Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

Similar documents
East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

APPENDIX D COST SUMMARY TABLES

IMPLEMENTATION WORKBOOK

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate

APPENDIX L: COST ESTIMATING TOOLS

Trail Feasibility. 1. Introduction FINAL. October What s inside?

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

Item No. 14 Town of Atherton

Northside School Class I Bike Path, Cool, CA Application Attachments

CORE MPO Non-motorized Transportation Plan. Appendix F. Technical Report on Cost Estimation Methodology

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Span-Wire Intersections Study SPAN-WIRE INTERSECTIONS STUDY. City of Naples Streets & Stormwater Department 1

4 GENERIC COST ESTIMATING TOOL

Chapter 4: Funding and Implementation

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave.

Downtown Davidson Pedestrian and Bicycle Safety Plan

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Construction Specifications Manual

APPENDIX G: DETAILED COST ESTIMATES

5 CIRCULATION AND STREET DESIGN

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

2014 Regional Bicycle and Pedestrian Study Evaluation Tools Leslie A. Meehan, AICP MPO Technical Coordinating Committee Meeting April 1, 2015

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE AGENDA Tuesday, October 11, :30 PM Conference Room A

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

ACTION TRANSMITTAL No

Souder, Miller & Associates 401 W. Broadway Farmington, NM

RZC Appendix 8A Marymoor Subarea Street Requirements

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

Chapter 5 Future Transportation

NORTH DOWNTOWN N EAST WEST

Driveway Design Criteria

Complete Streets Funding Program Project Prioritization Plan

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Final Sidewalk Feasibility Study

Legislative Update Williamsburg Residency

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Hennepin County Transportation Department

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Pavement Rehabilitation & Buffered Bike Lane

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

See Figure 38, Existing Nonmotorized Connections.

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Route 79/Davol Street Corridor Study

ADA Training Standard Plans

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Warsaw, Missouri Main Street Complete Streets Preliminary Engineering Report

Transportation Action Plan. Transportation & Planning Committee March 14, 2016

Field guide for Accessible Public Rights-of-Way Edition

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Perryville TOD and Greenway Plan

section 4 Existing Conditions, Issues, and Options

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Giles Run Connector Road

Introduction. Who is WILMAPCO. Why are walkable communities important

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

Preliminary Engineering Study

5. RUNNINGWAY GUIDELINES

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

BOLAND DRIVE PATH PROJECT. Martin Le Jack Reilly Paul Rodriguez Allison Rotella Maria Wilson

STATION #3 INITIAL ALTERNATIVES

Hospital Link Project Project Update September 2017

Preparing a Curb Ramp Project. December 15, 2010

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

CURB RAMP INSPECTION REPORT

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Public Meeting #1 January 30, 2018

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

Duwamish Way-finding and CTR Report

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Route 29 Solutions Projects

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

3.0 PROJECT DESCRIPTION

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

Transcription:

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Sponsor St Peters Project No. RB19-000022 Project Type Other TOTAL FUNDING Total County Sponsor Federal $1,177,251.00 $238,179.00 $59,546.00 $879,526.00 Project Description The project will include the construction of a 10 feet wide multi-use path along the east side of Mid Rivers Mall Drive from Route N to MO 364 (end at MoDOT right of way). The project also includes the construction of a northbound right turn lane at the Home Depot Plaza signalized intersection which will be funded by the City of St. Peters. The current sidewalk on the east side of the roadway is 6 feet wide but does not meet current ADA standards. The current bike path on the west side of the roadway consists of a separated 8 feet wide path for 300 feet but utilizes the 8 feet wide shoulder for the remaining 950 feet of this section. The existing multiuse path holds water and dirt/debris builds up quickly creating hazardous conditions for bicyclists and pedestrians. The proposed multi-use path improvements are consistent with the Gateway Bike Plan adopted by the City of St. Peters as well as the City of St. Peters ADA Transition Plan. The path will connect to Cottleville's path along the north side of Route N that was recently installed and their funded sidewalk improvement project along the south side of Route N on the north end of the project limits. It will connect on the south end of the project limits to the existing path across the MO 364 interchange that will have a future connection to St. Charles County's Veterans Tribute Park. The project will also provide a link between MO 364 and the City's ongoing Mid Rivers Mall Drive Multi-Use Path (Dye Club Rd to Cottleville Pkwy) TAP 7305(616) project, which connects to the Dardenne Greenway that extends across the St. Charles Community College campus north through the City's Woodlands Sports Park, ending at Mexico Road. The project will install a right turn lane for northbound Mid Rivers Mall Drive at the Home Depot Plaza signalized intersection. No Federal funds are being requested for this portion of the project. Many vehicles currently utilize the shoulder to get around through vehicles waiting for a green indication at the signal. The existing shoulder is a mixture of asphalt and concrete of varying depth. It was not constructed to withstand the traffic volumes that it is experiencing. Installing a right turn bay will reduce congestion and increase safety at the signalized intersection.

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Project Location Map

ST. CHARLES COUNTY ROAD BOARD 2020 TIP FINANCIAL WORKSHEET MID RIVERS MALL DRIVE MULTI-USE PATH FUNDING FOR IMPROVEMENTS County Sponsor Federal Other Total Design $15,081.00 $3,771.00 $75,410.00 $94,262.00 Utility Relocations Right-of-Way $2,400.00 $600.00 $12,000.00 $15,000.00 Construction $220,698.00 $55,175.00 $792,116.00 $1,067,989.00 TOTAL $238,179.00 $59,546.00 $879,526.00 $1,177,251.00 PERCENT (%) 20.23% 5.06% 74.71% 0.00% 100.00% FINANCIAL PLAN Design County Sponsor Federal Other Total 2021 $15,081.00 $3,771.00 $75,410.00 $94,262.00 2022 2023 Utility Relocations County Sponsor Federal Other Total 2021 2022 2023 Right-of-Way County Sponsor Federal Other Total 2021 2022 $2,400.00 $600.00 $12,000.00 $15,000.00 2023 Construction County Sponsor Federal Other Total 2021 2022 2023 $220,698.00 $55,175.00 $792,116.00 $1,067,989.00

Specific Roadway Items Estimate of Project Costs Project Sponsor: City Of Saint Peters Project Title: Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Date: 6-Feb-19 Mobilization 1 LS $100,000.00 $100,000.00 Traffic Control 1 LS $10,000.00 $10,000.00 Concrete Pavement - Approach (8" Non- Reinforced 3800 SY $75.00 $285,000.00 Concrete Pavement -Island (6" Raised) 10 SY $57.00 $570.00 Guard Rail - Type A 300 LF $32.00 $9,600.00 Guard Rail Crashworthy End (25') 2 EA $3,500.00 $7,000.00 Adjust utility to Grade - includes sump bridges 15 EACH $1,000.00 $15,000.00 Silt Fence 3000 LF $3.00 $9,000.00 Seeding Cool Season Mixtures 0.6 ACRE $10,000.00 $6,000.00 Modular Block Retaining Wall 1,300 SF $45.00 $58,500.00 Pedestrian fence (4' Tall) 320 LF $110.00 $35,200.00 Type 5 Aggregate for Shouldering (4 Thick) 2500 SY $7.00 $17,500.00 Concrete Pavement (8" Non-Reinforced) 325 SY $60.00 $19,500.00 6" Concrete Curb & Gutter (2.5' Wide) 375 LF $40.00 $15,000.00 12" Class III Reinforced Concrete Pipe 260 LF $75.00 $19,500.00 12" Flared End Section 1 EACH $1,000.00 $1,000.00 Curb Inlet 1 EACH $5,000.00 $5,000.00 $613,370.00 Specific Bicycle Items Type 5 Aggregate for Base (4 Thick) 6000 SY $7.00 $42,000.00 Concrete Pavement -Trail (6 Non-Reinforced) 2200 SY $70.00 $154,000.00 Removal of Improvements 1 LS $40,000.00 $40,000.00 Class A Excavation - (Include Haul Off) 1000 CY $35.00 $35,000.00 $271,000.00

Specific Pedestrian Items Stanchion at Signals 6 EACH $1,500.00 $9,000.00 Curb Ramp (7" Non-Reinforced) 300 SY $135.00 $40,500.00 Truncated Domes 250 SF $35.00 $8,750.00 $58,250.00 Specific Transit Items Miscellaneous Other Items Construction Cost Total Contingency Inflation Preliminary Engineering Right-of-Way Construction Engineering/Inspection Project Total * $942,620.00 $94,262.00 $31,106.46 $94,262.00 $15,000.00 $1,177,250.46 * The project total cost should match the total cost reported in the project application. Add lines as needed.

HWY N I MID RIVERS MALL DRIVE MULTI-USE PATH Legend FENCE MULTI-USE PATH BLOCK WALL PARCELS HWY N MID RIV ERS MA LL DRIV E DATE: 1/14/19 SHEET TITLE: Mid Rivers Mall Drive Sidewalk SHEET 5.mxd SHEET SCALE: 40 SCALE DRAWN BY: CHRIS MOYER FILE LOCATION: Q:\GIS_Maps\Dept. AdHocs\Adhocs_2018\ TDS\Mid Rivers Mall Drive Sidewalk

ß Þ Ý á ß Þ Ý á ß Þ Ý á! I MID RIVERS MALL DRIVE MULTI-USE PATH MID RIVERS MALL DRIVE Legend! PROPOSED STRUCTURE PROPOSED PIPE NEW DRIVE LANE FENCE MULTI-USE PATH BLOCK WALL PARCELS DATE: 1/14/19 SHEET TITLE:Mid Rivers Mall Drive Sidewalk SHEET 6.mxd SHEET SCALE: 40 SCALE DRAWN BY: CHRIS MOYER FILE LOCATION: Q:\GIS_Maps\Dept. AdHocs\Adhocs_2018\ TDS\Mid Rivers Mall Drive Sidewalk

! I MID RIVERS MALL DRIVE MULTI-USE PATH MID RIVERS MALL DRIVE Legend! PROPOSED STRUCTURE PROPOSED PIPE NEW DRIVE LANE FENCE MULTI-USE PATH BLOCK WALL PARCELS DATE: 1/14/19 SHEET TITLE:Mid Rivers Mall Drive Sidewalk SHEET 7.mxd SHEET SCALE: 40 SCALE DRAWN BY: CHRIS MOYER FILE LOCATION: Q:\GIS_Maps\Dept. AdHocs\Adhocs_2018\ TDS\Mid Rivers Mall Drive Sidewalk