PRESENTATION OUTLINE

Similar documents
I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I 595 Express Corridor Improvements Project. February 2014 Update

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

FDOT Broward County Traffic Report August 31, 2018 through September 7, Interstate 95

FDOT Broward County Traffic Report March 2 through March 9, 2018

FDOT Broward County Traffic Report April 27 through May 4, 2018

FDOT Broward County Traffic Report September 14, 2018 through September 21, Interstate 95

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

FDOT Broward County Traffic Report May 11 through May 18, Interstate 95

City of Beverly Hills North Santa Monica Blvd Reconstruction. Community Meeting Presentation September 30 and October 1, 2015

FDOT Broward County Traffic Report June 29, 2018 through July 6, 2018

FM #: ETDM #: 11241

FDOT Broward County Traffic Report April 20 through April 27, 2018

FDOT Broward County Traffic Report August 10, 2018 through August 17, 2018

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

Florida Department of Transportation

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

Access Routes from US 101 to the Richmond San Rafael Bridge

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

Joshua Jester, E.I., Florida Department of Transportation, District One

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

GENERAL DESCRIPTION. Page 1 of 5

Session 1 23 CFR 772: Type I Project Definitions

Model Applications for Oakland Park Boulevard Transit Corridor Study

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

Route 29 Solutions Projects

County of Fairfax, Virginia. Department of Transportation

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Frequently Asked Questions

MnPASS System Today and the Future

Marina Loft (DRC 51-R-12)

Terwillegar Drive Expressway Draft Concept Plan

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

405 Express Lanes General Information & Frequently Asked Questions

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

FDOT Treasure Coast Traffic Impact Report

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018

Transportation and Air Quality Committee GEL Project Briefing and Update

Appendix D: Concept Screening

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities.

FDOT Treasure Coast Traffic Impact Report

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION MEMORANDUM. DATE June 2, 2011

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

Legislative Update Williamsburg Residency

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

San Tomas Expressway

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Design Traffic Technical Memorandum

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

Mr. Dave Marshall, Chair Appointed by Commissioner Wexler, District 5. Mr. Henry Hochmair, Vice Chair Appointed by Commissioner Ritter, District 3

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Santa Clara I-280 CORRIDOR STUDY

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents

APPENDIX L: COST ESTIMATING TOOLS

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

MINUTES. BROWARD COUNTY BICYCLING AND PEDESTRIAN ADVISORY COMMITTEE (BPAC) MEETING WEDNESDAY, March 9 th, :30 PM

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

Route 47 (North Main Street) Reconstruction

COMMUNITY MEETING #1 Summary

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Table of Contents SR-91 IMPLEMENTATION PLAN i

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA

I-395 Express Lanes Northern Extension Project Public Hearings

Washington DC Section of ITE Project Briefing

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

MEMORANDUM. Trip Generation and Distribution. CyRide / ISU Intermodal Facility Steering Committee. Date: August 31, 2009

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Transcription:

November 8, 2017

PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2

SOUTH FLORIDA REGIONAL EXPRESS LANES NETWORK 3

PURPOSE / BENEFITS OF EXPRESS LANES Improve Mobility Provide additional capacity/throughput Relieve Congestion More reliable travel times 4

PURPOSE / BENEFITS OF EXPRESS LANES Improve System Connectivity Serve long distance trips By-pass local service interchanges Minimize mainline weave conflicts Additional Transit Alternatives 5

6

ROADWAY TYPICAL SECTION (I-95) Typical Section - 4 GP Lanes with Auxiliary Lanes Milling, Resurfacing, Overbuild and Widening to Accommodate the Following: Two Tolled Express Lanes in Each Direction Existing General Purpose and Auxiliary Lanes to Remain Ingress/Egress Connection Points Limits are: South of Hollywood Boulevard to North of SW 42 nd Street 7

ROADWAY TYPICAL SECTION (I-95) Typical Section - 3 GP Lanes with Auxiliary Lanes and 95 Express / I-595 Direct Connects Transition Milling, Resurfacing, Overbuild, Widening and Reconstruction to Accommodate the Following: Direct Connect Ramps between 95 Express and I-595 Two Tolled Express Lanes in Each Direction Existing General Purpose and Auxiliary Lanes to Remain Limits are: North of SW 42 nd Street to SR 84 8

ROADWAY TYPICAL SECTION (I-95) Typical Section - 3 GP Lanes with Auxiliary Lanes Milling, Resurfacing and Restriping to Accommodate the Following: Two Tolled Express Lanes in Each Direction Existing General Purpose and Auxiliary Lanes to Remain Limits are: SR 84 to Broward Boulevard 9

TYPICAL SECTION (I-595) Typical Section I-595 Viaduct Limits are: Milling, Resurfacing, Overbuild, Widening and SR 7/US 441 to I 95 Reconstruction to Accommodate the Following: One Additional Auxiliary Lane in the eastbound direction and Two Additional Auxiliary Lanes in the westbound direction Standard Shoulder and Lane Widths Direct Connect Ramps Between 95 Express and I-595 10

RAMP SIGNALING Operational Technique to Control the Rate of Traffic Entering an Expressway Improves the Flow of Traffic Entering the Mainline While Avoiding Lengthy Backups on the Entrance Ramps and Cross-Streets All Service Interchanges - Hallandale Beach Blvd. to Linton Blvd. (Phase 3 Implementation) 11

NOISE WALLS Replacement of Existing Noise Barrier Segments Impacted by the Proposed Improvements: Approximately 2,620 Linear Feet of 8-Foot and 14- Foot Tall Shoulder Mounted Noise Barrier Extension of Existing and New Noise Walls: Approximately 2,020 Linear Feet of 8-Foot Tall Shoulder Mounted Noise Barrier 12

EXISTING AND PROPOSED REPLACEMENT NOISE WALLS ALONG I-95 Existing 18 Tall Ground Mounted Noise Barrier Existing 22 Tall Ground Mounted Noise Barrier 13

EXISTING AND PROPOSED REPLACEMENT NOISE WALLS ALONG I-95 Portion of Existing 14 Tall Shoulder Mounted Noise Barrier to be Replaced (South Replacement Barrier No. 2-3C North Replacement Barrier No. 3-3C) Recommended 8 Tall Shoulder Mounted Noise Barrier No. 4-3C Portion of Existing 14 Tall Shoulder Mounted Noise Barrier to be Replaced and Extended (Replacement Barrier No. 1-3C) Existing 8 & 14 Tall Shoulder Mounted Noise Barrier Existing 8 Tall Shoulder Mounted Noise Barrier to be Replaced and Extended (Replacement Barrier No. 5-3C) 14

EXISTING AND PROPOSED REPLACEMENT NOISE WALLS ALONG I-95 Recommended 8 Tall Shoulder Mounted Noise Barrier No. 6-3C Existing 17 Tall Ground Mounted Noise Barrier Existing 17 Tall Ground Mounted Noise Barrier Existing 17 Tall Ground Mounted Noise Barrier Existing 12 & 14 Tall Shoulder Mounted Noise Barrier Existing 12 Tall Ground Mounted Noise Barrier 15

EXISTING AND PROPOSED REPLACEMENT NOISE WALLS ALONG I-595 Existing 22 Tall Ground Mounted Noise Barrier Existing 8 Tall Shoulder Mounted Noise Barrier Portion of Existing 8 Tall Shoulder Mounted Noise Barrier to be Replaced (Replacement Barrier No. 7-3C) 16

LIGHTING I-95 mainline: New lighting to replace existing lighting system (South of Hollywood Blvd. to Broward Blvd.) I-595 and Direct Connect Ramps: New lighting system (SR 7 to SW 26 th Terrace) SR84 Westbound: New lighting to replace existing lighting system New LED lighting systems to meet current FDOT Standards Existing Lighting System To Be Replaced 17

LANDSCAPING Original I-95/I-595 landscaping placement was based on anticipated interchange flyover ramp improvements To be maintained during construction by Contractor Disturbed areas to be replaced in kind as requirement of construction contract Additional improvements at Interchanges and Cross- Streets including: Hollywood Blvd. Johnson St Taft St. Stirling Road Griffin Road 18

95 EXPRESS PHASE 3C SCHEDULE Contract Execution Spring 2018 Begin Construction (Field) Summer 2019 End Construction 2024 19

PROJECT WEBSITE www.95express.com/phase3 20

95 Express Phase 3 Point of Contact Vanita Saini, PE, Project Manager Florida Department of Transportation, District Four 3400 W. Commercial Blvd. Fort Lauderdale, FL 33309 (954) 777-4468 Vanita.Saini@dot.state.fl.us 21

22 QUESTIONS