Preliminary Survey Notification and Information for Fisheries Interests.

Similar documents
Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement

Background Paper: Surveys. Nord Stream 2 AG Sep-17

MARINERS BRIEFING NEW ENGLAND SURVEY ACTIVITY CONTACT. RODNEY AVILA FISHERIES LIAISON Phone:

Shaded blocks indicate activity.

MARINERS BRIEFING NEW ENGLAND SURVEY ACTIVITY CONTACT. RODNEY AVILA FISHERIES LIAISON Phone:

Design and Planning Considerations For a Seabed Survey

IMPLEMENTATION. Argyll Marine Special Areas of Conservation

AGGREGATE DREDGING AND THE MARINE ENVIRONMENT

Notice to Mariners No 24 / 2017 Blyth Offshore Demonstrator Project 9 th September 2017

CMM Conservation and Management Measure for the Management of Bottom Fishing in the SPRFMO Convention Area

T H E A R E A I N VO LV E D

Protection for Vessels Engaged in Servicing Submarine Cables

WAVE HUB. Dr Mike Patching. A Future for Wave Energy in Cornwall. BEng, PhD, CEng, MEI

5. purse seines 3 000

Interim Spatial Separation Agreement between Dutch Pulse Trawlers and English East Coast Inshore Fishermen Background

The shaded blocks below indicate the areas of activity published within this Bulletin.

RAMSTM. 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs

CHALLENGES IN UXO-DETECTION: COMBINING DIFFERENT GEOPHYSICAL TECHNIQUES WITHIN UXO INVESTIGATION & CLEARANCE

MARINE ANTIQUITIES SCHEME

OTHER REGULATORY ISSUES VERSION AT 23nd August 2016

Fisheries Unit Welsh Government Rhodfa Padarn Llanbadarn Fawr Aberystwyth SY23 3UR 15 November 2013

Certified Professionals in Hydrographic Solutions

from ocean to cloud PARAMETRIC SUB-BOTTOM PROFILER, A NEW APPROACH FOR AN OLD PROBLEM

The shaded blocks below indicate the areas of activity published within this Bulletin.

For live Kingfisher updates of offshore activities, visit and on Twitter. 1 of 10

Multi-Purpose Workboats and Vessels. Marine Engineering and Construction. Salvage and Wreck Removal. Marine Consultancy Services

CONDUCT OF MOBILE DRILLING RIG SITE SURVEYS. Volume 2

Devon & Severn Inshore Fisheries & Conservation Authority. Sarah Clark Principal Environment Officer

Point LaBarbe/McGulpin Point Response April 2 May 8, 2018 Regional Response Team 3 Meeting November, 2018

Acoustic Pipeline Inspection Mind The Gap

Undulate ray (Raja undulata) in divisions 7.d e (English Channel)

Vieques Underwater Demonstration Project

WESTERMOST ROUGH. OffshOre Wind farm.

OFFSHORE SURVEY IN DEVELOPMENT PROJECTS. Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe

ASX Announcement. 27 February 2018 CETO Wave Energy Update

Byelaws: Questions and answers

141 cruise days 3100 researcher days 68 researchers 32 international 15 institutes 10 countries

Panel Discussion on unmanned Hydrography

Emerging Subsea Networks

Project Context. Legend. Jacky. Project Boundary. Fixed Platform/Structure Existing Demonstrator Turbine. Scottish Territorial Waters Boundary

NOAA s Underwater UXO Demonstration Projects Vieques Island, Puerto Rico

Serco NorthLink Ferries Ref: Performance Monitoring Contract Year Five

MACKEREL LICENSING (MANX AND CHANNEL ISLANDS BOATS) ORDER 1978

Welcome! Did You Know...? Aquatic Centre Dock Rebuild. Key Objectives

/ Advice May 2011

Regional Hydrographic Research, Studies & Projects

MARINE SAFETY PLAN

UNDERWATER SERVICES COMPANY PROFILE

Burbo Bank Extension Offshore Wind Farm

Notice of operations at London Array Offshore Wind Farm

Benefits of Proper Route Engineering to Mitigate Risk During the Design Life of Submarine Cable Systems

Developing Fisheries Management Measures for Natura 2000 SAC sites in UK Offshore Waters

National Grid NSN Link Limited

Salmon Five Point Approach restoring salmon in England

FANTARED 2. A study to identify, quantify and ameliorate the impacts of static gear lost at sea

Utilizing Vessel Based Mobile LiDAR & Bathymetry Survey Techniques for Survey of Four Southern California Breakwaters

Wind Mills of the Mind Delivering large scale offshore wind. Andy Kinsella CEO, Offshore November 24th, 2011, Dundalk

Socioeconomic Profile and Spatial Analysis of Fisheries in the three central California National Marine Sanctuaries

Contents. 3) Construction Vessels ) Guard Vessels ) Crew Transfer Vessels ) Upcoming Operations (following 7 days)...

Plaice (Pleuronectes platessa) in Subarea IV (North Sea) and Division IIIa (Skagerrak)

Offshore Wind Vessels. Steven Kopits Douglas-Westwood LLC

Marine Management Organisation Marine Licence

Proposed Marine Park in the Brothers Islands

ICES advice on fishing opportunities

Geotechnics, Face and Stockpile Operations

Conservation Services Programme Project MIT : Protected species bycatch media

Other vessel's involved in the Swale cable pull in and burial operations will be the multicat Wiltango, and the barges Wilcarry 300, & Wilcarry 342.

The MEDUSA Deep Sea and FUSION AUVs:

Please note: The present advice replaces the advice given in June 2017 for catches in 2018.

With a team of highly qualified divers Vision offers a wide range of services including;

The Role of Hellenic Navy Hydrographic Service in Preparing for the Olympic Games. Contents

OFFICIAL 2016 A YEAR OF CHANGE IN THE REGULATION OF DECOMMISSIONING?

Guidance Note: Commercial Fishing and Wildlife. December 2008.

Evolution of Deepwater Coral Protection in the Southeast U.S

The Marking of Offshore Wind Farms. Provide guidance for a response to IALA. M-4 B445.8 &.9 (& B for on-shore wind farms).

Proposed fisheries management measures for English offshore MPAs in the Channel, the Southwest Approaches and the Irish Sea

Massachusetts on Offshore Wind and Fishing

Contents. 3) Construction Vessels ) Guard Vessels ) Crew Transfer Vessels ) Upcoming Operations (following 7 days)...

Marine Renewables Industry Association. Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling

Consultation Document

Maritime Rules Part 25: Nautical Charts and Publications

Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 23 Temporary Fencing and other means of enclosure (Enabling

Proposal for cooperation between GRASP and the CMS Gorilla Agreement

MPA proposals West of Scotland

Code of Practise for Deployment and Marking of Fishing Gear

Connecting wind energy THE OFFSHORE GRID IN THE NETHERLANDS

July Ballast Water Management FAQ

INTERIM MEASURES ADOPTED BY PARTICIPANTS IN NEGOTIATIONS TO ESTABLISH SOUTH PACIFIC REGIONAL FISHERIES MANAGEMENT ORGANISATION

CONDUCT OF MOBILE DRILLING RIG SITE SURVEYS. Volume 1

The Orkney Creel Fishery

7TH ANNUAL MEETING OF THE COMMISSION

L 198/8 Official Journal of the European Union

Vlaanderen is maritiem. Notices to Mariners OSTEND 16 FEBRUARY 2017 NR. 04.

2017 NORTHERN COD STEWARDSHIP FISHERY MANAGEMENT PLAN PROPOSAL SUBMITTED TO

Proposed UK Offshore Renewable Energy Installations (OREI) - Guidance on Navigational Safety Issues.

# Post Consultation and Submissions Resource Consent Conditions for Surfing Impact Mitigation August 2016

Angling in the Baltic and North Sea German case by DAFV (Deutscher Angelfischer-Verband e.v)

Welsh Government Trunk Road Maintenance Manual

Assessment and operation of Wind Turbine Installation Vessels.

BASELINE SURVEY, VISUAL - SITE SPECIFIC

Transcription:

1) Viking Link Project The Viking Link project is a proposal to build a high voltage direct current (HVDC) electricity interconnector between the Lincolnshire Coast in the UK and Southern Jutland in Denmark crossing through the territorial waters of both the Netherlands and Germany. Viking Link is being jointly developed by National Grid Viking Link Limited, and Energinet.dk, the Danish transmission system operator. Intertek and NIRAS have been named as project consultants and will be responsible for securing offshore consent from UK, Netherlands, German and Danish Authorities to install submarine and underground cabling with optional Fibre optic cables for the project, while also delivering the offshore route design, environmental assessment and marine survey work. Specialist Marine Consultants Ltd has been appointed by Intertek to support the project by providing fisheries liaison services which incorporates a fishing activity assessment. The marine cable landing points and indicative route options being (subject to finalisation) are shown in Figure 1. Appendix 1 & 2 displays further route point position & chart information. Figure 1: The Proposed Survey and Cable Route Options (subject to finalisation) 1

2) Project Plan Offshore Survey Work and Consultation 2016 This route is currently under review and to assist in the final route selection an offshore survey programme is planned to commence in April 2016. We have discussed potential route corridors with marine stakeholders and have carried out desktop surveys to gain an understanding of known constraints in the area, such as environmental designations, environmentally sensitive areas, wind farm development locations, aggregate extraction areas, important navigational routes, anchorage areas, the seabed and shallow geology and mobile sediment. Over the coming months, we will hold further consultations with marine stakeholders, including fishermen, Natural England, the Joint Nature Conservation Committee, the Marine and Coastguard Agency, the Chamber of Shipping, The Crown Estate and Asset owners to understand and limit the impact of our proposals to the marine and coastal environment. We have identified two potential route corridors in the UK; a Northern and Southern route for the submarine cables as shown in Figure 1. Both route corridors have advantages and disadvantages and we will be undertaking consultation to determine the most suitable route corridor which will be surveyed. Both corridors can be routed to any of the three potential landfall sites in Lincolnshire. A geophysical, benthic, geotechnical and cable crossing survey will be undertaken which will comprise Multibeam (MB), Side Scan Sonar (SSS), Sub-Bottom Profiler (SBP), Magnetometer (M), Grab Sampling (GS), Drop Down Camera (DDC), 2m Beam Trawl (BT), Remotely Operated Vehicle (ROV), Vibrocore (VC) and Cone Penetration Testing (CPT) equipment. The survey contractor will use the following vessels, survey spreads and indicative survey schedule (subject to weather, standby days and operational delays) within each sector shown in Table 1. Table 1: Offshore Survey Schedule Survey Type Sector Vessel Proposed Timings Survey Gear / Plan (2016) Geophysical Denmark Frontier 17 March- 14 April Geophysical MB/SSS/SBP/M 550m route corridor, 75m line spacing German Netherlands UK - Offshore Frontier/Pioneer 4 April 05 May (UK commence 16 th April) Geophysical MB/SSS/SBP/M 550m route corridor, 75m line spacing Benthic UK- Inshore Denmark German Netherlands UK - Offshore Valkyrie Discovery Frontier/Pioneer MV (TBC) Frontier/Pioneer Frontier/Pioneer Frontier/Pioneer 18 April-11 May 16 May-2 June 6-10 April GS/DDC 11 August 24 August 5-12 May Geophysical MB/SSS/SBP/M Geophysical MB/SSS/SBP/M 550m route corridor, 75m line spacing GS/DDC/B 5-12 May GS/DDC 5-12 May GS/DDC 2

Geotechnical UK- Inshore Discovery 31 May-2 June GS/DDC Denmark German Netherlands MV Markab 20 April -3 July VC/CPT UK - Offshore UK- Inshore Voe Earl 10-22 June VC/CPT ROV- Cable Crossing Investigation All Meridian 28 April- 28 May ROV 4) Vessel Details Name: Frontier Vessel Bridge: +31 10 7130 936 Type: ROV and Survey Vessel Owner/Operator: Call Sign: C6BH4 IMO No: 9701657 Survey Gear Geophysical/Benthic (Multibeam/Side Scan/ Sub Bottom Profiler/Grab/Camera) Name: Pioneer Vessel Bridge: +31 10 7130 944 Type: ROV and Survey Vessel Owner/Operator: Call Sign: C6BH3 IMO No: 9701645 Survey Gear Geophysical/Benthic (Multibeam/Side Scan/ Sub Bottom Profiler/Grab/Camera) Name: MV Markab Vessel Bridge: +49 421 944 024 3061 Type: ROV and Survey Vessel Owner/Operator: Hempel Shipping/ Call Sign: HO2743 IMO No: 7424724 Survey Gear Geotechnical Vibrocore/CPT 3

Name: Meridian Vessel Bridge Number: +44 122 4257 621 Type: ROV and Survey Vessel Owner/Operator: Call Sign: C6QR4 IMO No: 8101331 Survey Gear ROV Name: Valkyrie Type: Survey Vessel Owner/Operator: Call Sign: 2BWA9 IMO No: - Survey Gear Geophysical and benthic (Multibeam/side scan/grab/camera) Name: Discovery Type: Survey Vessel Vessel Bridge: +44 787 6454 806 Owner/Operator: Call Sign: 2AEL8 IMO No: - Survey Gear Geophysical and Benthic (Multibeam/side scan/grab/camera) 4

Name: Voe Earl Type: Anchor/Tug Owner/Operator: Delta Marine / Call Sign: 2FEP6 IMO No: 9639983 Survey Gear Vibrocore/CPT 3) Cable Route Plan Coordinates A list of the cable route waypoints are included in Appendix 1. 4) Provision of Fisheries Liaison and Consultation Service It is our intention to provide fishing interests with as much information as possible and to feedback to the project any correspondence and points raised so that these can be addressed prior to works commencing and assist with an initial fishing activity assessment. Detailed below is a list of those main identified fishing organisations SMC will contact to outline survey and project timetables and operations with these notices. If any recipient is aware of organisations that require information and are not included on this list, it would be appreciated if their details could be provided to us for future notifications. National Federation Fishermen s Organisations Danish Fishermens Producer Organisation Deutscher Fischerei Verband Sveriges Fiskares Riksforbund Scottish Fishermen s Organisation North Eastern and Eastern IFCA North Sea Advisory Council Marine Management Organisation Union des Armateurs a la Peche de france UAPF De Redercentrale C.V- Belgium Visned Dutch Fishing Organisation Nederlandse Visserbond Scottish White Fish producers Association Scottish Fishermen s Federation 5

5) Onshore Fisheries Liaison SMC FLO contact details are listed below: Simon Prince telephone: 01723 892861 / 07920 273866 Email: simonp@smchse.com In addition to this, information produced on the project will also be displayed on SMC s website www.fisheriesliaison.com under Projects: Viking Link Interconnector. More detailed higher resolution charts are available to download. If there are any questions you have regarding the forthcoming survey works, please feel free to raise these using the contact details supplied. Further information updates will be provided. 6

Appendix 1 7

Appendix 2 8

9

10

11