ULTIMATE 12 RUDDER INSTALLATION INSTRUCTIONS

Similar documents
RUDDER KIT INSTRUCTIONS

RUDDER KIT INSTRUCTIONS

INSTALLING THE TRIDENT 11, 13 OR 15 RUDDER

Ref Part Part # Qty Letter A Rudder Catcher B X 1/2 PH Bolts C Rudder Bracket

INSTALLING THE PROWLER 13 RUDDER

(PLEASE CONTACT YOUR LOCAL DEALER or CUSTOMER SERVICE FOR WARRANTY INFORMATION)

ASSEMBLY MANUAL HOBIE CATSY

CamRT Sun Top Bimini Installation Instructions

Bladerider X8 Assembly Help Notes

PT 11 trouble-shooting and maintenance.

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

(PLEASE CONTACT YOUR LOCAL DEALER or CUSTOMER SERVICE FOR WARRANTY INFORMATION)

2012-June-12 SECOND DRAFT Hobie Getaway Spinnaker Installation Instructions

Falcon 3 145, 170, 195 and Tandem Owner / Service Manual

HOW-TO: Install a Wildcat Lighting System

FDR CHRYSLER 16' CATAMARAN (MUSKETEER) The initial rigging of a sailboat is not difficult, but if the boat is strange

OPPI Rigging Guide 3/2008

Rudder Kit Assembly Instructions for Quest 13

Kayaking Bob s Tandem Island SpraySkirt Kit Installation Instructions

Installation Instructions

Installation Guide, MPower Echelon Console

Weta Basic Rigging Guide

Mount the actuator in the bracket provided and install a 24-foot EFTC cable to the actuator.

Table of content Introduction 5 1. Part 1. Assembly Tools needed for Assembly Glossary Hulls Mounting the beams 7

STERN MOTOR FOOT CONTROL KIT For use with the Torqeedo 403 Ultralight

Lectric Cycles Mid-Drive Electric Motor Installation

Assembly instructions nortik scubi 2 Recreational kayak

AdvancedTrak Rudder Kit AE4005. Assembly and Installation Instructions

PARTS - FORWARD. Kayaking + Fishing Parts & Accessories Hook HATCH SEAL "TRIM-LOC" (TOP MOLDED) 5 REQ

Pico rigging manual 2007.doc Page 1 of 28

Pre-Paint>Fuselage>Empennage>Fit vertical tail fin. Objectives of this task: Materials and equipment required: Fit the spar extender

CHAPTER 5 REWIND STARTERS

SEADUCER BOATS GAS SPORT HYDRO

Far East Boat Optimist Rigging Instructions

INSTALLATION AND OPERATING INSTRUCTIONS. T10219-AD Deckboat 40 with AutoDeploy and Wireless Remote Control

2019 MADONE ASSEMBLY MANUAL

For ELECTRIC ANCHOR WINCH Models: T Pontoon 35 T sw Salt Water Series Coastal 35

For ANCHOR WINCH Model: T Big Water 45 T sw Salt Water Series Big Water 45

INSTALLING YOUR CLC RUDDER

400/488 Rotating Davit Installation Instructions

Club 420 Class Rigging Manual

Installation Instructions - Electric Steel Drive Systems for Arm Sets to ,

INSTRUCTION NO

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Instruction Manual. Features. Specification: Length: 730mm Width: 500mm Height: 1000mm Sail Area: 0.15m 2. Weight: 692g (w/o battery & receiver)

NAVIGATOR PROP BUILDING INSTRUCTIONS & PHOTOS

Bike Rack and Tire Carrier

Index 1. Trampoline 2. Main Foils 3. Spinnaker Pole 4. Mast Setup 5. Mast Rigging 6. Rig Tension 7. Trapeze Lines 8. Rudders 9. Boom 10. Main Sheet an

Constitution Instructions

Installation of 2 Tier In Line Greeting Card Rack

TM D E A L E R C A T A L O G

Hobie Island Spinnaker Instructions

Fitting Instructions for Single Line Mainsail Reefing System For Yachts Up To 9m (30ft) - Part No

INSTRUCTIONS FOR CHAIN LINK INSTALLATION

User s Manual. Model SWTC800. CAUTION: Adult Assembly Required

Installation Instructions - Electric Aluminum Drive Systems for Arm Sets to 22 Electric Arm Systems , ,

CRUZBIKE Quest 2.0 Assembly

PIVOT SHUTTLE Dropper Post Cable Housing Replacement Maintenance Procedure

INSTALLATION INSTRUCTIONS

CO V E R S TA R AU TO MAT I C S A F E T Y CO V E R INSTALLATION GUIDE

RANGER PROP BUILDING INSTRUCTIONS & PHOTOS

SECTION 2 RING MOUNT

M32 CATAMARAN ASSEMBLY MANUAL

Rigging Manual. 1 Parts of the Hull. 2 Parts of the Sail. 3 Sunfish Mast Kit. 4 Bailer Installation. 5 Ratchet Block Installation

Installing a Tiller Pilot on a Double Ended Yacht

Inuit Owners Manual. Inuit 13.5

Mainz Product Catalogue

A-FRAME RESIN IN & OUT FLIP UP LADDER

TABLE OF CONTENTS FRAME FEATURES INTRODUCTION

3. Sail Kit. Table of Contents: Portland Pudgy Safety Dinghy: 3. Sail Kit

EZ-Mount 4 Spring Enclosed System to 22 (Low & High Mount Applications) Installation Instructions


Import Bike Rack OEM INSTALLATION MANUAL

SCUBAPRO. Balanced Power Inflator

F-1279-R UPPER RIGHT SKIN F-1280-R RIGHT SIDE SKIN F-1281-R LOWER RIGHT SKIN F-1208-R FUSELAGE FRAME

Follow these easy steps to properly assemble your new Zim 420

Wysiwig - Wayfarer Rigging Guide

HOBIE TEDDY ASSEMBLY MANUAL

U STAND INSTALLATION INSTRUCTIONS

Thank you for purchasing a WIKE BOX BIKE!

Dolly wheels in slot #8 for Boat #10.

1 Parts of the Hull. 2 Parts of the Sail. 3 Sunfish Mast Kit. 4 Bailer Installation. 5 Ratchet Block Installation

SCOUT PROP BUILDING INSTRUCTIONS & PHOTOS

SEADUCER BOATS GAS MONO COME VISIT US ON THE WEB AT

In each step, the needed parts are shown the number right below. Locate all parts for the step.

FRAME FEATURES TABLE OF CONTENTS INTRODUCTION. A guide to your Cervélo C Series frame.

Trampoline Installation Instructions

Wing assemblyfinal Master 4/29/04 11:20 PM Page 1. Issued January 1, Sabre Aircraft. Assembly Manual. Sabre 16ss Wing

VR SERIES TECHNICAL MANUAL

Installation Instructions for the AlphaDeck Staging System

Place a rope coil here

REPLACING THE AFT RUDDER CABLES

Installing N-Strike Recon CS-6 Stage 1 and Stage 2 Performance Kits

Pressure Dump Valve Service Kit for Series 3000 Units

EZee Glider Manual. Tools needed for Assembly: Wrench (included) Philips Screwdriver (not included) Assembly Instructions

a WOW Lab Prep Instructions

Installation Instructions for your Winter Storage Cover

Final Assembly Instructions Bikes with Threaded Headsets

Procedures for Winter Sailing

Transcription:

ULTIMATE 12 RUDDER INSTALLATION INSTRUCTIONS TOOLS NEEDED: DRILL ¼ DRILL BIT ¾ HOLE SAW 3/16 DRILL BIT PHILLIPS HEAD SCREWDRIVER 7/16 WRENCH HEAT SOURCE: PROPANE TORCH, LIGHTER OR HOT AIR GUN WIRE CUTTER CRIMPERS RIVET GUN 1. REMOVE THE SEAT AND FOOT PEGS. 2. REMOVE THE STERN FLOATATION FOAM. 3. CUT THE STERN GRAB HANDLE ROPE AND REMOVE FROM THE BOAT AND THE HANDLE. 4. USING A 3/16 DRILL BIT, CAREFULLY DRILL OUT THE 5 TH RIVET IN THE ADAPT A TRAC ON BOTH SIDES, COUNTING FROM THE STERN FORWARD. 5. USING A 3/16 DRILL BIT, CAREFULLY DRILL OUT THE 4 TH RIVET IN THE ADAPT A TRAC ON THE STARBOARD SIDE, COUNTING FROM THE STERN FORWARD. 6. USING A ¼ DRILL BIT, DRILL TWO HOLES IN THE STERN OF THE BOAT JUST ABOVE THE PARTING LINE FOR THE RUDDER UPHAUL LINES.

7. DRILL A ¼ HOLE ON THE PORT SIDE DECK, 3 FROM THE STERN. THEN DRILL ANOTHER 1/4 HOLE 1 FROM THE FIRST HOLE FOR THE RELOCATED GRAB HANDLE. 8. DRILL A ¼ HOLE 9 ½ FROM THE STERN FOR THE RUDDER HOLD DOWN BUNGEE. 9. PUSH THE BUNGEE DOWN THROUGH THE DECK OF THE BOAT. TIE A KNOT AT THE END OF THE BUNGEE.

10. USE A ¾ HOLE SAW TO DRILL THE HOLE FOR THE RUDDER UPHAUL LINES TO EXIT THE INSIDE OF THE BOAT RAIL. 11. DRILL A 3/16 HOLE 1 BEHIND THE SMALL BLACK PAD ON THE STARBOARD SIDE FOR THE UPHAUL BUNGEE. INSTALL THE BUNGEE WITH HOOK AND GATE USING AN 8-32 X ¾ SCREW AND NUT.

12. USE THE 3/16 BIT TO DRILL 2 HOLES ABOUT ¾ APART FOR THE GRAB HANDLE BUNGEE. NOTICE THE LOCATION IN THE PICTURE BELOW. 13. DRILL A ¼ HOLE THROUGH THE SIDE OF THE SEAT CLIPS ¾ DOWN FROM THE MOUNTING BOLTS. YOU MAY FIND IT EASIER TO DRILL THESE HOLE WITH THE BRACKETS REMOVED FROM THE BOAT. 14. PLACE A MARK 4 FROM THE STERN ON BOTH SIDES OF THE BOAT AT THE PARTING LINE. DRILL WITH A ¼ BIT. WITH THE DRILL STILL RUNNING, CAREFULLY LAY THE DRILL BACK TOWARD THE STERN IN LINE WITH THE PARTING LINE. THIS WILL ALLOW THE CABLES AND TUBING TO ENTER THE BOAT IN MORE OF A STRAIGHT LINE.

15. HOLD THE RUDDER BRACKET ON THE END OF THE BOAT WITH THE TRIANGLE END AT THE TOP. WITH THE BRACKET PUSHED TIGHT AGAINST THE STERN AND UP AGAINST THE RAIL, USE A MARKER TO MARK THE HOLE LOCATIONS. THIS MAY REQUIRE AN ASSISTANT TO MARK THE HOLES WHILE YOU HOLD THE BRACKET IN PLACE. 16. DRILL THE HOLE LOCATIONS WITH A ¼ DRILL BIT. 17. INSTALL THE BRACKET WITH THE SUPPLIED ¼-20 X 5/8 SCREWS AND NYLOK NUTS. 18. REMOVE THE 3/16 DIA. BUNGEE FROM THE STERN OF THE BOAT. INSTALL THE 12 BUNGEE IN ITS PLACE, TYING A KNOT ON EACH END.

19. PUSH THE ENDS OF THE SUPPLIED 20 ROPE UP THROUGH THE TWO NEW GRAB HANDLE HOLES YOU DRILLED IN STEP 7. PUSH THE ROPES THROUGH THE HANDLE AND TIE IN A KNOT. THE KNOT SHOULD PULL BACK DOWN INTO THE HANDLE. 20. PUSH THE ENDS OF THE SUPPLIED 30 BUNGEE INTO THE HOLES THAT YOU DRILLED IN STEP 11. PASS ONE LEG OF THE BUNGEE THROUGH THE HANDLE ROPE LOOP FROM THE UNDERSIDE OF THE DECK. THEN TIE THE TWO BUNGEE ENDS TOGETHER. THE BUNGEE SHOULD BE TIED TIGHT ENOUGH TO PULL THE HANDLE DOWN AGAINST THE DECK OF THE BOAT. 21. FLARE ONE END OF THE BLACK RUDDER TUBING WITH A HEAT SOURCE. FLARE THE END LARGE ENOUGH THAT IT WILL NOT PULL BACK THROUGH THE HOLES YOU DRILLED IN STEP 12.

22. PUSH THE TUBING INTO THE BOAT FROM THE STERN UNTIL THE FLARED END IS UP TIGHT AGAINST THE BOAT. 23. INSTALL A 1/4 P-CLIP ON THE TUBING AND INSTALL THE CLIP ON THE INSIDE OF THE BOAT ON THE BACKSIDE OF THE NEW 5 TH RIVET. 24. PUSH THE TUBING THROUGH THE HOLE YOU DRILLED IN THE SEAT CLIP. PULL TAUGHT. 25. CUT THE TUBING ABOUT ½ PAST THE SEAT CLIP. USE A HEAT SOURCE TO FLARE THE END OF THE TUBING LARGE ENOUGH THAT IT WILL NOT PULL BACK THROUGH THE CLIPS. 26. INSERT THE CABLES INTO THE BLACK TUBING FROM THE STERN OF THE BOAT. 27. REMOVE THE RUDDER PIN FROM THE RUDDER. INSTALL THE RUDDER ON THE BRACKET AND SECURE WITH THE PIN AND RETAINING RING.

28. PUSH THE RUDDER ROPES THROUGH THE TWO HOLES ON THE STERN OF THE BOAT THAT YOU DRILLED IN STEP 6. 29. INSERT A NEW RIVET INTO THE #4 LOCATION OF THE ADAPT A TRAC. INSTALL A 5/16 P- CLIP ON THE BACK OF THE RIVET. SET THE RIVET. 30. RUN THE ROPES THROUGH THE 5/16 P-CLIP. MAKE SURE THE ROPES ARE NOT TWISTED OR TANGLED. 31. PUSH THE ROPES THROUGH THE ¾ HOLE YOU DRILLED IN STEP 9. 32. ATTACH THE RUDDER CABLES TO THE RUDDER WITH THE CLEVIS PINS AND RETAINING RINGS. 33. ROTATE THE RUDDER BLADE SO THAT IT LIES ON THE DECK OF THE BOAT. SECURE WITH THE BUNGEE AND HOOK YOU INSTALLED IN STEP 9. 34. PULL THE RUDDER CABLES TAUGHT FROM THE SEAT AREA. CUT THE CABLES 13 FROM THE SEAT CLIP. 35. PUT ONE PIECE OF SHRINK TUBING AND TWO COPPER FERRULES ON EACH CABLE.

36. LOOP THE CABLE THROUGH THE GROMMET IN THE NEW FOOTPAD STRAP AND BACK THROUGH THE COPPER FERRULES. MAKE THE LOOP IN THE CABLE JUST BIG ENOUGH THAT IT WILL NOT BIND ON THE CORNERS OF THE WEBBING. THE CABLE SHOULD BE FLUSH WITH THE END OF THE COPPER FERRULES. 37. CRIMP THE FERRULES. USING A HEAT SOURCE, SHRINK THE TUBING DOWN ON TOP OF THE FERRULES. 38. INSERT THE NEW FOOTPADS ONTO THE FOOTRAILS. 39. USE A #8 SELF TAPPING SCREW INSERTED IN THE FRONT OF THE FOOTRAIL TO KEEP THE FOOTPAD FROM COMING OFF THE RAIL. 40. REMOVE THE HOOK FROM THE RUDDER BLADE. DETERMINE WHICH ROPE WILL ROTATE THE BLADE FROM THE DECK BY PULLING ON BOTH ROPES SEPARATLY. THE ROPE THAT MOVES THE RUDDER SHOULD PASS THROUGH THE HOOK. TIE THE TWO ROPES TOGETHER USING A BARRELL KNOT. 41. APPLY ADHESIVE ( LEXEL OR CONTACT CEMENT) TO THE TOP OF THE TRIANGULAR FLOATATION BLOCK. PUSH THE BLOCK INTO THE STERN OF THE BOAT. 42. APPLY ADHESIVE TO THE VISIBLE EDGE OF THE INSTALLED FLOATATION BLOCK. INSTALL THE BULKHEAD FLOATATION BLOCK TOP FIRST THEN PRESS AND HOLD THE BLOCK IN PLACE.