Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Similar documents
Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Chapter 3 DESIGN SPECIFICATIONS

Active Transportation Facility Glossary

2.0 LANE WIDTHS GUIDELINE

Appendix A Guiding Principles for Cycling Safety in Work Zones

Zlatko Krstulich, P.Eng. City of O9awa

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Public Information Centre

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Bicycling Routes on Provincial Roads Policy

Bicycle Facilities Planning

Appendix 3 Roadway and Bike/Ped Design Standards

Downey Road. Transportation Improvement Study

LANCASTER CITY BICYCLE NETWORK

WELCOME Public Information Centre

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Toronto Complete Streets Guidelines

Appendix O. Assessment of Bicycle Facility Alternatives

Copenhagen Cycling Map. Red Lines Cycling facilities

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Pennsylvania Avenue (CR 484) Design Alternatives Study

Non-Motorized Transportation 7-1

We support the following: Tom Davies Square 200 Brady Street Sudbury, Ontario

ECONOMY PEOPLE ENVIRONMENT

Public Works and Infrastructure Committee. General Manager, Transportation Services

10.0 CURB EXTENSIONS GUIDELINE

MASTER BICYCLE AND PEDESTRIAN PLAN

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

NJDOT Complete Streets Checklist

Dowling/Beaty Cycling Route

Classification Criteria

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

River Road - Proposed Road Safety Enhancement Measures

Traffic Calming Policy

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

G AT E WAY PLAN. Community BRIEFING KIT GATEWAY BIKE

5. RUNNINGWAY GUIDELINES

Welcome. If you have any questions or comments on the project, please contact:

City of Saline. Complete Streets Ordinance

Cycling Facilities on Woodbine Avenue and Corley Avenue

Construction Specifications Manual

INDOT Complete Streets Guideline & Policy

The study area for this project is the entire County of Oxford including both the urban centres and rural areas.

Shifting Gears for a Healthier City.

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

Traffic Safety Plan Second Avenue

Implementing Active Transportation (AT) Facilities in Small Communities

Small Town & Rural Multimodal Networks

Duwamish Way-finding and CTR Report

Peterborough Council on Aging

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Planning Guidance in the 2012 AASHTO Bike Guide

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

ACTIVE TRANSPORTATION SUMMIT. Active Transportation in Small Urban and Rural Communities Bicycles

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Lake to Lake LAKE YORK. CYCLING ROUTE and WALKING TRAIL FEASIBILITY and DESIGN STUDY LAKE. CITY of REGION ONTARIO SIMCOE TORONTO

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Safe Routes to School Action Plan Aberdeen, Idaho

ACTIVE TRANSPORTATION

THE CORPORATION OF THE CITY OF BELLEVILLE BY-LAW NUMBER

Chapter 5 Future Transportation

Pedestrian Crossing Guidelines 2016

Color your stress away

Tonight is for you. Learn everything you can. Share all your ideas.

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Sharrows and Elephants and Bike Boxes!, s, Oh My!

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Cycling Network Plan Implementation in Thorncliffe Park and Flemingdon Park

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Devonport City Cycling Network Strategy

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

122 Avenue: 107 Street to Fort Road

Southcote Road Improvements Class Environmental Assessment Study

Environment and Public Works Committee Presentation

Prince George s County plans, policies, and projects

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Purpose. Process. Recommendations

42nd Ave N Reconstruction

Welcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study.

Edenbrook Hill Drive Traffic Calming Study

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Major Bike Routes 102 Avenue Workshop April 21, 2015

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

Tunnel Reconstruction South 5 th Street Association October 16, 2018

South Carolina Department of Transportation. Engineering Directive

Stakeholder Consultation Survey Proposed Cycle Options on Napa Valley Avenue

Document 2 - City of Ottawa Pedestrian Crossover (PXO) Program

City Snapshot September 27, 2018

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Terwillegar Drive Expressway Draft Concept Plan

Transcription:

WELCOME Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 Purpose of the Open House The purpose of this Open House is to gain public input on the bicycle lanes proposed for Bridge Street East in the City of Belleville. Please feel free to view the presentation material. Should you have any questions, please speak to any of the City staff in attendance.

TRANSPORTATION MASTER PLAN Transportation Master Plan - 2014 The City of Belleville Transportation Master Plan was endorsed by Council in 2014. This new Transportation Master Plan reflects the changes to population and employment trends, as well as attitudes towards forms of active transportation such as walking, cycling and transit. This Plan will guide the development of the City s transportation network over the next 20 years. Public Consultation Transportation Master Plan The preparation of the Transportation Master Plan followed a Municipal Class Environmental Assessment process which is an approved process under the Environmental Assessment Act. Public consultation was a key component of the study. A need to develop cycling infrastructure was identified. A cycling network was developed through a consultative process including three Open Houses and a Stakeholder Steering Committee comprised of members of the public. Cycling Network A Recommended Cycling Network is included in the Transportation Master Plan. The Network is to be phased in over the next 20 plus years.

RECOMMENDED CYCLING NETWORK PHASING

CYCLING NETWORK TO DATE 2014 Bridge Street East Public Open House In 2014, a public meeting was held regarding proposed bicycle lanes on Bridge Street East. From public feedback received at the Bridge Street East meeting, the overall Cycling Network was news to a lot of participants. Concerns were expressed by attendees and the project did not proceed at that time. 2015 - Public Consultation - Cycling Network Implementation Plan In 2015, Council approved a Cycling Network Implementation Plan project to seek public input on what cycling projects are short-term priorities. City staff used this input to develop a three year Implementation Plan. Cycling facilities on Bridge Street East were identified as a priority by respondents. Council approved $250,000 toward Cycling Implementation Plan projects in 2016. Council approved another $250,000 towards cycling infrastructure in 2017.

CYCLING NETWORK TO DATE 2016 Cycling Projects The 2016 projects under the Cycling Network Implementation Plan were: North-South Corridor, West End included paving an existing path north of Tracey Street, improvements to the Frank Street underpass, and a designated cycling route on portions of Tracey, Frank, and Elmer Streets. Central North-South Corridor, West of the Moira River included bicycle lanes on North Park Street, and a designated cycling route on College, Geddes, Strachan and St. Charles Streets. In addition, the following cycling improvements were completed under other capital projects in 2016: Yeomans Street Bike Lanes Dundas Street West Active Transportation Path Asphalt paving of West Riverside Park Trail, College Street to Bell Boulevard 2017 Cycling Projects The 2017 projects under the Cycling Network Implementation Plan are: Central North-South Corridor East of the Moira River Designated Cycling Route on Centre Street, College Street East, Cannifton Road (including upgrades at rail underpass), Reid Street, Station Street, Albion Street, Pine Street, and Foster Avenue. East-West Corridor - Bridge Street East Bike Lanes, Church Street to Haig Road In addition, the following cycling improvements are planned under other capital projects in 2017: Bridge Street West Active Transportation Path, Yeomans Street to Centennial Park Northeast Industrial Park Paved Shoulders, Bike Lanes and Active Transportation Path Station Street and Haig Road Extension Bike Lanes

CYCLING NETWORK IMPLEMENTATION PLAN: 2017 PROJECTS

CYCLING FACILITIES What are Cycling Facilities? Belleville s Cycling Network will be made up of various types of off-road and on-road bicycle facilities. Off-Road facilities are similar to Belleville s existing trails through parks and open spaces. The type of On-Road facility will be site specific and will be selected following the guidelines provided in the Ministry of Transportation s Ontario Traffic Manual Book 18 Cycling Facilities. Belleville s Cycling Network may include: Off-Road Trail Active transportation path through open or park space, not within road right-of-way In-Boulevard Active Transportation Path Path located within the road right-of-way which may be shared with pedestrians Completely separated from the road by a grass or paved boulevard Bicycle Lane Painted lane providing dedicated space soley for cyclist use, typically adjacent to the curb Shared Lane "Sharrows" direct cyclists where to travel within a lane and remind motorists to share the road

CYCLING FACILITIES BICYCLE LANE The Ministry of Transportation has published Ontario Traffic Manual Book 18 Cycling Facilities to provide guidance to municipalities on the planning, design and operation of cycling facilities. What is a bicycle lane? A conventional bicycle lane is a portion of a roadway which has been designated by pavement markings and signage for the preferential or exclusive use of cyclists. Bike lanes separate the bicycle right-of-way from the motor vehicle traffic. What do bike lanes look like? Cyclists are separated from motorists by a solid white line. Bike lanes are installed adjacent to the curb. Bicycle lanes are marked with an image of a bicycle and a white diamond stenciled on the pavement. Bicycles travel in the same direction as traffic. In the City of Belleville, bike lanes are currently on Yeomans Street and North Park Street.

PROPOSED BRIDGE STREET EAST BIKE LANES Bridge Street East: Bicycle Lanes Following the bicycle facility selection process guidelines provided in the Ontario Traffic Manual (OTM) Book 18, bicycle lanes are confirmed as an appropriate solution for cycling facilities on Bridge Street East. As bicycle lanes are the most appropriate cycling facility, a re-assignment of the existing road width is required to accommodate bike lanes. Removal of on-street parking is required for the implementation of the Bridge Street East bicycle lanes. Current and Proposed Parking Restrictions Plans have been prepared showing current and proposed parking restrictions on Bridge Street East and side streets for your review. Furthermore, current restrictions under the current City of Belleville Traffic By- Law not shown on the plans include: No overnight parking between 1:00 a.m. and 6:00 a.m. No parking for a greater period of time than twelve (12) consecutive hours. Bridge Street East Bicycle Lanes The bicycle lanes proposed for Bridge Street East would start at Church Street and continue to Haig Road on both sides of the street. The bicycle lanes proposed for Bridge Street East would include standard pavement markings and signage: Solid White Line Pavement Markings Bicycle Symbol Pavement Markings Diamond Symbol Pavement Markings Reserved Bicycle Lane Signs

PROPOSED BRIDGE STREET EAST BIKE LANES Frequently Asked Questions Is Bridge Street East wide enough for bike lanes? The proposed widths for bike and motor vehicle lanes on Bridge Street East are consistent with design guidelines. The lane widths proposed for Bridge Street East are the same as those on Yeomans Street and North Park Street. Removal of on-street parking between Church Street and Haig Road is required for the implementation of the Bridge Street East bike lanes. What about the traffic speed and volume on Bridge Street East? Speed - A speed survey was conducted on Bridge Street East. Motor vehicle operating speed on Bridge Street East was measured at 54 km/h and is considered Moderate following OTM Book 18 Cycling Facilities guidelines. Volume Projected traffic volumes for a twenty year planning horizon are in the range of 7000 9500 vehicles per day. Traffic speed and volume have been considered in confirming that bicycle lanes are an appropriate solution for cycling facilities on Bridge Street East.

PROPOSED BRIDGE STREET EAST BIKE LANES I am concerned about heavy truck traffic on Bridge Street East. Under the current City of Belleville Traffic By-Law, heavy trucks are prohibited on Bridge Street East. Do children have to use the bike lane? No. Under the current City of Belleville Traffic By-Law, children under the age of 12 are permitted to cycle on the sidewalk. Bridge Street East is a bus route. What happens to bicycle lanes at bus stops? At bus stops, the bicycle lane is dashed to indicate that the bus can pull across the bicycle lane, and to notify the cyclist that buses will be pulling over. Under the Highway Traffic Act (HTA) of Ontario, the definition of a vehicle includes a bicycle; therefore the driver of a bicycle must obey all traffic laws and has the same responsibilities and rights as a motorist. Cyclists are encouraged to familiarize themselves with sections of the HTA as they pertain to cycling on roadways. Wouldn t Victoria Avenue be a better candidate for bicycle lanes than Bridge Street East? The overall Belleville Cycling Network was developed with the Transportation Master Plan through consultation with Technical and Stakeholder Steering Committees and the public. Further information on the network development process can be found in the Transportation Master Plan. While Victoria Avenue was considered in the development of the Cycling Network, the Committee and public consultation recommended Bridge Street East as the preferred route in the planned Network.

PROPOSED BRIDGE STREET EAST BIKE LANES Doesn t the Bayshore Trail already provide the same route and purpose as the proposed Bridge Street East Bike Lanes? Bridge Street serves as a key east-west route on the cycling network for utilitarian / commuter cyclists across the City s entire urban area. The Bridge Street East portion of this route provides access to employers, businesses, and retailers on Dundas Street East through multiple local side streets (until such time that cycling facilities are provided on Dundas Street East). The Bayshore Trail is available for recreational cyclists. The Trail does not provide frequent access to Dundas Street East destinations. What s happening with the Bridge Street West cycling facilities? The Bridge Street West Cycling Facilities project has been divided into phases. The first phase from Yeomans Street to Centennial Park is planned to be implemented this year. Alignment options will be presented for public comment at an upcoming Public Open House for future phases including Centennial Park to Avonlough Road (Loyalist College) and Yeomans Street to Downtown Belleville.

PROPOSED BRIDGE STREET EAST BIKE LANES Thank You Thank you for your participation today. Please be sure to sign the attendance sheet and fill out a comment sheet. If you have further questions or comments, please contact: Deanna O'Leary, P.Eng. Senior Project Manager Engineering & Development Services City of Belleville City Hall, 169 Front Street Belleville, Ontario K8N 2Y8 613-967-3200 x3527 doleary@city.belleville.on.ca What Happens Next? Public Consultation City staff will receive and review public input: Comment Sheets Emails Comments will be received until May 11, 2017. Council Consideration Council to consider Traffic By-Law amendments. Tendering and Implementation Project would proceed this year, subject to public comments received and Council's approval of Traffic By-Law amendments.