DG Prospector OWNER S MANUAL AND INSTALLATION GUIDE. Assembly Installation Maintenance Southwest Windpower, Inc. All Rights Reserved

Similar documents
DG Prospector TM Owner s Manual and Installation Guide 3-CMLT-1414 Rev B

27 FOOT LAND TOWER KIT For AIRtm WIND MODULE

Installation and Training Manual

How to install AEA s 10 meter meteorological tower

Tripod Setup Guide (M-TPx)

65 FOOT LAND TOWER KIT For WHISPER 100 AND 200 WIND TURBINES

Low Wind High Yields Series

45-FOOT LAND TOWER KIT For AIR TM WIND MODULES

-- SGP (NOVA TEAM SQUARE)

WHISPER 42 FOOT (13 Meter) TOWER KIT for SKYSTREAM 3.7 AND WHISPER 500 WIND TURBINE

IS37 10 Metre Instrument Mast Handbook

TOWER INSTALLATION MANUAL For A.R.E. Guyed Pipe Towers Short Towers 43, 64 and 85 feet tall

Final Assembly Instructions Bikes with Threaded Headsets

Guyed 70 Foot Tower Kit for Skystream 3.7 Owner s Manual

Final Assembly Instructions Bikes with Quill Stems

Final Assembly Instructions Bikes with Threaded Headsets

TRI-POD SETUP. Guidelines for Typical Field Setup. Site Selection

KERSPLASH POOL CLIMBING WALL INSTALLATION INSTRUCTIONS

Final Assembly Instructions Bikes with 16 Wheel Size

Zip-Line Kit Instructions

Repair instructions. Pivot bushing replacement. XL-AS10001RM-en-DE Rev B

Soma Wind Generators

Thumb Shifter Plus Thumb Shifter

Instant Garage 20' x 12' 3" x 8' 3"

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

EZee Glider Manual. Tools needed for Assembly: Wrench (included) Philips Screwdriver (not included) Assembly Instructions

Santa Fe Cycles Assembly Guide Introduction

Falcon 3 145, 170, 195 and Tandem Owner / Service Manual

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

ASSEMBLY MANUAL HOBIE CATSY

Shifting Lever. Dealer's Manual. RAPIDFIRE Plus SL-M2000 SL-M3010 SL-M4010. Thumb Shifter SL-TZ500. ROAD MTB Trekking. City Touring/ Comfort Bike

TO RECEIVE the most benefit from a

SPOOLER INSTRUCTIONS. STEP 12 If you are going to paint your posts, that should be done at this time.

7130 Lancer Rear Drive Magnetic Commercial Indoor Cycling Bike

Ref Part Part # Qty Letter A Rudder Catcher B X 1/2 PH Bolts C Rudder Bracket


Paddle Bar Replacement

POOL FENCE STARTER KIT INSTALLATION MANUAL WARNING! ADULT ASSEMBLY ONLY DESIGNED FOR ASSEMBLY ON GRASS

INSTRUCTION MANUAL. January 23, 2003, Revision 0

Backboard and Rim Owners Manual

SASK-A-POLE OWNERS AND USERS MANUAL

NEXT GENERATION FLEX FENCE

1500 Follow Spot Yoke

Mini Glider Manual. Your Glider comes partially assembled. The front wheel and the handlebars require assembly.

RUDDER KIT INSTRUCTIONS

Trampoline & Enclosure Assembly Instructions

Troyer s Gourd Rack 8 unit F R H O P

Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning

Precision Liquid Settlement Array Manual

FNFB-30 (30 FT FIELDPRO FOOTBALL BACKSTOP SYSTEM) Installation Instructions

RUDDER KIT INSTRUCTIONS

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

HOME ASSEMBLY INSTRUCTIONS

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

REPLACING THE AFT RUDDER CABLES

USER S MANUAL QUESTIONS? CAUTION. Model No. FMEX Serial No. Write the serial number in the space above for reference. Serial Number Decal

TRAILMATE METEOR ASSEMBLY MANUAL

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

3M Liqui-Cel EXF-10x28 Series Membrane Contactor with ANSI or JIS Connections with Integrated End Caps

Instant Garage 16' x 12' 3" x 8' 6"

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

Trampoline & Enclosure Assembly Instructions

M2 Antenna Systems, Inc. Model No: VLP16

Model 23H Hand Crank Seamer

Assembly Guide ST200 FUNCTIONAL TRAINER

10m-130mm Tubular Tower. Technical Specifications

BALL STOP INSTALLTION GUIDE

Front derailleur. Dealer's Manual SORA FD-R3000 FD-R3030 CLARIS FD-R2000 FD-R2030. ROAD MTB Trekking. City Touring/ Comfort Bike DM-RBFD001-01

Front derailleur. Dealer's Manual FD-M9000 FD-M9020 FD-M9025 FD-M8000 FD-M8020 FD-M8025 FD-M612 FD-M617 FD-M618 FD-M672 FD-M677

THOR 10 HAMMER CAGE INSTRUCTIONS

DM-FD (English) Dealer's Manual. Front derailleur FD-M9000 FD-M9020 FD-M9025 FD-M8000 FD-M8020 FD-M8025 FD-M612 FD-M617 FD-M618 FD-M672

Operating & Maintenance MANUAL

Instruction Manual for ZY-021 Height adjustable Acrylic Backboard with Chain net

MSA Latchways Ladder System

Lectric Cycles Mid-Drive Electric Motor Installation

Marine 6-Boat Free-Standing Racks SKU: Updated November 2011

Row Marker OEM /

KMX Kompact Sports Trike

CHAINLESS ANCHORING SYSTEM USER MANUAL

InstallatIon and owner s InstrUCtIons

Model: 7200 Collegiate Volleyball System

C - SERIES. Height Adjustable Portable Goal Supports. Installation & Owner s Instructions C1000 C2000. Made in the USA

Assembly Instructions And User Guide

UNITY 2. Uni-DAAMS Manual. Version 1.3 (Changes to Section 1.1) March 2010

WARNING! ADULT ASSEMBLY ONLY

TRAVSMART permanent single-cable horizontal lifeline system

HOBO Station Tri-pod Setup Guide

Operator s Safety Manual Sumner Max Jax / Beam Jax

READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT.

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

ATOC Meteorological Tower (6 meter-4 level) Guide

INSTRUCTIONS 360 Y-DROP HAGIE STS 2015

DM-RARD (English) Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike. Rear Derailleur DURA-ACE RD-R9100 ULTEGRA RD-R8000

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

Rudder Kit Assembly Instructions for Quest 13

HoldUp Plus2. Safety Kit included: See additional instructions for installation. REAR WHEEL TRAY. BASE (1x) lock WASHER (1x) KEY (2x) SAFETY CLIP (1x)

ROAD DISC TECHNICAL MANUAL

Installation Guide Wall Mounted Angled Flagpole

DM-RD (English) Dealer s Manual. ROAD Rear Derailleur RD-9000 RD-6800 RD-5800 RD-4700

Transcription:

TM DG Prospector OWNER S MANUAL AND INSTALLATION GUIDE Assembly Installation Maintenance 2012 Southwest Windpower, Inc. All Rights Reserved

Southwest Windpower Congratulations on your purchase and welcome to our family! Dear DG Prospector Owner, Congratulations! You have just received the simplest tower and renewable energy predictor system available. This kit is designed to be easy to assemble and erect. The DG Prospector is comprised of a simple and lightweight guy supported tower, an integrated instrument for sensing wind direction, wind speed, solar insulation and temperature, and a self-powered data acquisition and recording system. Assembly of the tower and data acquisition system will take two persons approximately two hours to build and erect with basic hand tools. No excavation or lifting equipment is necessary. The tower for the DG Prospector includes a simple yet effective tower base and anchoring system, which eliminates the need for a concrete pad. It is important to read this manual first and understand your soil conditions before you begin construction. Read this manual thoroughly before beginning assembly. Southwest Windpower, Inc. assumes no responsibility for inaccuracies or omissions. The user of this information and product assumes full responsibility and risk. All specifications are subject to change without notice. If you have any questions on siting, proper installation or operation, please contact Southwest Windpower, Inc. or your dealer before installation. Sincerely, Southwest Windpower Southwest Windpower Inc. 1801 W. Route 66 Flagstaff, AZ 86001 USA customerservice@windenergy.com (928) 779-9463 Southwest Windpower GmbH Mannesmannstr. 6 50996 Cologne Germany Tel: +49 (0) 221 16 53 94 50 www.southwestwindpower.eu DG Prospector Manual 3-CMLT-1414, Revision: A 2 DG Prospector TM Owner s Manual, Rev A

TABLE OF CONTENTS Important Safety Instructions 4 ARRIVAL KIT & TOWER PARTS 5-6 SITE SELECTION 7-8 TOWER BASE & EARTH ANCHOR LAYOUT 9-11 SOIL TYPE & RECOMMENDED ANCHORS 12 TOWER ASSEMBLY 13-16 ATTACHING THE POWER PREDICTOR 17 TOWER MAINTENANCE 18 DG Prospector TM Owner s Manual, Rev A 3

Important Safety Instructions Read these instructions in their entirety before installing or operating. SAVE THESE INSTRUCTIONS. Enclosed are important instructions that must be followed during installation and maintenance. Locate your tower well away from occupied buildings and power lines; a minimum of 76 m (250 ft) is recommended. Obtain all required permits and engineering certifications for your tower and tower location. Install DG Prospector on a calm day - no wind at ground level. Prevent tower climbing by unauthorized persons or children. Never climb without proper safety equipment. Two people must be present when the tower is raised. Have at least two people available during assembly and erection of tower. If the guy wires appear loose, or if the tower is making an unusual sound, correct the condition immediately. A loose guy wire or component will incur further damage. Soil and wind conditions vary; towers and tower foundations must be designed for your specific location. In this manual IMPORTANT: Please take note TIP: Helpful information WARNING: Risk of injury or death - proceed with extreme caution Recommended Tools, Equipment and Materials for Installation Description Quantity 100 ft (30.5 m) Measuring Tape 1 Small Adjustable Spanner Wrench 2 10 kg Hammer 1 Mallet 1 Pliers 1 Carpenters Level 1 Safety Glasses Protective Gloves 1 pair/person 1 pair/person #1 Phillips Head Screwdriver 1 4 DG Prospector TM Owner s Manual, Rev A

ARRIVAL KIT Tower Kit Not Shown: Description Quantity Power Predictor Data Logging Module 1 Integrated Wind Speed, Wind Direction And Solar Insolation Sensor 1 Instrument Boom 1 Instrument Boom Bracket 1 Instrument Boom Isolating Clamping U-Bolts 2 Instrument Boom Tower Clamping U-Bolts 2 Sensor Extension Cable 1 Nylon Wire Ties 10 Owner s Manual 1 DG Prospector TM Owner s Manual, Rev A 5

DG Prospector Tower Parts (Images Not Shown to Scale) IMPORTANT: Before you begin installation of your DG Prospector be sure to have all parts and required tools. If any parts are missing, call Southwest Windpower. (1) Tower Base (1) Lower Guy Cable Wire: 6.4 m (21 ft) (1) Upper Guy Cable Wire: 9.1 m (30 ft) (2) Guy Wire Attachment Plates: (1) For Lower Guy Wire Cable (1) For Upper Guy Wire Cable Not shown: (1) M10 x 65 mm Bolt (1) M10 Locknut (16) Cable Clamps (8) Cable Thimbles (4) Arrowhead Earth Anchor (1) Earth Anchor Driving Rod (4) Tower Base Earth Spikes 6 DG Prospector TM Owner s Manual, Rev A

Site Selection The information in this section gives specifics about the ideal siting of the DG Prospector. If your area does not have an ideal location, find the best location possible. The DG Prospector is a predictive tool that can enable you to determine if you have sufficient wind and solar resource to justify the investment in renewable energy conversion systems. It is important therefore that you install the DG Prospector tower in a location that will be representative of the site at which you will intend to also install your wind turbine and/ or solar panels. The site should avoid obstacles to the wind, including vegetation, buildings etc. and with respect to the prevailing or general wind direction to minimize the turbulence and lower wind velocities that those obstructions will create. Although the data acquisition system is self-powered keep in mind the future requirement for electrical service to support the installation of your renewable energy system when sighting the DG Prospector. Avoid locations that unnecessarily increase the distance from your electrical interconnection (to minimize the amount of wire that will be needed) and areas that will require a difficult route to the point of interconnection (a trench that conflicts with exiting below grade features such as sewer and water lines). Surface Roughness Rough ground is land covered with small bushes, trees or other obstructions. Smooth land is an area covered only by grass or earth. The smoother the ground, the less the friction. The rougher the ground the greater the friction, thereby requiring the tower to be higher. IMPORTANT: It is important to locate your DG Prospector in an area where you might intend to install a wind generator. Topography TIP: Place your tower on the highest land practical. If your location is basically flat, topography is not an issue when deciding where to place your DG Prospector. There are circumstances where the highest land available may not be the best place for your wind generator. Highest land nearby may be awkward to get to, may be too far away from where you need the power, or may be a site that would expose your wind generator to potentially damaging turbulent conditions. Barriers Barriers (buildings, trees, etc. that impede flow of wind) produce wakes that may extend far downwind of the barrier and to a height considerably above the barrier. These wakes are areas of decreased wind speed and can cause potentially damaging turbulence. Barriers near the DG Prospector may affect its performance. DG Prospector TM Owner s Manual, Rev A 7

PRIOR TO INSTALLATION Siting Tips PROPER SITING = Better Performance & Increased Longevity Look at vegitation deformation to determine best area and prevailling wind direction. ATYPICAL SITING CONSIDERATIONS Prevailing wind 1 2 3 Coastal or Lakeside Trees and taller structures can be down-wind. 0 No Deformity I 5-9 mph* Brush & Slight Flagging Prevailing wind II 8-11 mph* Slight Flagging III 10-13 mph* Moderate Flagging IV 12-16 mph* Complete Flagging V 14-18 mph* Partial Throwing 1 Griggs-Putnam Index. *Probable mean annual windspeed. Data prepared by E.W. Hewson, J.E. Wade, 2 and R.W. Baker of Oregon State University 3 VI 15-21 mph* Complete Throwing VII 22-higher mph* Carpeting EXCESSIVE TURBULENCE = Fatigue Damage & Shorter Turbine Life Prevailing wind Prevailing wind Prevailing wind 1 2 1 2 3 2 3 3 2 1 1 3 Ridge Tops Wind compresses as it blows over the top of a hill, increasing the wind speed. 3 2 1 Prevailing wind Prevailing wind Coastal Prevailing or wind Lakeside Ridge Prevailing Tops wind 3 2 1 Plateau/Mesa 1 2 3 1 2 3 Excess Turbulence 3 2 1 Plateau/Mesa Site the generator far enough from the cliff to avoid turbulent wind. 76 m (250 ft) Turbine should be a minimum of 76m (250 ft) away from and 6m (20 ft) above obtacles. Coastal or Lakeside Ridge Tops 8 DG Prospector TM Owner s Manual, Rev A Plateau/Mesa

Tower Base & Earth Anchor Layout Tower Layout The tower is assembled on the ground, then tilted into position. The tower base supports the tower on the ground, and serves as the pivot point to raise and lower the tower. Two sets of guy wires (an upper and lower set with four wires per set) secure the tower vertically: Tower Assembly - Hillside If possible, position the tower to tilt along the incline of the hill, with the top of the tower uphill from the tower base. Tower Base 1. Locate the area where you will install the tower. Place the tower base on the ground and orient in the direction the tower will be tilted. The upper set of guy wires secure the tower at a height of approximately 8.0 m( 26 ft). The lower set of guy wires secure the tower at a height of approximately 4.6 m (15 ft). Four arrowhead earth anchors (located approximately 4.6 m (15 ft) from the tower base at 90 intervals) secure the guy wires to the ground. One upper guy wire and one lower guy wire attach to each earth anchor. Tower Base 2. Have one person stand at the tower base holding a measuring tape. 3. The second person measures a 4.6 m (15 ft) circumference around the tower base. Make sure there are no obstructions along the circumference. Make sure there is sufficient room to tilt the tower into position. 4. Drive the 4 tower base earth spikes into the ground toward the center of the base, as shown here. Earth Spikes DG Prospector TM Owner s Manual, Rev A 9

Arrowhead Earth Anchors Arrowhead Earth Anchor 1. Position the first earth anchor on the ground along the tower tilt axis, 4.6 m (15 ft) from the tower base. 2. Place the second earth anchor along the tower tilt axis, 4.6 m (15 ft) from the tower base in the opposite direction. With the tower base in the center, the first and second earth anchors should form a straight line 9.2 m (30 ft) along the tower tilt axis. Distance from Tower Base to anchor (4 places) 4.6 m (15 ft) Distance between anchors (4 places) 6.6 m (21.2 ft) 4.6 m (15 ft) 3. Repeat for the third and forth anchors. With the tower base in the center, the third and fourth earth anchors should form a line perpendicular to the line formed by the first two earth anchors. 4. Each earth anchor should be 4.6 m (15 ft) from the tower base. 5. Check the position of the earth anchors to ensure that they are within approximately 15 cm (6 in) of their ideal position. Figure illustrates numbers 2-4 6.6 m (21 2 1/2 ) 6. Insert the beveled end of the earth anchor driving rod into the arrowhead earth anchor, as shown here. Driving Rod Earth Anchor 10 DG Prospector TM Owner s Manual, Rev A

Driving Rod 10 kg Hammer 7. Drive the earth anchor into the ground using the earth anchor driving rod and a 10 kg hammer. Notice the angle at which the earth anchor is being driven. This angle is important for maximum pull strength. The angle should be in line with the angle of the guy wire (i.e. the angle should be pointing towards the tower base). 9. Then, insert the earth anchor driving rod through the cable eye and pull up with force. You will notice the earth anchor cable pulling out of the ground slightly. This will lock the earth anchor in the ground. Note: No more than 30 cm (12 in) of earth anchor cable should be out of the ground once it has been locked into place. Earth Anchor Cable Driving Rod Earth Anchor Cable IMPORTANT: Earth anchors must be installed in soil that has been undisturbed. 8. Drive the earth anchor into the ground until 15 cm (6 in) of cable remains above ground. 10. Finish installing the remaining three earth anchors as described above. Driving Rod IMPORTANT: Although the earth anchor is designed to break through rocks, if there is a rock or obstruction that is too large, remove and relocate the anchor. The depth of the anchor is critical to its effectiveness. Earth Anchor Cable DG Prospector TM Owner s Manual, Rev A 11

SOIL TYPE AND RECOMMENDED ANCHORS What anchor to be used depends on the soil type. Refer to the Soil Type and Anchor Recommendations table below for suggestions. Soil Type Loose Sand Loose Gravel Loam Clay Rocky Soil Gravely Soil Solid Rock (Soft) Solid Rock (Hard) Recommended Anchor Arrowhead Arrowhead Arrowhead Arrowhead Arrowhead Arrowhead Large/Long Expansion Bolt Smaller Expansion Bolt IMPORTANT: If the arrowhead earth anchors included with the DG Prospector do not work with your soil conditions, contact Southwest Windpower, Inc. for assistance with an alternative anchor. 12 DG Prospector TM Owner s Manual, Rev A

Tower Assembly 1.8 m (72 in) Top Tower Tube The tower is assembled in several easy steps. Location for 9.1 m (30 ft) guy wire attachment plate Tower Tube Layout 1. Lay out the six tower tubes on the ground as shown. Leave approximately 15 cm (6 in) between each tube. Guy Wire Attachment Plate 1.8 m (72 in) Middle Tower Tubes 1.8 m (72 in) Location for 6.4 m (21 ft) guy wire attachment plate 1.8 m (72 in) 1.8 m (72 in) 1.8 m (72 in) 1.8 m (72 in) 1.2 m (48 in) 1.2 m (48 in) Bottom Tower Tube Note: Drawings not to scale. DG Prospector DG Prospector TM Owner s TM Owner s Manual, Manual, Rev A Rev 13A 13

2. With the tubes laid out as shown on the preceding page, slide the guy wire attachment plates over the corresponding tower tubes. Slide the 9.1 m (30 ft) guy wire attachment plate over the top tower tube. Slide the 6.4 m (21 ft) guy wire attachment plate over the fourth tower tube from the bottom. 4. Join the tower tubes together using a soft-faced mallet or hammer. Use a piece of wood between the tube and the mallet to protect the end of the tube. The expanded end of the tube prevents the guy wire attachment plate from sliding down the tube, and positions the guy wire attachment plate at the correct height. Guy Wire Cable Tower Tubes Tower Guy Wire Attachment Plate Cable Thimbles 5. Secure the lower tube to the tower base with the M10 bolt and nylock nut. Tighten the nut until it just contacts the tower base. 3. Align the guy wire attachment plate so that each guy wire is in line with the anchors. M10 Bolt 1.2 m (48 ) Bottom Tower Tube Tower Base 14 DG Prospector TM Owner s Manual, Rev A

Attaching the Guy Wires 1. Orient guy wire attachment plates with their corners pointing towards the anchors. 2. Uncoil each guy wire bundle and extend them to their respective anchoring point. The fourth anchor point is directly under the tower. Caution: Be careful not to let the guy wires become twisted when the tower is erected. IMPORTANT: You may need to use pliers to spread open the cable thimbles to install them on the anchors. Use the pliers to press the open end of the cable thimbles back together before attaching the guy wires. 4. Leave about 15 cm (6 in) of slack in the guy wires, and tighten the cable clamps. Note: The guy wire to the tower should contact the saddle side of the cable clamp. On level ground, there will be approximately 1.5 m (5 ft) of extra cable. 5. Attach two cable thimbles to the third earth anchor located directly below the tower. 6. Measure the length of the upper and lower guy wires on the side earth anchors. Use the same length for the guy wires on the third earth anchor. Attachment Plate 7. Secure the cable clamps to the third guy wire. Tower Cable Thimbles Guy Wire 8. Place two cable thimbles on the fourth earth anchor. DO NOT connect the guy wires at this time. 3. Begin attaching the guy wires to the earth anchors at the sides of the tower. Cable Thimbles Cable Clamp Guy Wire Cable Insert 2 cable thimbles in each earth anchor eyelet. Thread an upper guy wire and lower guy wire around its own cable thimble. Loosely attach two cable clamps to each guy wire. 9. The fourth set of guy wires are used to help tilt the tower into position. Secure these guy wires after the tower is upright. DG Prospector TM Owner s Manual, Rev A 15

Attaching the Power Predictor Southwest Windpower, Inc. highly recommends first tilting the tower into position without the sensor and sensor cable attached, to verify proper installation and operation of the tower. Important: Ensure that all side and rear guy wires are attached and that all cable clamps are tight before raising the tower. 1. Affix the integrated instrument to the instrument boom using a small, #1, Phillips head screw driver and the screws that are in the body of the instrument. 2. Refer to the figure below for the proper orientation of the instrument on the boom. NOTE: Please refer to the Power Predictor owner s manual for detailed instructions for installation of the data acquisition system. 3. Feed the sensor wire into the instrument boom. 4. Assemble the isolating clamps to the boom and boom hanger bracket and the boom hanger bracket to the tower with the stainless steel clamping U-bolts. 5. Connect the sensor extension cable to the instrument and carefully lay it alongside the tower avoiding any sharp edges or tight bends. Sensor wire Boom hanger bracket Boom Boom Boom hanger bracket Sensor wire 6. Carefully secure the sensor cable to the tower with the provided nylon wire ties. 7. Clamp the Power Predictor data logger unit to the side of the tower at convenient height but at a level that will be above snow depth (if applicable) and on the north side of the tower (in the Northern Hemisphere) to avoid overheating the enclosure in direct sunlight. 8. Connect the sensor cable to the data logger and precede with the commissioning of the data acquisition system according to the Power Predictor owner s manual. Important: When the tower is lowered to install the sensor and sensor cable, undo only the pull-side cables. When adjusting the cables, NEVER loosen both sets of guy wires at the same time. When the tower is re-erected, only those pull-side cables will need to be readjusted. 16 DG Prospector TM Owner s Manual, Rev A

Raising the Tower Important: Ensure that all side and rear guy wires are attached and that all cable clamps are tight before raising the tower. 1. Before raising the tower, have another person ready to assist with installation. Note: Be sure to wear gloves when handling the guy wires! 2. One person should push the tower up into position. The other person should pull by the unattached upper guy wire. With the tower off the ground a few feet, make sure that all the wires are coming up cleanly. Check to see which wire(s) are too tight (the wires act in pairs). Release the tension on one of the wires by loosening the 2 cable clamps until the cable can be slid through them Let out some cable until there is no tension in the wire. Caution: It is easy to over tighten the guy wires. Wires should only have the slack taken out with no real tension. 3. Retighten the cable clamps before raising the tower. 4. Once the tower is raised to vertical, attach the last guy wires to their anchor. 5. Walk a short distance from the tower and look to see that it is straight. 6. Focus on the angle of the tower. Adjust the cables until the tower is straight up and down. Use a carpenter s level held against the tower for this. Tower Guy wires Carpenter s Level 7. To adjust the angle of the tower, relax one guy wire and tighten the guy wire opposite to it. Repeat this process until the tower is straight. 8. When the tower is straight, make sure that all cable clamps are tight. Adjusting the Guy Wires Tower 9. After all the adjustments have been made, lower the tower. If the guy wires are too tight they may cause the tower to bow as it is raised. If this happens, lower the tower to the ground and reduce the tension on the guy wires. Important: When the tower is lowered to install the instrument boom, undo only the pull-side cables. When adjusting the cables, NEVER loosen both sets of guy wires at the same time. When the tower is re-erected, only those pullside cables will need to be readjusted. DG Prospector TM Owner s Manual, Rev A 17

DG Prospector Maintenance There are no moving parts in the tower, so maintenance is minimal. However, as part of your annual maintenance, Southwest Windpower, Inc. recommends that several areas are inspected to ensure long term integrity of your DG Prospector. Check guy wire condition. Inspect for wear and fraying at the guy wire to earth anchor connection points. Check guy wire tension. Guy wires should have uniform tension. Wires should be free of slack, but not overly taut. Check all bolts for tightness. Check cable clamps and pivot bolt. Check any unusual noises or vibrations. Investigate and correct as necessary. Refer to the owner s manual for the Power Predictor for maintenance requirments. 18 DG Prospector TM Owner s Manual, Rev A

Southwest Windpower Inc. 1801 West Route 66 Flagstaff, Arizona 86001 USA t: +1 928.779.9463 f: +1 928.779.1485 www.windenergy.com Southwest Windpower GmbH Mannesmannstr. 6 50996 Cologne Germany t: +49 (0) 221 16 53 94 50