Combination Air Valve

Similar documents
Combination Air Valve Model

BERMAD Waterworks. Combination Air Valve. Air Valves Series. Typical Applications. Features & Benefits. Additional Features.

DAV - WP DAV - WP. Wastewater Air Valves. Product Catalogue. (Wastewater Air Valves) DAV - WP

Wastewater combination air valve in stainless steel AISI 316 Mod. SCS

DAV Series. DAV-MH Air Release & Vacuum Break Valves

AIR AND VACUUM VALVES

1200B2 Series Service Regulators. Instruction Manual

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

DAV - P. Product Catalogue DAV - P. Air release & Vacuum Break Valves. (Plastic Air Valves) DAV - P. Edition 2012

DAV - MP DAV - MP. Metallic-Shield Air Valves. Product Catalogue. (Metallic-Shield Air Valves) DAV - MP

Product Catalogue DAV - P DAV - P. Air release & Vacuum Break Valves. (Plastic Air Valves) DAV - P

Bermad Pressure Reducing. Model: 42T

1800C and 1800C-HC Series Service Regulators

Model: 43T. Bermad Pressure Relief Valve

Speed control assembly model A-1

Installation, Operation, and Maintenance Manual

Type HSR Pressure Reducing Regulator for Residential, Commercial, or Industrial Applications

Types S100K and S102K Pressure Regulators

2.0 INSTALLATION & SERVICE

Anti-flood device Model B-1

COMBINATION AIR RELEASE DEGASSING (CARD) VALVES INSTALLATION AND MAINTENANCE MANUAL

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

SCA Series Inverted Bucket Steam Traps

DC5A. Cyclone Separator Trap for Air. Copyright 2015 by TLV Co., Ltd. All rights reserved ISO 9001/ ISO MA-03 (DC5A) 19 June 2015

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION

Bermad Model:

Series RGX "ANTI - SURGE" AIR RELEASE & VACUUM BREAK VALVES CATALOGUE INDEX PAGE

1805 Series Relief Valves

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

LRS(H)4 Pressure-Reducing Regulator User Manual

V43 Pressure Actuated Water Regulating Valve

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

Types S108K and S109K Pressure Reducing Regulators with Integral Slam-Shut Device

Regulator from 1800 B series

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Solid Indicator (Non-mixer) Model CP-30SI

Engineering Data Sheet

TECHNICAL DATA CAUTION

TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions

MITIGATING PIPE AND RISER HYDRAULIC PIPELINE ISSUES WITH THE I-RISER PLUS

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Installation, Operation, and Maintenance Manual

V DGX Series. Direct-Operated Regulators Manual D103834X012

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering

TECHNICAL DATA. Pressure Regulation 531a. April 24, 2009

Installation Troubleshooting Maintenance Instructions Installation / Start-up

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve

Manual Actuated Boiler Blowdown Valves

BERMAD Waterworks. Level Control Valve with Altitude Pilot. 700 Series. Model X. Features and Benefits. Major Additional Features

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS

1. Preface Important Safety Notes Brief Product Information Product Working Principle Installation Guidelines...

TECHNICAL DATA Q= C. Table 1 - Specifications

TECHNICAL DATA. Page 1 of 12

776 Cryogenic Safety Valve

Instruction Manual O-Ring Ejector Chlorine & Sulfur Dioxide to 500 PPD (10 kg/h)

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1

Welker Constant Pressure Cylinders With Welker Solid Indicator, Syringe T-Handle, or Vortex Mixer

HORNE 20 THERMOSTATIC MIXING VALVE TYPE H-2003

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

Water. VAG DUOJET Automatic Air Valve Single-chamber type PN 10/16/25/40 - DN KAT-A 1912

Installation, Operation, and Maintenance Manual

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

Mounting and operating instructions EB 2530 EN. Self-operated Pressure Regulator. Pressure Reducing Valve Type M 44-2

APCO ASU-SCAV & ASU-CAV SINGLE BODY COMBINATION AIR VALVES

Fig 1, Fig 12, Fig 13, Fig 14, Fig 16 and Fig 16L Strainers Installation and Maintenance Instructions

THE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401

Pressure Dump Valve Service Kit for Series 2300 Units

BCV31 DN20 - Blowdown Control Valve

THE BP-690 SERIES. Operating and Service Manual. Series includes all variants of BP-LF/MF-690/691

Constant Pressure Crude Oil Container Model CPCCP

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

FTGS14 Ball Float Steam Trap DN15 (½") to DN25 (1")

Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections

RD(H)20/25 Pressure-Reducing Regulator User Manual

INSTALLATION, OPERATION and MAINTENANCE MANUAL

INDUSTRIAL VALVES MODELS: C62-A; C62-D. INSTRUCTION MANUAL Installation Operation Parts Service DIAPHRAGM BYPASS PRESSURE REGULATING VALVES

IFS NUVENT SERIES IWF FOR POTABLE WATER ANTI SLAM AIR RELEASE AND VACUUM BREAK AIR VALVES

Model GPR Primary Pressure Regulating Valve. Instruction Manual

Instruction Manual - Diaframless TM Ejector Chlorine, Sulfur Dioxide and Ammonia

CA10S, CA14 and CA14S Air and Gas Traps

Installation, Operation, and Maintenance Manual

WW-730. Pressure Sustaining/Relief Control Valve

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

Telefon (+45) Telefax (+45)

Mooney * Noise Controller Installation, Operation, and Maintenance Manual

DelVal Flow Controls Private limited

TECHNICAL DATA. Q = C v P S

Installation & Operation Manual Proven Quality since 1892

TITAN FLOW CONTROL, INC.

CRP INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SAMPLING VALVES

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

User's Manual. MixRite TF 10. Edition 05.08

TECHNICAL DATA. Table 1 - Specifications

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

R600 and HSRL Series Instruction Manual

Transcription:

Combination Air Valve For Sewage and Wastewater Model C50 Installation, Operation and Maintenance Manual (IOM)

Table of Contents General... Page 2 Safety... Page 2 Operational Data... Page 3 Materials and Connections... Page 3 C50 Chart... Page 4 C50 Parts List... Page 5 Inflow Prevention Parts List... Page 6 Surge Protection Parts List... Page 7 Unpacking and post shipment inspection... Page 8 Site Preparation... Page 8 Installation... Page 9 Start-up and first operation... Page 10 Operation and Maintenance... Page 10 Inspection... Page 12 Troubleshooting... Page 14 Disassembling and Reassembling the valve... Page 15 1

General BERMAD C50 is a high quality combination air valve for a variety of sewage and wastewater networks and operating conditions. It evacuates air during pipeline filling, allows efficient release of air and gas pockets from pressurized pipes, and enables large volume air intake in the event of network draining. With its advanced aerodynamic design and double orifice, this valve provides excellent protection against air and gas accumulation and vacuum formation with improved sealing at low pressure conditions. This document is the Installation, Operation and Maintenance manual (IOM) of this valve; it describes the procedures required for proper usage of the valve. Safety Since air valves operate in pressurized waste water networks and sewage systems with toxic or corrosive environment, you are required to carefully read this manual before using the valve. Handle the valve with care and make sure to comply with all the relevant required safety instructions and standards, general and local. 2

Operational Data Pressure rating ISO PN10, ANSI / ASME 150 Operating pressure range 0.1-10 bar / 1.5-150 psi Operating temperature Water up to 60 C / 140 F Materials and Connections Body material Glass-reinforced plastic Inlet diameter DN50, DN80, (2, 3 ) Connections Threaded Male and Female BSPT, NPT Flanged ISO PN16 or ANSI/ASME 150 Outlet types Sideways, Downwards Additional Features: Surge Protection (C50-SP) Inflow Prevention (C50-IP) 3

C50 - Chart Upper Body (2#) Cover (15#) Insect Screen Dynamic Seal (Kinetic Orifice) Peel Seal (Automatic Orifice) Spring (13#) Washer (3012#) Float Rod Lower Float (11#) Body (1#) BSPT / NPT Female Threaded 4

C50 Parts List Upper Body (#2) Upper O-Ring (#5027) Kinetic Seal (#4) Kinetic Plug (#6) Upper Float (#3) Peel Seal (#5) Bolt (#2065) Washer (#3005) Cover (#15) Lower O-Ring (#5025) Hex domed nut (#3015) Upper Float Cork (#12) Spring (#13) Upper Float Assembly (#101) Washer (#3012) Washer (#3014) Washer (#3012) Extension for drain elbow (#14) Drain Elbow (#8) Lower Float Assembly (#100) Lower Float (#11) Body (#1) Flushing Port Drainage Port 5

Inflow Prevention Parts List O-Ring (#5013) Inflow Seal (#61) Inflow grid (#52) Inflow Extension (#53) Drain Elbow (#8) 6

Surge Protection Parts List Surge Seal (#51) Surge grid (#52) O-Ring (#5013) Surge extension (#53) Drain Elbow (#8) 7

Unpacking and post shipment inspection Make sure that till the actual installation the valve remains dry and clean in its original package. Unpack the valve and make sure that all the wrapping materials are removed. Before installation it is necessary to inspect that no damage to the valve had occurred during shipment; do not install a damaged valve! Verify that the valve to be installed meets the design specifications of the specific installation site; take extra care and make sure that the expected system pressure complies with the pressure rating of the valve. Site Preparation Air Valves located above ground should be protected from freezing and vandalism. If the valve is to be installed in a pit, make sure that the pit has proper drainage and sufficient dimensions for servicing the valve. Flush the pipeline prior to the Air Valve installation in order to prevent damage to the valve internals due to large debris carried by the water during startup. 8

Installation Typical Applications Sewage and wastewater pumping stations Air relief and vacuum prevention. Sewage and wastewater pipelines Protection agains air and gas accumulation and vacuum formation at elevations, slope change points and at road/river crossings. Municipal and industrial wastewater treatment plants Protection against air and gas accumulation and vacuum formation. Installation instructions Install the Air Valve as close as possible to the pipe, at a high point of its circumference, in vertical position (within 5 degrees of vertical alignment) and with its inlet facing down. The diameter of the pipe connecting the Air Valve with the pipeline should be at least equal to the Air Valve inlet diameter. Install a shutoff valve between the air valve and the pipeline for allowing easy inspection and maintenance. 9

Start-up and first operation Open the shutoff valve and verify that the Air Valve connections are not leaking; if needed follow the troubleshooting instruction section of this document. Please note that at the first time the valve is filled up some water may exit through its outlet port. Prevent water hammer during startup and pipeline filling by maintaining the velocity lower than 0.5m/sec (1.6 feet/sec). Consider adding the Surge Protection feature in systems where higher velocity is expected. Operation and Maintenance Principles of Operation Pipeline filling During the filling process of a pipeline, high air flow is forced out through the kinetic orifice of the air valve. Once water enters the valve s chamber, the float buoyed upwards causes the kinetic orifice to close. The unique aerodynamic structure of the valve body and float ensures that the float cannot be closed before water reaches the valve. 10

Pressurized Operation During pressurized operation of the pipeline, air accumulates in the upper part of the air valve chamber, causing the float to gravitate downwards. This in turn causes the automatic orifice to open, releasing the accumulated air. Once the air is discharged, the water level and float rise, causing the automatic orifice to close. Pipeline Draining When a pipeline is drained, a negative differential pressure is created causing atmospheric air to push the float down. The kinetic orifice stays open and air enters the valve chamber, preventing vacuum formation in the pipeline. Surge Protection (anti-slam) The anti-slam device is fitted to the air valve outlet. In the event of a pressure surge it partially closes the valve s outlet. The approaching water column decelerates due to the resistance of the rising air pressure in the valve. Inflow Prevention The inflow prevention mechanism is a Normally Closed check device fitted on the valve s outlet and preventing flow of atmospheric air into the valve. 11

Inspection The valve does not require any specific maintenance, however a periodical inspection of the seals and flushing of the valve are recommended for removing debris and foreign objects. The valve s flushing and cleaning frequency depends on water quality and dirt-load. Stage A. Flushing the valve: 1. Close the shutoff valve connecting the Air valve with the main pipeline. 2. Open the drainage port, located at the lower side of the body (Part #1), and the flushing port at the upper side of the Body. 3. Flush the valve by discharging pressurized clean water into the flushing port till clean water exists through the drainage port. 4. Close the flushing and the drainage ports and reopen the shutoff valve. Stage B. Dismantling the valve: (to be performed only if stage A is not sufficient for cleaning the valve): 1. Unscrew the bolts (Part #2065) and lift the internal sub assemblies of the valve out of the Body (Part #1). 12

2. Clean the Body. 3. Inspect the internal sub-assemblies of the valve (lower and upper parts) and if necessary dismantle and clean. 4. Reassemble the cover (Part #15) and tighten the bolts (Part #2065). 5. Close the flushing and the drainage ports and reopen the shutoff valve. 13

Troubleshooting Symptom Leakage at the inlet connection Action Tighten the valve connection, use thread sealant. Check whether any part/seal is damaged. Leakage at the valve cover Leakage at the valve s outlet Valve does not release air or allow air intake Tighten the valve s cover Check the orifices area for leaks. Flush the valve to remove debris, dissemble and inspect the valve s orifices, floats and seals. Remove any foreign objects, check and replace any damaged part. Verify that the operating pressure does not exceed the valve s rated working pressure. Check and remove foreign objects. Clean the valve s internal parts, replace if necessary. Consult Bermad if the symptom continues. 14

Disassembling and Reassembling the valve The C50 valve consists of two main subassemblies; the Upper Float Assembly and the Lower Float Assembly. Disassembling the Upper Float Assembly: 1. Release the Upper Body (Part #2) by turning it counterclockwise, un-screw and remove it from the Valve s Cover (Part #15). Make sure that the internal parts of this assembly do not fall out. 2. Inspect the Upper O-Ring (Part #5027) and if necessary replace it with a new one. 3. Pull the float and the Kinetic Plug (Parts # 3 & 6) out of the Upper Float cover. 4. Inspect the float s Peel Seal (Part #5) and the Kinetic Seal (Part #4) for wear and tear. If necessary replace the old parts. Reassembling the Upper Float Assembly: 1. Wet the Kinetic Seal (Part #4) with water and install it on the Kinetic Plug (Part #6) with its raised edges side facing downward. See Fig. A Fig. A 15

2. Wet the new Peel Seal (Part #5) with clean water. 3. Use the Lower Insertion Assistance Handle and insert the lower end of the Peel Seal (Part #5) to its designated groove in the Uper float (Part #3). Make sure that the Fig. B serrated side of the seal (A) is facing the float flat side (B) as shown in the following drawing. See Fig. B 4. Use the Upper Insertion Assistance Handle to conduit the loose end of the Peel Seal (Part #5) through its designated bore in the Kinetic Plug (Part #6) body. Pull the Upper Insertion Assistance Handle till the upper mushroom shape of the Peel Seal sticks out of the Kinetic Plug upper side. Make sure that the Peal Seal remains straight and not folded within the bore. 5. Once the Peel Seal is correctly seated in place cut the Insertion Assistance Handles and discard them. See Fig. C Fig. C A B 16

6. Connect the Kinetic Plug (Part #6) to the Float (Part # 4) using its Snap legs in the right orientation as shown in the following picture. See Fig. D 7. Insert the complete float assembly to its place in the Upper Body (Part #2). Fig. D Disassembling the Lower Float Assembly: 1. Release and remove the Cover (Part #15) by unscrewing the M12 bolts (#2065) together with their washers; remove the cover (Part # 15) and the Lower O-Ring (Part #5025). 2. Release and remove the Hex dome nut (Part #3015), the Upper Float Cork (Part #12) and then the three washers (Part # 3012, 3014), the rod with the Lower Float (Part #11) and the Spring (Part #13). Inspect these parts for wear and tear. If necessary replace the old parts. Reassembling the Lower Float Assembly: 1. Install the Spring (Part #13) together with upper and lower washers (Part # 3012, 3014) on the upper side of the Rod (Part #11). 2. Install the Upper Float Cork (Part #12) together with upper and lower washers (Part # 3012, 3014) and lock with the Hex dome nut (Part #3015). 17

3. Connect the Upper Float Assembly to the Lower Float Assembly through the Air Valve Cover (Part #15). 4. Reassemble the Air Valve Cover (Part #15) on the Body (Part #1) using the M12 bolts (Part #2065) together with their washers. Make sure that the Lower O-Ring (Part #5025) is properly seated between the cover and the body. 5. The valve is reassembled, perform a compete start up procedure as described in page 10. 18

19

info@bermad.com info@bermad.com www.bermad.com www.bermad.com The information herein is subject to change without notice. BERMAD shall not be held liable for any errors. All rights reserved. Copyright by BERMAD. PIAXE12-C50