Access Management Conference

Similar documents
FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Safety Impacts: Presentation Overview

CIRCLE DRIVE TRAFFIC AND ACCESS MANAGEMENT POLICY GUIDE. Management Principles and Implementation Concepts

CITY MANUALS AND STANDARDS REVIEW

Austell Road Access Management Plan Public Meeting February 17, 2009

PennDOT Access Management Model Ordinances Training

State Highway 6 South

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

How to Develop a Pedestrian Safety Action Plan

Closing Plenary Session

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Chapter 2: Standards for Access, Non-Motorized, and Transit

Classification Criteria

5. RUNNINGWAY GUIDELINES

RAISED MEDIAN EFFECTIVENESS

Road Diets FDOT Process

Access Management in the Vicinity of Intersections

Access Management Regulations and Standards

Broad Street Bicycle Boulevard Design Guidelines

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

Executive Summary Route 30 Corridor Master Plan

Sixth Line Development - Transit Facilities Plan

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Access Location, Spacing, Turn Lanes, and Medians

Welcome. If you have any questions or comments on the project, please contact:

Borough of Danville, PA Traffic Calming Program Guidelines

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Clackamas County Comprehensive Plan

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

Solana Beach Comprehensive Active Transportation Strategy (CATS)

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) A: Class 2 Pedestrian / Cycle Ways. Pedestrian and Cycle Ways:

Appendix 3 Roadway and Bike/Ped Design Standards

ACKNOWLEDGMENTS City of Manvel THOROUGHFARE PLAN. Adopted: October 13, 2015 Ordinance No.: 2015-O-18

CHAPTER 17 ACCESS MANAGEMENT

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

This page intentionally left blank.

Access Management Regulations and Standards

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

GOAL 2A: ESTABLISH AND MAINTAIN A SAFE, CONVENIENT, AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM TO MOVE PEOPLE AND GOODS THROUGHOUT THE CITY.

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Frequently Asked Questions

CITY OF ELKO BICYCLE AND PATHWAY PLAN

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Designing for Pedestrian Safety

Services Department A September 18, 2006 Region of Durham Recommended Arterial Corridor All Wards Guidelines Study

Route 29 Corridor Assessment Update. Development of Possible Solutions

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CHAPTER 7 ACCESS MANAGEMENT. Background. Principles of Access Management. Hennepin County Transportation Systems Plan (HC-TSP)

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Iowa Corridor Management Pilot Project Overview. Recommendations For A Corridor Management Program August 2004

RM 620 FEASIBILITY STUDY

City of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX (956) SPEED HUMPS INSTALLATION POLICY

DUNBOW ROAD FUNCTIONAL PLANNING

Access Management Regulations and Standards for Minor Arterials, Collectors, Local Streets

Central Arkansas Regional Transportation Study Area ROADWAY DESIGN STANDARDS And Implementation Procedures

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Application of a Complete Street

Toolbox of Alternatives

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

East Burke Transportation, Safety and Capacity Improvements

Living Streets Policy

TRAFFIC IMPACT STUDY CRITERIA

CITY OF LUCAS 2014 MASTER THOROUGHFARE PLAN

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Chapter 3 BUS IMPROVEMENT CONCEPTS

City of Charlottesville Bicycle and Pedestrian Master Plan Update

This page intentionally left blank.

Route 7 Corridor Study

This page intentionally left blank.

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Overview. Existing Conditions. Corridor Description. Assessment

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

Appendix B MoDOT Access Management Guidelines

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

This chapter describes the proposed circulation system and transportation alternatives associated with

Glenn Avenue Corridor Traffic Operational Evaluation

Chapter 4 Traffic Analysis

City of Memphis On-Street Parking Modification Guidelines

Transportation Advisory Board

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Why Zone In on Speed Reduction?

City of Homewood Transportation Plan

TRAFFIC IMPACT ANALYSIS

SELECTED ROADWAY CAPACITY ANALYSIS

Capital Metro Downtown Multimodal Station

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Transcription:

Reduce motorist delay Signals Pedestrians Access Management Conference September, 2004 Safety Intersection Improvements

Project Description FM 518 provides east-west mobility and access to many retail, commercial, residential and employment destinations. Commissioned by Houston-Galveston Area Council Supported by the Cities of Pearland, Friendswood, League City and Kemah, TxDOT, and Brazoria and Galveston Counties, and various private entities. 25.6 Miles, 4 lanes, TWLTL FM 518 intersects with four major north-south facilities such as US 288, SH 35, IH-45, and SH 146.

Study Process Twelve month study period Rational planning approach Public Involvement and Stakeholder meetings drove process

Current Corridor Conditions Corridor Sections LOS LOM SH 288 West Side to FM 865 (Cullen) E Moderate FM 865 (Cullen) CR 89 E Moderate CR 89 to Woody / Corrigan F Serious Woody / Corrigan to Halbert / McLean E Moderate Halbert / McLean to SH 35 / Main F Serious SH 35 / Main to Sherwood F Serious Sherwood to Woodcreek F Severe Woodcreek to Dixie Farm F Serious Dixie Farm to Williamsport A - D Tolerable Williamsport to Newport F Serious Newport to Interurban F Serious Interurban to SH 3 F Severe SH 3 to FM 270 / FM 2094 F Serious FM 270 / FM 2094 to South Shore F Severe South Shore to SH 146 A - D Tolerable

Corridor Goals and Objectives Improve safety Improve traffic flow Reduce motorist delay Identify short-term transportation improvements Assess long-term corridor needs

Access Management Tools Defined for Corridor

Identification of Operational Improvements This process involved not only modeling recommended physical improvements such as left turn and right turn lanes but also, included optimizing the intersection phasing, timing, and offsets. Over half (29) of the 58 signalized intersections along the corridor could be improved by a combination of adding right turn and/or left turn lanes and modifying signal timing.

One Additional Lane Improves Intersection Operation TYPICAL MINOR STREET LANE CONFIGURATIONS EXISTING (CREATES NEED FOR SPLIT-PHASING) ALTERNATIVE CONFIGURATIONS (DO NOT REQUIRE SPIT-PHASING)

Intersection Improvements Dedicated Left-Turn and Right- Turn Lanes Reduce Platoon Disruption and Enhance Signal Operations Shortening Signal Cycle Length Reduces Driver Delay

Silverlake Village/CR 94A Signal 3 Re-stripe NB and SB from left-only, left-orstraight, and right-only to left-only, straightonly, and right-only Change N-S signal sequence from splitphased to quad-left

Signal System Recommendation The remaining isolated intersections should be incorporated into closedloop systems. The timing of all of the systems should be optimized for current traffic.

Identification of Safety Improvements GIS used to identify crash locations (hazards) and document access connections.

Application of Raised Medians

Characteristics of a short-term raised median recommendation Intersection with a high crash rate (>10) Adjacent land use has good alternative access ways (driveway on cross street) Adjacent land use has adequate internal circulation The addition of the raised median has limited safety benefits, but does contribute aesthetically to a gateway feature.

Medium-Term Raised Median Recommendations Intersection with a medium crash rate (>5) Adjacent land use has alternative access ways (multiple driveways). Adjacent land use has opportunity to share access with another development

Driveway Consolidation Consolidation Recommendations Pearland - 103 Friendswood - 28 League City - 23 Total - 155 Opportunities to Consolidate Addition of right-turn lane Retrofit of property Sidewalk, drainage and sewer projects

Results Operational Safety Air Quality/Energy

Operational Benefits AM CORRIDOR TRAVEL TIME DELAY PM CORRIDOR DELAY COMPARISON Corridor Corridor 0 50 100 150 200 250 300 350 400 450 500 Hours of Delay 0 25 50 75 100 125 150 175 200 225 250 Hours of Delay Existing Condition Study Recommendations Existing Condition Study Recommendations

Driveways Related to Crashes Driveways and Crashes Existing Driveways 140 120 100 80 60 40 20 200 180 160 140 120 100 80 60 40 20 Crashes Per Analysis Segment Drivew ays Crashes 0 Pearland Friendswood League City Cities 0

Conflict Points After Raised Median 225 Conflict Points per Analysis Segment 2000 1500 1000 500 175 125 75 25 3 Year Crashes per Analysis Segment 0 Pearland Friendswood League City Kemah Total Conflict Points Proposed Conflict Points Crash Data -25

Air Quality Air Quality Benefits Pollutant % Reduced NOx = 37% VOC = 34% CO = 36% NO. City AADT For Different Segments Average AADT For Each City Average Peak Period Traffic For Each City Average Off-Peak Period Traffic For Each City Nox VOC CO Grams/Day 1 Pearland 24,000 2 " 26,000 3 " 28,000 4 " 22,000 5 " 26,000 6 " 37,000 7 " 30,000 8 Pearland 21,000 26,750 11,503 15,248 260,471 249,167 2,274,221 9 Friendswood 16,100 10 " 15,200 11 " 11,700 12 Friendswood 38,000 20,250 8,708 11,543 47,904 73,423 507,681 13 League City 38,000 15 League City 31,000 34,500 14,835 19,665 138,037 167,049 1,371,037 15 Kemah 16,500 16 " 9,100 17 Kemah 10,300 11,967 5,146 6,821 75,100 74,665 712,458 Corridor Total 399,900 23,367 10,048 13,319 521,512 564,304 4,865,397

Bicycle/Pedestrian Improvements

Future Corridor Recommendations

Comprehensive Plan Chapter 213.001 of the Texas Municipal Code Access Management Goal Statement Chapter 211.001 of the Texas Municipal Code Compliment Access Management Standards Zoning Ordinance Subdivision Ordinance Chapter 213.001 of the Texas Municipal Code Access Management Guidelines

Comprehensive Plans Establish general policy on access management. More specific statement: The FM 518 corridor is to be planned, designed and managed in accordance with the FM 518 Corridor Access Management Plan. Activity center strategies vs. strip development

Comprehensive Plans Use of parallel roads, side streets, and cross access easements connecting adjacent developments. Properties under the same ownership, consolidated for development, or part of phased development plans shall be considered one property for the purposes of access management. New residential subdivisions should include an internal street layout that connects to the streets of surrounding developments Commercial development should be encouraged to share common access connections as well as to provide a convenient system of interparcel circulation.

Thoroughfare Plans Establish street hierarchy Designate public right-of-way to mitigate impacts to the functional integrity of FM 518 and other major arterials. Limit direct access to major thoroughfares Establish access management policies guidelines

Land Use Recommendations Subdivision Regulations Establish cross and shared access provisions Establish minimum connection spacing requirements Minimum lot frontages Discourage residential access on major thoroughfares Zoning Discourage shallow strip development with no alternative access Overlay zones FM 518 Minimum Connection Spacing Posted Speed (mph) 30 35 40 45 50 Distance (ft) 200 250 305 360 425

Action Plan Agency Policy board approval of study H-GAC Adopt FM 518 Corridor Access Plan by ordinance Cities Secure funding for short-term intersection improvements H-GAC and TxDOT Implement intersection improvements TxDOT Implement system-wide signal retiming TxDOT and Cities Secure funding for median improvements H-GAC and TxDOT Implement median improvements TxDOT Coordinate with TxDOT for median aesthetics Cities Identify funding and implement pedestrian / bike improvements H-GAC, TxDOT, and Cities Program long range thoroughfare improvements Cities Update comprehensive plans and subdivision standards Cities