KEPPEL GAS PTE. LTD.

Similar documents
Distribution Connection Forms

Transmission Connection Forms

Gas Distribution Connection Forms

Tuas Power Supply. Gas Retailer Handbook

HANDBOOK ON GAS SUPPLY - PROCEDURES AND REQUIREMENTS FOR SUPPLY OF NATURAL GAS

Natural Gas Connection Policy and Procedures

CITY GAS HANDBOOK ON GAS SUPPLY. Version 4

BCGA GUIDANCE NOTE 17

THE APPROVAL FOR THE PROVISION AND USE OF A METER BY-PASS

Allowances, Assessment Requests and Incentive Payments. U pdated - 3 rd October 2016

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION

Procedure: Pressure equipment safety

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

OPERATING CODE NO. 8 APPENDIX 2

AUTHORISE THE SETTING AND SEALING OF REGULATORS AND ASSOCIATED SAFETY DEVICES. AUTHORISE THE INSTALLATION OF A METER BY- PASS

Liquefied Petroleum Gas Market Regulations S.L

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013

September 2018 Pressure Test

Facilities and Estates. Natural Gas: Standard Operating Procedure. Document Control Summary. Contents

Gas Safety Code of Practice

For such purposes, UEFA intends to organise a tendering process ( Tender ).

ACS.TPCP1 SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS; LPG; OTHER GASES TESTING AND PURGING

PRESSURE SYSTEMS POLICY

Bill Ordinance 5824

Gas Interruptions. customer guide

Code for the Provision of Chargeable Mobile Content Services

Cooroy Golf Club Inc. (ABN ) of 28 Myall Street, Cooroy Q4563

* William A. Sala, Jr. John A. Roscher. Columbia Gas Transmission, LLC * Sorana Linder 700 Louisiana Street, Suite 700 Director, Regulated Services

Gas Safety Management Policy

ICC REGULATIONS FOR THE REVIEW OF BOWLERS REPORTED WITH SUSPECT ILLEGAL BOWLING ACTIONS

Control of Hazardous Energy. Environmental Health and Safety

Lock Out/Tag Out Control of Hazardous Energy

Recommendation to the Minister of Energy by the Gas Industry Co on the Specification for Reticulated Natural Gas

2.0 Dates and Times Tests to be carried out starting Monday 28 Nov for completion Friday 2 Dec.

Approved Installation Method (AIM)

PROCEDURES FOR STANDBY

Invitation to Express Interest (ITEI) Heavy Machinery Services

FUNCTIONS & WEDDINGS 2018

Significant Change to Dairy Heat Treatment Equipment and Systems

Overview EUSSAM12. Carry out tightness testing and direct purging of gas installations

Reviewed: DD Month Management of Closed Radioactive Sources

UEFA EURO Media Services & Operations / Tender Process

MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

STS 650 PRESSURE EQUIPMENT

Receipt By Jurong Port Representative -To be filled by Jurong Port Representative No Item Yes No Remark 1.

REQUESTING GAS SERVICE PIPE PRESSURE AND CAPACITY INFORMATION FROM GAS TRANSPORTERS.

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015

Invitation to express interest UEFA Club Competitions Accommodation Agency - Cycle

Invitation to express interest

Standard Pneumatic Test Procedure Requirements for Piping Systems

Installation Guide - C01202 & C01203 Thermostatic Mixing Valve TMV2

SAFETY FEATURES OF PORTABLE CRYOGENIC LIQUID CONTAINERS FOR INDUSTRIAL AND MEDICAL GASES

Gas and Carbon Monoxide Safety

Summary of the MRA LPG Codes of Practice

Please read this document of Terms and conditions carefully so that you fully understand our responsibilities and your commitments.

Below this line not for printing

High-Pressure Boiler Inspection Procedures: A Complete Checklist

New Castle County Guidelines for the Certified Construction Reviewer, Owner/Developer, Site Contractor and Professional Engineer

Official Journal of the European Union L 92/3

UEFA EURO Technical Services & Overlay / Tender Process. Supplier for Temporary TV Broadcasting Power Phase 1 - Invitation to Express Interest

Thames Water Utilities Limited (TWUL) Wholesale Data logger installation for revenue meters - terms, conditions and guidance

IGEM/GM/7A Edition 2 Communication 1803 Electrical connections for gas metering equipment

Spirax Compact FREME Flash Recovery Energy Management Equipment

Code for the Provision of Chargeable Mobile Content Services

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

THE FOLLOWING MATERIALS ARE FOUND IN THIS PACKET:

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

SGN Natural Gas Connection Policy. Glossary of Terms Introduction Connection Requests Connection Charges...8

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK

PSSI 10 Plant and Apparatus Containing Dielectric Gas

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

Lockout/Tagout Program

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs)

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy

TABLE TENNIS AUSTRALIA INC YOUTH OLYMPIC TEAM NOMINATION AND SELECTION CRITERIA

WHS CONTRACTOR INFORMATION PACKAGE

Model Byelaws for Hackney Carriages BYELAWS. Interpretation

Intamix Thermostatic Mixing Valve

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

Policy Redesign Project. Plant Safety Policy. Table of Contents

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

Pressure Systems Safety Regulation

LIQUEFIED PETROLEUM GAS (LPG) AND NATURAL GAS (NG) - FIRE PREVENTION ISSUES

VICTORIAN COUNTRY FOOTBALL LEAGUE (INC.) PLAYING CONTRACT

Annex B To Loughborough University Facilities Management Health and Safety Policy

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO

TABLE OF CONTENTS PART 2 - CONFINED SPACES

Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar

IGEM/GL/5 Edition 3 Communication 1783 Managing new works, modifications and repairs

Pressure Regulators. Operating Instructions. Instrumentation

Gas Pressures FAQs. Why only 19 mbar inlet pressure and 15 mbar outlet pressure? MOV: meter outlet valve ECV: emergency control valve

ICC REGULATIONS FOR THE REVIEW OF BOWLERS REPORTED WITH SUSPECTED ILLEGAL BOWLING ACTIONS

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018

Transcription:

KEPPEL GAS PTE. LTD. Keppel Gas Gas Retailer Handbook Version 1 (27 August 2014)

INTRODUCTION This Gas Retailer Handbook ( Handbook ) is prepared by Keppel Gas Pte. Ltd. to serve as a guide to eligible Natural Gas ( Gas ) customers who are current or future offtakers of Gas from the Distribution Networks (as defined in the Singapore Gas Network Code) in Singapore for the application for supply, connection, turn-on and turn off of Gas. This Handbook will cover the procedures, requirements and relevant forms for existing and new gas customers looking at gas connection and supply, switching of Gas Retailer, or addition, or cessation, and alteration works for expansion projects. In addition, Developers, Consultants, Professional Engineers, Licensed Gas Service Workers, contractors, and all other relevant persons involved in the connection for natural gas lines may also obtain key information and forms from this Handbook. We may amend this Handbook from time to time, without prior notice, which includes changes to the relevant legal codes and practices: 1. Gas Act (Cap 116A); 2. Gas (Supply) Regulations; 3. Gas Supply Code; 4. Gas Metering Code; 5. Gas Retailer Code of Conduct; 6. Gas Safety Code; 7. Code of Practice for Manufactured Gas Pipe Installation, Singapore Standard, CP51; 8. Handbook on Procedures and Requirements for Gas Supply; 9. All relevant acts, regulations and codes of practice. Items 1 to 6 can be found at http://www.ema.gov.sg Please visit our website at www.kepinfra.com for the latest updates to this Handbook. Do not hesitate to contact us, via the contact details below, for any queries. Business Centre & Account Management Matters Concerning Gas Commercial matters: i.e. Invoice settlement Gas Operation matters; i.e. Maintenance Gas leak or other emergencies Department Keppel Gas Commercial Keppel Gas Operations PowerGas Senoko CCR Contact Email Number +65 6278 1800 gas.commercial@kepinfra.com +65 6277 0600 kgas@kepinfra.com 1800 752 1800 (24 hours) - Page 1

CONTENTS A DEFINITIONS... 3 B GENERAL INFORMATION... 5 1 Background... 5 2 Gas Supply System... 5 3 Professional Engineer and Licensed Gas Service Worker... 6 4 Tariffs... 7 C PROCEDURES FOR GAS SUPPLY AND CONNECTION (NEW CUSTOMER)... 7 1 Preliminary Assessment... 7 1.1 Customer Service / Pre-submission Consultation... 7 2 Site Survey... 8 3 Application for Gas Supply and Connection... 8 3.1 Gas Supply... 8 3.2 Gas Connection... 8 3.3 Other Relevant Documents for Gas Supply and Connection Application... 8 4 Notification to Customers on the Project Cost... 9 5 Gas Transporter to Proceed for Gas Connection and Admittance... 9 6 Customer to Proceed with Construction of Gas Installation... 10 7 Application of Gas Turn-On... 10 D PROCEDURES FOR REPLACEMENT, ADDITION AND ALTERATION OF GAS FITTINGS AND APPLICANCES... 12 E PROCEDURES FOR GAS SUPPLY CONNECTION (EXISTING NATURAL GAS USERS)... 12 F GAS SUPPLY TERMINATION... 12 Appendix A: Distribution Connection Flowchart... 14 Appendix B: Distribution Connection Forms... 15 KGAS01: APPLICATION FOR GAS SUPPLY... 24 KGAS02: APPROVAL FOR GAS SUPPLY... 25 KGAS03: CERTIFICATE OF FINAL PRESSURE TEST... 26 KGAS04: CERTIFICATE OF PROOF TEST... 27 KGAS05: VERIFICATION OF TURBINE METER READING... 28 KGAS06: STATEMENT OF TURN-ON OF GAS... 30 KGAS07: APPROVAL FOR MODIFICATION WORKS TO EXISTING GAS INSTALLATION... 32 Notification of Isolation of Gas Supply... 33 Notification of Termination of Gas Supply... 35 Page 2

A DEFINITIONS Check Meter shall mean any subsidiary device used to verify the readings taken by a Meter; Designated Representative shall mean a Professional Engineer or a Licensed Gas Service Worker appointed by the developer or a person responsible for the premises; EMA shall mean Energy Market Authority; Gas Appliance shall mean any appliance in which gas is consumed, either for domestic requirements (including for cooking, heating or cooling purposes) or for industrial or commercial requirements (including for powering a gas engine or as feedstock in a chemical process); Gas Distribution Network shall mean those part of the transportation system (owned and operated by the Gas Transporter) which do not comprise the Gas Transmission Network; Gas Fitting shall mean any pipe, valve, Meter, regulator or other device for the control, measurement and use of gas; Gas Installation shall mean a discrete grouping of Gas Fittings linking a Gas Service Pipe to a Gas Appliance; Gas Main shall mean any gas pipe used for the distribution of gas from a Gas Transmission Pipeline to a consumer but does not include a Gas Service Pipe or an Internal Pipe; Gas Retailer shall mean any person who is issued a gas retailer license by EMA Gas Service Isolation Valve or GSIV shall mean a valve, located at or near the boundary line of any property or the apron of any building, used by a Gas Transporter to isolate the supply of gas to that property or building; Gas Service Pipe shall mean means a pipe or any part thereof, other than a Gas Main, used for the purpose of conveying gas from a Gas Main to a Gas Service Isolation Valve, and includes any pipe owned by, or under the management or control of, a Gas Transporter which is used for the purpose of conveying gas from the Gas Service Isolation Valve to the Meter at a gas customer s premises; Gas Service Work shall mean any work carried out on any Gas Installation or Gas Appliance, in whole or in part, including any design, construction, installation, commissioning, erection, testing, repair, addition, alteration or maintenance work; Gas Transmission Pipeline shall mean a bulk transmission pipeline or interconnected transmission pipeline, together with equipment (including pressure regulating and control valves) used for the conveyance of gas to a direct access customer or a Gas Mains network, and "Gas Transmission Network" shall be construed accordingly; Gas Transporter shall mean PowerGas Ltd; Page 3

GDP shall mean Gas Distribution Project; Internal Pipe shall mean any pipe, not being a gas pipeline, used for the purpose of conveying gas from a Gas Service Pipe to a Gas Appliance, including a Gas Fitting inserted therein but excluding a Meter; Keppel Gas shall mean Keppel Gas Pte. Ltd.; Licensed Gas Service Workers shall mean a person who is licensed under section 12 (3) of the Gas Act; Meter shall mean any device for computing the volume of gas supplied or amount of energy supplied, for charging purposes, but does not include a Check Meter; Meter Installation shall mean any meter and its associated equipment and installation, including any associated pipework, filter, valve, pressure regulating equipment, seal, housing, mounting, telemetry equipment and gas chromatograph; Metering and Pressure Regulating Skid shall mean the equipment housing the meter located at the customer s premises to meter and regulate the delivery gas pressure according to the customer s Gas supply requirement. MOM shall mean Ministry of Manpower; Professional Engineer or PE shall mean a person who is registered as a professional engineer in the mechanical engineering discipline under the Professional Engineers Act (Cap. 253); Page 4

B GENERAL INFORMATION 1 Background Keppel Gas establishes its presence and delivers value to the Singapore gas market by covering the entire gas supply value chain as an importer, shipper and retailer. Keppel Gas is a fully-owned subsidiary of Keppel Infrastructure Holdings Pte Ltd ( KI ). Keppel Gas is the first importer of piped natural gas from Malaysia, bringing in competitive molecules to the Singapore shores from national oil and gas company, Petronas Nasional Berhad. In May 2013, Keppel Energy and Keppel Integrated Engineering were re-organised under a single entity, Keppel Infrastructure Holdings Pte. Ltd. KI drives the Keppel Group's strategy to invest in, own and operate competitive energy and infrastructure solutions and services by tapping the expertise of its environmental engineering and technology. Keppel Gas operates under the newly organized entity Gas-to-Power division comprising of other business units, namely; generation company, Keppel Merlimau Cogen; electricity retailer, Keppel Electric; utilities and service corridor provider in Jurong Island, Pipenet. The business division, Gas-to-Power, provides synergistic services across the entire utilities value chain. KI is a brand of choice offering one-stop solution to businesses seeking to manage its supply of electricity, gas and district cooling services by delivering significant cost savings. 2 Gas Supply System Keppel Gas manages a supply portfolio comprising of piped natural gas from Malaysia and Indonesia, and liquefied natural gas from British Gas Singapore Gas Marketing. With a portfolio of gas supply, Keppel Gas can deliver Gas to its customers with great security and flexibility. Keppel Gas delivers molecules to the customers premises by flowing natural gas through Transmission Network 2 as defined in Annexure 12 of the Singapore Gas Network Code which are onshore regulated assets owned, operated and maintained by the Gas Transporter. Natural Gas can be supplied through the 28 barg or 40 barg Gas Transmission Network to transmission level customers. In contrast, supply pressure for Distribution Networks is about 2 barg. Depending on the customer s requirement, the delivery pressure to the customer s premises can be up to 2 barg. Page 5

For customers requiring pressure higher than 2.0 barg, costs associated with the installation of necessary equipment to achieve the required pressure shall be borne by the customers. Customer can refer to the specification found on EMA s website at www.ema.gov.sg to find out the characteristics to natural gas supplied in Singapore. 3 Professional Engineer and Licensed Gas Service Worker All Gas Service Work shall only be carried out by a Professional Engineer with a valid practicing certificate in the mechanical engineering discipline. In particular, all gas boilers must be certified by a Professional Engineer with specialization in boiler equipment in accordance with MOM requirements. The Professional Engineer shall be responsible for a. Designing and construction of the pipeline section from the Gas Service Isolation valve to the Inlet Service Valve of the Metering and Pressure Regulating Skid. b. Designing and construction of the pipeline section from the Outlet Service Valve of the Metering and Pressure Regulating Skid up to and including the Gas Installation. The scope of work in (a) can be undertaken by the Gas Transporter for an agreed fee. The Professional Engineer shall ensure all works must be carried out in full compliance with the Gas Act, and all relevant regulations, codes and standards. All works performed by or conducted by a Licensed Gas Service Worker must be carried out under the supervision of the Professional Engineer. Submission of plans for Gas Installation pipework and addition and alteration work shall be carried out by a Professional Engineer. The Professional Engineer must endorse his plans to confirm / certify that the submission complies with the Gas Act, and all relevant regulations, codes and standards. These plans will then be used for application for gas admittance and gas turn-on. A list of registered Licensed Gas Service Workers can be obtained from EMA s website at http://www.ema.gov.sg Page 6

4 Tariffs The Gas Transporter will levy a transportation tariff for the transportation of Gas to the customer s premises. The transportation tariff comprises of the following three components: a. transmission capacity charges; b. transmission usage charges; and c. distribution charge component. These charges are subject to review by the Gas Transporter and approved by EMA. Please note that Keppel Gas will levy a transportation charge on its customers. Further details on the transportation charges may be obtained from Keppel Gas via email at gas.commercial@kepinfra.com. C PROCEDURES FOR GAS SUPPLY AND CONNECTION (NEW CUSTOMER) The flowchart on the application procedures and the relevant forms can be found in Appendix A and Appendix B. 1 Preliminary Assessment 1.1 Customer Service / Pre-submission Consultation All enquires for gas supply (and/or electricity) can be made to Keppel Gas customer service at telephone number 6278 1800, during office hours from 9.00am, to 6.00pm, from Monday to Friday (excluding public holidays), or email to gas.commercial@kepinfra.com. Keppel Gas will follow up with the customer to understand the customer's requirements. Customers are required to appoint a Designated Representative who will liaise directly with Keppel Gas on all matters relating to Gas Installation. The Designated Representative shall ensure that the Gas Installation is designed, constructed, tested and commissioned in accordance to the requirements of the Gas Act, and all relevant regulations, codes and standards. The Designated Representative shall also endorse all drawings, documents, applications and submissions in relation to the Gas Installations. Page 7

2 Site Survey The customer must first submit Form GDP102 to Keppel Gas. A feasibility study and site survey will be conducted together with the Designated Representative, and Gas Transporter's representative to discuss the entry point at the customer's premises, location of Metering and Pressure Regulating Skid, the distance of connection pipelines and the project evaluation. 3 Application for Gas Supply and Connection 3.1 Gas Supply The customer is required to submit Form KGAS01 with the relevant documents as mentioned in Section 3.3 below to Keppel Gas. After the submission is processed, the applicant will be informed of the outcome via Form KGAS02. 3.2 Gas Connection Concurrently, the customer is also required to submit Form GDP101 with the relevant documents as mentioned in Section 3.3 to Keppel Gas. Keppel Gas will submit the completed forms, on behalf of the customer to the Gas Transporter. Gas Transporter is expected to reply within 14 days upon receipt of such request from Keppel Gas. 3.3 Other Relevant Documents for Gas Supply and Connection Application a. Location / site plans showing the proposed site and connection point; b. Pipe route from property boundary to Metering and Pressure Regulating Skid; c. Location of Metering and Pressure Regulating Skid d. Form GDP101 & GDP102; e. Written consent of the owner of Gas Installation (if applicant is not the owner); All proposed Gas Installation drawings / plans which are submitted together with the forms mentioned in Sections 3.1 and 3.2 must be duly endorsed by the Professional Engineer and submitted to Keppel Gas for preliminary approval. This approval does not cover the checking on the compliances and engineering design. The Designated Representative shall work closely with the Professional Engineer to ensure and confirm/certify that the submission and all gas service work are in compliance with the Code of Practice and Regulatory Requirements. Page 8

4 Notification to Customers on the Project Cost Upon evaluation for the Gas Connection by the Gas Transporter, Keppel Gas will provide a quotation for the extension and connection of gas main/service to the customer s premises Concurrently, Keppel Gas will continue to work with the customer for the execution of an agreement (the Agreement ). 5 Gas Transporter to Proceed for Gas Connection and Admittance Upon execution of the Agreement between Keppel Gas and the customer, and upon receipt of payment of a connection cost from the customer, Keppel Gas will confirm the gas connection project with the Gas Transporter who will then commence construction of the pipeline from the gas mains to the customer s premises. When the customer s premises is ready to receive gas, the Designated Representative is required to write in to Keppel Gas to request for gas admittance. The Designated Representative is required to submit two (2) copies of the following documents at least seven (7) days in advance of the gas admittance date. a. As-built drawings including pipe layout, single line diagram; b. Statement of welding procedure adopted in the construction; c. Welder s certificates; d. Non Destructive Testing ( NDT ) report for pipework; e. Risk Assessment of Gas Turn on procedure; f. Statement of Method for Gas Turn-on adopted. The statement shall clearly illustrate the steps/measures taken by the PE to ensure that Gas turn on is being carried out in a safe and efficient way.; and g. Gas installation specification Upon receiving confirmation about the gas admittance date from Keppel Gas, the Designated Representative is required to notify all relevant parties that gas will be admitted into the premises up to the Gas Installation on the specific date. The relevant parties shall include but not limited to, the person responsible for the premises, owner/developer, main contractor, subcontractors, architect, engineer, suppliers and vendors, that Gas will be admitted into the Gas Installation. On the date of gas admittance, the Professional Engineer is to ensure that the Gas Installation is not tampered with and hot works in the vicinity of the Gas Installation are carried out with all necessary safety precautions during the Page 9

date of Gas admittance. In particular, all hot works must be stop during the Gas admittance process. The Designated Representative will then submit Form GDP105 to Keppel Gas who will request the Gas Transporter to admit gas up to outlet valve of the Metering and Pressure Regulating Skid. Upon successful admittance of gas up to the Metering and Pressure Regulating Skid, the Gas Transporter will issue Form GDP110A to the customer, and provide a copy to Keppel Gas for record purposes. 6 Customer to Proceed with Construction of Gas Installation Concurrently, the Designated Representative is required to liaise with the Project Coordinator (as appointed by Keppel Gas) to oversee and carry out construction of Gas Installation from outlet valve of the Metering and Pressure Regulating Skid to the Gas Appliance at the customer's premises. The Professional Engineer shall ensure that the Gas Installation is constructed in accordance with the plan approved for construction and is in full compliance with all the statutory and relevant codes / standards requirements. Prior written consent must be sought from Keppel Gas if it involves plans which deviate from the original plan approved for construction. Any deviation(s) from the original submission shall be re-certified and approved by the Professional Engineer again. 7 Application of Gas Turn-On When the construction of the pipes from outlet valve of Meter Installation to the Gas Appliance is completed, the Designated Representative is required to conduct final pressure test in the presence of the Professional Engineer. Once installation has passed the final pressure test, both Designated Representative and Project Coordinator shall certify on Form KGAS03. The Designated Representative will then conduct the necessary proof test and submit Form KGAS04 to Keppel Gas after completion of the test. Concurrently, the Designated Representative is also required to set up vent points equipped with flame arrestor for testing purposes. Such identified vent points must be located in open space to allow gas to disperse into the surrounding easily. The Designated Represetnative must also ensure that all plugs, caps and other ends of the installation are affixed with warning labels marked 'Gas Pipe Tested. Do Not Tamper'. After the proof test on the Gas Installation, no one is allowed to carry out any further work without prior written approval from Page 10

Keppel Gas. Any further work on the installation will render the proof test null and void. If any further work has to be carried out, a new application for the work shall be made together with the plans. Upon completion of the proof test, if the gas supply is not turned on and the consumer's internal pipe including the Meter Installation is left unattended, the Designated Representative must ensure that the spool piece interconnecting the outlet service valve and the downstream pipeline is physically removed. This is necessary to prevent any flow of gas into the Gas Installation. All necessary tests and checks must be conducted again prior to any gas turn on process again. Once the customer's internal pipes from the Meter Installation up to the Gas Appliances are ready to receive gas, the Designated Representative is required to submit GDP111 to Keppel Gas to apply for gas turn-on. Before the Gas Transporter proceeds to turn on the gas Meter control valve, Keppel Gas will register the Meter reading in Form KGAS05. The Designated Representative shall then proceed to purge the Meter Installation to ensure 100% nitrogen (N 2 ) before proceeding to commission the customer's internal pipe up to the Gas Appliance with Gas. Upon successful purging of the gas pipeline system with nitrogen, the Designated Representative is allowed to admit gas into the Meter Installation up to the Gas Appliance(s). The Designated Representative under the supervision of the Professional Engineer shall ensure the Meter Installation and Gas Appliance(s) is filled with 100% Gas for the completion of the commissioning process. Keppel Gas will then issue Form KGAS06 upon certification by the Professional Engineer of successful purging and commissioning of the customer's Internal Pipe. Upon completion of the gas turn on process, the Designated Representative shall provide and affix the LIVE GAS. DO NOT TAMPER labels on all plugs, caps, isolating valves and other end points of the gas installation. The Designated Representative shall also ensure that safety lockout tags are provided for at the customer s own cost. Customer is required to carry out maintenance on the pipeline system on the regular basis in accordance to current industrial practice. The customer shall ensure that such maintenance records are properly documented. Keppel Gas reserves the rights to review the maintenance records. Page 11

D PROCEDURES FOR REPLACEMENT, ADDITION AND ALTERATION OF GAS FITTINGS AND APPLICANCES In the event if customer is required to perform any addition and alterations (A&A) works on the gas system, the customer is required to write in to Keppel Gas officially. Such written notice shall include but not limited to the following information: a. Type of modification works being carried out; b. Date and estimated timeline for modification works; c. The PE responsible for the modification works; Application for works to be carried out on the underground gas mains, such as the application for the termination of the gas supply to premises and the diversion of underground gas pipes, shall be made to Keppel Gas who will then inform the Gas Transporter. Under no circumstances should any modification works be carried out without the written approval of Keppel Gas. Upon receiving written approval from Keppel Gas, Keppel Gas shall work with the customer, and Gas Transporter to isolate the gas supply to the premises on the specific date as agreed by all parties. The above procedures from (C) 2 to 7 are also applicable for the replacement, addition and alteration of Gas Fittings and Gas Appliances. E PROCEDURES FOR GAS SUPPLY CONNECTION (EXISTING NATURAL GAS USERS) For existing Gas users who intend to apply for gas supply from Keppel Gas, please contact Keppel Gas for commercial / technical discussion through the customer service telephone number 6278 1800 or email to gas.commercial@kepinfra.com. Keppel Gas will work with the Gas Transporter and any other relevant parties to determine if there are any requirements for new Metering and Pressure Regulating Skid installation or modifications to existing infrastructure. Upon execution of the Agreement, Keppel Gas will work with the relevant parties to ensure a smooth switch over from the existing Gas Retailer to Keppel Gas. The above procedures from (C) 3 to 7 would also be applicable for existing customers, who require a new Metering and Pressure Regulating Skid installation. F GAS SUPPLY TERMINATION In the event that the Customer wishes to terminate the natural gas supply upon expiry of the Agreement or in accordance with the terms of the relevant gas agreement, the Customer shall notify Keppel Gas in accordance to the commercial Page 12

arrangement as prescribed under the relevant gas agreement. Upon receipt of the written notice, Keppel Gas will work with the Gas Transporter and any other relevant parties to effect the following arrangements: a. Gas Transporter to disconnect and isolate the gas supply to the premises; i. A Notification of Isolation of Gas Supply will be issued to the Customer by Keppel Gas upon complete isolation of gas supply at the MPRS outlet S/V or GSIV, whichever applicable. A copy of the Notification will be sent to the Gas Transporter for record purposes. ii. A Notification of Termination of Gas Supply will be issued to the Customer by Keppel Gas for the successful isolation of the GSIV. A copy of the Notification will be sent to the Gas Transporter for record purposes. b. The removal of the MPRS (if necessary) (to be witnessed by Keppel Gas); c. Keppel Gas to arrange for the final settlement of payment; d. Return of Banker s Guarantee (BG) to the Customer after settlement of outstanding payments, if any. Page 13

Appendix A: Distribution Connection Flowchart Customer to submit GDP102 (Customer Project Data Sheet) Keppel Gas to arrange for site survey DR, PC and Gas Transporter Customer to submit KGAS01 (Application for Gas Supply) Customer to submit GDP103 (Designated Representative Declaration) and the site places Customer to submit GDP101 (Application for Gas Distribution Connection) Keppel Gas will reply to KGAS01 via KGAS02 (Approval for Gas Supply) Gas Transporter will revert within 14 days and Keppel Gas will inform of connection charge and lead time Once payment is made and OTA signed, Gas Transporter will begin construction of Gas Fitting from GSIV up to and including MPRS Customer to carry out construction and connection of Gas Installation from MPRS to Gas Appliance When site from GSIV to MPRS is ready to receive Customer gas, to submit Customer GDT102 is to submit (Customer GDP105A Project Data Sheet) and organize site survey DR, PC and Gas Transporter (Application for Admittance of Gas) Upon successful admittance of gas, Gas Transporter will issue GDP110A (Statement of Admittance of Gas) After completion, Customer is to conduct Final Pressure Test and DR to certify on KGAS03 (Certificate of Final Pressure Test) Customer to conduct Proof Test and DR to submit KGAS04 (Certificate of Proof Test) after completion of the test Customer to submit GDP111 (Authorization to Turn on Gas Meter Control Valve) to apply for gas turn on Keppel Gas will issue KGAS05 (Verification of Turbine Meter Reading) DR to purge and commission the Customer s internal pipe up to the appliance Keppel Gas will issue KGAS06 (Statement of Turn-On of Gas) upon successful purging and commissioning End Page 14

Appendix B: Distribution Connection Forms Form GDP101 Form GDP102 Form GDP105A Form GDP106 Form GDP107 Form GDP108 Form GDP110A Form GDP111 Application for Gas Distribution Connection Customer Project Data Sheet Application for Admittance of Gas (with MPRS) Certificate of Completion Certificate of Final Pressure Test Certificate of Proof Test Statement of Admittance of Gas (with MPRS) Authorisation to Turn On Gas Meter Control Valve Form KGAS01 Form KGAS02 Form KGAS03 Form KGAS04 Form KGAS05 Form KGAS06 Form KGAS07 Application for Gas Supply Approval for Gas Supply Certificate of Final Pressure Test (Consumer s Internal Pipe) Certificate of Proof Test (Consumer s Internal Pipe) Verification of Turbine Meter Reading Statement of Turn-On of Gas Approval for Modification Works to Existing Gas Installation Page 15

Date: To: PowerGas Ltd c/o Director (Gas Network Projects) SP PowerGrid Ltd Application of Gas Distribution Connection Through Shipper Signature of Retailer Representative Name / Designation Keppel Gas Pte Ltd Name of Retailer GAS CONNECTION TO: (Project Name) (Address of Premises / Development) I would like to apply for connection to the PowerGas gas pipeline network for the above project. I hereby submit the following documents: Customer Project Data Sheet (Form GDP102) Location / site plan showing the proposed connection point(s). Name of Applicant : Designation : Company : Signature/ Date: GDP 101 (0911) Page 16

Customer Project Data Sheet Customer Information Project Name : Address of Premises/ Development : Customer Type : Retail Consumer Consumption Information Type of Gas : Town Gas / Natural Gas * Customer Type : Industrial / Commercial / Domestic * Application of Gas : Co-Gen / Tri-Gen / Boiler / Cooking / Water Heating / Others* If Others, please specify : Gas Consumption Duration per Day 8 / 12 / 24* hours or otherwise please specify : Expected Gas Admittance Date (DD/MM/YY) Applicable to NG projects only* Applicable to TG projects only* Load profile Design pressure of gas installation Submitted by Applicant Name of Company : Delivery Pressure and Flowrate Year 1 Year 2 Year 3 Year 4 Year 5 Maximum Instantaneous Flowrate: Minimum Flowrate: (Value should be greater than zero) MPRS Outlet Pressure Average Monthly Consumption mmbtu / year mmbtu / year mmbtu / year mmbtu / year mmbtu / year Sm 3 /hr Sm 3 /hr Barg Not Applicable Kwh/mth Maximum Instantaneous Flowrate: Not Applicable Sm 3 /hr Minimum Flowrate: (Value should be greater than zero) Name of Officer : Name of Officer : Designation : Designation : Date : Date : Not Applicable Confirmation by Retailer / Shipper Name of Retailer / Shipper : Keppel Gas Pte Ltd Sm 3 /hr Barg I agree with the above information provided by the applicant. Signature : * Delete where applicable Signature: Note : The above is for information and planning purposes only. PowerGas may not be able to nor is obliged to fulfill any of the above requirements. GDP102 (0911) Page 17

Application for Admittance of Gas PowerGas Ltd c/o Director (Gas Network Projects) SP PowerGrid Ltd Through Retailer Signature of Retailer Representative Name / Designation Keppel Gas Pte Ltd Name of Retailer (Project Name) (Address of Premises / Development) (A) i Ii iii I, the Designated Representative (DR) of the above project, certify that, The gas installation from, but excluding, the GSIV up to, but excluding, the meter installation is ready to receive gas. The consumer internal pipe is not connected to the meter installation. I attached the following forms for your reference please: - GDP 106 Certificate of Completion - GDP 107 Certificate of Final Pressure Test iv All end points are capped / blanked / plugged off v I undertake to conduct Proof Test and submit GDP 108 Certificate of Proof Test immediately prior to the connection. *PE / LGSW No. : Signature and Stamp of DR / Date (B) I hereby request for admittance of gas to the gas installation up to, but excluding, the meter installation on. Signature of Applicant / Date Name : Designation : To the Retailer: This is to confirm gas admittance shall be carried out on (date) at (time). Please notify all relevant personnel to be present on site. SPPG Officer-in-charge With MPRS GDP105A (0911) Page 18

PowerGas Ltd c/o Director (Gas Network Projects) SP PowerGrid Ltd Through Shipper Certificate of Completion Signature of Retailer Representative Name / Designation Keppel Gas Pte Ltd Name of Retailer (Project Name) (Address of Premises / Development) I, the Designated Representative of the above project, hereby certify that the Gas Installation for the above project from, but excluding, the GSIV up to, but excluding, the Meter Installation have been designed and constructed in compliance with the requirements of the latest revision of the following: Gas Act (Cap 116A); Gas (Supply) Regulations 2008; Gas Supply Code; Code of Practice for Manufactured Gas Pipe Installation, Singapore Standard, CP 51:2004; Other relevant code / standard : (please specify for installation with operating pressure higher than 20 Kpa) All relevant acts, regulations and rules which are applicable to the gas installation; 2 The design pressure of the Gas Installation is Barg. Signature and Stamp of DR / Date Name : PE / LGSW * No. : * Delete where applicable GDP 106 (0911) Page 19

PowerGas Ltd c/o Director (Gas Network Projects) SP PowerGrid Ltd Through Retailer Certificate of Final Pressure Test Signature of Retailer Representative Name / Designation Keppel Gas Pte Ltd Name of Retailer (Project Name) (Address of Premises / Development) I, Designated Representative of the above project, hereby certify that the Gas Installation from, but excluding, the GSIV up to, but excluding the Meter Installation, has been successfully tested at (Barg) for (hrs) and passed the final pressure test on (date) in accordance to the requirements of: Note: Please tick below where applicable Code of Practice for Manufactured Gas Pipe Installation, Singapore Standard, CP 51:2004 (or its latest revision); or Other relevant code / standard : (please specify for installation with operating pressure higher than 20 kpa) 2 I hereby declare that the Maximum Allowable Operating Pressure (MAOP) of the above Gas Installation is (Barg). Signature and Stamp of DR / Date Name : PE / LGSW * No. : * Delete where applicable GDP 107 (0911) Page 20

PowerGas Ltd c/o Director (Gas Network Projects) SP PowerGrid Ltd Through Retailer Certificate of Proof Test Signature of Retailer Name / Designation Keppel Gas Pte Ltd Name of Retailer (Project Name) (Address of Premises / Development) I, Designated Representative of the above project, hereby certify that the Gas Installation for the above project from, but excluding, the GSIV up to, but excluding, the Meter Installation have been tested and successfully passed the proof test 1 on (date). 2 I further certify that the test pressure has been released and the said Gas Installation is currently at atmospheric pressure. Accordingly, I hereby request to proceed with the connection and gas admittance. 3 I shall undertake to purge and commission the Gas Installation from, but excluding, the GSIV up to, but excluding, the Meter Installation immediately after the gas admittance. Signature and Stamp of DR / Date Name : PE / LGSW * No. : 1 Proof test shall be conducted in accordance to the requirements of Singapore Standard CP51 for installation designed to operate below 20 kpa, otherwise, proof test shall be carried out at 100 kpa or the operating pressure, whichever is lower, for a period of 30mins. REQUEST FOR INTERIM ADMITTANCE OF GAS I, Designated Representative of the above project, hereby certify that the Gas Installation for the above project from, but excluding, the GSIV up to, but excluding, the Meter Installation have been prepared and is ready for purging and commissioning. Please proceed to admit gas for the purpose of purging and commissioning. Signature and Stamp of DR / Date * Delete where applicable Name : PE / LGSW * No. : GDP 108 (0911) Page 21

To: For: (Name of Applicant) (Gas Installation or gas fitting s Address) STATEMENT OF ADMITTANCE OF GAS 1 Upon your request, we admitted natural / town* gas at the nominal pressure of Bar gauge up to the outlet valve of the meter installation on / / at about hrs. The gas installation from the Gas Service Isolation Valve (GSIV) up to the outlet valve of the meter installation is henceforth connected to the gas supply system. 2 The applicant and Designated Representative (DR) are required to notify all parties concerned, including but not limited to the responsible person, owner, developer, architect, engineer, main contractor and sub-contractors, suppliers, vendors etc. that gas has been admitted into the gas installation up to the outlet valve of the meter installation and to take all necessary precautions to prevent tampering and/or damages to the gas pipes. 3 The applicant and DR are to ensure compliance with all applicable legislation and codes of practice governing such gas installation or gas fitting including the latest version of the Gas Act (Cap 116A), the Gas (Supply) Regulations 2008 and the Gas Supply Code. 4 If you detect or suspect any gas leaks, please contact our 24-hours Customer Service Centre at Telephone 1800-752-1800 immediately. Name of SPPG Representative SP PowerGrid Ltd As Agent for and on behalf of PowerGas Ltd Signature / Date Acknowledged by: Signature / Date Name of Applicant Designation Company Name Company Stamp (If applicable) DR Stamp and Signature / Date Name of DR *PE/ LGSW No. * Delete where applicable With MPRS GDP110A (0911) Page 22

Authorisation to Turn On Gas Meter Control Valve Date : PowerGas Ltd c/o Director (Gas Network Projects) SP PowerGrid Ltd (Project Name) (Address of Premises / Development) I, Project Coordinator ( PC ) of the above project, certify that all legal requirements pertaining to gas safety have been complied with, including (but not limited to) (*) Regulation 3(4)(b) of the Gas (Supply) Regulations. 2 I hereby authorise PowerGas to turn on the Gas Meter Control Valve on my behalf now on (date) at (time). Signature of PC Name : Designation : Name of Retailer : * Regulation 3(4)(b) of the Gas (Supply) Regulations states that where an application for a supply of gas (or for an increase to an existing supply) is made to a gas retailer the relevant gas retailer shall prior to turning on the gas supply at the relevant gas meter control valve, ensure that the appropriate test as specified in the gas supply code is conducted on the gas appliance and the consumer s internal pipe including the meter installation to ascertain that it MPRS GDP 111 (0911) Page 23

KGAS01: APPLICATION FOR GAS SUPPLY To: Keppel Gas Pte Ltd Date: 1 HarbourFront Avenue Ref. No.: #05-05 Keppel Bay Tower Singapore 098632 Tel: 6278 1800 Fax: 6278 0777 PROPOSED GAS SUPPLY TO: (Name of Project) (Address of Premise / Development) I on behalf of the owner, wish to apply for the following:- For the gas supply Replacement, Addition or alteration work to gas installation (A&A Work) (Please tick the appropriate box) I hereby submit the pipe routing proposal and my declaration for gas pipe installation / replacement, addition or alteration (A&A) works as attached. The designated representative (DR) to liaise with Keppel Gas Pte Ltd on all related matters is: Name: Tel No: PE No. / LGSW No: I hereby submit the following documents: Customer Project Data Sheet Site plan showing the proposed connection point. Proposed pipe routing layout of the gas installation Specifications of the new Gas Appliances (where applicable); Pipe route from GSIV to the MPRS and location of MPRS, where applicable The expected date of connection and gas admittance is: Designated Representative for the project Name: Contact No. PE / LGSW * No. : Owner / Developer * of the project Name : Address : Name of Applicant : Designation : Company : Signature / Date KGAS01 Page 24

KGAS02: APPROVAL FOR GAS SUPPLY To: Date: Ref No.: Dear Sir APPROVAL FOR PROPOSED GAS SUPPLY TO: (Name of Project) (Address of Premises / Development) 1) We refer to your application dated, with regards to the above premise / development. 2) In view of your written declaration that the design of gas pipe installation and the work to be carried out for above mentioned project is in compliance with the Gas Act (Cap 116A), the Gas (Supply) Regulations, the Gas Supply Code, the Code of Practice for Manufactured Gas Pipe Installation, Singapore Standard, CP51:2004, Keppel Gas Pte Ltd Gas Retailer Handbook and all relevant acts, regulations, rules, codes of practice and design guidelines, we wish to inform you that we have no objection to the proposal. 3) Your PE is fully responsible for the gas installation design and compliance with the acts, regulations and codes. The approval is given without checking on the compliances and engineering design. 4) Please be informed that you and your Designated Representative are fully responsible for the compliance of all Legislations, Regulations, Codes and Practices applicable to the gas installation. 5) If you require further information or clarification, please contact our Project Coordinator. Yours sincerely, For and on behalf of Keppel Gas Pte Ltd Name: Designation: Our Project Coordinator is: Name : Tel (O): Mobile : KGAS02 Page 25

KGAS03: CERTIFICATE OF FINAL PRESSURE TEST To: Keppel Gas Pte Ltd Date: 1 HarbourFront Avenue Ref. No.: #05-05 Keppel Bay Tower Singapore 098632 Tel: 6278 1800 Fax: 6278 0777 (Name of Project) (Address of Premises / Development) I, Designated Representative of the above project, hereby certify that the Consumer s Internal Pipe for the above project, from the MPRS outlet to the appliance / equipment, has been successfully tested at (barg) for (hrs) and passed the final pressure test on (date) in accordance to the requirements of: Note: Please tick where applicable Code of Practice for Manufactured Gas Pipe Installation, Singapore Standard, CP 51:2004; or Other relevant code / standard : (please specify for installation with operating pressure higher than 20 KPa) 2 I hereby declare that the Maximum Allowable Operating Pressure (MAOP) is (barg). Signature and Stamp of PE / Date Name : PE No. : KGAS03 Page 26

KGAS04: CERTIFICATE OF PROOF TEST To: Keppel Gas Pte Ltd Date: 1 HarbourFront Avenue Ref. No.: #05-05 Keppel Bay Tower Singapore 098632 Tel: 6278 1800 Fax: 6278 0777 (Name of Project) (Address of Premises / Development) I, Designated Representative of the above project, hereby certify that the Consumer s Internal Pipe for the above project, from the MPRS outlet to the appliance / equipment has been successfully proof tested and passed the proof test 1 on (date). 2 I further certify that the test pressure has been released and the Consumer s Internal Pipe is currently at atmospheric pressure. Accordingly, I hereby request to proceed with the connection and gas turn-on. 3 I shall undertake and proceed to purge and commission the Consumer s Internal Pipe immediately after the gas turn-on. Signature and Stamp of PE / Date Name : PE No. : 1 Proof test shall be conducted in accordance to the requirements of Singapore Standard CP51 for installation designed to operate below 20 KPa, otherwise, proof test shall be carried out at 100KPa or the operating pressure, whichever is lower, for a period of 30mins. REQUEST FOR GAS TURN-ON I, Designated Representative of the above project, hereby certify that the Consumer s Internal Pipe for the above project from the MPRS outlet to the appliance / equipment has been prepared and is ready for purging and commissioning. Please proceed to turn-on gas for the purpose of purging and commissioning. Signature and Stamp of PE / Date Name : PE No. : KGAS04 Page 27

KGAS05: VERIFICATION OF TURBINE METER READING To: Keppel Gas Pte Ltd Date: 1 HarbourFront Avenue Ref. No.: #05-05 Keppel Bay Tower Singapore 098632 Tel: 6278 1800 Fax: 6278 0777 Re: Verification of Turbine Meter Reading We confirm that the Turbine Meter readings at the commencement of the operation are as follow: Date taken: Time: Meter Serial No.: Tag No.: FT - READINGS Mechanical Counter X 100 cu.ft. Uncorrected Volume ( Vb-c ) X 10 ft 3 Corrected Volume ( Vn ) X 100 ft 3 Energy ( Eph) X 10000 BTU Flow Rate ( qn ) mft 3 / d REMARKS: Company Name: Facilities Location: 24 hr Contact No. for Emergency: Contact Person: Witnessed By: Signature: Gas Customer Rep Name : Position: Date: KGAS05 Page 28

Signature: Keppel Gas Rep Name: Position: Date: KGAS05 Page 29

KGAS06: STATEMENT OF TURN-ON OF GAS To: Date: Keppel Gas Ref.: Your Ref.: Dear Sir STATEMENT OF TURN-ON OF GAS This is to inform you that in response to your application for turn-on of gas to your premises at, we have on (date) at (time) turned on the natural gas supply at the nominal pressure of kpa/bar gauge into the gas installation of the above mentioned premises. Kindly notify all relevant parties that gas has been turned on to the above premises and not to tamper with the gas installation. No further work on the above mentioned premises should be undertaken without our prior written consent. Signature of Keppel Gas Project Co-ordinator In Charge. Name: Phone No.: Note: * Delete where applicable Dear Sir, I acknowledge that gas has been turned on to the gas installation of the above mentioned premises on (date) at (time). I will inform all relevant parties that gas has been turned on to the above premises and not to tamper with the gas installation. Signature of Applicant or his Designated Representative Name: NRIC No. / Passport No.: Designation: Contact No.: Date: KGAS06 Page 30

Copy given to: (please tick appropriate box) Name/Company/Signature Owner MCST Gas Transporter Main Contractor Consultant Others This statement is to be issued to the applicant or a person authorised by the applicant immediately after turn-on of gas supply to the gas installation as required under the Gas (Supply) Regulations, Regulation 3(4)(d). KGAS06 Page 31

KGAS07: APPROVAL FOR MODIFICATION WORKS TO EXISTING GAS INSTALLATION To: Date: Ref No.: Dear Sir APPROVAL FOR PROPOSED ADDITION AND ALTERATION (A&A) MODIFICATIONS WORKS: (Name of Project) (Address of Premises / Development) 1. We refer to your application dated, with regards to the proposed modification works/ addition and alteration (A&A) works at the above premise / development. 2. In view of your written declaration that the design of proposed gas pipe installation and the work to be carried out for above mentioned project is in compliance with the Gas Act (Cap 116A), the Gas (Supply) Regulations, the Gas Supply Code, the Code of Practice for Manufactured Gas Pipe Installation, Singapore Standard, CP51:2004, Keppel Gas Pte Ltd Gas Retailer Handbook and all relevant acts, regulations, rules, codes of practice and design guidelines, we wish to inform you that we have no objection to the proposal. 3. Your PE is fully responsible for the gas installation design and compliance with the acts, regulations and codes. The approval is given without checking on the compliances and engineering design. 4. Please be informed that you and your Designated Representative are fully responsible for the compliance of all Legislations, Regulations, Codes and Practices applicable to the modification works. 5. Please be reminded that you are not allowed to connect the modification works to the existing Gas Installation without the approval of Keppel Gas. If you require further information or clarification, please contact our Project Coordinator. Yours sincerely, For and on behalf of Keppel Gas Pte Ltd Name: Designation: Our Project Coordinator is: Name : Tel (O): Mobile : KGAS07 Page 32

Notification of Isolation of Gas Supply To: Date: Keppel Gas Ref.: Your Ref.: Dear Sir, NOTIFICATION OF ISOLATION OF GAS SUPPLY TO < Customer s company name > PREMISES AT < Customer s company address > 1. This is to inform you that the Gas Transporter has, on (date) at hours, isolated the gas supply to your premise for the following purpose: (a) for your convenience in executing alteration works of the gas installation within your premise. (b) for termination of gas supply to your premise. [applicable to (a) and (b) only] The isolation conducted for the abovementioned purpose has been witnessed by your DR (name of the DR). (c) as risk mitigation measure of leakage of gas supply. 2. For purpose (a), you are hereby reminded that Keppel Gas and the Gas Transporter have to be notified in advance for any subsequent turn-on of gas to the above gas installation. 3. For purpose (b) or (c), you are hereby advised to await further instruction from Keppel Gas and the Gas Transporter for the next course of action. 4. Your understanding and co-operation is greatly appreciated. Yours faithfully, < name > < designation > Keppel Gas Pte Ltd Page 33

[applicable to (a) and (b) only] I acknowledge that gas has been isolated at the outlet S/V on the date and time as indicated above. Applicant / Designated Representative Name NRIC/Passport No. Page 34

Notification of Termination of Gas Supply To: Date: Keppel Gas Ref.: Your Ref.: Dear Sir, NOTIFICATION OF TERMINATION OF GAS SUPPLY TO < retail customer s company name > PREMISES AT < retail customer s company address > This is to inform you that the Gas Transporter has on < date & time > terminated the natural gas supply to your premise as witnessed by your DR < name of the DR >. Yours faithfully, < name > < designation > Keppel Gas Pte Ltd I acknowledge that gas has been terminated at GSIV on the date and time as indicated above. Applicant / Designated Representative Name NRIC/Passport No. CC: Gas Transporter Page 35