FY17 Clean River Program. December 2, 2016

Similar documents
MINNESOTA DEPARTMENT OF NATURAL RESOURCES DIVISION OF FISHERIES AND WILDLIFE. Gamefish Assessment Report

State of the Water. October 25, 2016 Union County Community Center

101 Corridor Managed Lanes

COMMUNITY WATERSHED PROJECT

Draft Central Valley Salmon and Steelhead Recovery Plan

LAKE DIANE Hillsdale County (T8-9S, R3W, Sections 34, 3, 4) Surveyed May Jeffrey J. Braunscheidel

Proposed Reclassification of Cherry Creek, North Platte River Basin, Wyoming. October 25, 2010

Don Pedro Project Relicensing

COLORADO RIVER RECOVERY PROGRAM RECOVERY PROGRAM FY 2015 ANNUAL PROJECT REPORT PROJECT NUMBER: 160

Watershed Restoration Plan for the Hiwassee River Basin

Yakima Klickitat Fisheries Project

Quay County, New Mexico 160 deeded acres; (MOL) $420,000

STUDY PERFORMANCE REPORT

Black Sturgeon Regional Plan

DRIPPING SPRINGS LAKE 5 YEAR LAKE MANAGEMENT PLAN

SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing

What is a River Basin Restoration Priority? 1. Criteria for Selecting a Targeted Local Watershed (TLW) 2. Hiwassee River Basin Overview 3

I. Project Title: Annual Operation and Maintenance of the Fish Passage Structure at the Government Highline Diversion Dam on the Upper Colorado River

STUDY PERFORMANCE REPORT

Full Project Proposal

BURBOT IN THE KOOTENAI RIVER, IDAHO: A STORY OF SUCCESS

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE SPORT FISHERIES MANAGEMENT

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE SPORT FISHERIES MANAGEMENT

Quemahoning Reservoir

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0

After Gear Time we join Donna Reynolds in the kitchen for Simple Cooking. Fish and Game are Donna s specialty and you won t be disappointed.

Proposed Reclassification of Deer Creek, North Platte River Basin, Wyoming

Mississippi State University

Trout Unlimited and the Kittatinny Ridge Coalition.

TROUT CREEK WATERSHED (Second Year of Snowline Data)

Technical Advisory Committee (TAC)

TABLE ROCK LAKE 2014 ANNUAL LAKE REPORT. Shane Bush Fisheries Management Biologist Missouri Department of Conservation Southwest Region

1.Mill Creek Watershed Summary Description and Land Use

Crawford Reservoir. FISH SURVEY AND MANAGEMENT INFORMATION Eric Gardunio, Fish Biologist Montrose Service Center

DRAFT MEMORANDUM TO FILE

Arizona Game and Fish Department Region VI Fisheries Program

CORRESPONDENCE/MEMORANDUM

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

Extant and Extirpated Native Fishes of Aravaipa Creek (Stefferud and Reinthal 2004)

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report

WATER OBSTRUCTION AND ENCROACHMENT PERMIT

Got Mussels? Freshwater Mussel Volunteer Survey Program

PUTTING CANADA s WILD SALMON POLICY INTO ACTION

Proposed Reclassification of Horse Creek, North Platte River Basin in Goshen County, Wyoming

Michigan Dept. of Natural Resources Status of the Fishery Resource Report Page 1. Weber Lake Cheboygan County, T34N, R3W, Sec.

5. Pedestrian System. Accomplishments Over the Past Five Years

Appendix 2. Miscellaneous Historical Creel Data. References

Update on Sediment Assessment

December 18, Dear Sir/Madam,

Coquitlam/Buntzen Project Water Use Plan

Columbia River Fishery Notice

I. Project Title: Annual Operation and Maintenance of the Fish Passage Structure at the Redlands Diversion Dam on the Gunnison River

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

California Water Service. PV Peninsula Water Reliability Project

Allegheny Parker. Credit: Timothy Wertz, PFBC

Columbia Lake Dam Removal Project

CUSHMAN RESERVOIRS. Skokomish Watershed Monitoring Conference - Public Meeting Florian Leischner 9/17/2015

THE UC DAVIS BIOSENTINEL MERCURY MONITORING PROGRAM: Feedback Tool for Watershed Management

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

San Antonio Creek Spreading Grounds Rehabilitation Project Ojai Valley, CA

Pennsylvania Fish & Boat Commission Biologist Report. Wilmore Dam. Cambria County. May 2011 Trap Net, Electrofishing and Hoop Net Survey

R & E Grant Application 15 Biennium

Stakeholder Communication and Public Involvement Plan

UNDERSTANDING YOUR ESTUARY Level IA- ESTUARY SEARCH

Plant City Bicycle and Pedestrian Master Plan. Project Update March 2, 2017

EXECUTIVE SUMMARY. Muskegon River Watershed Assessment

Brown County Historical Society. Fourteen tons of shells were shipped from Granite Falls and 16 tons from Wegdahl to the Muscatine Button Factory.

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

ADOPT-A-STREAM WATERSHED APPROACH COMMUNITY-BASED STEWARDSHIP. Nova Scotia Salmon Association March 2005

Chinook Salmon Spawning Study Russian River Fall 2005

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

FISH PROTECTION ACTIVITIES AT PRADO DAM, CORONA, CA.

cwd chronic wasting disease management and regulations for hunters

Mercury Concentrations in Fishes from Select Water Bodies in Trinity County, California,

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

1.Warm Springs Creek (Anaconda) Watershed Description and Land Use

Module 2 Narration What is a watershed?

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon

FALL 2014 TENNIS ON CAMPUS WEBINAR. CONFERENCE CALL # AND CODE: code 20235

Lower Saluda Scenic River Advisory Council

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

Barge MM 46 Response Natchez, MS Lower Mississippi River Mile Marker 363

Colorado River Fishery Project

Illinois State Water Survey

Rolling Knolls Pond Population Survey

Investigating reproduction and abundance of bighead carp (Hypophthalmichthys nobilis) and silver carp (H. molitrix) in the Greenup pool, Ohio River

2012 Bring Back the Natives Awarded Projects

SARASOTA BAY ESTUARY PROGRAM OYSTER HABITAT MONITORING RESULTS: YEAR 1. Jay R. Leverone

HANGING ROCK STATE PARK EXPANSION MASTER PLAN PHASE TWO INITIAL CONCEPTS INSTRUCTIONS

Importance of un-named tributary streams to Brook Trout populations. Dr. Jonathan M. Niles Dr. Dan Ressler

Pearl River 2018 Middle Reach REEL FACTS Dustin Rodgers Fisheries Biologist

11426 Moorage Way P.O. Box 368 LaConner, WA Phone: Fax:

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

Skagit River Basin wild steelhead fishery Public Meeting(s) Mill Creek-January 12, 2018 Sedro Woolley-January 16,2018

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.

Indiana Administrative Code Page IAC Aquaculture permit Authority: IC Affected: IC Sec. 17. (a) A person must not

Lakelse Sockeye Recovery Program

Salmon River Cooperative Noxious Weed Program (CNWP) Presented by the Salmon River Restoration Council

Proposed Changes to Bag and Size Limits Minnesota/Wisconsin Border Waters of the Mississippi River

Transcription:

FY17 Clean River Program December 2, 2016

2 FY18 Coordinated Monitoring Schedule 2017 San Antonio River Basin Highlight Report

San Antonio River Basin FY17 Coordinated Monitoring Schedule FY17 Segment Total Sites CRP Other Monitored Biological Metals Sediment Segment 1901: Lower San Antonio River 10 1 GBRA 11 4 2 Segment 1902: Lower Cibolo Creek 13 1 TCEQ 14 2 3 Segment1903: Medina River below Medina Diversion Lake 6 6 2 2 Segment 1904: Medina Lake 5 BCRAGD 5 Segment 1905: Medina River above Medina Lake 1 6 BCRAGD 7 2 1 Segment 1906: Lower Leon Creek 4 2 TCEQ 6 2 3 Segment 1907: Upper Leon Creek 3 3 Segment 1908: Upper Cibolo Creek 3 Boerne/TCEQ 3 1 Segment 1909: Medina Diversion Lake 2 BCRAGD 2 Segment 1910: Salado Creek 6 6 4 2 Segment 1911: Upper San Antonio River 23 23 6 8 Segment 1911: Upper SAR Unclassified Water Bodies 8 8 1 Segment 1912: Medio Creek 2 2 1 1 Segment 1913: Mid Cibolo Creek 3 3 1 Total 79 20 99 23 25 3

https://cms.lcra.org/ 4

https://www.tceq.tex as.gov/waterquality/a ssessment/14twqi/14 txir Golden Orb, Yellow Sandshell, Paper Pondshell, Threeridge & Pistolgrip mussels 5

1911I Martinez Creek 1911A Olmos Creek 1911C Alazan Creek 1911B Apache Creek 1911 Upper San Antonio River 1911E Sixmile Creek 1911D San Pedro Creek 1911H Picosa Creek 1911F Calaveras 1911G Brauing 1911 Upper San Antonio River 6 1911F Calaveras Lake and 1911G Braunig Lake not assessed in the 2014 IR

1901F Ecleto Creek 1901 Lower San Antonio River 1901B Cabeza Creek 1901E Manahuilla Creek not assessed in the 2014 IR 1901A Escondido Creek 1901C Hord Creek 1901D Lost Creek 7

1905A N. Prong Medina River 1905 Upper Medina River 1904 Medina Lake 1909 Medina Diversion Lake 1903 Lower Medina River 1903A Polecat Creek not assessed in the 2014 IR 8

1908 Upper Cibolo Creek 1902B Salatrillo Creek 1913 Mid Cibolo Creek 1902A Martinez Creek 1902C Clifton Branch 1902 Lower Cibolo Creek 9

1910F Upper Salado Creek 1910E Beitel Creek 1910A Walzem Creek 1910 Salado Creek 1910D Menger Creek 1910C Salado Creek Tributary 1910B Rosillo Creek 10

1906A Helotes Creek not assessed in the 2014 IR 1907 Upper Leon Creek 1906 Lower Leon Creek 11

1912A Upper Medio Creek 12 1912 Medio Creek

FY18 CRP Coordinated Monitoring Schedule EAC Comment Table Forward comments to Clarissa Perez by February 1, 2017 Segment number and name Comments (be very descriptive) Input By 1901 Lower San Antonio River If you are making a specific comment on one of the current stations, please identify the station number and provide your comments. If you are suggesting a new station or have a comment on a potential trouble spot, be as detailed with your location description as possible, latitude and longitude would be great, otherwise mention highways, streets, farm to market roads. If you feel necessary you can also provide a Google Map identifying the spot. Should there be any questions on your comment, we will contact you for further details Will need EAC comments on the FY18 Coordinated Monitoring Schedule by February 1, 2017. Current and historical CMS are located at https://cms.lcra.org/ 13

14 FY16/17 CRP Budget

Channel Catfish (Ictalurus punctatus) 2017 CRP Characterization Report Reviews activities within the Upper San Antonio River, Salado Creek and Upper Cibolo Creek Watersheds, including: Segment descriptions and hydrology; Land use and natural characteristics; 2014 Integrated Report impairments, concerns and potential causes; Recommendations for improving water quality; Potential stakeholders, maps, images, ongoing projects and major watershed events. TCEQ Deliverables: Draft Feb 15, 2017, Final May 15, 2017 15

2017 CRP Basin Characterization Tentative Report Time Line San Antonio River Mussel Survey Task Draft Report provided to the EAC for comments Due Date Dec 15, 2016 EAC comments due Jan 15, 2017 Draft Report due to the TCEQ Final Reports due to the TCEQ Post Report to CRP Web page Feb 15, 2017 May 15, 2017 June 30, 2017 Largemouth Bass (Micropterus salmoides) 16

Draft 2017 Texas Clean Rivers Program San Antonio River Basin Highlight Report EAC Steering Committee Members, The 2017 San Antonio River Basin Characterization Report (BCR) is designed to characterize activities within the Upper San Antonio River, Salado Creek and Upper Cibolo Creek watersheds, including segment descriptions, hydrology, land uses, maps, pictures and ongoing projects. Potential sources of impairments and concerns based on the 2014 Texas Integrated Report are identified and recommendations to improve water quality are suggested. The report is prepared by San Antonio River Authority staff in coordination with the Texas Commission on Environmental Quality (TCEQ) and in accordance with the State's guidelines. Committee members are asked to review and comment on the Draft 2017 CRP BCR. The comment table below will assist you in your review of the draft BCR. Please submit your comments to Clarissa Perez by January 15, 2017. Please note that the Draft Report has not been formatted. Once all TCEQ and EAC comments have been reviewed, the report will be adjusted accordingly, picture numbers removed (red text) and formatted to meet the TCEQ February 15, 2017 draft report deadline. I greatly appreciate your time in assisting with the review of the Draft 2017 Texas Clean Rivers Program San Antonio River Basin Characterization Report. Page & Section Page # and section Comment Include any information, comments or ideas you may have. Input By Name 17

18 QUESTIONS