WPB 5 / 7 / 10 INSTALLATION, OPERATION, & MAINTENANCE

Similar documents
UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions

AIR-OPERATED DOUBLE DIAPHRAGM PUMP USER S MANUAL

Model PSI Compressor with 3-Gallon Air Tank 12VDC

System Pressure Manager Standard & System Pressure Manager Plus

PumpAgents.com - Click here for Pricing/Ordering Nominal psi (bar) Cut-In Cut-Out

WATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

Jacuzzi. J-CQ420 Cartridge Filter Installation and Operating Instructions

Easy Nest Kits. Installation Suggestions

444C DUAL PERFORMANCE VALUE PACK

Model 106 DPI "Micro-switch" Installation and Operating Instructions

400C & 450C DUAL PERFORMANCE VALUE PACKS

NGP-250/500 Nitrogen Generator Quick Start Guide

IMPORTANT SAFETY INSTRUCTIONS

200 PSI COMPRESSORS - MODEL NUMBERS

100C Air Compressor Kit

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING

420C AIR COMPRESSOR KIT PART NO C AIR COMPRESSOR KIT PART NO

Reverse Osmosis System Installation Guide and Operation Manual.

OWNER S TECHNICAL MANUAL

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO

Inert Air (N2) Systems Manual

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

AWG Fittings LLC. Pressure Relief Valve Up to 250 PSI. Product Number Read this instruction manual before use.

Installation and Maintenance Manual. ECO Filtration Unit with 6-way-Top-Mount-Valve. Art. Nr

Installation, Operating, Maintenance and Safety Instructions for. Pressurised water systems for boats

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide

Vessel Installation and Operating Manual

AQUAMATIC EASY NEST KITS INSTALLATION SUGGESTIONS

Marschalk Model # 94000

Acid- Rite ph Adjustment System 2500 by Axiall, a Westlake Company

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

Warning: NEVER ALTER TEST EQUIPMENT

MODEL NUMBER: M20005 AIR SOURCE KIT. 30% Duty Compressor on. 2.0 Gallon Air Tank SAVE THIS MANUAL FOR FUTURE REFERENCE

R E D I C O N T R O L S

TECHNICAL DATA. than the water inlet pressure to the concentrate

42045 Heavy Duty ADA Base Model Kit: 85/105 PSI (ADA Compressor Only) Heavy Duty ADA Base Model Kit: 110/145 PSI (ADA Compressor Only)

2 GAL AIR COMPRESSOR OPERATOR S MANUAL 1/3HP/2-GALLON IMPORTANT: READ THIS OPERATOR S MANUAL BEFORE USING

Accu-Tab Systems 1000 Series by Axiall Corporation

Hi-Force Limited Prospect Way Daventry Northants NN11 8PL United Kingdom Tel: +44(0) : Fax: +44(0) : Website:

KIT. Small Automatic Water Boosters KIT MODELS

The Discussion of this exercise covers the following points:

Accu-Tab Systems 2000 P Series by Axiall Corporation

MODEL NUMBER: PSI AIR SOURCE KIT 200 PSI Compressor on 2.0 Gallon 200 PSI Air Tank

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

Service and Repair Manual

Anderson Greenwood Series 93 Positive Pressure POSRV Installation and Maintenance Instructions

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve

MODEL NUMBER: P PORTABLE COMPRESSOR

NTF-230 OPERATION MANUAL

400H HARDMOUNT AIR COMPRESSOR KIT PART NO H HARDMOUNT AIR COMPRESSOR KIT PART NO

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

HYDRAULIC PUNCH DRIVER 38456, 38520, 7306 / 7306SB, 7310 / 7310SB, 7506, 7606SB, 7610SB, 7625 / 7625Pg / 7625PgSB, 7646 / 7646Pg / 7646PgSB

ATL R/V Atlantis AUXILIARY PLANT OPERATION APPENDIX OPERATING PROCEDURES

Operating Instructions Model and Hydrostatic Test Pump

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Digital Range

Accu-Tab PowerBase 3070AT by Axiall Corporation

Advanced Fluid Handling Cart Owner s Manual

Electronic Control Pump Instruction Manual

CARTRIDGE FILTERS. Models: CF50, CF75, CF100, CF150,

Electronic Control Pump Instruction Manual

OPERATION MANUAL NTF-15

AMP Oil Free Manual AMP 50-8-TC AMP 50-6-D AMP General User and Maintenance Instructions

SSFU SUPER SPRAYFAST UNIVERSAL ADHESIVE APPLICATOR

SILENTAIRE TECHNOLOGY

Aquavar SOLO 2 Frequently Asked Questions

OPERATION MANUAL NTF-60 Plus

icon i150 / i350 Installation / Operation Manual

accidents which arise due to non-observance of these instructions and the safety information herein.

Installation and Operating Manual

MODEL NUMBER: P-A AUTOMATIC PORTABLE COMPRESSOR

Electronic Control Pump Instruction Manual

MANUAL: Jumbo Gate Valve

NTF-515. Operation Manual

SINGER MODEL 106/206-RPS-L&H

APPS-160 Gen 2 User Manual

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

CONGRATULATIONS ON YOUR PURCHASE OF YOUR THUNDER COMPRESSOR For your personal safety please read, understand and follow the information provided in

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

480C DUAL PERFORMANCE VALUE PACK

Chloramines Removal Filter CLF20 and CLF35 Models

Commercial Well Tank Installation Instructions

Mainsboost Charger Installation, Operation & Maintenance Instructions

AFDXXX(X)AC Series Operators Manual Please read this manual thoroughly before attempting to operate your water maker.

Document How to Set Single Stage Press Pressures

ATD LB PRESSURE BLASTER INSTRUCTION MANUAL

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.

Assembling & Installing your Pool Cleaner

Master Control Systems, Inc. Variable Speed Fire Pump Controllers

Temperature Controllers

Vortex Dual. Refrigerant Recovery Machine

Universal Valve Company Inc

Transcription:

PACIFIC LIQUID & AIR SYSTEMS WPB 5 / 7 / 10 INSTALLATION, OPERATION, & MAINTENANCE IN THE BEGINNING Before installing or operating this system, familiarize yourself with these instructions. You should also read the other instructions packed with this system. HOW THE SYSTEM WORKS Please see the PL&A publication: SETUP AND TUNING OF PRESSURE SWITCHES AND HYDROPNEUMATIC TANKS. It is either included with these instructions or available on our web site. Go to the Installation and Maintenance page of pacificliquid.com. SYSTEM LOCATION The WPB system should be located in a dry, protected, and well ventilated area. A garage or utility / laundry room is ideal. If the system is located in a pump house make sure it is well ventilated. INSTALLATION DIRECTLY IN THE COUNTY WATER LINE When the WPB System is used to directly boost county water pressure it is installed with the check and isolation valve in their normal position (ie connected to the suction of the pump). Plumb the line from the water meter into the threaded isolation valve on the suction side of the pump. (An approved backflow preventer may be required by your water authority. Check local codes.) Plumb the line from the house to the threaded isolation valve on the discharge manifold. Connect 230 VAC, 15 AMP service to the outside terminals of the pressure switch. Install a good ground to the ground screw on the pressure switch housing. (A ground fault interruption device may be required. Check local codes.) Although 230 VAC is recommended, all WPB Systems will run on 115 VAC. 230VAC operation will increase motor life and reduce electrical consumption. If 115 VAC operation is desired, refer to the wiring diagram on the side of the motor. Please note that a 30 AMP circuit is required for 115 VAC operation. Also, make sure that existing or new wiring is capable of carrying the higher current load at 115VAC. INSTALLATION IN WELL, CATCHMENT, AND AIR GAP SYSTEMS When WPB Systems are used with rainwater catchment tanks, a foot valve must be installed at the end of the suction pipe. If the WPB System is being installed with our "AIR GAP 200" System, the suction check / isolation valve assembly must be removed from the pump suction and installed at the tank discharge. If the AIR GAP tank is more than 50 feet from the WPB, leave the check / isolation valve assembly in place and install an additional check / isolation valve at the tank discharge. AIR GAP 200 installation instructions are available on our web site.. If you have specified that you are installing the WPB System on a shallow well, the suction check valve shown in the drawing has been replaced with a foot valve. Install the foot valve at the end of the well drop pipe. If the WPB System is more than 50 feet from the well an additional check valve should be installed at the pump suction. If you are installing the WPB System on a catchment system, the check valve / gate valve assembly should be installed at the tank discharge. If the suction pipe enters the catchment tank from above the tank (ie over the side) a foot valve must be used. If the WPB System is more than 50 feet from the catchment tank an additional check valve should be installed at the pump suction. Install the house feed line and electrical service as previously described for directly connected systems.. START UP -- DIRECT CONNECTED SYSTEMS If specified, your WPB System has been preset in our shop to a specific cut in / cut out pressure. If not, all systems are set at

30PSI on and 50PSI off. Typical booster settings are: cut in -- 10-20 PSI above static pressure, cut out -- 20 PSI above cut in. Tank pressure has been adjusted to 2 PSI below cut in pressure. If a change in the pressure switch setting is desired, refer to the PL&A publication entitled "SET UP AND TUNING OF PRESSURE SWITCHES AND HYDORPNEUMATIC TANKS". Check and note the tank air pressure with a good quality digital tire pressure gauge. Open the drain valve located on the discharge manifold. Open the isolation valve on the suction side of the pump and allow water to enter the system. After all air is purged from the System close the drain valve. After the tank fills, the pressure gauge will indicate the static pressure of the water supply. Apply power to the system. The pump will start and pressure will begin to rise. If the system has a Low Pressure Cut Off (LPCO) switch installed, you must hold the switch lever in the auto position until the system pressure reaches 20 PSI. Allow the pump to fully pressurize the system. Note the cut out pressure. Open the drain valve and allow the system pressure to drop. Note the cut in pressure of the pump. Cut in pressure must be a minimum of 30 PSI or 10PSI above static pressure, whichever is greater. Cut out pressure must be a minimum of 15 PSI above cut in pressure. If pressure settings are incorrect, readjust the switch or contact Pacific Liquid. If pressure settings are correct and tank air pressure is approximately 2 PSI below pump cut in pressure, the system is set up correctly. Thoroughly rinse the pump and tank by allowing the system to go through two or three discharge cycles. When complete, open the discharge isolation valve and bleed air from the household plumbing. Observe several pump cycles. START UP -- WELL, CATCHMENT, & AIR GAP SYSTEMS If your system is installed with an AIR GAP 200 holding tank, it must be sanitized. Follow the directions with the AIR GAP 200. If specified, your WPB system has been preset in our shop to a specific cut in / cut out pressure. If not, WPB5's are set for 20PSI on and 40PSI off. WPB 7's and 10's are set for 30PSI on and 50PSI off. Tank air pressure has been preset to 2 PSI below cut in pressure. If a change in the pressure switch setting is desired, refer to the PL&A publication entitled: SET UP AND TUNING OF PRESSURE SWITCHES AND HYDORPNEUMATIC TANKS. The pump must be primed prior to starting. Remove the hex bushing (pipe fitting) below the pressure gauge. Slowly fill the pump and associated piping with water. When full, retape the threads and replace the hex bushing. Open the drain valve and apply power to the system. If you specified the optional Low Pressure Cut Off switch, you will have to hold the switch lever in the auto position until the system pressure reaches 20 PSI. Depending upon the diameter and length of the suction piping, priming can take 10 seconds to several minutes. Although it is not required, prefilling the suction piping prior to starting the pump will reduce prime time to just a few seconds. When the system has primed and all air has been purged, close the drain valve and allow the system to fully pressurize. Note the cut out pressure. Open the drain valve and allow the system pressure to drop. Note the cut in pressure. Cut out pressure must be a minimum of 15 PSI above cut in pressure. If not, readjust the pressure switch or contact PL&A. If pressure settings are correct and tank pressure is approximately 2 PSI below pump cut in pressure, the system is set up correctly. Thoroughly rinse the pump and tank by allowing the system to go through two or three discharge cycles. When complete, open the discharge isolation valve and bleed air from the household plumbing. Observe several pump cycles. TROUBLE SHOOTING Your WPB System has been thoroughly tested prior to shipping. Although equipment failures can occur after testing, 99% of all operational problems are due to improper installation. Use the following list to trouble shoot a faulty installation. Please refer to the System setpoints that were attached to the installation packet. It lists serial number,

cut in/cut out pressure, tank precharge, and motor voltage. You will need to know these values when trouble shooting. If the following suggestions do not correct the problem, please contact your dealer or PL&A. Pump doesn't run (all installations) Make sure the proper voltage is applied to the outside terminals of the pressure switch. If your WPB has an LPCO switch, it must be held manually in the auto position until the system pressure exceeds 20PSI. If your system is direct connected, make sure that cut in pressure exceeds static pressure by at least 10PSI. Pump doesn't prime (shallow well, air gap, and catchment installations only) Make sure that the pump is filled with water. If you did not prefill the suction piping you must allow additional prime time. The drain valve must be open during priming in order for air to be purged. If the air is not allowed to escape, the pump will not prime. Check the suction piping for leaks. All it takes is a pin hole to keep the pump from priming. If an additional check valve has been installed, make sure it is facing in the proper direction. You can always check the pump's condition by placing your hand over the suction isolation valve. If it is operating properly the sensation will be similar to placing your hand over a vacuum cleaner hose. Pump doesn't cut off or restarts after a short period of time (all installations) If the pressure switch has been readjusted, make sure that cut off pressure is not set too high. Close the discharge isolation valve. If pressure rises and the pump shuts off properly, check for major leaks or open valves in the household plumbing. Use the same procedure with the discharge isolation valve to test for leakage back through the check valve. If the pressure rises and the pump shuts off properly, remove the check valve and check for debris. Make sure the motor is set for the proper voltage. Incorrect voltage will cause the motor to run at a lower speed resulting in low pressure. Incorrect voltage will also damage the motor windings very quickly. Pump cycles on and off rapidly This condition is not uncommon and is usually due to water hammer that is often generated by the household piping (too many 90 bends or restrictions). If the pump cycles during cut in or cut out, make sure that cut in and cut out pressures differ by at least 15PSI. Increasing the differential pressure to 20PSI will often cure the problem. If this does not work and the piping problem cannot be corrected a surge arrestor must be installed on the pressure switch. Contact PL&A for the correct part. MAINTENANCE There are several preventive maintenance steps that will help insure a long life for your WPB system. Failure to follow them will shorten system life, reduce reliability, and possibly void your warranty. If you nick or scratch the finish on the tank, touch it up immediately with a good enamel. Mild steel will rust quickly when exposed to Hawaii's corrosive environment. Like any tire valve the Shrader valve on the tank will leak. Also the bladder or diaphragm is a semipermeable membrane and will pass some air over time. Annually shut off the discharge and suction isolation valves, disconnect power, and drain the system. Check the air pressure and add air if the tank pressure has dropped. It should be 2 PSI below cut in pressure. Failure to do this will void your tank warranty. Check the system for leaks and repair immediately. Leaks will cause rust and possible motor damage.

Pressure switch settings drift over time. If the pump seems to run longer than it did originally, check the cut in and cut out pressure and readjust the switch if necessary. Replace faulty or broken pressure gauges immediately. A working pressure gauge is the best tool for diagnosing system problems. When you go on vacation or leave the house unoccupied for long periods of time, switch off the system. If you wish to leave it on for irrigation purposes, specify that a low pressure cut off switch be installed. This will protect the pump if the source of water is interrupted. 761 Ahua Honolulu, HI 96819 Phone 808.536.7699 Fax 808.536.8761 www.pacificliquid.com

WPB SYSTEM INSTALLATION VERSION 1.2 4/98 SEE NOTE 2 INSTALL WATER LINE TO HOUSE HERE INSTALL ELECTRICAL SERVICE HERE INSTALL WATER LINE FROM SOURCE HERE PRV -- SEE NOTE 1 ATTACH WATER HOSE TO DRAIN VALVE DURING TESTING PL&A CAD 4/98 NOTES: 1. IF SYSTEM IS DIRECT CONNECTED PLUMB PRV TO DRAIN. 2. IF APPLICATION IS A WELL, AIR GAP, OR CATCHMENT THE PUMP MUST BE PRIMED. REMOVE THE HEX BUSHING BELOW PRESSURE GAUGE AND FILL PUMP WITH WATER. 3. IF APPLICATION IS CATCHMENT OR SHALLOW WELL A FOOT VALVE MUST BE INSTALLED AT END OF SUCTION PIPE. 761 Ahua Honolulu, HI 96819 Phone 808.536.7699 Fax 808.536.8761 www.pacificliquid.com