Axial Compression Packing Method

Similar documents
!!!! SERVICE MANUAL PRESSURE POT 2 GALLON. Service Manual: LT Washington St 931 Progress Ave., #7

PXRF- Tracer Helium Flow Control System

PANACEA P200 STAINLESS STEEL USER MANUAL

PANACEA P100 LOW PRESSURE USER MANUAL

GE Healthcare. BPG Columns. Instructions for Use

Instruction Manual Updated 5/26/2009 Ver. 2.0

Constant Pressure Crude Oil Container Model CPCCP

PANACEA P125 USER MANUAL

Installation, Operation, and Maintenance Manual

RG1200 Service and Repair Manual

ABRASIVE REGULATOR II

Installation, Operation, and Maintenance Manual

Installation Guide. buoy.ai

Setup Guide for your HVO Naked Drone

ATI Skills Modules Checklist for Oxygen Therapy

Paintball Marker. User s Manual. 530 South Springbrook Road Newberg, OR 97132

ABRASIVE REGULATOR II

CentriFlow Meter Integrated Air Entrainment System

H4802, H4802-1, H , and Pole Tampers

GE Healthcare. Valve INV-907. Instructions ÄKTA

Installation, Operation, and Maintenance Manual

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

2 I All-Flo Pump Co.

2 I All-Flo Pump Co.

Thermocirc Installation and Maintenance Instructions

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Solid Indicator (Non-mixer) Model CP-30SI

Freedom8 ShoeBox Compressor Manual

SCF Enviro-Friendly. Back-up Ring. Endcap. #7141 (for both) O-Ring. Back-up ring and O-ring fit onto end cap.

Pressure Dump Valve Service Kit for Series 3000 Units

PRESSURE ADJUSTMENT Main pressure adjustment

Valve INV-907. Instructions. 1 Introduction. 2 Installation. Safety. Unpacking. Installing the valve

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS

Cornelius Keg Topping System for Barrels

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Welker Magnetic Indicator (With Gravity Mixer) Model CP2GM-HP

WARNING: READ THE GENERAL INFORMATION MANUAL INCLUDED FOR OPERATING AND SAFETY PRECAUTIONS AND OTHER IMPORTANT INFORMATION.

HYDRAULIC CYLINDER TEST

SINORIX Valve Reconditioning

Contents. Stainless Steel Side Block. 1.1 Separating the Side Block. Stainless Steel Side Block Reassembly of. Assembly from the Helmet Shell

Combination Air Valve

Pneumatic proportional controller Types M Types FM Function tested for use of the float in Ex-zone 0

UltRo Dual Flow Reverse Osmosis Water System

APT14, APT14HC and APT14SHC Spares 2

Parallel Reactor Standard Operating Procedure THIS SOP IS NOT MEANT TO REPLACE HANDS-ON TRAINING FROM QUALIFIED PERSONNEL!

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

Installation of Your SprayMaster System

VRS Assembly & Operating Instructions

LRS(H)4 Pressure-Reducing Regulator User Manual

User's Manual. MixRite TF 10. Edition 05.08

DS06D,G Dial Set Pressure Regulating Valve

Anderson Greenwood Series 93 Positive Pressure POSRV Installation and Maintenance Instructions

Retractable Hose Reel with 3/8" x 50' PVC Hose

GREIG FILTERS, INC. OPERATION MANUAL

Packing Procedure Recommendation. For. YMC RP silica. ODS-A, ODS-AQ, Octyl, Butyl, YMCbasic

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

BSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions

INSTALLATION & START-UP INSTRUCTIONS. Clack WS1 & WS1.25 METER WATER SOFTENER SYSTEMS

Pressure Dump Valve Service Kit for Series 2300 Units

500SE SECOND STAGE SERVICE PROCEDURE

Air Operated Hydraulic Pumping Systems to 50,000 psi

LNG Regulator Test Kit

DISPENSING VALVE MODEL VDP100 INSTRUCTION MANUAL

12S 1st Stage. -Maintenance Procedure-

5 Gallon Pressure Pot with HVLP Spray Gun and Hose

Operating Instructions Models and Hydrostatic Test Pumps

SP-400-M1/SP-403K-M1 INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR GRT75-PF-RFS PET FOUNTAIN

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Calcium Reactor. CalcFeeder PRO. User Manual 1.1a. Model. CalcFeeder AC1 PRO CalcFeeder AC2 PRO CalcFeeder AC3 PRO CalcFeeder AC4 PRO

Hose Reel Instruction Manual

SCA Series Inverted Bucket Steam Traps

Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below.

3/8" Dr. Air Butterfly Impact Wrench

Parts List. Description. Additional Considerations. Installation Instructions. Dual/Elite Hydraulic Treadmill Kit (supplied by EPI)

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Instruction Manual. Alfa Laval SB Membrane Sample Valve ESE02963-EN Original manual

Replacement of Interchangeable Membrane

Technical Bulletin. Parts and Service News. LPG Lock-Off valve replacement procedures for 4.2 Liter Ford V6

D05 Pressure Regulating Valves

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

BUTTERFLY VALVES Series 800

Installation Instructions

Section 3- Repair and Calibration Procedures

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Installation Instructions

G&H SPC-1 SANITARY PROPORTIONAL-CONTROLLED VALVE WITH POSITIONER INSTRUCTION MANUAL IM US1 S 0812

Techcon Systems TS1258 Pressure Pot

Steel Spring Driven Reel Instruction Manual

Instruction Manual. B&O WITH SLOPE BACK TENDER Live Steam

INSTALLATION INSTRUCTIONS

Alkylphosphines. Storage and Handling Recommendations

30T A/Manual Hydraulic Shop Press

Self Control Valves. User s Manual. Pressure Reducing Type (V182,V82) Pressure Relief Type (V185) Pressure Retaining Type (V186)

Installation Instructions

The P-Rod Double by The Airgun Lab Installation Instructions Revision F 08/01/2016 page 1 of 18

Water Weir Flow Controller. Introduction. Safety Precautions. Mounting the Hardware

Multi-Probe Sampling System User Guide & Manual

Paintball Marker. User s Manual. Direct Feed. SC: Stock Class. VSC: Vertical Air Stock Class. 530 South Springbrook Road Newberg, OR 97132

Transcription:

GE Healthcare Life Sciences Axial Compression Packing Method Method Description The axial compression packing method is quite easy and requires a minimal amount of equipment. It is useful for situations where rapid, repetitive, and highly reproducible packing is important. It has been used successfully with many types of media such as Superdex and Sephacryl, and gives especially good results with relatively noncompressible media types such as Source. In this method, hydraulic pressure is used to drive the column adapter into the column containing the media slurry. The media builds up on the bottom bed support within the column as the packing buffer exits through the bottom valve. The rate of adapter descent controls the density of the bed as it forms. As the adapter touches the bed, mechanically compression of the media establishes the final packed bed configuration. Practical example We will pack Source 15Q in a Fineline 100 column to a bed height of approximately 10 cm using the axial compression packing method. Typical numbers obtained by this method using the recommended test methods are of >20,000 ppm with an As of 0.8 to 1.3. Materials and Methods Fineline 100 column with locking pins Source 15Q 816 ml in a 50% slurry in packing buffer Packing Buffer 50 mm NaCl containing 20% ethanol (3 liters) Pressure vessel with regulator and 60 psi pressure gauge filled with 5 liters of water Two 4-port 2-way valves, 6 mm i.d. Three shutoff valves, 6 mm i.d. Three pieces hosing, 6 mm i.d., ~ 1 meter length One piece clear hosing 1.9 6 mm i.d. ~ 1 meter length Pressure gauge 60 psi, 6 mm i.d. Triclamps and 6 mm gaskets Level, 13 mm socket wrench, stirring rod, waste bucket, tape measure Setup Description Hardware Setup The column outlets should be equipped with 4-port 2-way valves and hosing with the same i.d. as the column. Hosing to waste is connected to a port on the bottom valve perpendicular to the column outlet using triclamps with matching i.d. gaskets. Both hydraulic chamber outlets are equipped with shutoff valves followed by hosing to waste on one outlet and to a pressure vessel on the other. The pressure gauge is positioned on a top valve port perpendicular to the adapter outlet, followed by clear hosing to observe air removal and a shutoff valve to a waste container. The pressure vessel is filled with enough water or 20% ethanol to completely purge air from the hosing and column, as well as fill the hydraulic chamber during packing. A pressure regulator and gauge is fitted on the vessel and hooked to an adequate source of compressed air. A shutoff valve on the vessel makes releasing the pressure after packing more convenient.

Figure 1. Hardware Slurry Preparation The slurry is prepared in packing buffer to a final volume to fit into the column at or below the bevel at which the adapter will be seated. The slurry should be temperature equilibrated under packing conditions. The slurry must be thoroughly mixed just prior to pouring it into column. Column Preparation Position and level the column for packing. Assemble the column such that all bolts thread easily in place. Mark the flange of the column and lid to facilitate reassembly in the same relative position after slurry is added to the column. Remove the adapter and pour 2-3 cm of packing buffer into the column. Open the bottom valve and briefly allow buffer to purge air from the bed support leaving about 1 cm of buffer in the column. Column Packing Purging air from the column Make sure the shutoff valve on the column lid is closed to the pressure vessel and pressurize the tank to 60-63 psi. Mix the slurry thoroughly and immediately pour it into the column. Use a long plastic rod to stir the media for ~10 seconds and avoid scraping the bottom screen. Bolt the adapter and lid with o-ring loosely in place, thread one of the locking pins (with washer) just through the column flange and tighten the bolts on the lid with a wrench. Push down gently on the adapter rod to seal the adapter into the column tube and make sure the top adapter valve is open from the column to the pressure gauge. The shutoff valve following the top pressure gauge is closed and the shutoff valve on the column lid that goes to waste is opened. Partially open the shutoff valve to the pressure vessel and allow the hydraulic chamber to fill. When water exits to waste from the opposite shutoff valve, the chamber is full. Close the valve to waste which results in pressurizing the hydraulic chamber. Open the shutoff valve after the clear tubing on the adapter and allow the adapter to descend just until the majority of air has been cleared from above the slurry and in the adapter shaft. Close this top shutoff valve and fully open the shutoff valve to the pressure vessel.

Packing the column Open the bottom valve of the column to waste. Allow the adapter to descend unhindered while monitoring the bed pressure on the gauge at the top valve. It should increase and stabilize around 50 psi, then begin to drop as the flow rate exiting the column decreases and the bed is mechanically compressed. When the pressure drops to 5 ± 1 psi, the bottom valve on the column is closed. The locking bar is rapidly placed over the adapter rod and secured in place with both locking pins and washers. Tighten the pins as snugly as possible by hand only! Release the pressure in the pressure vessel and disconnect it from the column. Gradually release the pressure on the column bed using the shutoff valve after the top pressure gauge. Curing the column Remaining air in the adapter is removed and the bed cured by running 1-2 CVs of packing or testing buffer upflow at 30-50 cm/hr. Best results will be obtained if the column is then allowed to sit undisturbed overnight before testing. Helpful Hints and Potential Pitfalls Media quantitation Source settles as a very firm bed allow storage buffer to be completely decanted without loss of media. If a known volume of packing buffer is then added and the resulting slurry volume measured, the settled volume of media can be determined directly from the difference in these volumes. Slurry preparation Source media has a very hydrophobic matrix that causes the beads to clump unless 20% ethanol is in the packing buffer. It is also recommended to keep slurry concentration between 30-35% to further minimize clumping. Even with these adjustments, extra stirring is usually necessary with this media to disperse the beads thoroughly before setting the adapter. Do not use a magnetic stir bar, as this will damage the media. Purging Air from the Column Care should be taken to perform these steps smoothly at a controlled rate. Lowering the adapter too far or quickly during the column purge will result in media buildup on the underside of the adapter screen and be detrimental to the pack. Always run the column upflow after packing to remove residual air from the adapter and prevent drying out and damage to the bed. Testing One recommended procedure uses packing buffer as the mobile phase at rate of 20-30 cm/hr. The sample is 150 mm NaCl containing 20% ethanol and totals ~1% of the packed column volume. Acetone interacts with the Source matrix and should not be used. Storage Once the locking bar is in place, packing buffer inside the hydraulic chamber can be removed or changed. It is recommended that liquid be kept in this chamber to lubricate the O-ring around the adapter. This storage solution should contain a bacteriostatic agent if not replaced regularly, and avoid salts that can damage the steel surfaces over time. Unpacking An easy way to unpack the Fineline column is to flow packing buffer from the pressure vessel up through the bottom valve and push the adapter and bed away from the bottom screen. One outlet of the hydraulic chamber must be open to waste and the top valve closed. When the adapter has risen about 10 cm, close the bottom valve and flow buffer into the top valve to raise the adapter off the bed and pass the bevel for easy removal. This prevents loss of media when the adapter is removed and loosens the bed for easy dispersion in the unpacking buffer.

30000 Van Deemter Analysis of Source 15Q in a Fineline 100 Column L= 10.3 cm Af 1.4 1.3 25000 1.2 1.1 20000 1 15000 0.9 0.8 10000 0.7 5 10 15 20 25 30 35 40 45 50 55 Flow Velocity (cm/hr) 35000 30000 Sample Size Analysis of Source 15Q packed in a Fineline 100 Column (10.3 cm bed height, 30 cm/hr) Af 1.9 1.7 25000 20000 15000 1.5 1.3 1.1 Asymmetry factor 10000 0.9 5000 0.7 0 0.5 0 1 2 3 4 5 6 7 8 9 Sample Size (%CV)

35000 30000 Sample Size Analysis of Source 15Q packed in a Fineline 100 Column (10.3 cm bed height, 30 cm/hr) Af 1.9 1.7 25000 20000 15000 1.5 1.3 1.1 Asymmetry factor 10000 0.9 5000 0.7 0 0.5 0 1 2 3 4 5 6 7 8 9 Sample Size (%CV) 5.8 Curing Source 15Q beds packed in a Fineline 100 Column (10 cm bed height) Just packed, 19232, Af 1.23 Overnight Curing 32404, Af 1.05 5.4 Conductivity (ms/cm) 5 4.6 4.2 3.8 3.4 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 Volume (mls)

Pressure Flow Curve of Source 15Q in a Fineline 100 Column 180 Empty column pressure is 1 psi at 80 cm/hr 160 140 Flow Velocity (cm/hr) 120 100 80 60 40 20 0 0 10 20 30 40 50 60 70 80 Pressure (psi) imagination at work GE, imagination at work, and GE monogram are trademarks of General Electric Company. Fineline, Sephacryl, Source, and Superdex, are trademarks of GE Healthcare companies. 2011 General Electric Company All rights reserved. GE Healthcare Bio-Sciences AB, Björkgatan 30, 751 84 Uppsala, Sweden. 10/2011