~~: men o. CITY of NOVI CITY COUNCIL. Agenda Item C February 21, erv1ces, ng1neenng IVISIOn. t ft:g br s E o..

Similar documents
CITY of NOVI CITY COUNCIL

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

r:f1 CITY of NOVI CITY COUNCIL Agenda Item J July 25, 2016

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

Preparing a Curb Ramp Project. December 15, 2010

;f; CITY of NOVI CITY COUNCIL. Agenda Item H November 25, 2013

Improve the livability of our streets by

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

Item No. 14 Town of Atherton

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Downtown Davidson Pedestrian and Bicycle Safety Plan

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

CITY OF PAPILLION, NEBRASKA

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

SITE DEVELOPMENT PLAN FOR PLANTATION LANDING TOWNHOMES WILMINGTON, NORTH CAROLINA

Chapter 4: Funding and Implementation

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Legislative Update Williamsburg Residency

SECTION 3 STREET DESIGN

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014

ADA on Construction. Guidance for Section C Plan Preparers

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

ITEM 3 ATTACHMENT A RESOLUTION NO

Accommodating Pedestrians in the Work Zone

CITY MANUALS AND STANDARDS REVIEW

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

ADA TRANSITION PLAN. For

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

North Avenue Corridor Study

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

SECTION TRAFFIC REGULATIONS

Building Great Neighbourhoods STRATHEARN

Traffic Calming Policy

Complete Streets Funding Program Project Prioritization Plan

ADA Operations Contact Info

Third Street Bridge & Corridor Project

PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Engineering - Bicycle and Pedestrian

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

CITY OF SOUTH DAYTONA

ADA TRANSITION PLAN. TOWN OF DeMOTTE

CONTRACT 5 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

Lynchburg District Update

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Clay Street Bridge Replacement Project

SCHOOL CROSSING PROTECTION CRITERIA

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

ADA TRANSITION PLAN 2013

Citizens Handbook for Requesting Traffic Calming Devices

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

TRAFFIC CALMING POLICY & PROCEDURES

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

Final Sidewalk Feasibility Study

Knox Street Complete Streets Project

ACTION TRANSMITTAL No

SCHOOL CROSSING PROTECTION CRITERIA

Driveway Design Criteria

Building Great Neighbourhoods QUEEN ALEXANDRA

Chapter 3.6 Elementary School Z. Volusia County MPO. March Page 13.0

Building Great Neighbourhoods LANSDOWNE

SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc.

ADA PRESENTATION (CURB RAMPS)

Memphis Walkability Toolkit

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

/ ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

Blue Ribbon Commission Report Recommendations on Pedestrian and Bicycle Infrastructure Improvements

ACHD Board of Commissioners Stacey Yarrington, Planner III Tandem Ridge/ EPP / PP-07-16/ RZ-12-16/ CPA-01-16/ A-07-16

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

Americans with Disabilities Act and Curb Ramps

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

Project Update May 2018

TRAFFIC MANAGEMENT PLAN

IMPLEMENTATION STRATEGIES

City of Margate, Florida. Neighborhood Traffic Management Manual

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

TOWN OF PARADISE VALLEY

Proposed Language as approved by the NCUTCD on June 23, 2011, for new section on Pedestrian Channelizing Devices

Transcription:

CITY of NOVI CITY COUNCIL Agenda Item C February 21, 2012 SUBJECT: Approval of Change Order No. 1 to ltalia Construction Inc. for the Nine Mile Pathway (Meadowbrook to Haggerty) project in the amount of $17,512. SUBMITTING DEPARTMENT D CITY MANAGER APPROV / ~~: men o 1c erv1ces, ng1neenng IVISIOn t ft:g br s E o.. EXPENDITURE REQUIRED $17,512 AMOUNT BUDGETED $304,480 LINE ITEM NUMBER 204-204.00-974.421 BACKGROUND INFORMATION: On August 22, 2011 ltalia Construction Inc. was awarded the construction contract for the Nine Mile Pathway (Meadowbrook Road to Haggerty Road) project in the amount of $167,857. This project involves the construction of a 6-foot wide concrete pathway along the north side of Nine Mile Road between Meadowbrook and Haggerty (the attached map shows the location of the pathway). This pathway segment was identified as the top priority by the Walkable Novi Committee and documented in the latest version of the Pathway & Prioritization Analysis and Process report. Completion of this segment now provides an alternate means of transportation that will benefit residents and businesses in Novr by connecting a large residential area with nearby non-motorized pathway systems such as the 1-275 pathway. This project impacted numerous property owners and communication was the key to making this project successful. The extensive communication with the residents greatly improved the final quality of the project, but also resulted in several modifications to the contract. The changes included minor realignments in the pathway, revisions to the crosswalk at the corner of Haggerty and Nine Mile to improve sight distance and safety, and other minor changes based on the field conditions to improve the quality of the final product. The attached Change Order incorporates these modifications and also balances all contract quantities to remove items that were not used and to increase contract quantities to match the constructed quantities. The pathway has been constructed and is substantially complete. Final restoration and permanent pavement markings will be completed in the spring prior to final completion of the project. RECOMMENDED ACTION: Approval of Change Order No. 1 to ltalia Construction Inc. for the Nine Mile Pathway (Meadowbrook to Haggerty) project in the amount of $17,512. Mayor Galt Mayor Pro Tern Staudt Council Member Casey Council Member Fischer 1 2 y N 1 2 y N Council Member Margolis Council Member Mutch Council Member Wrobel

BALANCING WORK CHANGE DIRECTIVE No. 1 I Project: 19 Mile Road Sidewalk (Meadowbrook to Haggerty) I Owner: City of No vi L.:..._------1 26300 Delwal Drive Novi, Michigan 48375 (248) 735-5632!Engineer: OHM 34000 Plymouth Road Livonia, Ml48150 (734) 522-6711!Contractor: ltalia Construction, Inc. 57151 Deer Creek Ct. Washington, Ml 48094 (586) 677-1697 I Drafted January 23, 2012 I Reasoning: This work change directive balances all contract quantities based on field conditions encountered and adjustments made during the course of the project based on communications with City personnel. Extras to the project were the result of modifications made to the pedestrian crossing at the Haggerty Road intersection to make it safer for pedestrians crossing Nine Mile Road, retaining walls added at the Nine Mile/Haggerty Road and the Cranbrooke/Nine Mile Road intersections, along with placement of th e permanent pavement marking materials this fall. The permanent pavement marking materials will be placed in the spring of 2012. Contract Items Page 1 of 2

New Contract Items Contract Price Item No. Item Description Unit Unit Price Quantity Add Deduct 18 Dr Structure Cover Lbs $1.25 679 $848.75 19 Dr Structure Cover, Adj, Case 2 Ea $180.00 5 $900.00 20 Dr Structure, Tap, 12 inch Ea $180.00 2 $360.00 21 Hand Patching Ton $130.00 11 $1,430.00 22 HMA Approach Ton $130.00 46 $5,980.00 23 Driveway, Nonreinf Cone, 6 inch Syd $27.00 227.5 $6,142.50 24 Curb and Gutter, Cone, Del F6 Ft $18.00 207.75 $3,739.50 25 Spillway, Cone Ft $20.00 10.5 $210.00 26 Sidewalk, Cone, 4 inch Sft $2.48 590.88 $1,465.38 27 Sidewalk, Cone, 6 inch Sft $3.00 197.7 $593.10 28 Sidewalk Ramp, ADA Sft $7.68 155.84 $1,196.85 29 Post, Steel, 3 lb Ft $12.00 29.7 $356.40 30 Sign, Type I, Erect, Salv Ea $50.00 3 $150.00 31 Sign, Type la Sft $38.00 14.75 $560.50 43 Plastic Drum, High Intensity, Furn Ea $10.00 74 $740.00 44 Plastic Drum, High Intensity, Oper Ea $10.00 74 $740.00 47 Mulch Blanket Syd $1.50 2708.6 $4,062.90 48 Surface Restoration, Seeding Syd $1.50 2708.6 $4,062.90 54 Utility Structure Cover, Adj, Case 2 Ea $180.00 $180.00 55 Sanitary Structure Cover, Adj, Case 2 Ea $220.00 2 $440.00 56 Gate Well Cover, Adj, Case 2 Ea $180.00 $180.00 57 Gate Well, Reconst, Case 2 Ea $180.00 $180.00 58 Irrigation Piping Ft $3.00 42.5 $127.50 59 Sprinkler Head, Adj Ea $25.00 10 $250.00 60 Sprinkler Head, Relocate Ea $25.00 3 $75.00 61 Maintenance Aggrregate, 21AA Ton $24.00 27.5 $660.00 Subtotals $25,300.90 $10,330.38 Total $14,970.52 Estimated Increase/Decrease in Contract Price $17,512.38 Original Contract Amount $167,856.86 Sum of Previous Approved Change Orders $0.00 Estimated Revised Contract Amount $185,369.24 *Final approved amounts in Contract Price must be formalized by way of a Change Order; especially any that exceed the Original Contract Price or 10% of the Contract Price, in sum.

-z::_ / -:7 _... Accepted By:~ ~:: ltalia Construction, Inc. / - ;l 3 ~/ 'Z- Approved By:~~ 12~-==-:::... _::::::::- -+L---~...:~---- ~ C~um, P :En;,;ee;;ng Manager \- Q.>-\- \~ 2/t /t2-- ; -z;, I /L Page2of2

I cltyofnovl.org BALANCING CHANGE ORDER No. 1 ---- I Project: 19 Mile Road Sidewalk (Meadowbrook to Haggerty) I Owner: City of Novi 26300 Lee BeGole Drive Novi, Michigan 48375 (248) 735-5632 I Engineer: OHM 34000 Plymouth Road Livonia, M148150 (734) 522-6711 I Contractor: ltalia Construction, Inc. 57151 Deer Creek Ct. Washington, Ml 48094 (586) 677-1697!Drafted January 23, 2012 I Description/Reasoning: This work change directive balances all contract quantities based on field conditions encountered and adjustments made during the course of the project based on communications with City personnel. Extras to the project were the result of modifications made to the pedestrian crossing at the Haggerty Road intersection to make it safer for pedestrians crossing Nine Mile Road, retaining walls added at the Nine Mile/Haggerty Road and the Cranbrooke/Nine Mile Road intersections. along with placement of the permanent pavement marking materials this fa ll. The permanent pavement marking materials will be placed in the spring of 2012. To the Contractor: You are hereby directed to comply with the changes to the contract documents. This change order reflects work completed or anticipated. Documentation supporting these changes are on file with the City of Nevi's Engineer. Current project plans and specifications will be adhered to unless specifically changed by this change order document. I THE CONTRACT AMOUNT SHALL BE CHANGED BY THE SUM OF: $17,512.381 joriginal CONTRACT AMOUNT: $167,856.861 jsum OF PREVIOUS APPROVED CHANGE ORDERS: $0.001 I REVISED CONTRACT AMOUNT: $185,369.241 THE CHANGES ADDRESSED BY THIS CHANGE ORDER HEREBY INCREASE THE CONTRACT TIME BY: I 0 Ierew Day(s) to 0 Substantial or 0 Final Completion -where applicable, attach the corresponding number of Work Change Directive to this Change Order.--./ """c.:zj Accepted By~ L ~ ~/ / --- ~'3-/L_ Prepared By: (]L 1!. IJI)., Recommended y ~ "r.r:j'7""' '_j J1 i)l/!_u/1 \- 8.At- \ ':U z/t/rz_ Aaron J. S ~tup, c l!lstrudiofytngineer I '.......' Approved By: ~""'~' ")f, L I z. ;

Meadowbrook Rd Haggerty Rd Nine Mile Pathway - Meadowbrook to Haggerty Location Map PROPOSED 6-FOOT WIDE PATHWAY SEGMENTS... Nine Mile Rd EXISTING 5-FOOT WIDE PATHWAY TO REMAIN Map Author: Croy 8/12/11 Project: Nine Mile Path Version #: V2.1 MAP INTERPRETATION NOTICE Map information depicted is not intended to replace or substitute for any official or primary source. This map was intended to meet National Map Accuracy Standards and use the most recent, accurate sources available to the people of the City of Novi. Boundary measurements and area calculations are approximate and should not be construed as survey measurements performed by a licensed Michigan Surveyor as defined in Michigan Public Act 132 of 1970 as amended. Pleased contact the City GIS Manager to confirm source and accuracy information related to this map. Legend Existing Major Road Pathway Existing Neighboring Pathway Existing Major Road Sidewalk Local Sidewalk Both Sides Local Sidewalk One Side Existing Neighboring Sidewalk EXISTING PATHWAYS I - 275 TRAIL SYSTEM I City of Novi Engineering Division Department of Public Services 26300 Delwal Drive Novi, MI 48375 cityofnovi.org Feet 0 175 350 700 1,050 1,400 1 inch = 1,000 feet