Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Similar documents
Totals: #Error #Error #Error #Error. Improvement Type: Resurfacing From: Muckleshoot Plaza SE. Regionally Significant: No

Annual Listing of Obligated MPO Projects

Pedestrian and Bicycle Safety Program Leg Agency Title of Project Project Description Dist

Appendix A. Detailed Project Listings. as of October 28, 2016

Citywide Sidewalk and Crosswalk Programs

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

PEDESTRIAN CROSSING TREATMENTS

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

PRESS RELEASE San Joaquin Council of Governments

C C C

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

Roosevelt Estates Neighborhood Improvements

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

INDEX. Geometric Design Guide for Canadian Roads INDEX

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

F L E T C H E R A V E N U E

CMAQ $ 23,775,198 STP

SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

PROJECT KEY TYPICAL SECTION 1 =60

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

Transportation 2040 Update - Financial Strategy Balancing

Draft North Industrial Area-Wide Traffic Plan

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

CITY OF LANCASTER PROPOSED NEW PROJECTS

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

5 CIRCULATION AND STREET DESIGN

City of Redmond Transportation Improvement Program Adopted: September 16, 2014 Table of Contents

The DC Pedestrian Master Plan

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

NJDOT Complete Streets Checklist

Local Communities. Where We re Growing: Planning Together for a Sustainable Region

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

122 Avenue: 107 Street to Fort Road

Tacoma Streets Initiative 2017 Progress Report City of Tacoma Public Works Transportation Commission February 21, 2017

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

City of Seattle Edward B. Murray, Mayor

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

APPENDIX L. Design Criteria

RZC Appendix 8A Marymoor Subarea Street Requirements

Lynchburg District Update

FDOT Treasure Coast Traffic Report

Transportation Planning Division

Roadway Project Recommendations:

Fleur Drive Reconstruction

Hennepin County Transportation Department

CITY OF SPOKANE VALLEY Request for Council Action

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Chapter 4: Funding and Implementation

DISTRICT BICYCLE PROGRAM

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

Active Transportation Facility Glossary

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Broad Street Bicycle Boulevard Design Guidelines

Project Team. Refined Pedestrian Crossing Toolbox. Problem Statement. Aerial of Study Corridor. Crossing Accommodations and Pedestrian Fatalities

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

42nd Ave N Reconstruction

5. RUNNINGWAY GUIDELINES

Southcote Road Improvements Class Environmental Assessment Study

2010 Regional Bicycle and Pedestrian Count Report

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

TECHNICAL MEMORANDUM. Introduction

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

CURRENT AND VOTER APPROVED SOUND TRANSIT SERVICE

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Building Great Neighbourhoods BONNIE DOON

Omaha s Complete Streets Policy

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS

What Is a Complete Street?

SBCAG STAFF REPORT Federal Transportation Improvement Program. MEETING DATE: January 19, 2017 AGENDA ITEM: 5E

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Orange Center Elementary School

Interim Transit Ridership Forecast Results Technical Memorandum

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Lake to Sound Trail FEASIBILITY STUDY. February 2009

BPP / SUB

Complete Streets Funding Program Project Prioritization Plan

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

INDOT Complete Streets Guideline & Policy

Downey Road. Transportation Improvement Study

Transcription:

Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects: Approved 9/12/2017 Jurisdiction: King County Department of Transportation (Transit) Project Number: MET-215 Title: Atlantic Base Maintenance Building HVAC Replacement Equipment 2018 9/30/2018 Local $0 $0 $720,376 $720,376 Equipment 2018 9/30/2018 5337 HIFG $2,881,504 $0 $0 $2,881,504 Equipment 2019 9/30/2019 Local $0 $0 $1,754,061 $1,754,061 Equipment 2019 9/30/2019 5337 HIFG $7,016,242 $0 $0 $7,016,242 WSDOT PIN: Totals: $9,897,746 $0 $2,474,437 $12,372,183 Functional Class: Not applicable (transit, enhancements, Etc.) Location: Atlantic Base 1500 6th Ave S, Seattle, WA 98134 Operations -- Transit From: To: Total Cost: $12,372,183 Environmental Status: CE Replace HVAC system at KC Metro's Atlantic Base as it has reached the end of its useful life. Atlantic Base supports Metro's trolley bus system operations. A new HVAC system will provide opportunities to use new mechanical/electrical technologies, be more energy efficient and reduce operating costs. A - 1

County: King List of 17-08 Amendment Projects: Approved 9/12/2017 Jurisdiction: North Bend Project Number: NB-6 Title: E North Bend Way/Downing Ave/E Park St Roundabout Construction 2019 6/1/2019 STP(US) $1,000,000 $0 $0 $1,000,000 Construction 2019 6/1/2019 Local $0 $0 $1,000,000 $1,000,000 WSDOT PIN: STPUS-17A1(002) Totals: $1,000,000 $0 $1,000,000 $2,000,000 Functional Class: Rural Minor Arterial Location: Intersection of North Bend Way and Park Street Single Intersection -- Roadway From: North Bend Way and Park Street To: North Bend Way and Park Street Total Cost: $2,270,000 Environmental Status: DNS This project will provide a single-lane roundabout at the intersection of E. North Bend Way and E. Park St. The roundabout will feature a landscaped center island, planted/hardscaped splitter islands, a new illumination system, and stormwater improvements. The project will also provide a shared use sidewalk and trail connections for pedestrians and bikes, ADA compliant access, and minor parking and driveway reconfigurations. Additional work includes irrigation of planted areas, planting of street trees, permanent signing, and potentially undergrounding of existing overhead utilities. A - 2

County: Kitsap List of 17-08 Amendment Projects: Approved 9/12/2017 Jurisdiction: Bremerton Project Number: BRE-22 Title: Kitsap Lake Elementary SRTS P/E-Design 2018 2/1/2018 Safe Routes To Schools $392,140 $0 $0 $392,140 ROW 2018 2/1/2018 Safe Routes To Schools $10,000 $0 $0 $10,000 ROW 2018 2/1/2018 Local $0 $0 $10,000 $10,000 Construction 2018 12/31/2018 Safe Routes To Schools $1,352,208 $0 $0 $1,352,208 WSDOT PIN: Totals: $1,754,348 $0 $10,000 $1,764,348 Functional Class: Rural Major Collector Location: Harlow Drive Sidewalk From: Osprey Circle To: Kitsap Way Total Cost: $1,764,348 Environmental Status: CE Project includes sidewalk, curb, gutter, curb ramps, crosswalk markings, street lights, RRFBs, signing, and stormwater conveyance. A - 3

County: Kitsap List of 17-08 Amendment Projects: Approved 9/12/2017 Jurisdiction: Kitsap County Project Number: KTCO-38 Title: Washington Boulevard Corridor Improvement Project Construction 2019 6/1/2019 STP(US) $450,000 $0 $0 $450,000 Construction 2019 6/1/2019 Local $0 $0 $915,000 $915,000 WSDOT PIN: Totals: $450,000 $0 $915,000 $1,365,000 Functional Class: Rural Local Access Location: Washington Boulevard NA Sidewalk From: Central Ave NE To: NE 3rd Street Total Cost: $2,220,000 Environmental Status: CE Construction of pedestrian facilities on Washington Blvd from NE 3rd Street to Central Avenue NE and construction of bicycle facilities on Washington Blvd from NE 3rd Street to SR 104 outbound (aka NE First St) and from SR 104 inbound to Central Avenue NE. The project includes ADA ramps on SR 104 as needed, luminaires as required, pedestrian lighting, sidewalks and stormwater facilities. This project will complement the proposed Port of Kingston Park located adjacent to the ferry terminal car holding lanes. It is anticipated that a portion of the sidewalk will be constructed on the park property. A - 4

County: Pierce List of 17-08 Amendment Projects: Approved 9/12/2017 Jurisdiction: Tacoma Project Number: TAC-110 Title: First Creek Middle School Safe Routes to School P/E-Design 2017 11/1/2017 Safe Routes To Schools $22,000 $0 $0 $22,000 P/E-Design 2017 11/1/2017 Local $0 $0 $15,000 $15,000 Construction 2019 2/1/2019 Safe Routes To Schools $296,885 $0 $0 $296,885 Construction 2019 2/1/2019 Local $0 $0 $50,000 $50,000 WSDOT PIN: Totals: $318,885 $0 $65,000 $383,885 Functional Class: Not applicable (transit, enhancements, Etc.) Location: Portland Ave. Other -- nonmotorized From: East 52nd Street To: East 52nd Street Total Cost: $383,885 Environmental Status: CE The project includes high-intensity activated crosswalk beacons signal, flashing beacons, sidewalk, crosswalk, and signs. A - 5

County: Pierce List of 17-08 Amendment Projects: Approved 9/12/2017 Project Number: TAC-111 Title: Lister Elementary School Safe Routes to School P/E-Design 2017 11/1/2017 Safe Routes To Schools $41,500 $0 $0 $41,500 P/E-Design 2017 11/1/2017 Local $0 $0 $26,000 $26,000 Construction 2018 10/31/2018 Safe Routes To Schools $389,711 $0 $0 $389,711 Construction 2018 10/31/2018 Local $0 $0 $49,000 $49,000 Equipment 2017 11/1/2017 Safe Routes To Schools $18,904 $0 $0 $18,904 Equipment 2017 11/1/2017 Local $0 $0 $10,000 $10,000 WSDOT PIN: Totals: $450,115 $0 $85,000 $535,115 Functional Class: Not applicable (transit, enhancements, Etc.) Location: East 44th Street Other -- nonmotorized From: E T Street To: E 44th Street Total Cost: $535,115 Environmental Status: CE The project includes sidewalk, curb, gutter, crosswalk, Americans with Disabilities Act curb ramps, flashing beacons, curb extensions, safety education, and encouragement. A - 6

County: Snohomish List of 17-08 Amendment Projects: Approved 9/12/2017 Jurisdiction: Bothell Project Number: BOTH-49 Title: 19th Ave SE/232nd St SE / 23rd Ave SE Non-motorized Improvements P/E-Design 2017 5/30/2017 Local $0 $0 $114,400 $114,400 P/E-Design 2017 10/30/2017 Safe Routes To Schools $96,600 $0 $0 $96,600 Construction 2018 7/16/2018 Safe Routes To Schools $652,200 $0 $0 $652,200 Construction 2018 7/16/2018 Local $0 $0 $534,800 $534,800 WSDOT PIN: Totals: $748,800 $0 $649,200 $1,398,000 Functional Class: Proposed Collector Location: 19th Ave SE / 232nd St SE / 23rd Ave SE Sidewalk From: 228th St SE / 19th Ave SE To: 23rd Ave SE / 236th St SE Total Cost: $1,398,000 Environmental Status: CE The project includes sidewalk, bike lanes, curb, gutter, storm water drainage, ADA curb ramps, crosswalks, rectangular rapid flashing beacons and crosswalk flags. A - 7

County: Snohomish List of 17-08 Amendment Projects: Approved 9/12/2017 Project Number: BOTH-50 Title: 7th Ave SE/88th Ave NE Non-Motorized Improvements P/E-Design 2017 10/30/2017 State $0 $79,200 $0 $79,200 P/E-Design 2017 10/30/2017 Local $0 $0 $52,800 $52,800 Construction 2019 1/15/2019 State $0 $531,000 $0 $531,000 Construction 2019 1/15/2019 Local $0 $0 $354,000 $354,000 WSDOT PIN: Totals: $0 $610,200 $406,800 $1,017,000 Functional Class: Proposed Collector Location: 7th Ave SE/ 88th Ave NE Sidewalk From: 240th St SE/7th Ave SE To: 88the Ave NE/NE 195th St Total Cost: $1,017,000 Environmental Status: CE The project includes sidewalk, bike lane, curb, gutter, storm water drainage, ADA curb ramps, crosswalk, crosswalk flags, rectangular rapid flashing beacons, and signs. A - 8

County: Snohomish List of 17-08 Amendment Projects: Approved 9/12/2017 Project Number: BOTH-51 Title: 188th St Non-motorized Improvements P/E-Design 2017 10/30/2017 Local $0 $0 $60,000 $60,000 P/E-Design 2017 10/30/2017 HSIP(SRTS) $90,000 $0 $0 $90,000 Construction 2019 1/15/2019 Local $0 $0 $388,400 $388,400 Construction 2019 1/15/2019 HSIP(SRTS) $582,600 $0 $0 $582,600 WSDOT PIN: Totals: $672,600 $0 $448,400 $1,121,000 Functional Class: Not applicable (transit, enhancements, Etc.) Location: NE 188th St Sidewalk From: NE 188th St/Bothell Everett Hw To: NE 188th St/92nd Ave NE Total Cost: $1,121,000 Environmental Status: CE This project includes sidewalk, bike lanes, planter strip, curb, gutter, storm water drainage, retaining wall, pedestrian railings, ADA curb ramps, crosswalks, and speed feedback signs. A - 9

County: WSDOT List of 17-08 Amendment Projects: Approved 9/12/2017 Jurisdiction: WSDOT Northwest Region Project Number: WDNW-1113 Title: I-90/Lacey V Murrow Bridge - Replace Anchor Cables Construction 2017 7/10/2017 Local $0 $0 $99,666 $99,666 Construction 2017 8/14/2017 NHPP $4,883,629 $0 $0 $4,883,629 WSDOT PIN: 109024M Totals: $4,883,629 $0 $99,666 $4,983,295 Functional Class: Urban Interstate Location: Lake Washington Bridge Rehabilitation From: MP 4.49 To: MP 5.79 Total Cost: $5,187,614 Replace anchor cables on the Lacey V Murrow floating bridge. Environmental Status: DCE Project Number: WDNW-1115 Title: I-90/Homer M Hadley Bridge - Replace Anchor Cables Construction 2017 7/10/2017 Local $0 $0 $53,511 $53,511 Construction 2017 8/14/2017 NHPP $2,622,055 $0 $0 $2,622,055 WSDOT PIN: 109024N Totals: $2,622,055 $0 $53,511 $2,675,566 Functional Class: Urban Interstate Location: Lake Washington Bridge Rehabilitation From: MP 4.53 To: MP 5.60 Total Cost: $2,760,116 Replace anchor cables on the Homer M Hadley floating bridge. Environmental Status: DCE A - 10

County: WSDOT List of 17-08 Amendment Projects: Approved 9/12/2017 Project Number: WDNW-1134 Title: US 2/Bickford Ave SE to Fryelands Blvd SE Vicinity - Corridor Improvements P/E-Design 2017 7/10/2017 State $0 $1,003,472 $0 $1,003,472 P/E-Design 2017 7/10/2017 HSIP $83,328 $0 $0 $83,328 Construction 2019 1/14/2019 State $0 $1,169,235 $0 $1,169,235 Construction 2019 1/14/2019 HSIP $8,292,525 $0 $0 $8,292,525 WSDOT PIN: 100210J 1 Totals: $8,375,853 $2,172,707 $0 $10,548,560 Functional Class: Urban Principal Arterial Location: West of Monroe Safety -- Roadway From: MP 3.80 To: MP 12.85 Total Cost: $10,548,560 Environmental Status: CE This project will reduce the risk of collisions by constructing a 6 foot median from the vicinity of Bickford Ave SE to Roosevelt Rd with median concrete barrier between the vicinity of Bickford Ave SE to 109th Ave SE. The scoping cost estimate was based on the construction of 6 foot median with rumble strips and median concrete barrier as outlined above. The selection of a Preferred Alternative and final estimate will be determined during the design phase using Practical Design methodology. A - 11

County: WSDOT List of 17-08 Amendment Projects: Approved 9/12/2017 Project Number: WDNW-1136 Title: SR 529/SB Union Slough Bridge - Rehabilitation P/E-Design 2017 7/10/2017 State $0 $44,212 $0 $44,212 P/E-Design 2017 7/10/2017 NHPP $1,061,098 $0 $0 $1,061,098 ROW 2017 12/20/2017 State $0 $430 $0 $430 ROW 2017 12/20/2017 NHPP $21,090 $0 $0 $21,090 Construction 2018 11/13/2018 State $0 $157,967 $0 $157,967 Construction 2018 11/13/2018 NHPP $7,740,393 $0 $0 $7,740,393 WSDOT PIN: 152906E Totals: $8,822,581 $202,609 $0 $9,025,190 Functional Class: Urban Principal Arterial Location: Everett Bridge Rehabilitation From: MP 4.93 To: MP 5.44 Total Cost: $9,025,190 Environmental Status: CE The project will repair the deteriorated concrete columns of bridge no. 529/15W on SR 529; the repair work will be applied to the columns and crossbeam bolsters of piers 2 through 12. The scour repair will be applied over and around piers 4,5,8,9 and 11 by placing heavy loose riprap with quarry spalls. A - 12

County: WSDOT List of 17-08 Amendment Projects: Approved 9/12/2017 Project Number: WDNW-1152 Title: I5/NB Holgate St Vicinity to SB Boren Ave Vicinity - Sign Structure Replacements P/E-Design 2017 10/9/2017 State $0 $4,448 $0 $4,448 P/E-Design 2017 10/9/2017 NHPP $106,753 $0 $0 $106,753 Construction 2018 6/4/2018 State $0 $18,008 $0 $18,008 Construction 2018 6/4/2018 NHPP $882,388 $0 $0 $882,388 WSDOT PIN: 100506E Totals: $989,141 $22,456 $0 $1,011,597 Functional Class: Urban Interstate Location: Downtown Seattle Bridge Rehabilitation From: MP 163.98 To: MP 166.10 Total Cost: $1,011,597 Environmental Status: CE The sign bridges on I-5 NB near Holgate St and on I-5 SB near Boren Ave are structurally deficient and will be replaced. A - 13

County: WSDOT List of 17-08 Amendment Projects: Approved 9/12/2017 Project Number: WDNW-1154 Title: SR 518/Des Moines Way S to Airport Expressway Bridges - Deck Overlay P/E-Design 2017 11/6/2017 State $0 $6,050 $0 $6,050 P/E-Design 2017 11/6/2017 NHPP $145,206 $0 $0 $145,206 Construction 2018 11/5/2018 State $0 $31,190 $0 $31,190 Construction 2018 11/5/2018 NHPP $1,472,396 $0 $0 $1,472,396 WSDOT PIN: 151801F Totals: $1,617,602 $37,240 $0 $1,654,842 Functional Class: Urban Principal Arterial Location: SeaTac & Burien Bridge Rehabilitation From: MP 0.58 To: MP 2.33 Total Cost: $1,654,842 Environmental Status: CE The asphalt bridge decks of Bridges 518/10, 518/14, and 518/14N-W are deteriorating and in need of repaving. Grinding and inlaying the bridge decks will preserve the pavement structure over these bridges. A - 14

County: WSDOT List of 17-08 Amendment Projects: Approved 9/12/2017 Project Number: WDNW-1155 Title: US 2/Fryelands Blvd SE Vicinity to Cascade View Dr Vicinity - ADA Compliance P/E-Design 2017 9/15/2017 State $0 $3,226 $0 $3,226 P/E-Design 2017 9/15/2017 NHPP $77,433 $0 $0 $77,433 Construction 2019 1/14/2019 State $0 $9,368 $0 $9,368 Construction 2019 1/14/2019 NHPP $459,034 $0 $0 $459,034 WSDOT PIN: 100214C Totals: $536,467 $12,594 $0 $549,061 Functional Class: Urban Principal Arterial Location: Monroe Safety -- Roadway From: MP 12.95 To: MP 13.92 Total Cost: $549,061 This project will evaluate and replace pedestrian ramps within the project limits for compliance with ADA guidelines. Environmental Status: CE A - 15

County: WSDOT List of 17-08 Amendment Projects: Approved 9/12/2017 Jurisdiction: WSDOT Olympic Region Project Number: WDO-454 Title: 17-19 OR Region Wide Basic Safety - Signing P/E-Design 2018 1/11/2018 State $0 $2,800 $0 $2,800 P/E-Design 2018 1/11/2018 HSIP $67,200 $0 $0 $67,200 Construction 2018 7/16/2018 State $0 $5,177 $0 $5,177 Construction 2018 7/16/2018 HSIP $253,675 $0 $0 $253,675 WSDOT PIN: 300017S Totals: $320,875 $7,977 $0 $328,852 Functional Class: Not applicable (transit, enhancements, Etc.) Location: Regionwide NA Safety -- Roadway From: various To: various Total Cost: $328,852 Environmental Status: CE To address region wide work and/or non-operational signing which may also include sign posts. This will assist the traveling public with sign visibility. Replace signing. A - 16