Summary Report. Lower Lynn Improvements - Mountain Highway Interchange Public Information Sessions and Comment Period. February 21 March 11, 2017

Similar documents
McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

McKenzie Interchange Project Spring 2016 Comment Period. Appendix 1: Display Boards and Feedback Form

Welcome to the McKenzie Interchange Project Open House!

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Highway 1 Kamloops to Alberta Four-Laning Program

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Terwillegar Drive Expressway Draft Concept Plan

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Governance and Priorities Committee Report For the July 2, 2015 Meeting

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

122 Avenue: 107 Street to Fort Road

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Public Information Centre

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME Public Information Centre

Tonight is for you. Learn everything you can. Share all your ideas.

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide)

CHIEF PEGUIS TRAIL EXTENSION WEST

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

City of Davis East Covell Corridor Plan

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

WELCOME! We want to hear from you! CAMBIE BRIDGE INTERIM IMPROVEMENTS KEY OBJECTIVES:

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Clackamas County Comprehensive Plan

Golden s Plan. For the Highway 6 & 93 Corridor

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Rue des Trappistes Culvert Replacement and Road Reconstruction PUBLIC ENGAGEMENT SUMMARY October 2017

Port Mann/Highway 1 Improvements

Proposed Low Level Road Project

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

SH3 Waitara to Bell Block

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

List of Display Boards

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Kelowna On the Move. Pedestrian and Bicycle Master Plan

September 2017 I City of New Westminster

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Highway 56 Traffic Study Rymal Road to Cemetery Road

Washington DC Section of ITE Project Briefing

PROJECT FACT SHEET May 25, 2018

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Pre-Plan Consultation Summary

PROJECT FACT SHEET March 21, 2018

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

ICBC invests $1.175 million to help make Surrey, Delta and White Rock s roads safer in 2013

TRANSPORTATION NEEDS ASSESSMENT

Thank you for attending

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

Route 29 Solutions Projects

Edenbrook Hill Drive Traffic Calming Study

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

Complete Streets. Designing Streets for Everyone. Sarnia

Public Works and Infrastructure Committee. General Manager, Transportation Services. P:\2016\Cluster B\TRA\TIM\pw16009tim.docx

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Downey Road. Transportation Improvement Study

Fairfax County Parkway Widening Fairfax County

Glenn Avenue Corridor Traffic Operational Evaluation

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

Date: February 18, 2015 Page: 1 of 9. ICBC invests $1.195 million to improve Surrey, Delta & White Rock roads

Transportation Master Plan Advisory Task Force

Clay Street Bridge Replacement Project

North Vancouver Community Associations Network. November 15, pm to 9 pm

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm

State Street and Pierce Park Lane Intersection Concept Report

Welcome to the Open House

Building Great Neighbourhoods QUEEN ALEXANDRA

Bank Street Widening Class EA Study Leitrim Road to Rideau Road. Gloucester South Seniors Centre, 4550 Bank Street

North Shore Transportation Improvement Strategy

Inter River Sub Area Transportation Study District of North Vancouver Stakeholder Meeting #2b Meeting Minutes

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

2. THAT the Mayor and Corporate Officer be authorized to execute all documents related to this matter.

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

TRANSPORTATION & MOBILITY

Building Great Neighbourhoods BONNIE DOON

Engagement Summary: Round 1

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

Welcome. Background. Goals. Vision

Hospital Link Project Project Update September 2017

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.

Shifting Gears for a Healthier City.

HIGHWAY 11 CORRIDOR STUDY

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

Welcome 78 Ave S.E. Underpass and Road Widening Project Update

Transcription:

Lower Lynn Improvements - Public Information Sessions and Comment Period February 21 March 11, 2017 Summary Report April 2017 Prepared by Kirk & Co. Consulting Ltd.

Lower Lynn Improvements Public Information Sessions and Comment Period Summary Report ABOUT KIRK & CO. CONSULTING LTD. Kirk & Co. is a recognized industry leader in designing and implementing comprehensive public and stakeholder consultation and engagement programs. Utilizing best practices, consultation and engagement programs are designed to maximize opportunities for input. Kirk & Co. independently analyzes and reports on public and stakeholder input. The views represented in this summary report reflect the priorities and concerns of those who participated in the comment period. They may not be representative of the views of the public and other stakeholders because participants self-selected into the Project comment period, and therefore do not reflect a random sample.

Lower Lynn Improvements Public Information Sessions and Comment Period Summary Report Lower Lynn Improvements Public Information Sessions and Comment Period February 21 March 11, 2017 Summary Report April 2017 Table Of Contents 1. Background...1 2. Engagement To-Date... 1 3. Public Information Sessions and Comment Period: February 21 March 11, 2017... 2 3.1 Purpose and Opportunities to Comment... 2 3.2 Participation... 2 3.3 Notification... 3 4. Comment Period Results... 4 Appendix 1 Display Boards and Feedback Form Appendix 2 Notification Materials

Summary Report Lower Lynn Improvements Public Information Sessions and Comment Period 1. Background The Ministry of Transportation and Infrastructure, the Government of Canada, and the District of North Vancouver are partnering in the design and construction of a new interchange at Highway 1 and Mountain Highway called the. The project, an investment of $36 million, is the first of four phases for the overall Lower Lynn Improvements which total $198 million. The new will increase safety along Highway 1 between Mountain Highway and the Ironworkers Memorial Second Narrows Bridge and help reduce congestion and travel times on this busy stretch of roadway. It will also provide an alternative to the east-west and north-south routes on the North Shore, adding additional capacity for travelers in these communities. Site preparation activities have been ongoing and on March 31, 2017, construction got underway. The is part of the Province s commitment to Improving Highway Capacity and Reliability in B.C. on the Move: A 10-Year Transportation Plan. 2. Engagement to-date The Ministry of Transportation and Infrastructure held an Open House and Comment Period for the Mountain Highway Interchange Project from January 19 to February 5, 2016 to provide information and collect feedback from First Nations, stakeholders and the public. Engagement materials included display boards and a comment form. Both were posted online on January 19, 2016. The display boards included information regarding the design and the other phases of the Lower Lynn Improvements. Participants were asked to provide comments regarding the project design and other considerations the project team should be aware of as they moved forward with planning and design for the Project, specifically: Minimizing impacts to park land and private property Protecting and enhancing Keith Creek Salop Trail expansion and connections Improving cycling and pedestrian facilities Improving safety for all modes of transportation Accommodating residential access along Keith Road Planning for future improvements to Highway 1 Construction impacts to neighbouring communities Continuation of transit services Participants were also asked to provide any additional comments regarding the Project. A total of 390 people attended the open house, and 126 completed comment forms were received. A Summary Report of the January 19 February 5, 2016 engagement can be found at: gov.bc.ca/lowerlynninterchanges. Feedback from the public, road users, First Nations and stakeholders throughout the project development and engagement was considered, along with technical and financial information, as the project team refined the project design and developed mitigation measures. 1

Summary Report Lower Lynn Improvements Public Information Sessions and Comment Period 3. Public Information Sessions and Comment Period: February 21 March 11, 2017 3.1 PURPOSE AND OPPORTUNITIES TO COMMENT In follow up to the Open House and Comment Period in 2016, the Ministry of Transportation and Infrastructure held Public Information Sessions and a Comment Period between February 21 and March 11, 2017. Two public information sessions were held (February 21 and 25, 2017) to present the revised design for the. Display boards included updated information regarding pedestrian and cycling improvements, municipal road connections, environmental mitigation strategies, noise mitigation, and an overview of the entire Lower Lynn improvements with particular focus on Phase 4, as announced on January 27, 2017. An interactive 3D model showing the revised design was also on display at both public information sessions. Printed copies of the display board materials were provided to attendees who were encouraged to review the revised design and seek further understanding from the Project team. Feedback forms were made available both in person and online at gov.bc.ca/lowerlynninterchanges. A digital version of the display boards were also made available online. A copy of the display boards and feedback form can be found in Appendix 1. HOW INPUT WILL BE USED Feedback received will be considered alongside technical and financial information, as the project team advances construction of the. There will also be future opportunities to provide input on the other phases of the Lower Lynn Improvements. 3.2 PARTICIPATION There were a total of 642 participant interactions during the Project Information Sessions and Comment Period: 532 people attended two public information sessions 110 completed feedback forms were received (51 hard copy, 59 online) 2

Summary Report 3.3 NOTIFICATION The public was notified about the Public Information Sessions and Comment Period through the following methods: Postcards: 13,000 postcards were distributed to residents and businesses within a one kilometre radius of the new. Lower Lynn Improvements Public Information Sessions and Comment Period Newspaper Advertising: Advertisements were placed in the North Shore News on February 8, 15 and 22, 2017. Invitation Emails to Stakeholders: 76 stakeholders were notified through email. Website: Notification of the Public Information Sessions and Comment Period was posted on the project website (gov.bc.ca/lowerlynninterchanges). All materials, including the display boards and feedback form, were made available online. A copy of the notification materials can be found in Appendix 2. 3

Summary Report 4. Comment Period Results The following are results from the 110 feedback forms received at the public information sessions and online. Some totals may not add to 100% due to rounding, and the number of mentions may not equal the total number of respondents as participants may have provided more than one comment in a response. Lower Lynn Improvements Public Information Sessions and Comment Period 1. Please indicate how likely you would be to use each of the following channels to get updates about construction activities and traffic pattern changes for the. Roadside changeable message signs Email updates (sign-up required through project website) Project website (gov.bc.ca/ lowerlynninterchanges) Newspaper advertisements Radio advertisements Social media (Twitter, Facebook) DriveBC website (www.drivebc.ca) Very likely Somewhat likely Neither likely nor unlikely Somewhat unlikely Very unlikely Total Responses 37% 39% 11% 6% 7% 98 40% 33% 5% 12% 10% 93 32% 31% 9% 14% 14% 96 33% 29% 5% 9% 14% 98 13% 29% 20% 11% 27% 91 22% 16% 9% 14% 38% 91 13% 21% 19% 20% 27% 90 4

Summary Report 2. Please provide any additional comments you may have regarding any aspect of the Mountain Highway Interchange. Please do not include any personally identifiable information about yourself or others in your response. Key themes from 87 additional comments: Number of Mentions Lower Lynn Improvements Public Information Sessions and Comment Period 1. Concern regarding increased traffic congestion as a result of the proposed project design, in particular due to the amount of traffic lights, with some comments that regardless of improvements, the Ironworkers Memorial Bridge will continue to constrict traffic flow. 2. Support for cycling improvements and comments regarding cycling facilities, requesting design improvements to ensure safety and efficiency for cyclists such as physically separated bike lanes and improved light signals for cyclists. 3. Requests to ensure safe and accessible pedestrian access within the community during and after construction, including for specific areas such as: Pedestrian tunnel under Mountain Highway Access to Park & Tilford Lynnmour Elementary School Lynn Creek Along Mountain Highway (sidewalks) Bridgeman Park 4. General support for the, including that the proposed design will reduce traffic congestion. 5. Concerns regarding impacts to nearby residents, businesses and schools from construction and the proposed design, including increased traffic noise with requests for added sound barriers. 6. Concern regarding the loss of trees and vegetation during and after construction, with requests to minimize impacts to trees and incorporate greenery in the new design, and to ensure proper environmental mitigation measures. 7. Specific design-related requests, including: Eastbound Highway 1 off-ramp to Mountain Highway allowing north and south access to Mountain Highway (3 mentions) Incorporate roundabout with lights for peak periods at Mountain Highway/East Keith Road/Brooksbank intersection (2 mentions) Ensure that merge lanes are long and physically separated to reduce congestion and improve safety (2 mentions) 8. Requests for improved public transportation connectivity, including a SkyTrain to downtown and the need for improved parking and access to Phibbs Exchange. 9. Comments regarding East Keith Road, including concern over loss of the westbound vehicle lane to cycling, noting that it will increase congestion and accidents, and requests to add additional lanes. 22 15 14 12 11 9 7 6 6 5

Summary Report Lower Lynn Improvements Public Information Sessions and Comment Period Key themes from 87 additional comments: 10. Specific requests, including: Ensure that road and lane signage is clear (3 mentions) Install more street lighting Avoid using plastic pole road separators Incorporate public art on retaining wall/concrete structures 11. Requests for improved access to the Mount Seymour area, in particular when departing from Lynn Valley. 12. Support for the improvements in Phase 4 that will allow improved east/west local traffic flow. 13. Requests for full access and egress to East Keith Road from residential streets in the Calverhall neighbourhood, including: Heywood Street Shavington Street Cloverley Street Adderley Street 14. Comments regarding the Main Street/Dollarton Highway interchange (Phase 3), including: Concern regarding potential for accidents and congestion at the proposed onramp from Dollarton Highway to the Ironworkers Memorial Bridge (2 mentions) Requests for Dollarton Highway onramp to merge with Main Street onramp (2 mentions) Number of Mentions 6 6 5 5 4 6

kirkandco.ca

Lower Lynn Improvements - Public Information Sessions and Comment Period February 21 March 11, 2017 Appendix 1: Display Boards and Feedback Form April 2017 Prepared by Kirk & Co. Consulting Ltd.

Highway 1 Lower Lynn Improvements Welcome to the Public Information Session Purpose of this Information Session Present an updated project design for the Mountain Highway Interchange, incorporating input received through public consultation in 2016 Provide information about future phases of the Lower Lynn Improvements Seek feedback regarding the project and how you would like to stay informed as the moves into construction and new E. Keith Road/Brooksbank Avenue/Mountain Highway intersection (illustrated at completion in 2018). The Province of B.C. is investing $76.7 million, the Government of Canada is investing $66.6 million and the District of North Vancouver is investing $54.7 million for a total of $198 million to improve access to and from Highway 1 in the Lower Lynn area of North Vancouver. The will be the first of four phases of improvements delivered to the area. B.C. on the Move: A 10-Year Transportation Plan gov.bc.ca/lowerlynninterchanges

Highway 1 Lower Lynn Improvements Improvements are needed to improve safety and reduce congestion The three Lower Lynn Interchanges have a higher collision rate and incident severity than the provincial average Traffic counts at the north end of the Ironworkers Memorial Bridge show the average weekday traffic volume is 120,000 vehicles/day (total of both directions) Lower Lynn Interchanges serve approximately 60% of all vehicles entering and exiting the North Shore from the Ironworkers Memorial Bridge Inefficiencies at key points are hampering the flow of traffic on Highway 1 and the surrounding municipal roadway network HIGHWAY 1 BROOKSBANK AVENUE 5% of vehicles use the Mountain Hwy Interchange E. KEITH ROAD MOUNTAIN HWY HIGHWAY 1 25% of vehicles use the Keith Road/ Seymour Parkway Interchange HIGHWAY 1 N The need for improvements was identified as priority in B.C. on the Move: A Ten-Year Transportation Plan MAIN STREET 30% of vehicles use the Main Street/Dollarton Hwy Interchange DOLLARTON HIGHWAY Traffic volumes during morning and afternoon peak hours. B.C. on the Move: A 10-Year Transportation Plan gov.bc.ca/lowerlynninterchanges

Highway 1 Lower Lynn Improvements Additional Capacity and Highway Access During consultation last year, we heard a request for more capacity over Lynn Creek, more capacity on Highway 1, and direct Highway 1 access for southbound Mountain Highway traffic via a left-turn onto the eastbound on-ramp To address these issues, we recently announced a new phase of improvements, Phase 4 - Lynn Creek Connectivity Improvements. Phase 4 includes: Two additional Highway 1 lanes from Mount Seymour Parkway to Mountain Highway, including a new two-lane bridge over Lynn Creek, north of the existing Lynn Creek Bridge An eastbound on-ramp from Mountain Highway to the east of the existing Lynn Creek Bridge, including a new two lane bridge over Lynn Creek, south of the Lynn Creek Bridge Southbound Mountain Highway direct access to Highway 1 via a left-turn onto Highway 1 eastbound (to be constructed in Phase 4 by 2020) B.C. on the Move: A 10-Year Transportation Plan gov.bc.ca/lowerlynninterchanges

Highway 1 Lower Lynn Improvements New Highway 1 Lynn Creek Connectivity Project (concept) Highway 1 Lower Lynn Improvements Project Overview N H IS I TA N HI New Mountain Highway Interchange h AV E N U E WAY 1 AY W RE H 1 GH HI N Keith Road and Bridge Improvements TO I TA Existing Lynn Creek Bridge to remain DO H RE IG ET H LL N AR N KE U IT O H M RO AD New eastbound on-ramp and southbound left turn W AY FE RN ST IG Keith Rd / Seymour Parkway Interchange H ET HIGH AY GHW a m is AD RO IT EN KE N D ET r ST RE ive OU ST rr Main Street/Dollarton Highway VE M L ou DRI Two new bridges over Lynn Creek EL ym YNN ORL Highway 1 Lynn Creek Connectivity Improvements (Phase 4) New separated collector road RW Se O ARB Keith Road/Seymour Parkway M P A T. RK SE W YM AY O U T k To S qu O L D L I L LO O E T R O A D ree Complete R OE LO LIL AD RO nc Keith Road and Bridge Improvements (Complete) Ly n Anticipated Completion Project Phases N LY CR O W N ST AY W Main St / Dollarton Hwy Interchange N M O To Ironworkers Memorial Bridge U TH ET E B.C. on the Move: A 10-Year Transportation Plan U B.C. on the Move: A 10-Year Transportation Plan N Approximate scale B AV R O EN OK UE SB RE 500m AN K ST 400m N 300m AI 200m M 100m E AV 0 gov.bc.ca/lowerlynninterchanges

Highway 1 Lower Lynn Improvements Highway 1 Lower Lynn Improvements Safety and Mobility Benefits Reduced travel times Improved traffic flow during peak times Improved municipal connectivity Improved pedestrian, cycling and transit facilities Reduced collisions expected reduction of 20 35% Longer merge distances Increased sight lines Better traffic distribution between interchanges Separation of local traffic from Highway 1 traffic Widened shoulders will allow for safe pull-off in case of an incident without impacting travel lanes An additional access onto and off of Highway 1 at the new will reduce congestion at the Keith Road/Seymour Parkway and Main Street/Dollarton Highway interchanges Improved fish and wildlife habitat in the area through environmental rejuvenation and drainage enhancements Improvements to Main Street/Dollarton Highway Interchange will benefit transit users and support future upgrades to Phibbs Exchange B.C. on the Move: A 10-Year Transportation Plan gov.bc.ca/lowerlynninterchanges

Highway 1 Lower Lynn Improvements Project Overview Two new on-and off-ramps Designed to accommodate future eastbound on-ramp onto Highway 1 (as part of Phase 4) The Project is currently out for tender with anticipated closing of mid to late March. A new five-lane Mountain Highway overpass with traffic signals at both ends A new intersection at E. Keith Road/ Brooksbank Avenue/Mountain Highway Phase 4 Lower Lynn Connectivity Improvements Realignment of Mountain Highway to improve north/south municipal connectivity Improvements and expansion of pedestrian and cycling facilities and local trails Revegetation and drainage enhancements and new E. Keith Road/Brooksbank Avenue/Mountain Highway intersection (illustrated at completion in 2018). B.C. on the Move: A 10-Year Transportation Plan gov.bc.ca/lowerlynninterchanges

Highway 1 Lower Lynn Improvements Pedestrian and Cycling Improvements What We Heard Cyclists require safer routes with greater separation from vehicles and pedestrians, and more efficient connections Pedestrian paths should be designed for safety and efficiency Legend 1.8 m SIDEWALK 1.5 m BIKE LANE 3 m MULTI-USE PATHWAY 3 m concrete sound barrier Tunnel underneath Mountain Highway What We Are Doing Expansion and improvements to cyclist and pedestrian facilities including approximately 1km of roadway bike paths, 500m of sidewalk, and 400m of 3m-wide multiuse path A new intersection at E. Keith Road/Brooksbank Avenue/Mountain Highway which better separate pedestrians, cyclists, and vehicles Installation of a pedestrian and cycling underpass beneath Mountain Highway connecting the Salop Trail and Lynn Creek Trail 2 m decorative concrete fence 2 m decorative concrete fence In support of the District of North Vancouver and City of North Vancouver s overall cycling strategy, one westbound lane on E. Keith Road will be converted to a cycling lane B.C. on the Move: A 10-Year Transportation Plan gov.bc.ca/lowerlynninterchanges

Highway 1 Lower Lynn Improvements Pedestrian and Cycling Improvements New intersection at E. Keith Road/Brooksbank Avenue/Mountain Highway (looking north) Cycling and pedestrian facilities on the new Mountain Highway overpass (looking north) B.C. on the Move: A 10-Year Transportation Plan gov.bc.ca/lowerlynninterchanges

Highway 1 Lower Lynn Improvements Shavington Street Access What We Heard Concerns over changes in turning capabilities to and from Shavington Street What We Are Doing North side of E. Keith Road: Residents will have all left and right access to and from Shavington Street South side of E. Keith Road: Residents will be restricted to right-in, rightout movements to and from Shavington Street E. KEITH RD SHAVINGTON ST SHAVINGTON ST Residents will have full access to and from Cloverley Street New Shavington Street design B.C. on the Move: A 10-Year Transportation Plan gov.bc.ca/lowerlynninterchanges

Highway 1 Lower Lynn Improvements Environmental Mitigation What We Heard Concern about the impact on the environment associated with increased traffic, construction and road widening Minimize impact to vegetation and habitat Legend Mixed Forest (Douglas Fir, Western Red Cedar, Western Hemlock, Big Leaf Maple, Vine Maple, Red Alder and various native shrubs) Shrubs Only (Lady fern, Deer fern, Dull Oregon grape, Salal, Devil s club, Sword fern, Salmonberry, Red elderberry, Red huckleberry etc.) Seeding (South Coast - Vancouver Island/ Coast Mix) What We Are Doing Minimize project footprint Revegetation plan to plant native tree and shrubs in the riparian area of Keith Creek Installation of fish-passable culverts Drainage improvements to improve the water quality for Keith Creek Invasive knotweed management throughout the project footprint Reduced congestion will help reduce idling-related emissions Overall project results in an estimated greenhouse gas reduction of 1.9 billion tonnes over the next 25 years B.C. on the Move: A 10-Year Transportation Plan gov.bc.ca/lowerlynninterchanges

Highway 1 Lower Lynn Improvements Visual and Noise Mitigation What We Heard Concern of increased noise, increased traffic on residential streets, and greater visual impacts Need for sound/visual barriers to protect residents from increased noise as a result of closer traffic and construction activities What We Are Doing 75m of 3m-high concrete sound barrier along the west side of the new Mountain Highway, south of Highway 1 as recommended in a noise assessment 100m of 2m-high decorative concrete fence along south side of E. Keith Road to provide screening from traffic 80m of 2m-high decorative concrete fence along east side of Brooksbank Avenue and south side of E. Keith Road Use of vegetation as barriers as appropriate 75 m of 3 m high concrete sound barrier along the west side of the new Mountain Highway, south of Trans Canada Highway 1 MOUNTAIN HWY 100 m of 2 m high decorative concrete fence along the south side of E. Keith Road E. KEITH RD E. KEITH RD Rendering of concrete sound barrier along Mountain Highway SHAVINGTON ST HEYWOOD ST BROOKSBANK AVE 80 m of 2 m high decorative concrete fence along the south side of E. Keith Road and the east side of Brooksbank Avenue B.C. on the Move: A 10-Year Transportation Plan gov.bc.ca/lowerlynninterchanges

Highway 1 Lower Lynn Improvements Next Steps Construction Looking Ahead Lower Lynn Improvements Consultation Construction scheduled to start in 2017 (completed by fall 2018) Existing will remain open to traffic until new overpass is completed During construction, the Ministry of Transportation and Infrastructure will work to minimize impacts to residents, commuters, and the public by: Providing public notification including roadside message boards, advertisements in local papers, and website and social media updates Working outside of peak hours to limit impacts on commuters Continued engagement with key stakeholders, residents and First Nations Further engagement anticipated for mid-2017 regarding: Phase 2 Keith Road/Seymour Parkway Interchange Phase 3 Main Street/Dollarton Highway Interchange Phase 4 Lynn Creek Connectivity Improvements B.C. on the Move: A 10-Year Transportation Plan gov.bc.ca/lowerlynninterchanges

Highway 1 Lower Lynn Improvements We Want To Hear From You Provide us your feedback by: Completing a feedback form Filling out the online feedback form at gov.bc.ca/lowerlynninterchanges by March 11, 2017 Sending an email to lowerlynn@gov.bc.ca by March 11, 2017 Thank you for coming! B.C. on the Move: A 10-Year Transportation Plan gov.bc.ca/lowerlynninterchanges

Public Information Session Feedback Form is the first of four phases for the overall Highway 1 Lower Lynn Improvements. The Highway 1 Lower Lynn Improvements are being designed to operate together to provide the best overall traffic movement. They will improve safety, reliability, and reduce congestion in the Lower Lynn area. Construction of the new is expected to be completed by 2018 and will provide better access to and from Highway 1. We want to hear from you! We want to know how you want to stay informed on upcoming construction activities. Between February 21 and March 11, 2017, please provide us your feedback by: Completing this feedback form Filling out the online feedback form at gov.bc.ca/lowerlynninterchanges Sending an email to lowerlynn@gov.bc.ca Please provide your feedback by March 11, 2017. Privacy policy Your comments and feedback are collected by the Ministry of Transportation and Infrastructure under sections 26(c) and 26(e) of the Freedom of Information and Protection of Privacy Act ( FOIPPA ), for the purposes of soliciting the public s feedback on the Mountain Highway Interchange Project. To protect your own privacy and the privacy of others, please do not include any personal information including phone numbers and email addresses in the body of your comments. Please do not share personal information about others. This survey is voluntary and a response is encouraged, not required. Should you have any questions about the collection of this information please contact: Jay Porter, PMP, Senior Project Manager, Ministry of Transportation and Infrastructure 310 1500 Woolridge, Coquitlam, BC, V3K0B8 604 527 3105 1. Please indicate how likely you would be to use each of the following channels to get updates about construction activities and traffic pattern changes for the. Very likely Somewhat likely Neither likely nor unlikely Somewhat unlikely Very unlikely DriveBC website (www.drivebc.ca) Project website (gov.bc.ca/lowerlynninterchanges) Email updates (sign-up required through project website) Newspaper advertisements Radio advertisements Roadside changeable message signs Social media (Twitter, Facebook) 1 February 2017 Public Information Session Feedback Form

2. Please provide any additional comments you may have regarding any aspect of the Mountain Highway Interchange. Please do not include any personally identifiable information about yourself or others in your response. How your feedback will be used Your feedback will be considered alongside technical and financial information, as the project team moves into construction of the. There will also be future opportunities to provide input on the other phases of the Lower Lynn Improvements. February 2017 Public Information Session Feedback Form 2

kirkandco.ca

Lower Lynn Improvements - Public Information Sessions and Comment Period February 21 March 11, 2017 Appendix 2: Notification Materials April 2017 DRAFT Prepared by Kirk & Co. Consulting Ltd.

Lower Lynn Improvements Public Information Sessions and Comment Period Summary Report POSTCARD - FRONT Highway 1 Lower Lynn Improvements Public Information Sessions Tuesday, February 21 and Saturday, February 25, 2017 The Ministry of Transportation and Infrastructure, the Government of Canada and the District of North Vancouver are partnering in the design and construction of a new interchange at Highway 1 and Mountain Highway called the. This project is part of a series of improvements along Highway 1 in the Lower Lynn area which will be carried out between 2017 and 2021. The revised design for the is the result of the Ministry of Transportation and Infrastructure s consideration of your input from early 2016, and work with the District of North Vancouver to further improve safety and connectivity in your area. The revised design includes an additional $60 million in improvements as announced on January 27, 2017 $20 million each from the Province of BC, Government of Canada and District of North Vancouver bringing the total planned investment in highway improvements in the Lower Lynn area to $198 million. Ministry of Transportation and Infrastructure DRAFT

Lower Lynn Improvements Public Information Sessions and Comment Period Summary Report POSTCARD - BACK You are invited to attend a public information session to learn about the revised design for the : Date Time Location Tuesday February 21, 2017 Saturday February 25, 2017 5:00 p.m. 8:00 p.m. 10:00 a.m. 1:00 p.m. Holiday Inn & Suites 700 Old Lillooet Road North Vancouver Lynnmour Elementary School 800 Forsman Avenue North Vancouver If you are unable to attend, you can visit gov.bc.ca/lowerlynninterchanges to learn about the revised design. How Your Input Will Be Considered Your input will be considered, along with technical and financial input, as the project team moves into construction of the. There will also be future opportunities to provide input on the other phases of the Lower Lynn Improvements. For more information: Visit gov.bc.ca/lowerlynninterchanges Email lowerlynn@gov.bc.ca Printed on paper made with 100% post-consumer waste. Please recycle. Ministry of Transportation and Infrastructure DRAFT

Lower Lynn Improvements Public Information Sessions and Comment Period Summary Report NEWSPAPER ADVERTISING (NOT SHOWN ACTUAL SIZE) Highway 1 Lower Lynn Improvements: Public Information Sessions Tuesday, February 21 and Saturday, February 25, 2017 The Ministry of Transportation and Infrastructure, the Government of Canada and the District of North Vancouver are partnering in the design and construction of a new interchange at Highway 1 and Mountain Highway called the. This project is part of a series of improvements along Highway 1 in the Lower Lynn area which will be carried out between 2017 and 2021. The revised design for the is the result of the Ministry of Transportation and Infrastructure s consideration of your input from early 2016, and work with the District of North Vancouver to further improve safety and connectivity in your area. The revised design includes an additional $60 million in improvements as announced on January 27, 2017 $20 million each from the Province of BC, Government of Canada and District of North Vancouver bringing the total planned investment in highway improvements in the Lower Lynn area to $198 million. You are invited to attend a public information session to learn about the revised design for the : Date/Time Tuesday, February 21, 2017 5:00 p.m. 8:00 p.m. Saturday, February 25, 2017 10:00 a.m. 1:00 p.m. Location Holiday Inn & Suites 700 Old Lillooet Road, North Vancouver Lynnmour Elementary School 800 Forsman Avenue, North Vancouver If you are unable to attend, you can visit gov.bc.ca/lowerlynninterchanges to learn about the revised design. How Your Input Will Be Considered Your input will be considered, along with technical and financial input, as the project team moves into construction of the. There will also be future opportunities to provide input on the other phases of the Lower Lynn Improvements. DRAFT

kirkandco.ca