multi-modal Transportation Plan

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

The Detroit Road Traffic, Parking Analysis and Marion Ramp Feasibility Study

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

Physical Implications of Complete Streets Policies

Board of Supervisors February 27, 2017

Duwamish Way-finding and CTR Report

Planning Suburban Bike Networks

Completing the Street: Denning Drive

VAN AKEN DISTRICT CONNECTIONS PLAN COMMUNITY MEETING #1 June 20, 2016 SMITHGROUP JJR WSP PARSONS BRINCKERHOFF STUDIO GRAPHIQUE

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

Appendix B: Benefit-Cost Analysis

This page intentionally left blank.

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

ACTION TRANSMITTAL No

Bay to Bay Boulevard Complete Streets Project

AGENDA ACTION ITEMS INFORMATION ITEMS

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Today. Develop Plans. Public Listening Session

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

New Castle County Bicycle Plan. Heather Dunigan ext

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Regional Trails Corridor Assessment

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Designing for Pedestrian Safety

Complete & Green Streets Progress Report 2016

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Bicycle and Pedestrian Advisory Council May 15, 2015

CONCERNS / CHALLENGES

Access Routes from US 101 to the Richmond San Rafael Bridge

Pavement Rehabilitation & Buffered Bike Lane

After. Before ROAD DIETS MODULE of 9 Safety Proven Countermeasures.

BICYCLE FACILITIES FULL BUILD PLAN

DRAFT ROCKY RIVER MASTER PLAN PUBLIC MEETING 1 RESULTS REPORT

Old Colony Bikeway. Erin Pacileo Joe Conroy Pat Ruby Ryan Hipp. Civil & Environmental Engineering. South Bay Center. Moakley Park.

Sharrows and Elephants and Bike Boxes!, s, Oh My!

This page intentionally left blank.

MAKE YOUR PLACE IN CHANNELSIDE

City of Richmond Bicycle Master Plan

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

42nd Ave N Reconstruction

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

After. Before ROAD DIETS MODULE of 9 Safety Proven Countermeasures.

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

Safe Routes to School: Munroe Elementary Walk Audit Report. Image: Drexel, Barrell & Co.

Bobbie Walthall. Hi Bobby, please include these comments in tonight s CC packet. Thanks for your consideration, Phil Collison Lawrence Resident

Speed Limits Study and Proposal. Public Input Session: 8/14/13

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

KEARNY MESA COMMUNITY PLAN UPDATE

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

This page intentionally left blank.

LANCASTER CITY BICYCLE NETWORK

Bicycle Master Plan for Greenville, SC Presentation to City Council June 13, 2011

COMMENT CARD SUMMARY

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

64% UNSAFE and. Where can features be added to improve the street for bicyclists?

43 rd Avenue, Skillman Avenue Protected Bike Lanes

Road Diets and Roundabouts

SHIFTING GEARS. for a better ride ahead. MONTGOMERY COUNTY DEPARTMENT OF TRANSPORTATION April 5, 2014

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

Active Transportation Access to Transit

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections


Priority 1: Ala Wai Pedestrian and Bicycle Safety and Mobility Project

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Applications for Funding

Dowling/Beaty Cycling Route

Bicycle Friendly Niagara Falls

N Prospect Ave and E North Ave. URB PLAN 772 Spring 2017 Hamideh Moayyed, Chris Sandor, Trent Schultz, and Charlie Griffith

PROJECT KEY TYPICAL SECTION 1 =60

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:

Complete Streets Policies in Charlotte

Complete Streets Successes, Opportunities, and Challenges

Lawrence Loop SWOT Analysis

Regina Bikeways Needs Assessment Study: Measuring the value of the bikeway infrastructure

NACTO Designing Cities 2014 Dongho Chang, City Traffic Engineer October 23, 2014

Enhancing Downtown

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study

Rail Station Fact Sheet North Side Station* (*station under construction with anticipated start of service in late 2018)

Building Great Neighbourhoods BONNIE DOON

2016 I-30 CROSSING ARKANSAS BOULEVARD KEY IDEAS OF PLAN B:

Good Neighbor Plan Initiative Update. Transportation & Trinity River Project Committee 9 September 2013 Dallas Love Field Phase One Final Report

Chapter 5 Future Transportation

Welcome. If you have any questions or comments on the project, please contact:

Fairview and Main Local Streets Improvement Plan

SAFE ROUTES TO SCHOOL (SR2S)

PRESS RELEASE San Joaquin Council of Governments

EXECUTIVE SUMMARY. Vision

West Village Mobility & Integration

Rail Station Fact Sheet CentrePort/DFW Airport Station

Transcription:

Lake Ave, Lakewood 2018-2019 West Shoreway Lakefront Path 2017 Lake Ave, Cleveland Clifton Blvd Extension 2017 Neighborhood street bike boulevards Proposed Lake Connector Existing Bike Trails Trails - Funded Trails - Proposed West Side Greenway The West side needs a safe and easy bike path connection between the new Shoreway Lakefront Path at Edgewater Park and the Rocky River Reservation Path. It would be an active transportation link to the Metroparks and downtown for Lakewood and the West side of Cleveland. http://www.bikecleveland.org/bikelakewood/ Re-connecting Cleveland TIGER Project

Lake Ave, Lakewood 2018-2019 Clifton Blvd Extension 2017 West Shoreway Lakefront Path 2017 Lake Ave, Cleveland 4 3 5 2 Neighborhood street bike boulevards Proposed Lake Link Trail Existing Bike Trails 1 Trails - Funded Trails - Proposed 4 miles of new off street path or protected bike lanes 0.5 miles of new bicycle boulevards 3 1 2 0.9 miles of Lake Ave in Cleveland (off street path) 2.7 miles of Lake Ave in Lakewood (off street path) 4 5 Re-connecting Cleveland TIGER Project 0.2 miles on Lake/Clifton rd (neighborhood street bike boulevard) 0.5 miles on Clifton Blvd Extension (2017 protected bike lanes) 0.5 miles on Lake rd and Sloane Ave (bike boulevard / protected lanes)

Biking on Lake Ave in Lakewood and Cleveland is unsafe for all except experienced and fearless riders because cars pass at high speed and lanes are undefined. Lake Ave should have safe protected bike infrastructure, separated from cars, to make it safe for all people on bikes, age 8 to 80. A safe and easy bike path connection between the new Shoreway Lakefront Path at Edgewater Park and the Rocky River Reservation Path would provide Lakewood and Cleveland residents with an active link to Lakewood Park, the Metroparks, and downtown. Bike lanes separated from car traffic have been proven to make the road safer for people driving, walking and biking. Protected bike lanes and bike paths also increase property values, since people want to live close to good biking and walking routes.

1 Lake Avenue in Cleveland Off street path on the North side of Lake Ave connecting to the Shoreway Lakefront Path at Edgewater park e.g. Off-street path. Part of Lake Link Trail on Fairhill Rd Current: 4 ft sidewalks on North side 24 feet of existing treelawn Proposed: 12 foot path 16 foot treelawn Metroparks Trail Friendship Trail - Fort Erie, Canada

2 Lake Avenue in Lakewood Off street path on the North side of Lake Ave e.g. Off-street path. Part of Lake Link Trail on Fairhill Rd and Freedom Trail in Fort Erie, Canada Current: 4 ft sidewalks on North side 24 feet of existing treelawn Proposed: 12 foot path 16 foot treelawn On-street protected bike lanes are also an option. Lake Ave in Lakewood resurfacing planned for 2018+2019

3 Lake Rd & Clifton Rd Bicycle boulevard connecting Lake Ave path to Clifton Blvd Extension protected lanes 0.2 mile bicycle boulevard on low-speed residential streets, connecting to Clifton blvd extension protected bike lanes.

4 Clifton Boulevard Extension Lakewood is installing 10 foot bike lanes with 4 foot stanchionprotected buffers on both sides of the street in August 2017.

5 Lake Rd & Sloane Ave 0.25 mile bike boulevard on residential streets Lake Rd and Sloane Subway 0.25 mile off-street path or protected bike lane on Sloane Ave. Bike signal to cross Detroit Ave and connect to Rocky River Metropark path