Royal Hamilton Amateur Dinghy Club

Similar documents
Storm Preparedness Plan for Manchester, Massachusetts Issued by the Manchester Harbormaster Department. A.

MOORING INFORMATION FOR BOAT OWNERS AT RGYC

Harbor Hurricane Preparedness Plan*

Sidebar: Where to mount those high-watt panels

Cyclone And Severe Weather Marina Plan

EXTREME WEATHER PROCEDURE VESSEL MASTERS & OWNERS

Page 1. Single Scull Car Rack Assembly and User s Manual " "

NAUTICAL TERMINOLOGY

Roles: Presentation Questions:

WHITTEMORE IMPROVEMENT ASSOCIATION MOORING REGULATIONS

2009 Bermuda Optimist Open & National Championship

05 Boat Handling. Captain

MANAGEMENT SYSTEM MANUAL

ARM 6.4 R/V ARMSTRONG SMALL BOAT OPERATIONS

Docks and Moorings Policies & Procedures

Marine Guide for Ship Masters Contents

Request for Proposals L4865 The Pier 25 Marine Facility Concession in Hudson River Park (RFP) Questions & Answers.

Harbourage Yacht Club Policies

Mooring Solutions for Yachts

TOWN OF SOMERSET HARBORMASTER. REGULATIONS FOR MOORING, MOORING PERMITS and ANCHORING

Town of Essex Police Department Harbor Division HARBOR REGULATIONS

Emergency Action Plans for Dam Safety

Gulf Harbour Village Marina Licence of Berth Terms & Conditions

APPENDIX A OPEN WATER SWIMMING

C&C 40 Koyukuk. Price: $ 49,000. Number:

Index All you need to know

ISAF OFFSHORE SPECIAL REGULATIONS Appendix J

Mooring Systems for Yachts

Seamanship. A braided line comprises a core of braided or stranded threads covered with a sheath. The center or core of the line gives strength.

UCI NAUTICAL DEPARTMENT

Marieholm 32. Price: 9,950 inc Vat

Wysiwig - Wayfarer Rigging Guide

Serenity Houseboat. Standard Operating Procedures for:

The Basics of Victory Sailing II

ON-DECK TRIP: Charter Boat Check-Out/Check-In Form

Intermediate Cruising Standard (ASA 104)

Conduct Sailing Activities

Junior Sailing Handbook

SAFETY OF NAVIGATION STANDARDS IN THE PORTS OF NAUTICAL TOURISM WITH A SPECIAL FOCUS ON THE MAINTENANCE OF THE PORT ORDER

9. Boat Cover. Table of Contents:

SAIL WELL, STAY WELL. Sydney Flying Squadron ACN Sydney Flying Squadron. SAILING A SKIFF a guide

Control Devices and Techniques

Chapter 1 Boat systems

Miss Joy Boat Manual

This guidance is based on the Risk Assessment approved by the Management Committee under the Club s Health & Safety Policy.

Miss Joy Boat Manual

ISA Dinghy Sailing Pre Entry Assessment

COASTAL IN-BOOM FURLING SYSTEM. Installation Manual

Deckhand Crew. Deckhand Crew Responsibilities

Chelsea Yacht Club. Adult Sailing Program Course Description. Basic Keelboat

Elliott Bay Marina Rules and Regulations

Basic Cruising Standard

Royal Queensland Yacht Squadron MARINA RULES & REGULATIONS

Rudder Kit Assembly Instructions for Quest 13

F-27 RIGGING GUIDE EXTRACTED FROM ORIGINAL F-27 SAILING MANUAL

38' Bluewater Ingrid Cutter Location: Muskegon MI

MARINA BERTH RENTAL APPLICATION FORM

SAILING INSTRUCTIONS. Port of Los Angeles Harbor Cup Cal Maritime Invitational Intercollegiate Regatta March 9 th -11 th, RULES

Commonwealth of Dominica. Office of the Maritime Administrator

Product Information Report Lockout/Tagout Hazardous Energy Control

Basic Keelboat Sailing Standard (ASA 101)

On a calm day in open water check how the boat reacts at low speed. quick burst

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE

Bayliner 285 Cruiser

PORT TALBOT BULK TERMINAL MOORING OPERATIONS MANUAL

Unit 18 LEAVING THE DOCK

Malo 34. Malo Yachts / Sunbeam Yachts / C-Yacht

NEPTUNE SAILING CLUB RULES

LOA 39.8, LWL 30, Beam 10, Draft 6, Displacement 20,000 lbs Designer: Concordia Company Built 1960 by Abeking and Rasmussen.

2014 Merry Fisher 855 $189,000 NZD

Mooring, rafting, springing, locks etc, etc

STUDENT STUDY GUIDE ASA 104 INTERMEDIATE COASTAL CRUISING & BAREBOAT CHARTERING

Preparing for a Hurricane

HOW TO RIG A CORMORANT

Lockout/Tagout Training Overview. Safety Fest 2013

CHAPTER 4: INSPECTION PROCEDURES APPLICABLE TO VESSEL TYPES, CLASSES, AND CATEGORIES

APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METRE SAILING CANOE (JANUARY 2008) 1 GENERAL

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

ABP South Wales and River Usk Towage Guidelines

Rocky Captain Users Manual

Safety Management System And Marine Occupational Health and Safety Manual

TUNE YOUR SAILS SPEED. Optimist Tuning Guide. Photo Wavelength

RC Nirvana Class One-Design Racing Rule 04/01/08

BSR GPTC Z TR GM References and Reporting Page 1 of 8

EXHIBIT "A" CITY OF MORRO BAY - HARBOR DEPARTMENT RULES AND REGULATIONS FOR VESSELS USING CITY PIERS, DOCKS AND OFFSHORE MOORINGS

BOARD REPORT. TO: Chair and Directors File No:

Kayaking Bob s Tandem Island SpraySkirt Kit Installation Instructions

Installation and service should be performed by a qualified service professional.

ASA 103: Basic Coastal Cruising Curriculum

Schedule of Events for Skippers Catalina Channel Crossing

Royal Temple Yacht Club Notice of Race & Sailing Instructions 2019

RISK ASSESSMENT -HEATS-

For ELECTRIC ANCHOR WINCH Models: T Pontoon 35 T sw Salt Water Series Coastal 35

BREAKWATER MARINA Cyclone Management Plan

Swimming Pool Requirements

RULES AND PROCEDURES OF THE FARALLON PATROL V5 April 2014

4301 Whale Song Jeanneau 43

Hope Mills Lake Recreational Improvement Plan. Lake Advisory Committee

For ANCHOR WINCH Model: T Big Water 45 T sw Salt Water Series Big Water 45

ASA 103: Basic Coastal Cruising Curriculum

Transcription:

Royal Hamilton Amateur Dinghy Club Revised 1 st June, 2015 Page 1 of 8

Overview The purpose of this document is to provide guidance for Marina Management and Berth Holders in the event of a major force of nature, including Hurricanes and/or Storm Surges. The procedures laid out here form the backbone of the plan, and will not necessarily cover every aspect or possible occurrence. Rather, this is meant to provide necessary information, steps and possible remedial activities to help ensure the least amount of damage and cleanup during this kind of event Purpose This plan has been formulated to ensure proper lines of communication are established and Marina Management and Berth Holders are all working together and along the same lines as each other. Having a written document that can be hands-on is vital to proper planning. To this end we have tried to make the plan simple, step-by-step where possible, and allow for flexibility and adaptability. This plan will be in a continual state of refinement. Definitions For the purpose of this plan the following terms will be defined as; RHADC Marina The area attached to the, on the western side, made up of the system of concrete docks and the floating dock system enclosed. Marina Management The Flag Officers, Committee of Management of RHADC, Dock Committee and Dock Master Berth HOLDERS The license holder of the berth, and/or any sub-licensees or assigns. Hurricane Watch As issued by the Bermuda Weather Service, meaning the possibility of Hurricane force winds (sustained 64+ knots) within 36 hours. Hurricane Warning As issued by the Bermuda Weather Service, meaning the possibility of Hurricane force winds (sustained 64+ knots) within 24 hours. Plan Initiation The time at which the Marina Management implement this plan, and which shall drive all other timings included Page 2 of 8

Stages of the Plan Early Warning Plan Initiation Notification Boat Removal Boat Securing Preparation Readiness Cleanup Post Mortem - The point at which a Hurricane has developed and may pose a threat to Bermuda. This may be 2-3 days in advance of any official Hurricane Watch being issued. Marina Management will meet to discuss the state of readiness, review the Plan and ensure necessary steps are ready to be implemented if necessary. A Chairman will also be selected at this point to progress the Plan as necessary. - The point at which a Hurricane Watch is announced - A structured system of notice boards, telephone message system, telephone call, faxing, emailing etc. to inform the Berth Holders of the implementation of the Plan. - The first stages of the Plan, being removal of boats planning on vacating before the proper securing of those remaining may preclude this. - The proper tying of boats remaining to reduce potential damage to the Marina or other occupants - The steps not involving boats that will be necessary to secure the general area. The steps in this part will have a detrimental effect on continuing efforts by Berth Holders as power may be switched off and access to floating docks removed. - The point at which the Plan has been put into action and all parties are prepared for the Hurricane. This will be determined by the Marina Management and followed up on as necessary. - The point at which the Hurricane has safely passed and any necessary work can begin to restore the Marina back to normal. - The review of the Plan, the effectiveness of the actions and timings and the reworking of same as necessary. Page 3 of 8

Timeframe In the event of a potential threat, and this Plan being initiated, the following timeframe will be used to drive the above stages. Please note this timeframe is for use of the Marina Management, although it will allow Berth Holders to be familiar with the steps, timings and progression to help boost the overall effectiveness of the Plan. Time Time 0000 2 days Time 0000 Time 0000 + 12 hours Time 0000 + 24 hours Time 0000 + 30 hours Time 0000 + 36 hours Stage Early Warning Hurricane Watch Issued Notification begins Boat Removal begins Hurricane Warning issued Boat Securing begins Final preparation Readiness is determined Hurricane Strikes Page 4 of 8

Requirements for boats leaving Berth Holders who have indicated they plan to remove their boats from the Marina and all boats on the West side of the outside camber need to ensure this is done at the earliest opportunity after the issuance of a Hurricane Watch. As the plan is built relevant to the information on owner s preferences, any boats that remain, or are delayed in moving, that should be leaving can cause possible problems. Marina Management may order a full evacuation of the marina. Please ensure that your storm mooring has been checked and is ready to accept your boat. Leaving this activity to the last minute will be problematic. Essentially, we will be moving boats around in the Marina, utilising vacated spots where possible to better secure remaining boats for the better protection of the Marina facilities and equipment. This activity will begin 12 hours after issuance of a Hurricane Watch, and may mean that your boat will not be able to be removed easily and safely if not moved promptly. It would also be a wise idea to remove any personal items from the docks before you go. Things like personal water hoses, power cords, etc. should either be taken or stored in your dockbox if applicable. If you wish to remove your dockbox as well, you will need appropriate tools. Berth Holders must ensure their contact information and that of their backups is up to date. The Club Secretary maintains this information. Berth Holders are strongly encourage to inform their appointed backups of any travel plans you may have during Hurricane season. Having you and them away or unavailable at the same time during a storm could cause problems. If this is to be the case, please arrange for another backup and inform the Dock Master on 505 8372 or email at dockmaster@rhadc.bm. Messages left on the Club s main voice message box may not necessarily be received and/or actioned. Please remember that during a Hurricane situation, marine services and personnel will be extremely busy catering to their many customer s needs. You may wish to review your proposed backups and adjust as necessary. Good planning and early preparation will be your best allies. Page 5 of 8

Requirements for Boats remaining in the Marina It is essential that all boats remaining in the Marina be properly prepared and secured well in advance of the storm s arrival. A list of essential and required items that should be readily available, either onboard or in your dockbox include, but are not limited to; Removing any bimini tops, covers dodgers, etc., or properly securing/stow them such that windage is minimal. Remove and stow all sails, including roller-furled sails. Ensure any covers (such as console or cockpit) are tight fitting, do not add to windage and are adequately fastened. Trim down outboard engines. Shut down any power systems and unplug and store power cords. Store any loose items in the boat. Remove any on-deck anchors and store in boat. If possible, raise or remove swim platform. Secure all ladders in the stowed position. IMPORTANT: The Marina Management Team may choose to move boats around in the Marina to allow for better securing and to reduce the risk of damage to boats and/or docks. Please do not arbitrarily move your boat to another berth without first checking with Marina Management. We will have a list of boats that will be leaving in the event of a storm, and will have a planned approach to relocations, so it is imperative that you check with Management. Page 6 of 8

Notification One of the key items of the Plan is the notification methods and communication lines. The sooner everyone is aware of the potential strike of a Hurricane and begins their action plans, the better. Once a Hurricane Watch has been issued, the following will happen; Notification will be placed in and around the Club (posters) A message will be placed on the Club s messaging system. To access use the following procedure; Dial the main number 236-2250. Choose option for Storm Warnings. A message will play containing necessary information and actions. A email notice will be sent out to all Berth Holders who have indicated they have an address. If not email address is on file, contact will be made by telephone It is important that you acknowledge our message. We therefore ask you to respond to emails or an answering machine notice by return email or a message left at the Club Office. Essentially every effort will be made to contact and advise Berth Holders of a potential threat. This does not relieve Berth Holders of the responsibility of ensuring they remain aware of Hurricane Watch announcements, and begin preparations immediately. Page 7 of 8

Proper Securing Boats tied properly have a much reduced chance of being damaged or causing damage. ALL BOATS ARE TO BE SECURED WITH BOWS FACING WEST. For most boats in the finger piers the proper method is to tie your boat in the normal manner, utilising bow, stern and fore and aft spring lines. This should be standard practice regardless of weather conditions. In addition to this you should beef up your tie-ups by using heavier lines and also add breast lines if there is no other boat alongside of you. The diagram shows this method. Specifically you should: Follow published Berthing Guidelines Use heavy tie-up lines (minimum 7 for small boats). Use extra fenders against the finger pier (whether you have permanently installed fenders or not) at least 3 fenders of 6 minimum diameter should be attached on both sides of the boat. Tie your boat so its bumpers are against the finger pier. Spread the load on the cleats adequately. Make sure you leave several feet clearance between your boat and the main walkway. Remember, lines do stretch. Preparation The following are some of the steps, not involving boats, that will be necessary to secure the Marina and the general area. 1. All dockboxes shall be fastened to the ground and closed securely. 2. All boats and equipment must be secured to the ground. 3. All ramps and angled walkways shall be removed and secured to solid ground. 4. Follow all Technomarine checks and inspections. 5. Turn off power to the Marina. 6. Turn off water to the Marina. 7. Ensure that all boats have been removed from the left the West side of the breakwater. Page 8 of 8