FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

Similar documents
Steering Committee Meeting #2 July 26, 2011

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Active Transportation Facility Glossary

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

Route 29 Solutions Projects

Access Management Conference

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Reams Road RCA Study. Board of County Commissioners Public Hearing

NJDOT Complete Streets Checklist

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Brian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009

Physical Implications of Complete Streets Policies

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Living Streets Policy

Lynchburg District Update

Chapter 5 Future Transportation

Project Description Form 8EE

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Bicycle and Pedestrian Plans and Improvements

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

5 CIRCULATION AND STREET DESIGN

Appendix 3 Roadway and Bike/Ped Design Standards

ACTIVE TRANSPORTATION

CITY MANUALS AND STANDARDS REVIEW

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Road Diets FDOT Process

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

This page intentionally left blank.

Item No. 14 Town of Atherton

El Paso County 2040 Major Transportation Corridors Plan

Eliminate on-street parking where it will allow for a dedicated bus only lane %

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

CHAPTER 1 INTRODUCTION

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

LANE ELIMINATION PROJECTS

Duwamish Way-finding and CTR Report

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Third Street Bridge & Corridor Project

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Transportation Planning Division

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

CONTEXT SENSITIVE STREETS STANDARDS COMMITTEE

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

STONY PLAIN ROAD STREETSCAPE

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

Bay to Bay Boulevard Complete Streets Project

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Completing the Street: Denning Drive

CITY OF ELKO BICYCLE AND PATHWAY PLAN

Access Management in the Vicinity of Intersections

TABLE OF CONTENTS. Executive Summary

Complete Streets: Planning, Policy & Performance

Austell Road Access Management Plan Public Meeting February 17, 2009

Readington Road (C.R. 637) Construction

Project Update May 2018

Basalt Creek Transportation Refinement Plan Recommendations

Multimodal Analysis in the 2010 Highway Capacity Manual

Multimodal Through Corridors and Placemaking Corridors

The Transformation of Portland into a Two-Wheeled Mecca. Mia Birk, Principal, Alta Planning + Design

LOUISIANA COMPLETE STREETS POLICY. Ellen W. Soll, AICP Principal Soll Planning

Appendix D: Planning Level Cost Calculator

5. RUNNINGWAY GUIDELINES

Copenhagen Cycling Map. Red Lines Cycling facilities

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Cycle Track Design Best Practices Cycle Track Sections

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

Preliminary Engineering Study

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

MASTER THOROUGHFARE PLAN

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Prince George s County plans, policies, and projects

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

PRESS RELEASE San Joaquin Council of Governments

SECTION 1 - TRAFFIC PLANNING

RM 620 FEASIBILITY STUDY

Transcription:

FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m.

Introductions Agency Partners H-GAC Missouri City TxDOT

Introductions Consulting Team In Association with : CJ Hensch & Associates, Inc. Kendig Keast Collaborative The Lentz Group Parsons Brinckerhoff

Presentation Outline Access Management Study Details & Process Project Scope and Boundaries Project Goals Data Collection Project Schedule Public Involvement Analysis Existing Conditions (Roadway/Pedestrian/Bicycle/Transit/Traffic/Land Use/Zoning) Existing Access Management Practices Planned Improvements Crash Analysis Traffic Simulation Analysis Preliminary Findings Preliminary Recommendations

Project Scope

Project Boundaries

Project Goals Safety for all modes of transportation Reduce crashes and conflicts Improve traffic flow Explore bicycle accommodation opportunities Reduce motorist delay Improve quality of life

Data Collection City ordinances Thoroughfare Plans Land Use Plans GIS Layers Planned Improvements Traffic & Crash Data Aerial Photos

Project Schedule

Upcoming Meetings Steering Committee #3: September 13, 2011 Stakeholder Meeting #2: September 13, 2011 TAC Presentation: September 14, 2011 TPC Presentation: September 23, 2011 Public Meeting #2: Early November (TBD) Council Meeting City of Missouri City: November 21, 2011

Public Involvement Approach Open process encouraging idea exchange Serious consideration of all suggestions Objective presentation of options Activities 3 Steering Committee Meetings 2 Stakeholder Meetings 2 Public Meetings Website (www.h-gac.com/taq.com)

Existing Roadway Characteristics Four-lanes with center two-way turn lane Eight feet shoulders and open drainage 125 to 140 feet right-of-way Posted speed limit is 45/50 miles per hour Eight signalized intersections School zone @ Plantation Settlement Lane Speed limit is 35 miles per hour when lights are flashing

Existing Roadway Characteristics (Cont d) From To Distance (Feet) Number of Driveways Driveway Density (Driveways/Mile) West Side East Side West Side East Side S.H. 6 Hampton Dr. 750 2 1 14 7 Hampton Dr. Township Ln. 725 1 1 7 7 Township Ln. Plantation Settlement Ln. 2,000 3 3 8 8 Plantation Settlement Ln. El Dorado Blvd. 1,615 0 1 0 3 El Dorado Blvd. Cartwright Rd. 1,115 3 0 14 0 Cartwright Rd. 5 th St. 3,000 8 13 14 23 5th St. Lexington Blvd. 3,660 17 2 25 3 Lexington Blvd. Dove Country Dr. 2,700 12 2 23 4 Total Driveways 46 23

Existing Pedestrian, Bicycle and Transit Characteristics Six signalized intersections have pedestrian facilities No pedestrian facilities at Hampton and Dove Country Eight feet shoulders serve as bike path No continuous sidewalk along FM 1092 Sidewalks only at signalized intersections Mosley Park Oyster Creek trail METRO Missouri City Park and Ride Facility @ 13849 Fondren Road Routes 163 and 170 Destination to Houston Downtown and Texas Medical Center

Existing Traffic Characteristics Based on 2009 Houston District RI-2T Log 2011 AADT is 29,900 2031 AADT is 51,500 Based on Missouri City Traffic Management Plan 2008 AADT is 35,550 2015 AADT is 41,700 2025 AADT is 48,500 AADT - Annual Average Daily Traffic

Existing Crash Data Year Number of Crashes Total Injuries Total Fatalities 2008 82 31 0 2009 85 21 1 2010 116 33 0 Source: City of Missouri City

Existing Land Use & Zoning Provision for shared access and parking facilities Commercial or industrial (non-residential) tracts Zoning Non-residential (local commercial) Higher-density residential (multi-family) Planned developments Specific use permit

Planned Improvements Recently Completed Intersection improvements at Cartwright, Lexington, and SH 6 Under Construction Traffic signal @ Township Lane City wide ITS Improvements Upgrade existing signal equipment Build Traffic Management Center Planned Improvements Southbound Triple Left Turns at FM 1092 and SH 6 SH 6 METRO Temporary Park and Ride

Planned Improvements (Cont d) Planned Roadway Improvements (TIP & RTP) *no funds committed From US 90A to SH 6 (Year 2015): Reconstruction to six-lane divided curb and gutter roadway with closed storm drains, cross-drainage culverts, and bridge widening From Cartwright Road to SH 6 (Year 2016): Widening to eight-lanes From Lexington Boulevard to Cartwright Road (Year 2017): Widening to eight-lanes

Crash Analysis Crash Summary Year Number of Crashes Crashes per 100 Million Vehicle Miles Travelled Total Injuries Total Fatalities 2008 82 241.6 31 0 2009 85 287.5 21 1 2010 116 378.3 33 0 Source: City of Missouri City Additional Data Crashes involving vehicle run off the roadway = 7 Crashes involving vehicle hit Pedestrian/Bicyclist = 2 2009 Statewide traffic crash rates (Per 100 Million Vehicle Miles Travelled) Urban Farm-to-Market roads = 224.75 Urban four or more lanes, divided = 114.65

Traffic Simulation Analysis

Pedestrian/Bicycle/Transit Analysis Lack of facilities Linkages and better continuity needed in sidewalk and trail network Measures needed to raise motorist awareness of pedestrians and bicyclists (e.g., special crosswalk treatments) More off-street trail/bikeway opportunities already planned (Missouri City Trails Master Plan) No current plans for bus route along the corridor Pedestrian traffic along back of the properties. Adding sidewalks make the corridor more pedestrian friendly.

Land Use & Zoning Analysis Underutilized and vacant properties at FM1092-Cartwright intersection Vacant tracts along north corridor with space for creative land planning Potential for planned, integrated developments with shared and cross access

Practices to Avoid in Development Access Frequent access points along arterial Large site with multiple access points and undefined internal circulation Stand-alone sites without consistent cross access

Practices to Apply in Development Access Well planned internal circulation Bike/ped access from multiple directions Limited major access points from arterial

Preliminary Findings Safety in school zones Crash rate higher than Statewide average 5 th Street skewed intersection Increase in traffic volumes/congestion Disconnected sidewalk segments Prevent access to main activity areas Corridor width, traffic volumes and vehicular speeds Inhibit cross-corridor pedestrian movement Lack of pedestrian bridges and intersecting sidewalks along the Oyster Creek trail Limits its use as an effective off-street pedestrian route Missing pedestrian features at signalized intersections Only one Transit facility Strip center at Cartwright is not operating at full potential Needs to be repositioned as a neighborhood shopping/activity center Vacant tracts

Preliminary Recommendations Short Term

Preliminary Recommendations Short Term Plantation Ridge FM 1092 El Dorado

Preliminary Recommendations Long Term

Preliminary Recommendations Long Term FM 1092 FM 1092 Plantation Settlement Plantation Ridge El Dorado

Preliminary Recommendations

Preliminary Recommendations

Questions?

Thank you for attending. Please complete and return the questionnaire before you leave.