GENERAL LEGEND 12"CMP

Similar documents
2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

DRAFT EIS - CONCEPTUAL DESIGN I-5 ALTERNATIVE APRIL 2015 SHEET KEY

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

SECTION 3 STREET DESIGN

DRAFT EIS CONCEPTUAL DESIGN SR 99 ALTERNATIVE APRIL 2015 SHEET KEY

CITY OF ROSEVILLE DESIGN STANDARDS

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

Driveway Design Criteria

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

PROPOSAL. PROPOSAL OF, a corporation a


FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.

Access requests to County streets and roadways are processed through one of the following methods:

APPENDIX A Urban Control Zone Corridor Study Reports

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

CITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council

section 4 Existing Conditions, Issues, and Options

Planning & Zoning Commission

Inspector MUST Sign and Date Each Inspection

Downtown Redevelopment Project Update

Preparing a Curb Ramp Project. December 15, 2010

Emerson Circle Entrance

Engineering Design Criteria & Standard Drawings

Lecture 10 : Sewer Appurtenances

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

*A Certificate of Survey for the property may be on file at City Hall if the house was built after 1984.

ENGINEERING FIRM OF RECORD COMPANY REPRESENTATIVE PROJECT MANAGER AND ENGINEERING LEAD INDIAN HILL SENIOR LIFESTYLE CENTER YONKERS, NY

Tabulation of Bids. Counties:

American Railway Engineering and Maintenance of Way Association Letter Ballot. Draft

CHAPTER 5 CULVERT DESIGN

PART A5 STREETS DECEMBER 2015

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

SECTION 14: LANDSCAPING AND BEAUTIFICATION

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

ADA Operations Contact Info

Final Sidewalk Feasibility Study

Shared Use Path Design

Basic Road Design. If you don't know where you are going, any road will get you there. Lewis Carroll

22. Specialty Valves.

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave.

Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version

Swimming Pool Requirements

City/ Town: Route: Intersection Name; Street Names:

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

ROADWAY AND PARKING DETAILS TYPICAL STREET SECTIONS PRINCIPAL ARTERIAL NOT TO SCALE

City of Margate, Florida. Neighborhood Traffic Management Manual

DIRECTIONAL DRILLING SAFE WORK PRACTICE

CONTRACT 5 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

Design Criteria. Design Criteria

Northside School Class I Bike Path, Cool, CA Application Attachments

Swimming Pools, Hot Tubs and Spas

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

DETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:

CITY OF WARRENVILLE MEMO

SECTION VII ROADWAY AND SITE IMPROVEMENTS

ADA PRESENTATION (CURB RAMPS)

Pierce County Department of Planning and Land Services Development Engineering Section

Warsaw, Missouri Van Buren Street Preliminary Engineering Report

A. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Sidewalk Accessibility Checklist

ADA Training Standard Plans

EQUIPMENT AND MATERIALS

Americans with Disabilities Act and Curb Ramps

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

CHAPTER 6 VERTICAL ALIGNMENT

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

SWIMMING POOL REQUIREMENTS

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

APPENDIX C SANITARY SEWER PEAK DESIGN FACTOR

L C E C.P. #2. BASIS OF BEARINGS: Texas Coordinate System of 1983 (NAD83), North Central Zone (4202) as tied to GEOSHACK VRS SYSTEM.

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Access Management Standards

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

S TREET (TO DADE ) BE IMPROVED. 96.3' - -, I I i---- , so. a - - r- - r - so. o, LOT 1 LOT 2 POND T.O.B (() I 100.0' I I LOT 3 !

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

CORE MPO Non-motorized Transportation Plan. Appendix F. Technical Report on Cost Estimation Methodology

Building Standards Department Pool Requirements 111 N. Michigan AV, Bradley, IL Phone Fax PRIVATE SWIMMING POOLS

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

CURB RAMP INSPECTION REPORT

Initial Project Assessment DRAFT Technical Memorandum

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

SWIMMING POOL / SPA PLAN REVIEW CHECKLIST

Route 47 (North Main Street) Reconstruction

Transcription:

PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET SIDEWALK IMPROVEMENTS WEST BRANCH, IOWA W psinonoc a Creek REVISIONS VICINITY MAP = 1' LOCATION 8"S 18"ST 8"W 6"FM 4"G UE OHE T CTV FO OR OR OR SURVEY LINE & STATION INDICATOR CONCRETE SURFACE ASPHALT SURFACE CONCRETE W/ASPHALT OVERLAY LOW GRADE ASPHALT SURFACE GRANULAR SURFACE DIRT SURFACE BRICK SURFACE SURFACING REMOVAL/REPLACEMENT EARTH SECTION NEW SEWER/MANHOLE NEW SEWER/INTAKE NEW WATER MAIN NEW FORCE MAIN NEW HYDRANT NEW WATER VALVE EXISTING SANITARY SEWER AND SIZE EXISTING STORM SEWER AND SIZE EXISTING WATER MAIN AND SIZE EXISTING FORCE MAIN AND SIZE GAS MAIN AND SIZE UNDERGROUND POWER LINE OVERHEAD POWER LINE UNDERGROUND TELEPHONE LINE CABLE TELEVISION LINE FIBER OPTICS TOP OF EMBANKMENT TOE OF EMBANKMENT DRAINAGE COURSE SANITARY MANHOLE STORM WATER MANHOLE ELECTRIC MANHOLE TELEPHONE MANHOLE WATER MANHOLE CURB INTAKE AREA OR BEEHIVE INTAKE EXISTING HYDRANT EXISTING WATER VALVE GAS VALVE UTILITY POLE GUY ANCHOR STREET LIGHT SIGN TELEPHONE CABLE JUNCTION BOX TRAFFIC SIGNALS PEDESTRIAN CONTROL LIGHT RAILROAD CONTROL LIGHT RAILROAD SIGN UTILITY ACCESS COVER PARKING METER TREE EVERGREEN STUMP BUSH, SHRUB OR HEDGE GENERAL LEGEND 12"CMP CULVERT; SIZE AND TYPE FLARED END SECTION RAILROAD MAILBOX FENCE (MISC.) SECURITY FENCE WOOD FENCE SILT FENCE CHAIN LINK FENCE PROPERTY LINE PROPERTY PIN SECTION CORNER PLAT BOUNDARY BUILDING ELEVATION MARKER CENTERLINE DIAMETER ELEVATION POLYVINYLCHLORIDE PIPE CAST IRON PIPE DUCTILE IRON PIPE CORRUGATED METAL PIPE VITRIFIED CLAY PIPE REINFORCED CONCRETE PIPE REINFORCED CONCRETE ARCH PIPE LINED REINFORCED CONCRETE PIPE LINED CONCRETE PRESSURE PIPE STATION LINE AHEAD LINE BACK BENCH MARK AND NUMBER RIGHT-OF-WAY POINT OF INTERSECTION POINT ON TANGENT LINEAR FEET TACKED HUB SOIL BORING AND NUMBER POINT OF VERTICAL CURVATURE POINT OF VERTICAL TANGENCY VERTICAL CURVE POINT OF CURVATURE POINT OF TANGENCY MIDDLE ORDINATE DRAWING CONTROL POINT AND NUMBER TYPICAL HIGH PRESSURE GAS INTERMEDIATE PRESSURE GAS INVERT EACH WAY, EACH FACE EACH WAY NOTE: THIS IS A GENERAL LEGEND. ITEMS MAY OR MAY NOT APPEAR ON DRAWINGS. OR SF PL 855.55 C L DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 PI POT LF TH SB-2 PVC PVT VC PC PT MO DWG. CP-1 (TYP.) HPG IPG INV. E.W.,E.F. E.W. @ 3 AT DRAWING NUMBER NO. DRAWING TITLE A.1 INDEX AND TITLE SHEET B.1 DETAILS D.1 DEMOLITION PLAN D.2-D.5 S.1-S.3 PLAN AND PROFILE T.1 TABULATION X.1-X.5 DRAWING INDEX CURB RAMPS CROSS SECTIONS GENERAL NOTES 1. ALL ELEVATIONS ARE TO DATUM. 2. REMOVE AND REPLACE ALL STREET SIGNS AS DIRECTED BY ENGINEER. COST IS INCIDENTAL TO. 3. SHAPE ALL DITCHES TO DRAIN AFTER. 4. CONFIRM LOCATION AND DEPTH OF ALL EXISTING UNDERGROUND UTILITIES AS REQUIRED TO ELIMINATE CONFLICTS PRIOR TO. ALLOW UTILITY PERSONNEL TO RELOCATE UTILITIES WHERE CONFLICTS OCCUR. 5. DO NOT INTERRUPT EXISTING UTILITIES OR INDIVIDUAL SERVICES UNLESS DIRECTED BY ENGINEER. 6. LOCATIONS OF LIMIT LINES SHOWN ON PLANS ARE APPROXIMATE. ENGINEER WILL LOCATE LIMITS IN FIELD. CONFINE ALL OPERATIONS, INCLUDING ACCESS TO WORK, TO LIMITS. 7. STATIONING IS ALONG RIGHT EDGE SIDEWALK, UNLESS OTHERWISE NOTED. 8. PROTECT UTILITY POLES, LINES AND APPURTENANCES NOT SHOWN FOR RELOCATION. 9. RESET ALL PROPERTY PINS DISTURBED BY ; PINS RESET BY REGISTERED LAND SURVEYOR; COST IS INCIDENTAL TO. 1. PROTECT ALL SURFACING, NOT INDICATED BY SHADING FOR REMOVAL AND REPLACEMENT FROM DAMAGE DURING. PROTECTION OF VEGETATION TREES AND OTHER VEGETATION WHICH MAY BE REMOVED ARE MARKED WITH AN "X" OVER THE APPROPRIATE SYMBOL. FOR EXAMPLE 12" INDICATES THE REMOVAL OF A 12" TREE. REPLACEMENT, BY CONTRACTOR, OF THESE ITEMS IS NOT REQUIRED. TUNNEL, INSTALL TIGHT SHEETING, HAND EXCAVATE OR EMPLOY OTHER MEANS BY ENGINEER TO PROTECT EXPOSED PORTIONS AND ROOT SYSTEMS OF TREES AND OTHER VEGETATION NOT SCHEDULED FOR REMOVAL. IF TREES AND OTHER VEGETATION NOT SCHEDULED FOR REMOVAL ARE DAMAGED DURING, REPLACE IN KIND AND SIZE AT NO COST TO CITY OR PROPERTY OWNER. INDEX AND TITLE SHEET A.1

ALIGNMENT PLOTTED: Monday, July 23, 212 2:44:25 PM FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\B.1 X-REFS: CL VARIES EXISTING PCC OLIPHANT STREET VARIES 1.5% VARIES 4" PCC SIDEWALK PORTLAND CEMENT CONCRETE TYPICAL SIDEWALK SECTION NOT TO REVISIONS DETAILS B.1

X-REFS: Design Cooridor & VK Topo 29 & arieal & Boundary (edg) 212 AUTOCAD & S.1 Curb Ramps FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\DEMO PLOTTED: Monday, July 23, 212 5:39:12 PM REVISIONS ' 2' 4' ' 2' 4' DEMOLITION PLAN D.1

X-REFS: Design Cooridor & VK Topo 29 & Boundary (edg) 212 AUTOCAD FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\SIDEWALK PLAN AND PROFILES PLOTTED: Monday, July 23, 212 2:45:1 PM REVISIONS ' 1' 2' PLAN AND PROFILE D.2

X-REFS: Design Cooridor & VK Topo 29 & Boundary (edg) 212 AUTOCAD FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\SIDEWALK PLAN AND PROFILES PLOTTED: Monday, July 23, 212 2:45:11 PM REVISIONS ' 1' 2' PLAN AND PROFILE D.3

X-REFS: Design Cooridor & VK Topo 29 & Boundary (edg) 212 AUTOCAD FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\SIDEWALK PLAN AND PROFILES PLOTTED: Monday, July 23, 212 2:45:21 PM REVISIONS ' 1' 2' PLAN AND PROFILE D.4

X-REFS: Design Cooridor & VK Topo 29 & Boundary (edg) 212 AUTOCAD FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\SIDEWALK PLAN AND PROFILES PLOTTED: Monday, July 23, 212 2:45:31 PM REVISIONS ' 1' 2' PLAN AND PROFILE D.5

X-REFS: Design Cooridor & VK Topo 29 & Boundary (edg) 212 AUTOCAD FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\S.1 CURB RAMPS PLOTTED: Monday, July 23, 212 2:45:52 PM REVISIONS SIDEWALK COMPLIANCE 113-1 6-22-11 * DO NOT INCLUDE CURB SEE S SHEETS POINT TO POINT SIDEWALK DESCRIPTION DISTANCE* ELEVATION SLOPE RANGE FOR INFORMATION ONLY: REMARKS FT FT % % POINT NORTHING EASTERN ELVATION 112 113 RAMP RUNNING SLOPE 5. -.31-6.2% 5.% to 8.3% 111 617456.41 222845.73 776.57 EXISTING 113 114 RAMP CROSS SLOPE 5..8 1.6% 1.5% to 2% 112 617453.98 222845.8 776.54 RAMP 114 115 RAMP RUNNING SLOPE 5..31 6.2% 5.% to 8.3% 113 617448.98 222845.95 776.85 LANDING 115 112 RAMP CROSS SLOPE 5. -.8-1.6% 1.5% to 2% 114 617449.12 22285.94 776.77 LANDING 113 117 LANDING 5..8 1.6% 1.5% to 2% 115 617454.12 22285.8 776.46 RAMP 117 1111 LANDING 5..7 1.4% 1.5% to 2% 116 617455. 22285.77 776.42 EXISTING 1111 114 LANDING 5. -.7-1.4% 1.5% to 2% 117 617443.98 222846.9 776.77 LANDING 114 113 LANDING 5. -.8-1.6% 1.5% to 2% 118 617428.99 222846.51 774.79 EXISTING 117 1111 RAMP CROSS SLOPE 5..7 1.4% 1.5% to 2% 119 617429.1 22285.35 774.77 EXISTING 117 118 RAMP RUNNING SLOPE 15. 1.98 13.2% 5.% to 8.3% Match Point 111 617439.1 22285.23 776.12 RAMP 118 119 RAMP CROSS SLOPE 3.84.2.52% 1.5% to 2% 1111 617444.13 222851.9 776.7 LANDING 119 111 RAMP RUNNING SLOPE 1. -1.35-13.5% 5.% to 8.3% Match Point 121 617484.61 222844.85 777.29 EXISTING 111 1111 RAMP RUNNING SLOPE 5.1 -.58-11.37% 5.% to 8.3% Match Point 122 617486.75 222844.78 777.37 RAMP 123 617494.42 222844.55 777.85 LANDING 122 123 RAMP RUNNING SLOPE 7.67 -.48-6.26% 5.% to 8.3% 124 617494.57 222849.55 777.78 LANDING 123 124 RAMP CROSS SLOPE 5..7 1.4% 5.% to 8.3% 125 617486.9 222849.78 777.3 RAMP 124 125 RAMP RUNNING SLOPE 7.68.48 6.25% 5.% to 8.3% 126 617494.9 222859.92 777.22 EXISTING 125 122 RAMP CROSS SLOPE 5. -.7-1.4% 5.% to 8.3% 127 617494.87 222859.3 777.26 RAMP 123 124 LANDING 5..7 1.4% 1.5% to 2% 128 617499.57 222849.39 777.85 LANDING 124 128 LANDING 5. -.7-1.4% 1.5% to 2% 129 617499.87 222858.87 777.33 RAMP 128 1211 LANDING 5. -.8-1.6% 1.5% to 2% 121 617499.95 222861.6 777.26 EXISTING 1211 123 LANDING 5..8 1.6% 1.5% to 2% 1211 617499.41 222844.4 777.93 LANDING 127 124 RAMP RUNNING SLOPE 9.49 -.52-5.48% 5.% to 8.3% 1212 617499.95 22284.39 778.8 RAMP 124 128 RAMP CROSS SLOPE 5. -.7-1.4% 1.5% to 2% 1213 617498.84 22282.29 778.83 EXISTING 128 129 RAMP RUNNING SLOPE 9.48.52 5.48% 5.% to 8.3% 1214 617494.66 22282.4 778.85 EXISTING 129 127 RAMP CROSS SLOPE 5..7 1.4% 1.5% to 2% 1215 617495.13 22284.16 778.2 RAMP 1211 1212 RAMP RUNNING SLOPE 4.4 -.15-3.71% 5.% to 8.3% 1216 617499.7 222825.35 778.64 RAMP 1212 1213 RAMP RUNNING SLOPE 2.13 -.75-3.73% 5.% to 8.3% 1217 617495.35 222825.74 778.56 RAMP 1213 1214 RAMP CROSS SLOPE 4.18 -.2 -.48% 1.5% to 2% 131 617495.9 222891.97 776.81 EXISTING 1214 1215 RAMP RUNNING SLOPE 19.76.83 4.2% 5.% to 8.3% 132 617495.93 222892.82 776.85 RAMP 1215 123 RAMP RUNNING SLOPE 4.45.17 3.82% 5.% to 8.3% 133 617495.99 222894.81 776.88 LANDING 1212 1216 RAMP RUNNING SLOPE 15.4 -.56-3.72% 5.% to 8.3% 134 617496.14 222899.81 776.95 LANDING 1216 1213 RAMP RUNNING SLOPE 5.14 -.19-3.7% 5.% to 8.3% 135 617497.76 2228114.77 778.6 EXISTING 1214 1217 RAMP RUNNING SLOPE 5.38.29 5.39% 5.% to 8.3% 136 61751.61 2228114.65 778.5 EXISTING 1217 1215 RAMP RUNNING SLOPE 14.42.54 3.74% 5.% to 8.3% 137 61751.14 222899.66 776.95 RAMP 138 6175.99 222894.66 776.88 LANDING 132 133 RAMP RUNNING SLOPE 2. -.3-1.5% 5.% to 8.3% 139 6175.92 222892.66 776.85 RAMP 133 138 RAMP CROSS SLOPE 5...% 1.5% to 2% 131 6175.91 222889.95 776.93 EXISTING 138 139 RAMP RUNNING SLOPE 2..3 1.5% 5.% to 8.3% 211 617966.69 222826.73 736.6 EXISTING 139 132 RAMP CROSS SLOPE 5...% 1.5% to 2% 212 617966.8 222826.73 736.64 RAMP 133 134 LANDING 5. -.7-1.5% 1.5% to 2% 213 617961.8 222826.76 736.95 RAMP 134 137 LANDING 5...% 1.5% to 2% 214 617961.11 2228211.75 737.2 RAMP 137 138 LANDING 5..7 1.5% 1.5% to 2% 215 617966.11 2228211.73 736.71 RAMP 138 133 LANDING 5...% 1.5% to 2% 216 617967.1 2228211.72 736.53 EXISTING 134 135 RAMP RUNNING SLOPE 15.4-1.11-7.35% 5.% to 8.3% 217 617956.8 222826.79 737.2 LANDING 135 136 RAMP CROSS SLOPE 3.85.1.17% 1.5% to 2% 218 617956.12 2228211.79 737.1 LANDING 136 137 RAMP RUNNING SLOPE 15. 1.1 7.33% 5.% to 8.3% 221 617993.18 222826.56 736.55 EXISTING 137 134 RAMP CROSS SLOPE 5...% 1.5% to 2% 222 617993.69 222826.56 736.59 RAMP 223 618.1 222826.53 736.99 RAMP 212 213 RAMP RUNNING SLOPE 5. -.31-6.25% 5.% to 8.3% 224 618.13 2228211.52 737.7 RAMP 213 214 RAMP CROSS SLOPE 4.99 -.7-1.5% 1.5% to 2% 225 617993.72 2228211.56 736.66 RAMP 214 215 RAMP RUNNING SLOPE 5..31 6.25% 5.% to 8.3% 226 617992.87 2228211.57 736.58 EXISTING 215 212 RAMP CROSS SLOPE 5..7 1.5% 1.5% to 2% 227 6185.1 222826.49 737.4 LANDING 213 217 LANDING 5. -.7-1.5% 1.5% to 2% 228 6185.14 2228211.49 737.12 LANDING 217 218 LANDING 5. -.8-1.5% 1.5% to 2% 229 6185.18 2228216.49 736.86 EXISTING 218 214 LANDING 5..8 1.5% 1.5% to 2% 221 6181.34 2228216.52 736.88 EXISTING 214 213 LANDING 4.99.7 1.5% 1.5% to 2% 222 223 RAMP RUNNING SLOPE 6.41 -.4-6.25% 5.% to 8.3% 223 224 RAMP CROSS SLOPE 4.99 -.7-1.5% 1.5% to 2% 224 225 RAMP RUNNING SLOPE 6.41.4 6.25% 5.% to 8.3% 225 222 RAMP CROSS SLOPE 5..7 1.5% 1.5% to 2% 223 227 LANDING 5. -.5-1.% 1.5% to 2% 227 228 LANDING 5. -.7-1.5% 1.5% to 2% 228 224 LANDING 5.1.5 1.% 1.5% to 2% 224 223 LANDING 4.99.7 1.5% 1.5% to 2% 228 229 RAMP RUNNING SLOPE 5..26 5.1% 5.% to 8.3% 229 221 RAMP CROSS SLOPE 3.83 -.2 -.5% 1.5% to 2% 221 224 RAMP RUNNING SLOPE 5.15 -.19-3.61% 5.% to 8.3% CURB RAMPS - TABULATION S.1

X-REFS: Design Cooridor & VK Topo 29 & Boundary (edg) 212 AUTOCAD FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\S.1 CURB RAMPS PLOTTED: Monday, July 23, 212 2:45:58 PM REVISIONS ' 5' 1' CURB RAMPS - ORANGE ST S.2

X-REFS: Design Cooridor & VK Topo 29 & Boundary (edg) 212 AUTOCAD FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\S.1 CURB RAMPS PLOTTED: Monday, July 23, 212 2:46:3 PM REVISIONS ' 5' 1' CURB RAMPS - NORTHSIDE DR S.3

X-REFS: VK Topo 29 & Boundary (edg) 212 AUTOCAD & arieal & Easement & S.1 Curb Ramps & Design Cooridor 212-7-1 BENDA ALIGNMENT FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\DESIGN COORIDOR PLOTTED: Monday, July 23, 212 2:46:11 PM REVISIONS Station Cut Area (SF) Fill Area (SF) Total Volume Table Cut Vol Fill Vol Cumulative Cut Vol Cumulative Fill Vol Net Vol Station Cut Area (SF) Fill Area (SF) Total Volume Table Cut Vol Fill Vol Cumulative Cut Vol Cumulative Fill Vol Net Vol Station Cut Area (SF) Fill Area (SF) Total Volume Table Cut Vol Fill Vol Cumulative Cut Vol Cumulative Fill Vol Net Vol TABULATIONS T.1

X-REFS: VK Topo 29 & Boundary (edg) 212 AUTOCAD & arieal & Easement & S.1 Curb Ramps & Design Cooridor 212-7-1 BENDA ALIGNMENT FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\DESIGN COORIDOR PLOTTED: Monday, July 23, 212 2:46:18 PM REVISIONS 1 ft 11 ft 1 ft 6 ft 6 ft 3 ft 3 ft 5 ft 5 ft CROSS SECTIONS X.1

X-REFS: VK Topo 29 & Boundary (edg) 212 AUTOCAD & arieal & Easement & S.1 Curb Ramps & Design Cooridor 212-7-1 BENDA ALIGNMENT FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\DESIGN COORIDOR PLOTTED: Monday, July 23, 212 2:46:23 PM REVISIONS 1 ft 2 ft 14 ft 15 ft 12 ft 12 ft 13 ft 13 ft 12 ft 12 ft 12 ft 12 ft 1 ft 11 ft 11 ft 11 ft CROSS SECTIONS X.2

X-REFS: VK Topo 29 & Boundary (edg) 212 AUTOCAD & arieal & Easement & S.1 Curb Ramps & Design Cooridor 212-7-1 BENDA ALIGNMENT FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\DESIGN COORIDOR PLOTTED: Monday, July 23, 212 2:46:28 PM REVISIONS 1 ft 1 ft 1 ft 1 ft 4 ft 1 ft 1 ft 3 ft 3 ft 3 ft 3 ft 5 ft 5 ft 2 ft 3 ft CROSS SECTIONS X.3

X-REFS: VK Topo 29 & Boundary (edg) 212 AUTOCAD & arieal & Easement & S.1 Curb Ramps & Design Cooridor 212-7-1 BENDA ALIGNMENT FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\DESIGN COORIDOR PLOTTED: Monday, July 23, 212 2:46:33 PM REVISIONS 9 ft 11 ft 12 ft 12 ft CROSS SECTIONS X.4

X-REFS: VK Topo 29 & Boundary (edg) 212 AUTOCAD & arieal & Easement & S.1 Curb Ramps & Design Cooridor 212-7-1 BENDA ALIGNMENT FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\DESIGN COORIDOR PLOTTED: Monday, July 23, 212 2:46:38 PM REVISIONS -1 ft 5 ft CROSS SECTIONS X.5