Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

Similar documents
Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

2017 Temporary traffic control guidelines for pedestrians. v.2

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

122 Avenue: 107 Street to Fort Road

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

Terwillegar Drive Expressway Draft Concept Plan

Blair/Williamson Intersection Expressed Needs

Hospital Link Project Project Update September 2017

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Access Routes from US 101 to the Richmond San Rafael Bridge

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Hospital Link Project Project Update November 2017

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

PROJECT FACT SHEET May 25, 2018

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

January 31, Woodrow Wilson Small Area Study

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Meade Street Bridge Design Alternative Study

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

PROJECT FACT SHEET March 21, 2018

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Major Bike Routes 102 Avenue Workshop April 21, 2015

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Meeting Date 10/18/2005 Type Internal Team Progress Other Date of Issuance 10/25/05. Coordination See attached sign-in sheet

Charlesgate. World Series Path

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

THE NACTO MANUALS AND DESIGNING FOR VISION ZERO ZAKI MUSTAFA SHIRLEY ZAMORA

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Purple Line Extension Community Meeting

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Welcome! San Jose Avenue Open House August 25, 2015

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

TEMPORARY OCCUPANCY PERMITS. Street Space, Additional Street Space and Temporary Occupancy Permits PUBLIC WORKS CODE : ARTICLE 15, SEC.

I-10 AT SCENIC LOOP RD. Open House

DDI s Can Move More Than Cars! 2016 Western ITE Conference Albuquerque, NM July 12, 2016 Alex Ariniello, P.E. Public Works Director, Town of Superior

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

Draft North Industrial Area-Wide Traffic Plan

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Work Zone Safety A Look At Best Practices. AASHTO SCOTE June 6, 2016

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

FY 2006 TRANSPORTATION CAPITAL PROGRAM

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Frequently Asked Questions

Richmond-Adelaide Cycle Tracks

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

Bellevue Downtown Association Downtown Bike Series

Transportation and General Civil Engineering Projects

Pavement Rehabilitation & Buffered Bike Lane

Astoria Boulevard ADA and Station Renewal Track Improvements. February 19, 2019

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Gerald Desmond Bridge Replacement: The Severance of a Major Bicycling and Ped Route

Design Criteria. Design Criteria

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

Intersection LOS Intersection level of service (LOS) is defined by the Highway Capacity Manual (HCM) by the following criteria:

SANTA CRUZ/ALAMEDA ROAD CONFIGURATIONS INTERSECTION AND STREET VIEWS

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

A number of inferences have been drawn from the observations, each of which is discussed below.

KC Scout Kansas City s Bi-State Transportation Management Center

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Washington St. Corridor Study

10 th STREET BRIDGE REPLACEMENT Schedule 'C' EA: Phase 3 Presentation to Council Recommended Design Alternatives City of Owen Sound August 27, 2018

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

The purpose of today s information session is to provide project information about the Fermor Avenue Bridge Rehabilitation and Roadworks.

Non-Motorized Overpass at SR 5/US1

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

Average Delay/Vehicle (sec/veh) Signalized. Unsignalized Intersection

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Welcome to the Sellwood Bridge Project Open House!

Why invest in the 1 Street S.W. Corridor?

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

Figure 7.6 Indicative site layout for Northcote Street tunnel site (C7), eastern ventilation facility site (C8) and Wattle Street and Walker Avenue

List of Display Boards

FY 2005 TRANSPORTATION CAPITAL PROGRAM

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

ECONOMY PEOPLE ENVIRONMENT

APPENDIX E Evaluation of Improvement Alternatives

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Designing with the Railroad

Traffic Control Inspection Checklist Segment:

PUBLIC INFORMATION MEETING

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

Transcription:

BRIDGE REHABILITATION Welcome 53 Avenue Overpass over Whitemud Drive Rehabilitation Public Information Session Wednesday, March 9, 2016 4:30-8:00 p.m. Tonight you can: Learn about the 53 Avenue Overpass rehabilitation and construction impacts Ask questions of the project team Leave us your feedback

BRIDGE REHABILITATION Overview: 53 Avenue Overpass Over Whitemud Drive Rehabilitation The 53 Avenue Overpass was built in 1977 as a two-span structure carrying six lanes of traffic (including two turning lanes) and two pedestrian walkways over Whitemud Drive. Maintenance and rehabilitation construction begins in March 2016 to extend its life. Construction will take place on half of the bridge at a time and include: Replacement of bridge girders and deck. Minor substructure repairs. Major Construction Schedule: Spring to Fall 2016 Minimal construction on 53 Avenue in Spring 2017

BRIDGE REHABILITATION Overview: 53 Avenue Overpass Over Whitemud Drive Rehabilitation Traffic on 53 Avenue will have lane reductions. Traffic on Whitemud Drive will also be detoured locally to avoid vehicles directly under the construction zone. In preparation for the construction detours, lane crossovers were constructed on Whitemud Drive in 2015. Three detour configurations are planned, depending upon the stage of the overpass rehabilitation. Signs will prewarn drivers of detours.

BRIDGE REHABILITATION Construction Impacts Lane reduction: Overpass - One traffic lane plus a turning lane in each direction will remain open. Lane reduction: Whitemud Drive - Two traffic lanes in each direction will remain open during temporary detours. Ramp closures - Terwillegar north bound ramp for short durations. Bus stop temporary relocation - Bus stops will be moved out of the construction area. Bus Route Modifications - Bus schedules will be adjusted as required, expect minor delays. Pedestrian detour - Pedestrians will be detoured to either side of the bridge. Speed reductions - Construction zone speed limits will be enforced on Whitemud Drive and 53 Avenue.

MERGE = 145 THE WAY WE MOVE BRIDGE REHABILITATION Whitemud Drive Detour Plan #1 Bridge not shown in this view. See following drawings for 53 Avenue Vehicle and Pedestrian Detours 3 lanes each direction through construction zone Short merge onto Terwillegar Drive south bound Short merge onto Terwillegar Drive north bound TERWILLIGAR DRIVE SB TERWILLIGAR DRIVE NB Reduced travel speeds Reduced lane widths

BRIDGE REHABILITATION Whitemud Drive Detour Plan #2 TO Bridge not shown in this view. See following drawings for 53 Avenue Vehicle and Pedestrian Detours 3.7 3.7 3.7 3.7 Temporary crossover detour - 4 occurrences (6-8 days/ occurrence) Short merge onto Terwillegar south bound Terwillegar north bound ramp closed 2 lanes in each direction through construction zone Reduced travel speeds TERWILLIGAR DRIVE SB TERWILLIGAR DRIVE NB Reduced lane widths Bridge demolition

THE WAY WE MOVE BRIDGE REHABILITATION Whitemud Drive Detour Plan #3 R300 TO Bridge not shown in this view. See following drawings for 53 Avenue Vehicle and Pedestrian Detours Temporary crossover detour - 4 occurrences (6-8 days/ occurrence) Terwillegar north bound ramp closed 2 lanes in each direction through construction zone Short merge onto Terwillegar south bound Reduced travel speeds TERWILLIGAR DRIVE SB TERWILLIGAR DRIVE NB Reduced lane widths Bridge demolition

BRIDGE REHABILITATION 53 Avenue Vehicle and Pedestrian Detours 53 AVE WB LEGEND 53 AVE EB 0 0 0 0 0 0 PEDESTRIAN DETOURS WEST BOUND EAST BOUND WORKING AREA One lane in each direction One turning bay in each direction Pedestrian traffic on south sidewalk across bridge North sidewalk closed Recommend cyclists dismount crossing bridge Stage 1 Construction on North Half of Bridge

BRIDGE REHABILITATION 53 Avenue Vehicle and Pedestrian Detours 0 0 0 0 0 0 53 AVE WB LEGEND PEDESTRIAN DETOURS 53 AVE EB WEST BOUND EAST BOUND WORKING AREA One lane in each direction One turning bay in each direction Pedestrian traffic on north sidewalk across bridge South sidewalk closed Recommend cyclists dismount crossing bridge Stage 2 Construction on South Half of Bridge

BRIDGE REHABILITATION Temporary Bus Stop and Schedule Changes Five bus stops within the construction zone will be closed and replaced by three temporary bus stops, located outside the construction zone. Effective April 24th, additional travel time will be added to routes 23, 30, 32, 33, 36 and. ETS will monitor and adjust as required. New schedules will be posted at the bus stops and available online at www.takeets.com. The schedule for Route 3 will not change, however some bus stops will be temporarily relocated.

BRIDGE REHABILITATION Temporary Bus Stop Changes *off peak only 23 30 32 23 30 32 33* 33 36 36 3 TEMPORARY BUS BUS STOP CLOSED BUS STOPS EXISTING BUS STOP - OPEN EXISTING BUS STOP - OPEN CLOSED BUS STOPS CLOSED BUS STOPS TEMPORARY BUS STOP TEMPORARY BUS STOP 3 53 AVE WB LEGEND 53 AVE EB 0 0 0 0 0 0 TEMPORARY BUS STOP 23 36 EXISTING BUS STOP 30 32 33* 3 EXISTING BUS BUS STOP - STOP OPEN - OPEN 33 3 3 TEMPORARY BUS STOP STOP BUS STOP EXISTING BUS STOP TO BE CLOSED *off peak only Temporary Bus Stop Changes for Stage 1 and 2