Parts & Installation Instructions SV & SV 2 8.5, 9.5 & 10.5 and SVLD 7.5 Snow Plow

Similar documents
Divider Systems. Rear Tire Divider (RTD) Section 4. Model Years Model Years Model Years

Replaces Lesco 300 & 500 Parts

Reproduction. Not for 27" & 29" TWO STAGE INTERMEDIATE SNOWTHROWERS Parts Manual for M1227E M1227EX M1529E

Backboard and Rim Owners Manual

GENUINE PARTS INSTALLATION INSTRUCTIONS

Parts Manual. Scraper Hitches PH:

Replaces Lesco 300 & 500 Parts Cutting Unit

VERSA BIKE RACK INSTRUCTIONS

INSTRUCTIONS 360 Y-DROP HAGIE STS 2015

HoldUp Plus2. Safety Kit included: See additional instructions for installation. REAR WHEEL TRAY. BASE (1x) lock WASHER (1x) KEY (2x) SAFETY CLIP (1x)

Ersatzteilliste. Düsenwagen R 30

MID-CUT AND FRONT CUT UNITS

E-trike Li Assembly Guide

Assembly Instructions for the Rolling Harrow and Reel Turbo-Till 6/26/03

TR-AUGER. Section C INDEX BOOT / HOPPER

Assembly Guide ST200 FUNCTIONAL TRAINER

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

80 SERIES MOBILE-KARRIERS. The Specialist In Drum Handling Equipment OPERATOR S MANUAL FOR MORSE 80 SERIES

Sunset Swings By Health in Motion, LLC

! CAUTION! ! WARNING! General Information

Row Marker OEM /

Detroit Speed, Inc. A-body Rear Coilover Conversion Kit A-body (Moser Rear Axle) P/N: , , , , ,

1650EXLT, ,

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

44in Side Discharge Mower for Wheel Horse XL 440H Lawn Tractors Model No Serial No and Up

Vac Bagger Wheelhorse 42 and 48 Mowers for Classic Garden Tractors

BRONZE BUSHING REPLACEMENT PROCEDURE DN345 & NL450C

Fontaine Fifth Wheel Ultra LT Rebuild Procedures

VERTICAL SURFBOARD CARRIER READ ME! IMPORTANT WARNING!

FRONT BOLT ACTION ASSAULT SHOTGUN

42 inch Mower for TimeCutter Z Riding Mowers. Note: Determine the left and right sides of the machine from the normal operating position.

READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT.

STAND AID 1600/ ECONOSTAND

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

MASTER TRUING STAND TS-3. Optional Dial indicator set with brackets Dial indicator bracket set only

Tru Trak Sulky Proline Mid Size Mower Attachment

Universal Anchoring Adapter For Mercedes

CENTER-STRUT HEIGHT ADJUSTMENT UNITS MANUAL OPERATION

THOR 10 HAMMER CAGE INSTRUCTIONS

Marine 6-Boat Free-Standing Racks SKU: Updated November 2011

INSTALLATION INSTRUCTIONS

Assembly Instructions. -Cantilever Boat Lifts

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

Reproduction. Not for. Parts Manual. VCS404 16" Walk Behind Mower. Models

Assembly Instructions for the Rolling Harrow and Board Turbo-Till 6/26/03

ROCKSOLID DUAL POST ANCHOR

INSTALLATION INSTRUCTIONS

U.S. Patent No. 7,922,246. Patents Pending

Detroit Speed, Inc. Rear Coilover Conversion Kit Camaro/Firebird P/N: &

ATV BLADE HARDWARE. For POLARIS ATVs OWNER S MANUAL MODEL NUMBER: CUSTOMER MUST RECEIVE A COPY OF THIS OWNERS MANUAL AT TIME OF SALE

Tread Brake Assembly Instructions

LAT PULLDOWN MACHINE. Assembly Manual (888) FOR YOUR SAFETY READ ALL INSTRUCTIONS CAREFULLY

WEIGHT STACK ATTACHMENT. Assembly Manual (888) FOR YOUR SAFETY READ ALL INSTRUCTIONS CAREFULLY

Installation Instructions - Super Six Electric Arm Kits with Underbody Pivots , , ,

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

INSTALLATION INSTRUCTIONS FOR ROLLOVER PROTECTION SYSTEM (ROPS)

a division of Enviro Safety Products

USER S MANUAL QUESTIONS? CAUTION. Model No. FMEX Serial No. Write the serial number in the space above for reference. Serial Number Decal

Mfg. No: Grass Catcher, Single Bag (Export)

TRAILMATE METEOR ASSEMBLY MANUAL

Cover EX Installation Instructions

To address this issue, Ariens Company has developed two cradle plates kits:

Retractable Security Cover for a Swim Spa

S E R V I C E I IPL, LR10 36, LR Spare parts Ersatzteile Pièces détachées Reserve onderdelen Repuestos Reservdelar

Parts Manual HEAVY DUTY RIGHT HAND ARM

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

Concrete Mixer Supply.Com. Section 8

Installation Guide RHT-380. This Manual Must Be Read Before Operating The Equipment CUSTOMER COPY

Pressure Dump Valve Service Kit for Series 2300 Units

Operator s/parts Manual

#59114 Rola 2-Bike Rack Carrier (Shown Assembled) (A) (C) (B)

BELT DRIVE INDOOR CYCLING BIKE SF-B1712 USER MANUAL

ROCKSOLID SINGLE POST ANCHOR

48 Mower Wheel Horse 5xi Garden Tractor Attachment

Grapple Buckets GB(E)2590, GB(E)2596 & GB(E) P Parts Manual. Copyright 2018 Printed 07/11/18

Parts Manual. Versa Hand Arm

Rev S Terminator Parts Book Page 1 of 14 Top E nd

WINCH MOUNT KIT OWNER S MANUAL

STADIUM GLASS OWNER S MANUAL BASKETBALL GOAL SYSTEM

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

FOLD AND ROLL PLAYBACK TABLE TENNIS TABLE

Specifications Testing & Adjusting Disassembly & Assembly

Installation. Striping Kit for 42in and 50in Mowers Model No Installation Instructions. Removing the Mower Deck.

SPINNER RIDE GETTING STARTED GUIDE. Welcome to a personalized fitness experience for your members

BELT DRIVE INDOOR CYCLING BIKE SF-B1712

ELC7. Bobcat 7 Pin CanBus Electric Control System. Model Number ELC7. Phone: ELC7 08/10/15

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

MAGNETIC INDOOR CYCLING BIKE

Pressure Dump Valve Service Kit for Series 3000 Units

Troyer s Gourd Rack 8 unit F R H O P

A-FRAME RESIN IN & OUT FLIP UP LADDER

ATV BLADE HARDWARE. For POLARIS ATVs OWNER S MANUAL MODEL NUMBER: CUSTOMER MUST RECEIVE A COPY OF THIS OWNERS MANUAL AT TIME OF SALE

Apex 3 Theory of Operation

TURF BROOM ATTACHMENT ASSEMBLY KIT

Soccer Goal. Model: SG20 Series. Installation, Operation and Maintenance Instructions

Rev J Terminator Parts Book Page 1 of 15 Top End

IMPORTANT: RECEIVING INSTRUCTIONS:

Installation Instructions

Transcription:

Form -0 R September 0 Parts & Installation Instructions SV & SV.,. &. and SVLD. Snow Plow Item Part No. Part No. Part No. Part No. Part No. Part No. Qty. Description SVLD. SV. SV. SV. SV. SV. Moldboard Assembly 0 0 044 0 044 0 R.H. & L.H. Wing 0 00 044 0 0444 00 R.H. Wing 0 00 044 0 044 0 L.H. Wing 0 40 4 Trip Edge Weld/ Holes --------- 4 4 4 40 4 Trip Edge Weld/ Holes 4 4 4 4 4 4 4 X -/ Pin 040 040 040 040 040 040 /4 x Cotter Pin 4 4 T -Bar Weldment 0 0 0 0 0 4 Trip Spring 04 04 04 04 04 04 Bolt H /- x Gr. 0 0 0 0 0 0 Locknut /- 0 0 0 0 0 0 4 Flatwasher / 04 04 04 04 04 04 4 Eyebolt w/locknuts and Cap 0 0 0 0 0 0 Cutting Edge Kit / Bolt 0 0 0 0 0 0 Cutting Edge 0 0 0 0 0 0 Hardware Bag 0 0 0 0 0 0 Locknut /- 4 Bolt C /- x 0 0 0 0 0 0 Bolt C /- x -/4 Gr. 0 0 0 0 0 0 Bottom Belt Kit / Bolt ** Bottom Belt 0 0 0 0 0 0 Hardware Bag * 4 4 4 4 4 Backing Plate * 0 0 0 0 0 0 Locknut /- * 0 0 0 0 0 0 Bolt C /- x -/4 Gr. --------- 04 04 04 04 04 Cutting Edge Kit / Bolt --------- 044 044 04 04 04 Cutting Edge --------- 04 04 04 04 04 Hardware Bag --------- 0 0 0 0 0 4 Locknut /- 4 --------- 0000 0000 0000 0000 0000 4 Bolt C /- x --------- 040 040 040 040 040 Bottom Belt Kit / Bolt --------- 040 040 040 040 040 Bottom Belt Kit / Bolt ** --------- 404 404 404 404 404 Bottom Belt --------- 04 04 04 04 04 Hardware Bag * --------- 40 40 40 40 40 Backing Plate * --------- 0 0 0 0 0 Locknut /- * --------- Bolt C /- x -/4 Gr. 044 0 0 0 0 0 Hardware Carton ** Pivot Pin * 0 00 00 00 00 00 00 Bolt H /- x -/ Gr. * 0 0 0 0 0 0 Lockwasher / ** 0 0 0 0 0 0 Plow Marker Kit 00 000 000 000 000 000 Plow Marker 4 4 4 4 4 4 4 Locknut /4-0 SS 4 0 0 0 0 0 0 4 Bolt H /4-0 x SS 0 0 0 0 0 0 Top Deflector Kit ** Top Deflector 04 04 04 04 04 04 Hardware Bag * 4 4 4 4 4 4 Deflector Brace * 00 00 00 00 00 00 Bolt H /- x -/4 Gr. * 0 0 0 0 0 0 Flatwasher / * 04 04 04 04 04 04 Locknut /- A-Frame Parts indented are included in the carton, bag or assembly under which they are indented. * (SV & SV ) Items in 00 Hardware Bag included in 0 * (SVLD) Items in 00 Hardware Bag included in 044 * * (SV & SV ) Items packed in the 0 Hardware Carton * * (SVLD) Items packed in the 044 Hardware Carton

SUPER V OPTIONAL MUSHROOM RUNNERS - FIGURE Item Part No. Qty Description 04 Super-V Mushroom Runner Kit 4 Mushroom Shoe Casting Assy. 44 Runner Spacer 0 Runner Washer 4 0 Linch Pin 4 Runner Bracket Assy. 0 Hardware Bag 04 4 Bolt H /- x Gr. 0 4 Locknut /- Reference Form -4 for Installation Instructions REMOVE SET SCREW 0 4 4 4 4 Figure SUPER V 4 REMOVE SET SCREW 0 4 4 4 Figure

INSTALLATION INSTRUCTIONS:. Position wing assemblies & face down on cardboard as not to damage the painted surfaces. Grease the bushings on both left and right wings. Position the wings so pivot bushings align. Note: Cutting Edges will be inline at this time.. Remove /"- x set screw located in top of A-Frame () tower. Grease A-Frame () bushings and Pivot Pin (). With a helper, lift the A-Frame () and insert its bushings in alignment with the wing bushings.. Insert Pivot Pin () through bushings. Install and tighten /" x.0" bolt (0) and /" lockwasher () to top of A-Frame holding Pivot Pin () in place. Note: Wipe off any excess grease at this time. 4. Using the A-Frame as leverage tilt the moldboard assembly raising the Cutting Edges off the ground. Support Cutting Edges () to inches off the ground.. Install the Bottom Belt () to left and right wing at Tripedge () using /" x." carriage bolt () and locknut (). Note: Be sure that Belt () folds are upward and notches are toward the A-Frame (). Assemble Backing Plate () so bent end is facing the cutting edge forcing the belt against the Tripedge (). See Figure.. Using the A-Frame as leverage tilt the moldboard assembly raising the Cutting Edges off the supports. Remove supports and set moldboard assembly to the upright position.. Assemble Snow Deflector Brace () to Pivot Pin (). Place brace under the pivot pin plate. Attach using two /" x -/4" bolts (), / washers () and / locknuts ().. Position moldboard assembly in the Vee position.. Assemble Top Snow Deflector () positioning the deflector under deflector brace (). Attach deflector ends under left and right wing gussets using /" x -/4" bolts (), / locknuts () and / washers (). Tighten locknuts such that washers slightly compress the rubber surface. Note: Snow Deflector Belt should fold/loop downward between brace and each wing gusset when wings are not in the Vee position. See Hydraulic Instructions (Form -) for assembly of Wing Cylinders. CAUTION: CHECK THE TRIPEDGE ADJUSTMENT AT THIS TIME. A. THE SPRINGS ARE PROPERLY ADJUSTED WHEN A PIECE OF PAPER CAN BE PLACED BETWEEN EACH COIL. B. IF THE TRIPEDGE SPRINGS NEED ADJUSTMENT, LOOSEN THE BOTTOM NUT (A) ON BOTH SPRING ASSEMBLIES. ROTATE THE TOP LOCKNUT NUT (B) UNTIL THE SPRINGS ARE PROPERLY ADJUSTED. C. BE SURE TO TIGHTEN THE BOTTOM NUT (A) SECURELY ON BOTH ASSEMBLIES TO PREVENT LOOSENING OF THE ASSEMBLIES. B A Spring Assembly Meyer Products LLC reserves the right, under its continuing product improvement program, to change construction or design details, specifications and prices without notice or without incurring any obligation.

Parts & Installation Instructions Stainless Steel SV.,. &. Item Part No. Part No. Part No. Qty. Description SV. SV. SV. Moldboard Assembly 044 04 04 R.H. & L.H. Wing 04 040 04 SS R.H. Wing 04 04 04 SS L.H. Wing 40 40 4 RH Moldboard Weld 40 40 4 LH Moldboard Weld 40 40 4 RH Stainless Steel Sheet 4 400 404 4 LH Stainless Steel Sheet 40 4 40 Bottom Mount Plate 4 40 4 Trip Edge Weld 0 0 0 Locknut /- 0 0 0 Locknut /- Flatwasher SAE 4 4 4 Bolt C /- x -/4 4 4 4 X -/ Pin 4 4 4 Roll Pin / x. 4 4 T -Bar Weldment 4 0 0 0 4 Trip Spring 04 04 04 Bolt H /- x Gr. 0 0 0 Locknut /- 0 0 0 4 Flatwasher / 04 04 04 4 Eyebolt w/locknuts and Cap 04 04 04 Cutting Edge Kit 044 04 04 Cutting Edge 04 04 04 Hardware Bag 0 0 0 0 4 Locknut /- 0000 0000 0000 4 Bolt C /- x 040 040 040 Bottom Belt Kit 040 040 040 Bottom Belt Kit ** 404 404 404 Bottom Belt 04 04 04 Hardware Bag * 4 40 40 40 Backing Plate * 0 0 0 Locknut /- * Bolt C /- x -/4 Gr. 0 0 0 Hardware Carton ** Pivot Pin * 00 00 00 Bolt H /- x -/ Gr. * 0 0 0 Lockwasher / ** 0 0 0 Plow Marker Kit 000 000 000 Plow Marker 4 4 4 4 Locknut /4-0 SS 0 0 0 4 Bolt H /4-0 x SS 0 0 0 Top Deflector Kit ** Top Deflector 04 04 04 Hardware Bag * 4 4 4 4 Deflector Brace * 00 00 00 Bolt H /- x -/4 Gr. * 0 0 0 Flatwasher / * 04 04 04 Locknut /- A-Frame Parts indented are included in the carton, bag or assembly under which they are indented. * (SV ) Items in 00 Hardware Bag included in 0 ** (SV ) Items packed in the 0 Hardware Carton

STAINLESS STEEL SUPER V 4 4 Figure 4 4 & 0 OPTIONAL MUSHROOM RUNNERS - FIGURE Item Part No. Qty Description 04 Super-V Mushroom Runner Kit 4 Mushroom Shoe Casting Assy. 44 Runner Spacer 0 Runner Washer 4 0 Linch Pin 4 Runner Bracket Assy. 0 Hardware Bag 04 4 Bolt H /- x Gr. 0 4 Locknut /- Reference Form -4 for Installation Instructions 4 Figure

STAINLESS STEEL SV INSTALLATION INSTRUCTIONS:. Position wing assemblies & face down on cardboard as not to damage the painted surfaces. Grease the bushings on both left and right wings. Position the wings so pivot bushings align. Note: Cutting Edges will be inline at this time.. Remove /"- x set screw located in top of A-Frame () tower. Grease A-Frame () bushings and Pivot Pin (). With a helper, lift the A-Frame () and insert its bushings in alignment with the wing bushings.. Insert Pivot Pin () through bushings. Install and tighten /" x.0" bolt () and /" lockwasher () to top of A-Frame holding Pivot Pin () in place. Note: Wipe off any excess grease at this time. 4. Using the A-Frame as leverage tilt the moldboard assembly raising the Cutting Edges off the ground. Support Cutting Edges () to inches off the ground.. Install the Bottom Belt () to left and right wing at Tripedge () using /" x." carriage bolt () and locknut (). Note: Be sure that Belt () folds are upward and notches are toward the A-Frame (). Assemble Backing Plate (4) so bent end is facing the cutting edge forcing the belt against the Tripedge ).. Using the A-Frame as leverage tilt the moldboard assembly raising the Cutting Edges off the supports. Remove supports and set moldboard assembly to the upright position.. Assemble Snow Deflector Brace (4) to Pivot Pin (). Place brace under the pivot pin plate. Attach using two /" x -/4" bolts (), / washers () and / locknuts ().. Position moldboard assembly in the Vee position.. Assemble Top Snow Deflector () positioning the deflector under deflector brace (4). Attach deflector ends under left and right wing gussets using /" x -/4" bolts (), / locknuts () and / washers (). Tighten locknuts such that washers slightly compress the rubber surface. Note: Snow Deflector Belt should fold/loop downward between brace and each wing gusset when wings are not in the Vee position. See Hydraulic Instructions (Form -) for assembly of Wing Cylinders. CAUTION: CHECK THE TRIPEDGE ADJUSTMENT AT THIS TIME. A. THE SPRINGS ARE PROPERLY ADJUSTED WHEN A PIECE OF PAPER CAN BE PLACED BETWEEN EACH COIL. B. IF THE TRIPEDGE SPRINGS NEED ADJUSTMENT, LOOSEN THE BOTTOM NUT (A) ON BOTH SPRING ASSEMBLIES. ROTATE THE TOP LOCKNUT NUT (B) UNTIL THE SPRINGS ARE PROPERLY ADJUSTED. C. BE SURE TO TIGHTEN THE BOTTOM NUT (A) SECURELY ON BOTH ASSEMBLIES TO PREVENT LOOSENING OF THE ASSEMBLIES. B A Spring Assembly Meyer Products LLC reserves the right, under its continuing product improvement program, to change construction or design details, specifications and prices without notice or without incurring any obligation. 0 Printed in the U.S.A. Meyer Products LLC Euclid Ave. Cleveland, Ohio 44-4 Phone () 4- www.meyerproducts.com email info@meyerproducts.com